Sap pp- MRP execution

How can we carry MRP execution process for several plants under same company codes?

Hi,
Defining Scope of planning, it is possible to run MRP for several plants.
To create scope of planning use tcode OM0E.
Insert all the plants which you want to run MRP.
Run MRP by tcode MD01.
In that screen make tick mark in define parellel processing.
In SPRO give server name in parellel processing.
Regards,
Dharma

Similar Messages

  • Storage location exclude from MRP execution

    Hi,
    I want know how to exclude any particular storage location from MRP execution .
    For example,
    1.     ABC is FERT material.
    2.     BOM of ABC is consisting of RM & PM material.
    3.      There  are  two storage location
                 a.            Central Godown   
                  b.            Shop Floor Godown
    4.     Stock of shop floor does not want to consider in MRP calculation.
    I have set from t-code OMRI storage location MRP indicator as u2018 1 u2018 .  But this is not solved our purpose.
    Please let me know me how to solve the problem.
    Regards,
    Amit Biswas

    In responce to reply ,
    Reply to first SAP user,
    1. Activate mrp for mrp area OM01
    2. Define MRP area OMIZ
    This is not clear to me. If you kindly elaborately explain then it will be helpful for me.
    Reply to Mr. Himanshu,
    I have already done through OMRI but this is not solved my purpose.
    Reply to Mr. Akil
    In your cases, in every material mrp indication has to be set.
    My objective: through standard configuration, entire material will be excluded u201C particular storage location u201C on MRP execution.
    Please let me know your valueable guidance.
    Regards,
    Amit Biswas

  • Is there any best practice document by SAP on MRP

    Hi experts ,
    i am working on consumption based planning for client , there i required to refer Best practice document by SAP for MRP.
    I was searched the same in building block library and help document is not there.
    please let me know if any doc is there
    Kaustubh

    hi ,
    check this link
    http://help.sap.com/printdocu/core/print46c/en/data/pdf/MMCBPCBP/MMCBPCBP.pdf
    Regards
    G.Ganesh Kumar

  • Inter company PR through MRP Execution

    Hi Guys ,
    Greetings!
    How to get Inter company PR through MRP Execution
    Note: i have done required configuration setting in MRP  still i am unable to get the same.
    Thanks in advances
    Regards:
    xxxxxxx

    Hi Tata,
    Say Plant X supplies to Plant Z and they belong to different company codes,
    Create a special procurement key in plant X using transaction "OMD9". The key should be a copy of "40" or it self with defination that Plant Z as Special procurement plant.
    Assign this special procurement key to material master in Plant X- MRP2 view, and in plant Z the defination of this material should be "E" - Inhouse production with BOM & Routing for production.
    You should also setup the customer and assign that in the shipping data for plants in the mm-sto settings of SPRO. Here you also need to maintain the delivery/billing type and availability checks.
    With this settings now if a Stock Transfer PO is created in Plant X againsts Plant Z or if a demand exists for the material in Plant X, the requirement is transfered to the plant Z and planned order is created for the same after MRP run based on the MRP parameters set in the material master in Plant Z.
    Once GR is done with referance to the STO in Plant Z and PGI is carried out.
    Once the material is recieved in Plant X, GR is created for the STO. This completes the logistic cycle.
    Thanks
    Bala

  • LongTerm Planning-Demand Creation,MRP Execution

    Hi,
    Can anyone explain me what is meant by Longterm planning. What are the Tcodes used for using LongTerm Planning.
    How can we say that a given material is planned by Longterm Planning?.
    How to create demand in Longterm planning and then execute MRP in Longterm planning?.
    Thanks in advance.

    Hi,
    LTP - Long Term Planning is one of the planning tool provided by SAP for the planning puropses. It has got multiple usgaes, for production planning, procurement planning or for budget control etc. Why it is used depends mainly on what kind of business one is doing, what kind of products a company is producing. Mainly we do LTP for MTS scenarios. In MTO scenarios also we can use LTP.
    As the name says it is used for the planning purpose only and we can do multiple plannings by using inactive planning versions available or by creationg them. Analyse the result of the planning in inactive version and subsequntly convert or transfer inactive plan to active demand plan and execute the processes in a normal way.
    Main object in LTP is the creation of planning scenarios, which contains details reagrding validity dates of scenario, which all objects need to be considered for planning (viz, production orders, sales orders, PO, PR, planned orders , stocks, capacity, BOM explosion etc check t code MS31/MS32/MS33 etc), the plants where LTP is going to be used,  what is the inactive version is going to be used etc. The creation of scenario helps in simulaitong the planning results.
    Demand for LTP will be created in a normal way as we do it in DM. You can also use SOP to transfer data to LTP.
    You use planning scenarios created earlier whenever you run LTP. The result of LTP are inactive plans and nonconvertibles. You can use MRP result only for the analysis purpose. You do this analysis lutliple times by using different planning scenarios for the same bunch of materials. When you feel one of the scenario/simulation is giving proper results then you can convert that inactive planning to active plan and proceed ahead with normal execution cycle.
    Hope this will help.
    Regards,
    Pavan

