Hi,
Please guide me which triggers in creating PR (Purchase Requisition) in the case of third party order processing. The following fields:
Order type "NB"
Item Category  "5" for Third party
Acct. Assgt Cat.  X    for All aux acct. assgts.
and in the
Transaction Flow:
Incompl. proced.  31     for Sched. Line  w/Pur.Req
Thanks
Jans

Hi Shiva Ram,
Thank you for your reply. I have already mentioned in my heading the schedule line category as "CS" and I have given the details of that schedule line category. I also know that Item category group "BANS" in the MM data automatically picks the Item category "TAS" .
But my question is exactly which Field or fields in the Item category and Schedule line category triggering in the creation of PR.
Thanks,
Jans

Similar Messages

  • Account assignment in schedule line category for third party sale

    in settings for schedule line category CS -for third party sales, in the field Account Assignment category we assign X-all auxiliary account assignment.
    what is the purpose and reason for using account assignment category in third party and at what point of time this comes into picture in third party sales process

    Hi Sudha A,
            Procureement against customer requirement will be booked against cost or expense account. So when creating PO, this account assignment category is determination factor for respective G/L accounts in MM.
    - Account assignment category will have general modification assigned. in MM account determinatoin OBYC settings-
    Valuation group code(this needs to be confirmed) + General Modification + valuation class determines G/L account.
    This is how G/L account will be displayed in PO - item level - account assignment tab.
    To see the settings in account assignment category - check the help of the field & choose customization & observe in details.
    Hope it clears,
    Regards,
    Reazuddin MD

  • Route is not considering in delivery scheduling for Third party order proce

    Hi All
    Advance thanks for your inputs
    We need to consider the route in the delivery scheduling for third party order processing..
    Example
    i have standard order (document type OR)  when i have item cat TAN its considering the route for ariving the material availability date, if it has TAS(third party) then its not considering the route......
    But we want to consider the route in deliver scheduling in case of third party order...
    kindlly pls advice..
    regards
    raja

    Hi Viven.,
                        Routes they come under normal order as we deliver the goods,but here in TAS,third party sale we are not delivering the goods,Just there is logical moment i.e MIGO,So i dont think we do routes for TAS
    Thanks & Regards
    Narayana

  • PO document type for third party PO...?

    Hello friends,
    My client's requirement is that third party PO should have different document type, say ZTRD?
    I tried to configure the same with PR and PO doc types.  I created new PO type ZTRD. I maintained the combination of PR doc type NB with item cat S to PO doc type ZTRD with item cat S. I also deleted the standard config i.e. combination PR doc type NB with item cat S to PO doc type NB with item cat S.
    I created third party SO which created third party PR (doc type NB). But when I tried to convert this PR into PO, still with above config, I am getting error - Doc. type/item cat. NB/S (requisition) <-> NB/S (purch. order) error.
    Please help me to configure the Z doc type for third party PO. 
    Thanks in Advance,
    Pat.

    Hi
    Please try the following, do not delete the standard settings
    1) Create Z document type for PR and assign this document type to relevant Schedule line Category  ( CS for example) in SD
    2) Create Z document type for PO and keep only Item category S & Z document type for the Item category S created for PR.
    Hope it helps.
    Thanks/Karthik

  • PO Creation for third party sales

    Hi
    We have the scenario Third party sales and High sea sales which is already in use (already configured) , where PR getting generated automatically .
    But client requirement is they want the PO to generate automatically by the system the moment i save the sales order .
    Where is the setting in the SAP , where system will generate the PO automatically instead of PR
    Please suggest

    Hi,
    Go to VOV7
    Select third party item category which u r using in sales order >>> Deatils >>> under transaction flow >>> Tickmark to CREATE  PO AUTOMATIC.
    If you activate this field, the system automatically generates both a purchase order requisition for third-party schedule lines as well as a purchase order in the background when you save the sales order.
    However u can not create PO directly.
    Kapil

