SAP BPC 7.0NW (project in Ramp-Up)

Hi,
We are doing 2 Ramp-Ups currently on the BPC for Netweaver version, and I have a question relating to script logic.
Knowing the Microsoft version very well, we are quite experienced with using logic for budgeting or forecasting purposes. I have read that ABAP/BADI's are the alternative for SQL Logic or could be. In fact, I am looking for the alternative statements of the SQL logic, but then Netweaver-compatible.
- Is there information available on how to write BPC-logic based on ABAP/BADI's?
- Will all of the SQL logic available in the Microsoft version become fully available in the NW version (now very limited availability)?
Thx
Bjorn Van Damme

Hi Bjorn,
The alternative to SQL based script logic in SAP BPC NetWeaver would be MDX based functions. There are 2 methods that you can utilize.
1. MDX based functions
2. ABAP based functions/ BADI's
SQL Logic in NetWeaver environment doesn't work. You may try utlizing microsoft based MDX in NetWeaver environment. Well, it is up to you if you are able to utilize BADI's too prefereable method in terms of NewWeaver environment. You may have to get the information from SAP regarding what standard functions are available in writing script logic using ABAP/BADI's.
Regards,
Sreekanth.

Similar Messages

  • SAP BPC and SSM

    Hi guys
    I am currently working on SAP BPC Financial planning project. I know that SAP BPC is used for financial planning & consolidation while SAP SSM is used for operational reviews.I was wondering if there is a value in connecting SAP BPC and SAP SSM. If yes, then how can the financial forecasted numbers in SAP BPC be used in SAP SSM (from conceptual perspective and not technical perspective).
    Please let me know.
    Thanks,
    Ameya Kulkarni

    Hi Ameya
    This maybe useful:
    www12.sap.com/westbalkans/company/events/worldtour08/pdf/KeyNote_RalfS/Enabling_Closed_Loop_Strategy_to_Execution.pdf
    Parminder

  • Custom Process Types not working in SAP BPC 10.0

    Hi Experts,
    We have migrated from SAP BPC 7.5 NW to SAP BPC 10.0 NW.
    We have three Custom Process Types created in BPC 7.5NW using the super class CL_UJD_SIMPLE_ACTOR as super class.
    It has been made Obsolete and Final class in BPC 10.0NW and the Custom Process types are not running as expected.
    Can you please suggest if there is any alternative for using the existing custom process types? Or do we have any alternative for creating custom process types?
    *Note: We have tried replacing the superclass with CL_UJD_ACTOR instead of CL_UJD_SIMPLE_ACTOR but of no use.
    Regards,
    Balraj.

    Hi Inl,
    The statement looks fine, just confirm:
    Your CATEGORY dimension is named CATEGORY? Is it really has property COMPARISOIN?
    Can you show the screenshot of UJKT run of script?
    What is your core BPC SP?
    Vadim

  • Questions on Installing SAP BPC NW 7 SP2

    Hi Friends,
    My company is Installing SAP BPC NW 7 SP2 and I am heading the project starting from 1st June. I have downloaded the Installation guide and still have few questions
    1) On which client we deploy BPC server component, I mean on 000 or any other.
    2) Initially we are doing on Sandbox, so we are using only one system for both ABAP and NET servers and we are using 64bit machine. How do I run 1.1 Net framework on it, I have read installation guide it says configure to WOW6432 but dont know how to do it
    3) When we download the ABAP server component what format will it be    .SAR or .CAR or any other
    Please do reply.
    Thanks in advance
    Bobby

    Hello Bobby,
    1.  You will install the BPC server component with SAINT, which has to be executed in client 000, but BPC will actually run in the client you designate for BW.
    2. The following article discusses configuring ASP.NET 1.1 to run in 32 bit mode on a 64 bit system [http://support.microsoft.com/kb/894435]
    3.  The ABAP server component will be a SAR file.
    Thank you,
    Daniel

