Schedule Line Category and Availability checks

Hi Folks,
A generic question.
Wanted to know, how would availability check results influenced if only Item category and MRP type are maintained and not the scheduled line categories.
Was trying to figure a strange Availability check behavior of non-confirmation for one item category and confirmation for another- item x location being same. The ATP checks settings are maintained and called from GATP. (not R/3 and R/3 customization is not imported too).
Regards

closing

Similar Messages

  • Schedule line category in Availability check

    Hi Experts,
    what is the role of Schedule line category in Availability check?
    Please give me awareness of schedule line category`s function too?
    Shibu

    Hi
    SEARCH THE FORUM
    Any way  Schedule line Help to Check  whether the quantity is available in that particular Requested DELIVERY DATE  & QUANTITY.
    thanks
    Ashok

  • Schedule line category and item category

    Hi all,
    Can some body explain what is the use and differences between Schedule line category and item category?
    Where exactly they come into picture when a sales cycle is done? it would be very helpful.
    Thanks in advance.
    Manu

    Hi,
    SCHEDULE LINE CATEGORY:-
    Schedule line Category determines the Schedule lines for the Line item, it will determine whether the Item is relevant for  Delivery or not
    Transfer of Requirements are also controlled
    Availability check at the Sales order is controlled with the Indicator set at SCHEDULE LINES
    For Third Party processing, the Purchase requisition is created based on the Setting at schedule lines
    Together with the ITEM CATEGORY , the schedule lines determine whether the Transaction is Relevant for MRP or not In the Transaction code VOV5
    ITEM CATEGORY:-
    Item category is a significant part in processing the sales document
    Item category determines whether particular item is relevant for Delivery ot not,
    Whether item is relevant for the  Billing
    In Determine the Availability and TOR Item category plays an important role, for example the Availability check at DELIVERY will be taken place based on  the DELIVERY ITEM CATEGORY
    Some Fnctionalities like OUTPUT, TEXT, PARTNER, INCOMPLETION are controlled
    DIP which in the ITEM CATEGORIES is the Main Integration Between SD and PS
    Thanks,
    santosh

  • Requirment class & Procedure for each schedule line category

    Hi all,
    In requirment class we have a switch on/off indicator for avai check and TOR.In define procedure for schedule line category also we have the same.
    If I dont want the system to carry out availabilty check, I can switch off the indicator in requirment class or at schedule line category.
    My question is why we have these indicators in 2 places.
    It is written we can fine tune these settings at Define procedure for schedule line category settings
    Could anyone explain in details with Business scenarious
    Thanks in advance
    Mano

    Hi,
    1. Availability check at Requirements Class level -
    The requirements class contains all control features for planning such as relevance for
    planning, requirements planning strategy and requirements consumption strategy.
    In addition, it is specified at a global level whether an availability check is to take place for
    the material in the sales and distribution documents on the basis of the ATP quantity
    (ATP = available to promise) and whether requirements are to be passed on.
    2. Availability check at Schedule line category level -
    A finer degree of control can be obtained for sales documents using the schedule line category.
    Replenishment lead time is only included in the check performed on the basis of the
    ATP quantity.
    You can control with the schedule line category whether an availability check and
    transfer of requirements should be carried out in the sales documents.
    Note -
    1. At the global requirements class level, the availability check can only be switched on in combination with the transfer of requirements. At schedule line level, the settings are proposed from the requirements class.
    2. If the availability check is switched on at requirements class level, it can be switched off at schedule line level. However, you cannot switch on the availability check at schedule line level, if it is switched off at requirements class level. You can make this setting at schedule line level. But the system ignores it and the setting for the requirements class applies.
    3. Also, at schedule line level when the availability check is switched on, the transfer of requirements can be switched off. For example, this makes sense for inquiries or sales information.
    4. The settings specific to schedule lines for performing an availability check are only relevant for sales documents. In the shipping documents, the settings from the requirements class and the delivery item category are used. As with the schedule line category, the availability check can be switched off as required in the delivery item category.
    regards
    bhaskar