  • SAP PM-MRP RUN

    Dear All,
    Can you tell me How to run MRP in sap PM & How it is configure.
    Thanks & Regarsd
    Vishal

    In Spare Parts or materials which ever used in PM orders, MRP views should be maintained. There is no specific MRP run for PM. MRP is for all the materials under the plant.
    Materials availability check can be done at the time of saving the order & releasing the order. Based on the material availability, you can control order release.
    For stock items, reservation will be created. While running MRP, these reservations also will be considered if stock is not available. For non-stock items, PR will be created directly from PM order.
    Material Availability check config:
    IMG => PM & CS => Maintenance & Service Processing => Maintenance & Service Order => Functions & Settings => Availability check for Materials
    Under that, you can find different config. This availability check will be done at plant & order type level.

  • SAP PP MRP Run Results

    Hello,
    We are in the phase of implementing SAP. I am working on PP module. When we run the MRP (MD01 or MD02) for a finished product, the system will not give any exception message on the planned order level for it if any of the components is not available at the suggested start time. In another words, the system will not suggest to postpone the finished product planned order date to match the last component arrival date.
    Any one can help in this regard.
    Best Regards,
    Fadi

    Fadi,
    I am afraid this is standard behavior.
    This condition (components too late) is not an ECC MRP exception, so it is not contained in MRP output.  MRP is not designed to push out orders when the components of the order are not available.  ECC MRP only works from the top level of the BOM downward, level by level.  When it is creating messages for a particular plant/material, it has not yet done the MRP of the the lower level components, and so has no way to determine whether or not they may be late.
    If there is a mismatch between the component supply order and the dependent demand of a higher level order, MRP should give a rescheduling message to the COMPONENT orders ('bring process forward').  From this message, an astute planner might intuit that he should reschedule the higher level orders.
    If you need bottom-up rescheduling, you will have to go to APO.  SAP ECC PP doesn't directly support that concept.
    Rgds,
    DB49
    Edited by: Dogboy49 on Dec 22, 2009 11:04 AM

  • RLM MRP execution at storage location

    Hello Friends,
    Need help - I am configuring RLM with MRP - need help with below:
    Requirement: I need to run MRP at the main storage location first (requirement is from Plant Maint order), followed by another MRP run at secondary storage locations. I want to deplete stock in the main storage location before using up stock at secondary storage locations.
    This is not for re-order point planning (VB) for both storage locations, I know that I can plan MRP separately at storage location levels, but that only works with re-order point replenishment.
    Is MRP area configuration my only option?
    If possible I want to avoid MRP area configuration - I hear once it is configured we can revert back!

    Hi Joe,
    As per your client requirement, you need to run MRP at Main storage location, and want to avoid performing at storage location, here you can define the supply chain derivation via plant Mainteniance order by using using item category and transport requistion in RLM Configuration. you have option to select the order type order type item category  ( ), item category change rule ...( newer change item category) & direct prourement type ( SAP Std ).
    Yes MRP Area is the only option, the MRP first as plant level is the option, check in setting ie Step-3 Supply process derivation via plant ( supply type PD).
    The parameters for the RLM Supply Process are a combination of the following:
    · Material requirements planning (MRP) type at the requesting plant or storage location (the plant making the request for materials)
    · MRP type at the supplying plant or storage location (the plant or storage location supplying the material)
    · Special procurement type at the demanding plant or storage location.
    For more information pls check this link..
    http://help.sap.com/saphelp_47x200/helpdata/en/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm
    http://help.sap.com/saphelp_oil472/helpdata/en/83/496c3a411aab70e10000000a114084/frameset.htm
    BR
    Satish

  • How to find which SAP R3 table are read during SAP R3 extractor execution ?

    Hi Colleagues,
    I would like to know which sap r3 table are read during the execution of a sap r3 extractor ?
    1. I execute 2lis_03_bf extractor
    2- I select debug mode
    3. I put a break-point statement at abap command : select
    I just see the program going to technical table, mara table and user exit from.
    I am sure that this extractor read also MBEW table but I did not found it during the execution of the debug mode.
    Can someone help me ? What should I do to see from which table the extractor 2lis_03_bf extractor is retrieving data ?
    Thanks !