  • Process demand for third party direct shipment

    Hello ,
    I need help in below given areas. in our rollout client is given statement of work like this.
    1)     Demand transfer to vendors
    2)     Reminder processing
    3)     Process demand for third party direct shipment
    Please can you explain me about these area, how it works with example. it is very benificial for us.
    Regards
    sapman

    Hi Sapera,
    There can be 3 typse of trading scenarios
    1. 3rd party with Shipping notification : Where in u create sales order  and create PO against the PR which si triggered in SAles order adn hen MIGO followed by MIRO and Billing. Here Billing to the end customer can be doen before MIRO because the billign quantity considered is based on the goods Receipt( MIGO) quantity. Many a times you might have your personnels or soem mechanisms to cross verify the delivered quanity as some times the vendor might not dispatch the quantiy in the PO. Here the MIGO doen si consumption posting/Non valuated GR as physically it doenot come into your stock and therefore is not shown in our stock. ITem category used in TAS
    2. 3rd party without shiiping notfication ; Here MIGO is not done and billig ncan be done only after MIRO as the billing quantity is based on the Invocie receipt quantity in MIRO
    3. Bought in items/ Dealer Sales : Here you bring in the materials from the vendor to our depot plant and then dispatch it to the customer . Here PR is geenrated from sales order followed by PO and MIGO. After MIGO you have to do PGI followed by Billing. MIRO doesnot have any impact on the PGI or Billing. Item category used is TAB
    But in all the three instancesthe configurational changes happen in schedule line cateogry and the account assignment which is maintiend in item category and for automatic determination of 2 different schedule line categories we need to maintian 2 different item categories alothough item category settings are almost the same.
    Hope this was helpful in giving you some insights on the trading processes
    Regards,
    Nithin

  • Process Required for Third party sales

    Hi Guru ji's ,
    Pls let me know the step by step procedure for Third party sales processing.
    on the below conditions.
    1] Sales order to be created automatically based on the Bapi .
    2] Based on the Sales order, automatic Purchase order and Gr must happen.
    3] Automatic invoices must also be created automatically.
    Can any one explain us what is to be done under the above said conditions,
    Best Regards,
    Gurpreet Singh Saini.

    Hi
    Please find enclosed the details on third party.
    Process Flow for 3rd Party Sales
    Customize the third party sales in summary:
    1. Create Vendor XK01
    2. Create Material u2013 Material Type as "Trading Goods". Item category group as "BANS".
    3. Assign Item Category TAS to Order type that you are going to use.
    4. A sale order is created and when saved a PR is generated at the background 
    5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
    6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO 
    7. Goods receipt MIGO 
    8. Goods issue
    9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the config and,   therefore, there is no delivery process attached in the whole process of Third party sales.
    10. Billing      *-- Seema Dhar
    SD -  3rd party sales order Create Sales Order
    VA01
          Order Type
          Sales org, distr chnl, div
          Enter
          Sold to
          PO #
          Material
          Quantity
          Enter
          Save
    SD -  3rd party sales order View the PR that is created with a third party sales order
    VA01
          Order Number
          Goto Item Overview
          Item ->Schedule Item
    SD -  3rd party sales order View the PR that is created
    ME52N
          Key in the PR number
          Save
    SD -  3rd party sales order Assign the PR to the vendor and create PO
    ME57
          Key in the PR number
          Toggle the "Assigned Purchase Requisition"
          Execute
          Check the box next to the material
          Assign Automatically button
          Click on "Assignments" button
          Click on "Process assignment"
          The "Process Assignment Create PO" box , enter
          Drag the PR and drop in the shopping basket
          Save
    SD -  3rd party sales order Receive Goods
    MIGO_GR
          PO Number
          DN Number
          Batch tab , click on classification
          Serial Numbers tab
          Date of Production
          Flag Item OK
          Check, just in case
          Post
          Save
    SD -  3rd party sales order Create Invoice
    MIRO
          Invoice Date
          Look for the PO , state the vendor and the Material
          Check the box
          Clilck on "Copy"
          Purchase Order Number (bottom half of the screen)
          Amount
          State the baseline date
          Simulate & Post
          Invoice Number
          *Invoice blocked due to date variance
    SD -  3rd party sales order Create a delivery order
    VL01N
          In the order screen , go to the menu Sales Document , select "Deliver"
          Go to "picking" tab
          State the qty and save
    SD -  3rd party sales order Create a billing document
    VF01
          Ensure that the delivery document is correct in the
          Enter
          Go to edit -> Log
          Save
    Third party Return Process
    If the vendor grants you a credit memo on a quantity or a value basis, you can then send this credit memo directly to your customer.
    The billing type Third-party credit memo (G2S) is available for this. The billing type Third-party credit memo works with the item category TASG (third-party credit memo item). The Billing-relevance indicator F is set in Customizing for Sales for this item category. This means that the cost is not created. In Customizing for Sales, the item category TASG is set at item level in copying control for the billing type G2S (copying control sales document by billing document) as the target item category (source: TAS-> Target:> TASG.)
    Process Flow
    Create a billing documente with billing type Third-party credit memo (for further information, see the section Creating a billing document in the Billing document). Enter the third-party order as a document still to be processed. The quantities are automatically removed from the invoice.
    The above is the process for giving a credit memo which can be adapted for return goods.
    Hope it will help you