  • Availability check box at schedule line level and requirement class level

    Hi All
    What is the significance of availability check field at schedule line level and requirement type level.
    If I remove the check box at schedule line level, then there won't be any availability check carried out in the sales order, even though in requirement class it is checked. Is it for doing availability once the requirement is passed to MRP...
    In make to stock scenario, no availability check is active at schedule line level.
    scenario 1. stock is 0 in plant, when i place an order for 10 quantity, does system give any confirmed quantity on so and so date...or the confirmed quantity will be zero or as there is no availability check carried out, it confirms 10 quantity on customer requested delivery date and the time of creation of delivery, it gives an error message stating zero quantity is available. which one is correct in all the above.
    In make to order scenario, no availability check is active at schedule line level.
    order was created for 10 qty, as there is no availability check active, does the system give some date based on the lead times maintained in the material master or not?
    Regards
    Sree

    Hi sreekar
    The significance of availability check at schedule line level  is to determine weather availability check and TOR should be carried out for sales orders  or not. 
    If you remove check box at schedule line level , availability check and TOR wont be  carried out at sales order level.
    Coming to the scenario you said , make to stock , i think the availability check you are using is 01 make it 02. which is planned requirements. and stratergy group as 10. in MRP3 view in MMR. .
    as the availability check u have put 01 & stratergy group as 10 availability check doesnt carry
    coming to the scenario 2  , if the stock is 0 in plant and if you create a sales order, then the confirmed quantity should be 0 and that particular order will go to backorder processing.
    sometimes it  confirms the ordered quantity as the  confirmed qunatity, and it gives a confiremed delivery date on which the stock is confirmed , but that date is a tentative date.
    all these unconfirmed orders will go to backorders. once the qunatity is confirmed automatically , delivery date also will be done
    Coming to scenario 3 , when you create MTO order there will be availability check checked at the schedule line level. can you tell wat is the schedule line you are getting is it CP or ND?
    for schedule lines , ND - no availability check will be there , PD - availability check will be there
    Note: plz check 1st the availability check you have entered in MMR , if it  is 01 make it as 02. and then run these cycles.
    Reward points if useful and if Any queries let me know
    Regards
    Srinath
    Edited by: sri nath on Mar 21, 2008 7:53 PM

  • User exit for va01 to validate the value for schedule line category

    Hi All,
    Pls tell me which user exit i used for to validate schedule line category for tcode VA01 .suppose i have two value in scedule line category CP and CN. but when user enter CP it will show warning message that CN is default or pls enter valied value.How to do in user exit.
    Nitin K

    Hi Nitin
         Try userexit_move_field_to_vbep in MV45AFZZ
             or userexit_check_vbep in MV45ZAFZB.
           check vbep-ettyp for the schedule line category and write the logic.
    Kuntal

  • Schedule line and availibility check

    Hello,
    I have three questions ;
    Q1) my schedule line category is set to " no avalibility check".
    Q1A) How does the system confirms the stock in sales order or  in delivery if schedule line category is set to "no avalilibity check"
    Q1B) does the sales order and delivery appear in MD04 is schedule line category is set to "no availbility check".
    Q2)my schedule line category is set to " no materials planing ?
    Q2A) How does the system confirms the stock in sales order or  in delivery if schedule line category is set to "no materials planning"
    Q2B)does the sales order and delivery appear in MD04 is schedule line category is set to "no materials planning"
    Q3) what is the relationship between MD04 and MRP run. Does all the sales orders or deliveries appear in MD04 after MRP run ?
    request pls answer pointwise for clarity
    regards
    sachin

    hi Sonu,
    Q/3 ) relationship between MRP run & MD04
    >The function of MRP is to plan the requirement of a header material as well as for the dependent requirements.This is done with the transaction code MD02.All the requirements are pulled up and planned.the outcome of the run will be a report which will show the details of the planning like
    >Materials planned
    >Materials with new exceptions
    .MRP run is therefore static.
    >MD04 shows you the stock requirement list of the material.after you run the MRP for a particular material this screen will show you the requirement for header materials,
    dependent requirement,available stock,the reservations made.if the stock is less u can either generate PR for externally procured or create prodn order for internal mfred.
    this is dynamic i.e whenever u run this t code u get the latest update on the status of that material.
    u can't see deliveries in MDO4 only reservations
    SO are not seen directly but as a customer requirement and when u run MRP they are changed to planned order.this planned order can be seen in MD04 from where u can either create PR or production order
    Q/2B
    "no planning " is used for those items for which u don't want to run MRP.certain materials are such that the controller can manage w/o running MRP i.e the SO comes and the product is either delivered or produced w/o running MRP.
    hope this helps,
    regards.
    Edited by: vikas koul on Jun 26, 2008 1:27 PM