    HI Hanson,
    You maynot directly hit the source table when you debug a LO Extractor, as you should be aware that the data
    is read as below in case of a LO datasources ,
    INIT or FULL load --> from Setup tables
    Delta                    --> from the delta queue
    Also finding the Source table fora LO extractor is simple as you check the EC pool and understand that , check the
    below blog for more details
    /people/sap.user72/blog/2005/09/05/sap-bw-and-business-content-datasources-in-pursuit-of-the-origins
    But you can try with any other BI content extractor, for examle if you take a 0FI_AP_4
    you find the table BSIK and BSAK are being read using FM
    Regards,
    Sathya

  • When SAP run mrp, it could only identifiy first 9 characters as material?

    Hi experts
      In SAP, Could we set when we run mrp, sap will only check the first 9 chars as mateiral number ?
    eg: material 12345-67890 and 12345-6789,  Could sap consider it as same material ? If there is any configure for this ?
    Thanks
    Alice

    Hi experts
    Our purpose is we need setup two material number like aaaa-aaaa1 and aaaa-aaaa2 for same part but from different localization source.
    Since they are same part , if mrp could only reconginze the first 9 character as materail number to run requirements ?   what does it mean planning material ? It could set the first 9 character as planning material different from the normal materail ?
    Thanks
    Alice

  • Sap pp -MRP-area

    Hello SAP-Guruu2019s
    Pls tell me the Procedure/steps/Details to maintain MRP-area for a Vendor & also for a Sub-Contractor.
    Any comments welcome   & Thanks in advanc