  • What are the key questions for third party order process?

    hi all,
    what type of questions can i receive for third party order process?
    pls.. do the needful
    thanks to all.

    Hi arun,
    Process Flow for 3rd Party Sales
    Customize the third party sales in summary:
    1. Create Vendor XK01
    2. Create Material – Material Type as "Trading Goods". Item category group as "BANS".
    3. Assign Item Category TAS to Order type that you are going to use.
    4. A sale order is created and when saved a PR is generated at the background 
    5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
    6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO 
    7. Goods receipt MIGO 
    8. Goods issue
    9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the config and,   therefore, there is no delivery process attached in the whole process of Third party sales.
    10. Billing     
    SD -  3rd party sales order Create Sales Order
    VA01
          Order Type
          Sales org, distr chnl, div
          Enter
          Sold to
          PO #
          Material
          Quantity
          Enter
          Save
    SD -  3rd party sales order View the PR that is created with a third party sales order
    VA01
          Order Number
          Goto Item Overview
          Item ->Schedule Item
    SD -  3rd party sales order View the PR that is created
    ME52N
          Key in the PR number
          Save
    SD -  3rd party sales order Assign the PR to the vendor and create PO
    ME57
          Key in the PR number
          Toggle the "Assigned Purchase Requisition"
          Execute
          Check the box next to the material
          Assign Automatically button
          Click on "Assignments" button
          Click on "Process assignment"
          The "Process Assignment Create PO" box , enter
          Drag the PR and drop in the shopping basket
          Save
    SD -  3rd party sales order Receive Goods
    MIGO_GR
          PO Number
          DN Number
          Batch tab , click on classification
          Serial Numbers tab
          Date of Production
          Flag Item OK
          Check, just in case
          Post
          Save
    SD -  3rd party sales order Create Invoice
    MIRO
          Invoice Date
          Look for the PO , state the vendor and the Material
          Check the box
          Clilck on "Copy"
          Purchase Order Number (bottom half of the screen)
          Amount
          State the baseline date
          Simulate & Post
          Invoice Number
          *Invoice blocked due to date variance
    SD -  3rd party sales order Create a delivery order
    VL01N
          In the order screen , go to the menu Sales Document , select "Deliver"
          Go to "picking" tab
          State the qty and save
    SD -  3rd party sales order Create a billing document
    VF01
          Ensure that the delivery document is correct in the
          Enter
          Go to edit -> Log
          Save
    Pl. be clear on this process.
    Also understand how migo and miro are handled.
    The item categories used.
    How the company knows of the shipment of goods to the customer.
    How returns are handled.
    Hope it helps. Please reward if useful.
    Thanks & Regards
    Sadhu Kishore

  • Delivery status for third-party-sales

    Hello,
    because of a customizing error our US colleagues created several sales orders with a open delivery status even no delivery is requested for third-party sales orders.
    Does someone know a solution how to complete these documents without creating the delivery note? We now changed the schedule line category to solve the problem for the future but we have to find also a solution for the existing documents. Our colleagues want to change the table for VA05 to deselect the item category third-party. But in my opinion we have to complete the documents it selves.
    Thanks for your help.
    Regards,
    Kirsten

    put a Reason for rejection in sales order and save the document. you no longer can use these documents.
    hope this help.
    reward if helpful.
    regards,
    seshu.