  • Transport Control in SAP BPC 7.0 M

    Hi,
    We are an IT company with more than 250 reporting units.  We intend to implement SAP BPC 7.0 M in our organisation to unify our forecating and reporting process across reporting units. I gather that there is no transport tool available in BPC to transport from development to quality to production. I am curious to know if SAP has provided a best practice for controlling changes to production. What is the best method to ensure that an administrator or a developer does not incorrectly make changes in the production system?
      Also how do we convince our internal infra guys that changes have to be made directly in production? We have a central team for remote hosting all our systems and they have raised some following questions related to the security/disaster recovery aspects.
    a. What is the backup and recovery procedure in case something happens to the production system.
    b. Is there a best practice that I could refer to with respect to transports to convince them.
    I am trying to prepare a document to convince them. I have got come inputs from sdn but I would really like an authoritative source to better understand this. Any answers/help would be highly appreciated!
    Rgds
    Shivram.

    Hi Shivram,
    for diaster recovery, you can just use the backup/restore functionality in BPC server manager. Where an admin can schedule it. Even you can use the SQL backup functionality, but if you use this you need to manually backup the fileshare folder.
    Regarding Transports, yes when the project is already in production, it is a bit dangerous to use the backup/restore functionality as we will loss the production system data. So need to use the dev/QA system to develop and test it and later do the changes manually in production system. Before take a backup of production system, then you will be safe.
    regards,
    Sreedhar

  • SAP BPC 7.5 Installation Error

    Hello All,
    We got a requirement to install the SAP BPC 7.5 on top of fresh machines with SAP BI 7.02 for our customer. As a part of installation and configuration process i have downloaded the SAP BPC Patches and installed on top of BI 7.02 with enhancement pack 2. created a new apshell Apshell whcih is default. the server was included in a DOmain XX. I also craeted the Dot Net server with domain user and which was included in admin group successfuklly. i was able to see the dot server manager diagnoistic green and successful. Now the real confusion starts.
    1. After installation of BPC DOT NET server on Windows 2003 server wich was already included in the domain now when i ca access the server http://localhost/osoft which is taking me to the screen sap bpc console and givig me a couple of options like
    1.Interfact to word
    2.interface to powerpoint
    3. Interface to excel
    4.Interface to web
    5.Administration
    when i click on administration it is taking me to second screen where it is askig me to select Appset in a small popup windows. There i dont have any popup to select where as it is leading to empty screen where there is no popup. when i click on ok then it will lead to again the main screen it have all the options interface to word,powerpoit etc..,
    I am really confused where i am missing ad whether i need to do anything else more for the same.
    I also see lot more in the installatio guide like select apshell.db9 etc where i am unable to see that option. i no where saw the file with name apset. I also saw in the some blogs and installation guide saying that to select the option install on top of mssql2005 where as i didnt see such an option anywhere.
    Can any one guide me o this where and what i am really missing.
    Edited by: Hemanth Kumar on Dec 25, 2010 5:18 PM

    Hi,
    This is one of the most common error I encountered during my recent BPC Project . This can be solved by the following ways.
    1.Please check the authorizations ( make sure to have full admin authorizations for the Apshell) .
    2.Make sure to Re- install both admin &  client tools (check the Diagnostics and uninstall  re-install both admin &  client tools once.)
    Regards
    CSM Reddy

  • Data (Master Data Changes and Transaction Data) from SAP BW to SAP BPC 5.1

    Hi guys
    I have seen posts on this forum describing data transfers from SAP R/3 to SAP BPC. I assume the procedure for data transfers from SAP BW to SAP BPC 5.1 should be the same i.e. using SSIS packages.
    However I have some unique requirements -
    1. DATA AT DIFFERENT AGGREGATED LEVELS - I need data from SAP BW at different levels - Some data comes at Product level while other at Customer level and some at Project Level. The current procedure takes BW queries output in excel sheets (6 files) and then use the data manager package to load the data in SAP BPC 5.1 using appropriate transformation and conversion files. This procedure is highly manual and I am looking at using SSIS package to do this. However, because of having data at different levels, it becomes a little tricky. How can we achieve this using SSIS?
    2. UPDATING MASTER DATA - I need to update the master data (dimension members) in SAP BPC 5.1 at the start of every month. The current procedure compares (in MS ACCESS) the data from the queries mentioned in 1 to the dimension members in SAP BPC 5.1 and spits a file with the new entries which needs to be manually updated in the appropriate dimensions using Admin Console. I am looking at automating this task. I cannot just replace all the contents of a dimension with the members coming from SAP BW since the dimension members contains some dummy members which are used for planning.
    3. HIERARCHY CHANGES - What is the best way to capture the hierarchy changes in SAP BW into SAP BPC 5.1?
    Please advise.
    Thanks,
    Ameya Kulkarni