    Hi,
    Pls. find the following details regarding MRP Area :
    MRP Area
    Definition
    The MRP area represents an organizational unit for which material requirements planning is carried out independently.
    Basically, there are three types of MRP area:
    Plant MRP Area
    The plant MRP area initially contains the plant together with all its storage locations and stock with subcontractors.
    When you have defined MRP areas for storage locations and for subcontractors and you have assigned the materials, the plant MRP area is reduced by exactly this number of subcontractors and storage locations. This is because they are now to be planned separately.
    MRP Areas for Storage Locations
    You can define an MRP area that consists of a particular storage location, by creating an MRP area and assigning the storage location to it. Material requirements for this storage location are then planned separately from the rest of the plant.
    You can also group several storage locations into one MRP area, by creating an MRP area and assigning the storage locations to it. These storage locations are then planned together.
    A storage location of a plant may be assigned to only one MRP area.
    MRP Areas for Subcontractors
    You can also define an MRP area for each subcontractor.
    A subcontractor may be assigned to only one MRP area. An MRP area of the subcontractor type may also only contain one subcontractor.
    Use
    You can carry out MRP specifically for the determined MRP areas. This enables you to carry out differentiated material requirements planning. The requester can be, for example, the production on a particular assembly line or a subcontract order.
    The MRP area allows you to have specific control over the staging and procurement of important parts produced in-house and purchased parts for each shop floor area. You can, however, also plan the provision of components for the individual subcontractors.
    MRP areas of the storage location or subcontractor type are only suitable for:
    components that are planned and produced for stock
    finished products that are planned and produced for stock. By assigning a storage location in a sales order or by entering an MRP area when creating the planned independent requirements, you can define whether a material is planned in the plant MRP area or in the MRP area of the storage location.
    Finished products and important assemblies intended for make-to-order or engineer-to-order production are always planned in the plant MRP area.
    The planning run takes into account the planning with MRP areas as follows:
    If you do not enter a separate scope of planning, the system plans the whole plant, that is, all MRP areas in the plant, during the total planning run. If you want to carry out a total planning run for a particular MRP area only, you must specify the required MRP area in the scope of planning.
    During single-item, multi-level planning, the system plans the selected material in the MRP area entered. In addition, the system takes into account planning file entries from other MRP areas, for example, if the material is to be procured using stock transfer.
    During single-item, single-level planning, the system plans the selected material in the MRP area entered only.
    Structure
    You define the MRP areas in Customizing for MRP. You can thereby assign the following to an MRP area:
    one or more storage locations (example: you want to carry out planning for a particular assembly line and therefore assign a production storage location to the MRP area)
    a subcontractor.
    You assign the various MRP areas to the materials in the material master. For this, you create an MRP area segment for a material for every MRP area, in which it is used. In this MRP area segment, you can define MRP parameters such as, for example, the lot size or MRP type. This allows you to plan the material differently in the MRP area from how you plan it in the plant MRP area.
    MRP with MRP areas for the material is not activated until the material has been assigned to an MRP area. If you have not assigned a material to an MRP area, that is, you have not created an MRP area segment in the material master, the material will continue to be planned in the plant MRP area only. If you have assigned an MRP area to it, the system can plan it in the plant MRP area and in the assigned MRP area.
    Integration
    You can carry out material requirements planning for MRP areas using all MRP procedures and all lot-sizing procedures.
    You can also carry out an independent material forecast for MRP areas using your own parameters.
    The material consumption values are updated separately for each MRP area.
    A separate ATP check is carried out for each MRP area.
    If several storage locations belong to an MRP area, the system can also carry out a check at two levels, that is, at storage location level and at MRP area level.
    Example: Subcontractor
    You can also carry out planning for components to be provided in subcontracting using an MRP area by defining an MRP area for every subcontractor and assigning the components to be provided to the MRP area of the subcontractor. You therefore plan the requirements to be provided for these components for one subcontractor separately from all other requirements (see Planning for Components to be Provided in Subcontracting).
    Depending on the requirements situation, the system creates either stock transfer reservations from the plant to the stock of material provided of the subcontractor or it creates purchase requisitions within subcontracting/third-party order processing, according to the special procurement key settings.
    Implementing MRP Areas
    Implementation Options
    The main reason for you to implement MRP areas is if you would like to plan materials, which are required in different shop floor areas, storage locations or by subcontractors, separately from one another.
    As soon as you have activated materials requirements planning with MRP areas, this type of MRP is active at client level, that is, MRP will be carried out in this way in all plants.
    Material requirements planning with MRP areas cannot be reversed.
    Process Flow
    You can implement material requirements planning with MRP areas in three steps:
    You convert the existing planning file entries at plant level to planning file entries at MRP area level.
    During the conversion, the system creates a plant MRP area for every plant as a background job. This, however, will not affect your planning. The processes in material requirements planning and the planning results remain unaffected.
    The conversion is also useful even if you do not work with MRP areas, but still have to plan for several plants, as the new planning file improves system performance during the planning run.
    You activate MRP with MRP areas in Customizing for MRP. This causes the MRP area field to appear in the applications of MRP and in related areas. When you enter the plant number, the system automatically fills the field with the number of the plant MRP area. The number of the plant MRP area is the same as the plant number.
    This does not affect the planning run as the plant MRP area still corresponds to the present plant.
    You define an MRP area, for example, for a storage location. You then assign the materials that are to be planned for this storage location, by creating an MRP area segment in the material master.
    Materials requirement planning for this storage location is then carried out separately. The storage location stock is no longer included in the available stock of the plant MRP area. The receipt and issue elements of this storage location (MRP area) are also not taken into account in the plant MRP area. They are only taken into account in the MRP area of the storage location.
    If you have already worked with storage location MRP the system still carries out storage location MRP even after the activation of MRP areas. You need to decide in principle whether you want to continue using storage location MRP or whether you want to create MRP areas for the storage locations that are planned separately. It is not possible to simultaneously plan a material using storage location MRP and an MRP area for the same storage location.
    If you decide to use MRP areas, you should then try to convert all storage locations that are planned separately to MRP areas in one step. Before you assign the material to an MRP area, you must remove the MRP indicator, which is located in the material master at the storage location organizational level (view MRP 4) in the screen area Storage location MRP.
    Even if you have defined MRP areas in Customizing, the system plans the materials in the plant MRP area until you assign the MRP areas to the materials.
    Only the assignment of one or more MRP areas to a material, by creating MRP area segments in the material master, actually cause changes in the material requirements planning.
    Hope this helps.
    Regards,
    Tejas

  • MRP Execution Date

    Hi Guys
    I run MRP every Friday night and check  the MRPlist on Monday. This time MRP run showed execution for FInish good but the component is still showing MRP date of last week.
    Can you guys suggest the reason for this or where to look for the same as potentially nothing has changed on master data or setting. If it have then what should I look for?
    Thanks in advance
    -Rahul

    Rahul,
    Do you use a batch job for planning these materials together ? Hope you are using MD01 or MDBT for planning.
    There could be quite a few resons why compoenents are not planned.
    First check if all technical parameters are correct.
    then also make sure there was change in demand for the componenets to reflect it in MRP i.e. there planning file entry was available beofre MRP.
    We run a planning file enrty job bere running MRP job through MDAB .
    Check these possibilities and revert,
    Santosh Sarda

  • SAP PP - MRP Strategies-

    Hi,
    Can anyone reply as to which MRP Stategy to be used so that STO's are not considered during MRP run at finished/semifinished material level or is there any customization which will exclude STO's comletely for MRP run.
    thanks & regards,
    tss1754