  • Distribution channel for third party sales

    Hello Gurus,
    May I know what is the distribution channel or type of it I should or could use for third party sales order creation?
    I have configured the ITC etc but not sure the distribution channel to use from the standard SAP provided ones.
    Or I can use any without affecting the process?
    regards
    Bass

    You can use any without affecting the process.
    3rd party process is controlled by - item cat. group, item category, schedule line cat., etc.
    At some places, separate order type or dist ch are used only for Reporting purpose.
    Thanks

  • Configuration for Third Party Sales Order

    Hi All,
    I would need some advise on how should I go about to configure a third party sales order. The MM consultant has configured a special item category for it but the sales order has some incompletion data error where the schedule line could not be maintained.
    Kindly advise.
    Thanks

    Hi Lee,
    Pls go through the following links below:
    [Third party sales order|http://www.sap-basis-abap.com/sd/third-party-order-processing.htm]
    [configuration for Third party sales order|http://www.saptechies.com/process-flow-for-3rd-party-sales/]
    Hope these helps you.
    Regards,
    Krishna.

  • Settings for third party order

    Hi,
           what are the settings needed for setting up third party order particularly at the schedule line level. Thanks in advance.
    Regards
    sri krishna

    Dear sri krishna,
    1) the first thing would be to have the item category group at the material level as BANS which is for a third party material.
    2) Assign the item categories so that we have TAS as the item category or for a normal item have TAS as the manual item category and change it at the order level.
    3) At the schdule line level, select the required order type for purchase order which is generally NB.
    4) Select item category which says third party
    5) Select the relevant account assignment category for third party out of the selection.
    6) In the item category if you want an automatic purchase order then switch the automatic PO indicator.
    Hope the explanation helps you.
    Thanks & Regards
    Sadhu Kishore

  • Error "No schedule line due for delivery upto the selected date"

    Hi Experts,
    I am getting an error while creating outbound delivery for sales order.All items have same item cat and schedule line category,same customer.
    The sales order have three items with delivery date of 18.09.2008.the material stock is available for all three material and there is no planned issue for these material.
    In sales order schedule lines for all three items is confirmed on 18.09.2008. When I create a delivery on 04.09.2008(before the chedule line),it allows to create delivery for the two items but when I create delivery for material 3 on 04.09.2008(before the chedule line),it is giving error "No schedule line due for delivery upto the selected date" .on going to help it gives information that check whether the order item to be delivered contains confirmed schedule line.I checked the confirmed schedule line is on 18.09.2008 (though we have availbe stock on 04.09.2008).
    Kindly guide me how to resolve the issue,here I want to create delivery prior to the delivery/Schedule line date in Sles order.for 2 items it works but for third it is giving error.
    Is it something to do with Material group 5 in material master sales view for the 1 and 2nd mtrl it is 14 days for for the third it is 7 days?
    Sarvesh
    Edited by: Sarvesh Vashist on Sep 5, 2008 5:31 AM

    Hi Experts,
    I am getting an error while creating outbound delivery for sales order.All items have same item cat and schedule line category,same customer.
    The sales order have three items with delivery date of 18.09.2008.the material stock is available for all three material and there is no planned issue for these material.
    In sales order schedule lines for all three items is confirmed on 18.09.2008. When I create a delivery on 04.09.2008(before the chedule line),it allows to create delivery for the two items but when I create delivery for material 3 on 04.09.2008(before the chedule line),it is giving error "No schedule line due for delivery upto the selected date" .on going to help it gives information that check whether the order item to be delivered contains confirmed schedule line.I checked the confirmed schedule line is on 18.09.2008 (though we have availbe stock on 04.09.2008).It allows to create a OBD either I change the delivery date in sales order to 04.09.2008 or create a delivery with delivery date 18.09.208.
    Kindly guide me how to resolve the issue,here I want to create delivery prior to the delivery/Schedule line date in Sles order.for 2 items it works but for third it is giving error.
    Is it something to do with Material group 5 in material master sales view for the 1 and 2nd mtrl it is 14 days for for the third it is 7 days?
    Sarvesh
    Edited by: Sarvesh Vashist on Sep 5, 2008 5:31 AM