    Hi Ameya,
    how did you solve the described problems? Can you give some hints about uploading master data and updating the hierarchy?
    BR, André

  • SAP BPC 10 - Error on Refreshing Reports  Input Forms

    Hi all,
    We are working on an BPC 10 Consolidation project for the Netweaver Version.
    We setup the Environment, Dimensions, Models, etc. We created a few reports too using the Excel interface.
    These were tested and they worked well.
    However, then one day we started getting this message, whenever we opened any Report or Input Form -
    "The Report that was defined is invalid - at least one of the axis contains no members."
    We observed that this message appeared when there was no data available for EPM Context (Current View) given.
    In short -
    - The data is pulled out in the report, where for a CV there is data available.
    - However, if the CV is changed to something which has no data available, the report does not go blank (i.e. does not get refreshed) and it keeps showing the old figures.
    We tried opening reports in the SAP delivered IFRS Starter Kit too but got the same message.
    We are not able to locate what went wrong. Did we change any option by mistake.
    If anybody has faced this message and got it resolved or has an idea why this message might be appearing, please reply.
    Any help would be highly appreciated!
    Thanks!
    Rajneesh

    Hi Rajneesh,
    Check whether you have both the row-axis and column-axis of the input template through 'edit report'.
    Probably your input template has some member dimensions missing in your template.
    We have faced the same problem before and corrected it.
    This error occurs sometimes when we create a input template by clearing defining the row & column axis in the template but afterwards try some EPMOlapmember in any axis by deleting the original report elements.
    So check the input template once again. I think you will track the error.
    Regards,
    Bishwajit

  • NEW TO SAP BPC - Advice on Data Management Packages

    Hi,
    I am an experienced Microsoft BI User, but am new to SAP BPC.
    I am working on a project that has required me to create custom SSIS packages for my client. To date my packages transform / cleanse and format the source into a clean CSV file, that requires no further intervention from the user, other than to use the standard SAP BPC Import Routine, with a simple Transformation file.
    In order to fully automate the process, I would like my Custom package to automatically invoke the Standard import package without any user based intervention.
    Can anyone advise on this?
    I have considered writing further logic in my custom package that would completely bypass SAP BPC Data Manager, and insert the information direclty into the Fact Tables, taking into consideration any members that don't exist in the Dimensions. However, I would prefer not to go down this route unless absolutely necessary.
    Can anyone point me in the right direction, so that I can call a clear routine from within my custom package, that would invoke a SAP BPC package /task to clear certain data from the fact table, and then call another Package / task that would update the Fact table based on a fully prepared csv file.
    Many thanks

    You could modify your custom package to perform all the steps thru BPC import and have the user initiate the Package from the BPC Data Manager.  You would just need to add a MODIFYSCRIPT variable (see the standard IMPORT package as an example) and add the BPC tasks required to Convert/Load that data your package already prepares.
    I have had prior success having a custom package initiated from within the BPC Data Manager extract data from an external data source (ie: Oracle), use user provided runtime input to customize data extraction parameters, manipulate the extracted data, and import it into BPC.
    Unfortunately I've never attempted to initiate a BPC task without the package being initiated from within BPC.  But I would surmise that if you provide the proper values for the individual BPC Tasks (ie: Convert and Load) required properties (ie: AppSet, App, User,...), I cannot think why it would not work.