    Hi,
    Standard MRP does not exclude the STO as it also impact the stock/requirement situation.                                                      
    If you'd like to achive your requirement, you may consider to use a specific storage location that is excluded from MRP (You can define it in  MMSC for certain storage location with material) or there is a BADI MD_CHANGE_MRP_DATA. It allows to change MRP relevant data for MRP  elements during the planning run and during the creation of the stock/requirements list.                                               
    I hope this helps.
    Regards,
    Tibor

  • SAP BO Report Execution time and Record count

    Hi All,
    We have a requirement to set the limits on report execution time and record count centrally. Can you please help me to identify where exactly we have to define the settings in CMC for BO4.
    Thanks in advance,
    Shalini

    Hi Shalini,
    Please follow these steps, also check in for any more details if any;
    Step 1: Launch CMC
    Step 2: Select Servers
    Step 3: Select Web Intelligence processing Server, right click and Goto Properties
    Step 4: Maximum List Of Values Size (entries) default value is 50000.
    Step 5: Increase this value if your "LOVS" greater than this value.
    Step 6: Save and close.
    Step 7: Restart the server.
    Hope this helps.
    - Ram

  • SAP MM MRP

    Hi Friends,
    We are going to implement MRP for an ice cream industry. Please help me with the pre-requisites for MRP configuration. What are the advantages for MRP and the pre-steps for it.
    Thanks in advance.
    -kiru

    Hi,
    Following steps need to be follow for configuring MRP
    1. Plant Parameters for MRP (SPRO)
    2. MRP type (MM)
    3. MRP controller (MM)
    4. Procurement Type(MM)
    5. Special Procurement Type if applicable (MM)
    6. Lot Sizing Procedure (MM)
    7. Scheduling Margin Key(MM)
    8. Scheduling Parameters for planned orders through (SPRO)
    Detail:
    1. Activate Plant Parameters for MRP(in SPRO)
    2. MRP Type Customization(E.g, PD, M1,M2,, -in SPRO - But need not suposed to do without client's permission)
    3. MRP Controller (in SPRO)
    4. Production Scheduler Profile (in SPRO)
    5. Order type Dependent Paremeters(in SPRO)
    6. Plant Parematers(in SPRO)
    7. Scheduling Parameters(in SPRO)
    Important T-Codes - OPL8,OPJH,OPKP
    Note: Go to SPRO, select reference IMG,
    Select Production - Material Requirements Planning, Here you will get all the details about the setting for MRP
    by
    Hi,
    Following steps need to be follow for configuring MRP
    1. Plant Parameters for MRP (SPRO)
    2. MRP type (MM)
    3. MRP controller (MM)
    4. Procurement Type(MM)
    5. Special Procurement Type if applicable (MM)
    6. Lot Sizing Procedure (MM)
    7. Scheduling Margin Key(MM)
    8. Scheduling Parameters for planned orders through (SPRO)
    Detail:
    1. Activate Plant Parameters for MRP(in SPRO)
    2. MRP Type Customization(E.g, PD, M1,M2,, -in SPRO - But need not suposed to do without client's permission)
    3. MRP Controller (in SPRO)
    4. Production Scheduler Profile (in SPRO)
    5. Order type Dependent Paremeters(in SPRO)
    6. Plant Parematers(in SPRO)
    7. Scheduling Parameters(in SPRO)
    Important T-Codes - OPL8,OPJH,OPKP
    Note: Go to SPRO, select reference IMG,
    Select Production - Material Requirements Planning, Here you will get all the details about the setting for MRP
    By
    Vipin

Maybe you are looking for

  • Problems with sending IDocs into R/3 using BPM

    Hi Vishnu, as I have read the forum, you have experience with sending IDocs into R/3 from XI using the BPM. Did you have problem, that this sending takes very long time? My BPM splits the xml, sends IDoc into R/3 immediately, but the processing of th

  • Query problem  in viewobject wizard

    I have problem to viewobject creation In the sql Query of viewobject wizard, I can not use build-in sql function like trunc, nvl to the attribute if I use function, there is no problem with query test(query is valid). However when I click ok or apply

  • How do I make "Reading List" permanent?

    I really like "Reading List," the part of Lion you can open by tapping the glasses image on the left side your Alias bar. I have Reading List on all the time. However, when I turn Safari off and open Safari later in the day, Reading List isn't there.

  • How to get iMovie HD

    How can I get iMovie HD?? I have iMovie 09 and 11 but I would like to get iMovie HD for the special effects.

  • Mac os x 10.4 logs out on its own when computer gets "busy"

    mac os x 10.4 logs out on its own when computer gets "busy"