  • Changing Schedule Line Category after checking Item availability

    Hi Expert,
       I would like to change the schedule line category according to the result of item availability check, i.e. change to another self defined schedule line category in case confirmed qty < order qty.
       Could any one please suggest where I can implement this logic? Which user-exit is required to modify? Thanks a lot!

    hi,
    U can change the SCH line category manually in sales order
    Menu path:
    Spro-->Img> sd> sales -> sales documents>sch lines-> assign sh line categories---->
    here find ur current combination
    eg:
    ITem cat+ MRP TYPE= SCH LINE CAT + MANUAL SCH LINE CAT
    <b>TAN + ND=CN+---<u><i><b>here u give teh sch lien cate u want</b></i></u>----</b>
    this will aloow u changing sch line cat manually in sales order
    regards,
    Arun prasad

  • Does BOP respect the availability check setting made in Schedule line category?

    Hi Gurus,
    Does BOP respect the settings made for availability check in schedule line category?
    Thanks,
    Nihar

    Hi Sourabh,
    In the Schedule line Category, we have an option Availability check right?
    Business requirement is to suppress Availability check at schedule line category level, where Availability check box is not selected.
    When I trigger availability check manually, the confirmation happens on the day requested & no additional schedule lines are created.
    For the same order, if I run the BOP with the above settings made in schedule line category; order is confirmed & is checking against stock & lead time.
    My question is: Online ATP respect the availability check setting made in schedule line category. Does BOP respects the same as Online ATP?
    I hope I was clear!
    Thanks,
    Nihar

  • Requirement type and Schedule line category

    Hi SD Gurus,
    1)  Please let us know, where to see the Requirement Type (Control filed of Availability check and TOR) in the sales order. I dont remember now and I knew that we can change the Requirement type in sales order, while creating the same.
    2) In the Intra-stock transport order (stock transfer between Plants with in a company code), how the schedule line category NN is getting determined and what is the purpose of this schedule line category? 
    Please advice on both the doubts...
    Regards,
    Manivannan R

    HI,
    Schedule line category determined in the combination of MRP type and ITEM Category(MRP will be maintainedin the material master and the item category will be determined in the combination of Sales doc typitem ct grpusagehlev.,itmcatdef.,itmcat+man.,itmcat) and the use of this item category NN is stock will be transfer frm sloc to sloc within a plant and for more info check tcode OMJJ take help of MM consultant.
    Regards,
    kishore.

  • Multiple schedule lines as and whhen mat is available

    Dear Friends I have a requirement where in I want schedule line to be genrated in sales order for one item as and when qty is avaliable and we run an avail check
    for ex
    There is a need for 20 bags 10 is available   after a few days so 2 schedule lines one stating del not possible n req del date and 2nd stating stating when its available the remaining 20 is ava 30 days from now .........so when its available i want that schedule line seperately ...........how do i get the third schedule line
    Right now even if 10 is avalibale it gives me 1 schedule line stating 20  20  0 (confirmed qty)
    Please let m eknw how i could get new schedule lines  as and when the mat is available
    regards
    madddy

    Of course MR Reazzudin
    well this is a ticket that i have received the customer wants schedule lines to be generated for a material automatically everytime it is in stock..currently even if there is a part of the items are aavailable it shows one schedule line with confrd qty as zero
    i mean if the order is for 10 and if 2 are ava rite now
    there should be aschedule line for 2 first and then wheneger further qty is available there is should be a new schedule line
    I myself am not very clear wit the whole process in background
    further information that i can provide is schedule line used is ZCP
    Req class and type is ZCS made to order stock.
    Thnk u for your time.