  • Which one is the best way in migration from sap bpc ms 5.1 to nw7.5

    Hi,
    I am doing Migration project from SAP BPC MS to NW.
    In this which one is the best way migrating By manually or By using SAP Migration tool.
    What are the merits and demarits migrating by manually.
    The data is moving from MS to NW as it is by using sap migration tool.
    Could you please answer my questions as early as possible.

    Hi,
    You would need manual effort anyways. Some of the objects are not either migrated or you need to update manually after the migration. Example, reports have to be modifed and as they may not work due to some of the options.
    Also your packages, script logic etc have to recreated. So its upto you as the migration toosl takes across your appset, applications, dimensions and the master data etc. The manual involvement is inevitable. You need to probably take what the tool allows you to do and make manual corrections for the objects that are not supported.
    Thanks,
    Sreeni

  • How to design and develop Cost center with SAP BPC 5.1 ?

    Hi all,
    Can any one tell me how to design and develop cost center planning (what are the steps to follow) using SAP BPC 5.1?
    Thanks,
    Sandy

    Hi Sandeep,
    1:We need to look at whether cost center planning is tied to a profit center level and/or to a company code level
    2:We could have dimensions like Account(which in this case would reflect cost element),category,entity,time with additional dimension s like profit center(cost centers can have a direct mapping to profit center,usage of properties would help in here),WBS ,projects,investment position id's etc.
    3:We could look at different applications like HR(pay roll related expenses),admin,capex(to bring in depreciation values) etc to bring in data to pull in data to different cost centers either directly or via script logic(usage of destination_app)
    4:For those values not tied up to profit centers ,we would look at allocating/distributing the expenses to different cost elements
    5:We need to decide whether we do the planning on a monthly/periodic vs yearly level where in we would look at actual values and incrementing at a certain % to fill in as the base for our planning(using category=actual/plan plus timeperiods).We could look at Top down vs botton up approach as well to segregate the planned costs
    6:Consideration should be made at security level to identify/restrict different users who needs to access specific cost centers
    Yes,this is just a small jist of structure,there are 100's of other considerations which would come into picture from a business requirement level.
    regards
    shyam

  • ABAP  dump during workstatus chaning in SAP BPC 7.5

    Hi, Experts
    We are working with SAP BPC 7.5 Ramp-up version. We faced a problem - during changing workstatus the system generates ABAP Dump.
    We checked ST22 with ABAP Dumps. It contains the following:
    What happened?
        Error in the ABAP Application Program
        The current ABAP program "CL_UJW_WORK_STATUS_DAO========CP" had to be
         terminated because it has
        come across a statement that unfortunately cannot be executed.
    ABAP errors are created in the following code:
    FIELD-SYMBOLS:
            <fs_line> TYPE ANY.
      CREATE DATA lr_line TYPE (i_tabname).
      ASSIGN lr_line->* to <fs_line>.
      l_where = 'APPSET = i_appset'. "#EC NOTEXT
      LOOP AT it_dim_mem INTO ls_dim_mem.
        CONCATENATE
          l_where ' AND ' ls_dim_mem-dimension ' = ''' ls_dim_mem-member ''''
          INTO l_where RESPECTING BLANKS.
      ENDLOOP.
      *SELECT SINGLE * INTO CORRESPONDING FIELDS OF es_lock_info FROM (i_tabname) WHERE (l_where).*
    *  fill lock information
      CLEAR ls_ujw_statcode.
      CALL METHOD me->read_status_code(
                   EXPORTING i_appset = i_appset
                             i_status = es_lock_info-status
                             i_spras  = 'E'
                   IMPORTING es_ujw_statcode =  ls_ujw_statcode ).
    ABAP dump says that in "SELECT SINGLE * INTO CORRESPONDING FIELDS OF es_lock_info FROM (i_tabname) WHERE (l_where).*"  exist a dynamically specified column name which is unknown.
    Does somebody have the same problems?
    Regards,
    Pavel

    Hi Pavel,
    This is obviously a bug and it looks like from the code block you copied into the forum that there is an issue with the actual select statements dynamic where clause. I haven't specifically seen this bug but I recommend you do an SAP Note search on the following component EPM-BPC-NW-WS (for work status) in your search criteria put the class name that you found in the dump. This should help you find whether or not a correction has been created (i.e. an SAP note) that solves your issue.
    Cheers, Scott

  • Difference between SAP BPC & SEM BCS

    Hi Gurus,
    What is the difference between SAP BPC & SEM BCS And throw some light on both?
    Thanks in Advance,
    Sandy.