  • Determination of Item category and Schedule line category

    Hi,
    I am fresher being trained in SAP-SD.I am confused with determination of Item and schedule line category. Pls help me
    How is item and schedule line category is determined. Should it be done by us or by the system. pls explain it in a low level.

    hello,
    these are very basic question and can solved if you search over the net or ask your instructor to recommend any book.
    coming to your question
    item category determination  in sales document is done via following rule
    sales document typeitem categorygroupusage+higher level item cat=item cat det in sales doc
    OR                              +       NORM                                                              =TAN
    SCHEDULE LINE CAT determination  in ITEM OF A sales document is done via following rule
    item category+mrp type=schedule line category
    TAN               +PD          =CP
    revert if helpful
    Mohit Singh

  • Credit exposure and the Schedule line category

    Hi,
    I have a problem in credit exposure update in FD33.When I use the schedule line category xx which has req/Assembly marked in schedule line category settings is updating the sales order values in Fd33 even if the sales order (while creating) is blocked due to credit.
    Whereas I use the schedule line category YY which has req/Assembly not marked in schedule line category settings is not updating the sales order values in Fd33  if the sales order(while creating) is blocked due to credit.
    Is this the standard behavior? If so Why.
    Regards
    Babu

    Hi Babu,
    Yes, this is a standard behavior.
    Please refer to note 393304.
    If the flag "transfer of requirements" is not set, that means that credit-blocked order won´t update credit values.        
    In this document has a complete explanation regarding this proceeding.
    I hope it can help you.
    regards
    Ruy Castro

  • Question on Schedule Line category in Sales Order not relevant to MRP

    Hi experts,
    I want to know whether the sales order having any schedule line category like CP, CN, etc will not be relevant for MRP. In other words, If I do the MRP run for the Sales Order Requiremnt having any Schedule Line Category in particular will not generate any procurement proposals like Planned order/ Purchase Requisitions. Please advice me on the same.
    Regards
    Brijesh

    Dear Brijesh,
    Please find some info related to scheduled lines below,
    The various schedule line categories are controlled in different ways:
    The schedule line AT in inquiries is used only for information.
    No requirements are transferred and no availability check is carried out for the schedule lines BN and CN.
    Requirements are transferred and the availability of the material is checked for the schedule lines BP and CP.
    No stocks are managed for the schedule line categories BT, CT and CX. No goods issue is posted for the categories BT and CT. However, goods issue is posted for CX.
    The schedule line categories BV and CV are controlled in the same manner as the categories BN and CN. However, requirements can be passed on for analysis purposes.
    Goods receipt is posted for the schedule line DN in a returns document.
    The schedule line categories CN, CP, CT, and CV are relevant for delivery; the other schedule line categories are not.
    *Control Elements for Schedule Line Categories
    Different schedule line categories are permitted according to the sales document type and item category you are using. You can use control elements to tailor the schedule line categories to meet the special demands of your installation. You can also define new schedule line categories.
    Hope this helps.
    Thanks
    Murtuza

  • Schedule Line Category change-USER EXIT

    REQUIREMENT:
    When saving a SALES ORDER, Change the schedule line category on the SALES ORDER from CP(Standard Availability Check) to CS(Third Party Processing u2013Trigger Purchase Requisition)
    Initially when we create the SALES ORDER, we have Schedule line category CP to generate schedule lines based on stock availability
    SO Date- 09/14/2010
    Schedule line 0001--- 09/14/2010 --- Confirmed Qty (0) --- Sched Line Categ(CP)
    Schedule line 0002--- 09/16/2010 --- Confirmed Qty (1) --- Sched Line Categ(CP)
    Config Change: We have changed the Schedule line category- CS to turn off Purchase Order Scheduling (Indicator turned off--P.req.del.scheduling)so that when we change the schedule line category, no PO scheduling happens again
    Our requirement is that when saving the sales order, we want to change both the schedule lines item category-0001/0002 from CP to CS
    SO Date- 09/14/2010
    Schedule line 0001--- 09/14/2010 --- Confirmed Qty (0) --- Sched Line Categ(CS)
    Schedule line 0002--- 09/16/2010 --- Confirmed Qty (1) --- Sched Line Categ(CS)
    After saving the order, a Purchase Requisition is generated for the Schedule Line 0002..
    MY QUESTION:
    Is this possible using the BAPI_SALESORDER_CHANGE without changing the dates on the schedule lines or deleting any schedule line
    Thanks
    Kumar

    Hello Kumar,
    Please check the User exit and let us know whether your requirment is met or not.
    #USEREXIT_MOVE_FIELD_TO_VBEP
    Use this user exit to assign values to new fields at the level of the sales document schedule lines.
    The user exit is called up at the end of the FORM routine VBEP_FUELLEN.
    Regards,
    Sarthak

Maybe you are looking for