    Hi Sandy,
    The functionality in BPC mainly 1) Planning   2) Consolidation
    1) Planning : You can have any type planning scenario.  Ex.: Sales planning.  Based on the actual previous data
    we will have some projection reports on the sales for future sales, so we can have planning scenario here . We can change
    the projections as per our requirement for any number of times.
    Ex 2: HR Planning.  Based on the market condition we have recruitment planning, based on the actual data (Existing Emp.)
    Ex 3: Accounts Expenditure planning like this we can have planning forecastings.
    2) Consolidations : We can consolidate the group company, companies with currency translations, allocations, Inter Unit
    eliminations, consolidated P&L accounts & Consolidated Balance Sheets are possible in this.
    But where as in BCS you can do only 2 part.  The first part is not possible.  Hence I personally suggest you to learn BPC NW
    it will be more useful.  BPC is now going to integrated with BO (Buss. Objects) also from 7.5 ver onwards.
    I hope this may help you.
    Regards,
    B.S.RAGHU

  • How to work with the Migration tool in SAP BPC from MS to NW

    Hi,
    I am working in a Migration project from SAP BPC MS to NW.
    we are having a migration tool purchaged from SAP.
    I don't know how to  work with,Could you please help me in this.
    Is there any way to do it by Manually?
    Thanks and Regards
    Krishna

    Hi Krishna,
    As you are not upgrading your version but you are migrating from one BPC platform to the other, you need to follow all the rules of installing fresh SAP BPC version. As you have not specified from which version you are migrating and to which version, you can refer to the following link for installations and upgrades (You need to login using your S-user ID):
    https://websmp203.sap-ag.de/support
    Hope this helps.
    Rgds,
    Poonam

  • SAP BPC Requirment Gathering Templetes

    Hi Experts,
    I am part of a SAP BPC Implementation Team, we are in the requirment gathering phase right now, it is a Financial planning and consolidation project.
    I ask your kind self to post me the Templetes and Checklist that could help me in the requirment gathering.
    I would appreciate you if you would post the document which are required for Requirments gathering at
    stevehunt dot bpc at gmail dot com .
    Thanks
    Steve

    Hi Peri,
    Different companies use different charts of accounts and the intercompany group of accounts have to be confirmed by customers finance.
    Vadim

Maybe you are looking for

  • Trouble with auto size text in a single line form field

    Hi.  I'm having an issue with filling out a form in Adobe Reader on my iPad.  The text field is single line.  The font is set to "auto" so that the line of text will not exceed a certain width.  When filling out this form on my laptop using Adobe Rea

  • Oracle error ORA-01115

    when we run sql update we get the error ORA-01115 : IO eror reading from file 348 and ORA-01110 : data file 657 : /dev/vx/rdsk/racdg1/PSindex03 ORA-27072 : skgfdisp : I/O error SVR4 Error : 12 : not enough space. the database is working perfectly. th

  • Unable to find correct BADI

    Hi All, I am very new to SRM world. I want to know about BADI's role in SRM. When can we use BADI. How can we get the information about the implemented BADIs in the project. Please post the easy documentation on BADI to me if you have. Thanks in Adva

  • Help - Problems with JScrollPane

    I am bulding an application which displays several data base records. I want to build a scrolling display which would allow the list to be various sizes. However, in setting up the code for JScrollPane, I cannot get the definitions correct because th

  • Oracle Forms Event in Finland

    http://www.oracle.com/technology/products/forms/htdocs/finland/invitation_f2soa.html If you are using Forms and based in this region, I think it would be a good idea to get along. Regards Grant