  • Cannot close sales order for third party sales

    Hello Gurus,
    I cant seem to close a third party sales order even after it has been delivered and the incoming reciept match the sales order as well as purchase requisition or purchase order. at first I thought it was the difference in the unit of measure b/w the delivered products and the ordered products, but that is not the case because even when they are still the same and the quantities match I still have an issue and when I run VA05 (list of sales order) the sales order for the third party sales still shows up. An example is sales order XXX / PO XYZ/ Inv XYY u2013 ordered 45,000, shipped 39,980), we resolve it with the following steps below
    1. change the PO quantity to match the invoice quantity
    2. the requisition then re-opened itself automatically.
    3. I then changed the requisition and marked it closed.
    4. I then could go to the sales order and change the order quantity to match the billed and invoiced quantity. The rejection code 52 did not work u2013 I received a hard error:  PO XYZ must be deleted before the line item could be rejected.
    This is a whole lot of steps to perform just to correct 1 backorder. The reason that it had to be corrected is that the sales order  mfg line stays on the Billing Due list and does not clear it self out unless you perform the steps above.
    Also like I said even when all the quantities are the same I still have this issue so is ther any thing I can do to resolve this issue in configuration or otherwise and also we are using the satndard item category "TAS" for third party sales.
    I will appreciate you contribution and help to resolve this matter
    Thanks

    Unfortunately, all the steps need to be performed to close the status. I think even giving tolerances will not close the status. If it is a regular sale order, a small BDC program may be written to change the sale order quantity to match the invoice quantity. Since its a third party and there are too many documents which are involved in the process using ABAP programs is not a convenient option.
    Regards,
    GSL.

  • Generate CSR for Third-Party Certificates

    Hi All,
    i have an issue when i tried to Generate CSR for Third-Party Certificates,
    i follow step by step in the document of cisco until this step:
    3.
    Now that your CSR is ready, copy and paste the CSR information into any CA enrollment tool.
    In order to copy and paste the information into the enrollment form, open the file in a text editor that
    does not add extra characters. Cisco recommends that you use Microsoft Notepad or UNIX vi. Refer
    to the website of the third−party CA for more information on how to submit the CSR through the
    enrollment tool.
    After you submit the CSR to the third−party CA, the third−party CA digitally signs the certificate and
    sends back the signed certificate via e−mail.
    4.
    Copy the signed certificate information that you receive back from the CA into a file.
    This example names the file CA.pem.
    my issue is where i sould copy and paste the CSR information into any CA enrollment tool. i just have done create mykey.pem and myreq.pem in my folder OpenSSL\bin
    Please help and Thanks you.
    Regards,
    Jasa

    you have to do more steps using openssl.
    before you obtain the third−part certificate, you have to copy that on a notepad text, and you have to obtain an intermediate and root certificate from the company that gives you the certificate.
    Then you have to copy and paste on a notepad or gedit:
    SSL (the certificate that they give you)
    Intermediate (the certificate that you obtain from the company that gives you the certificate)
    Root (the certificate that you obtain from the company that gives you the certificate)
    name the text file like: allcerts.pem
    then... you have to run this commands:
    C:\OpenSSL\bin>openssl pkcs12 -export -in allcerts.pem -inkey mykey.pem -out All-certs.p12 -clcerts -passin pass:yourpassword -passout pass:yourpassowrd
    C:\OpenSSL\bin>openssl pkcs12 -in All-certs.p12 -out finalcert.pem -passin pass:yourpassword -passout pass:yourpassword
    Then you are going to have a file named: finalcert.pem, thats the one you have to update to the WLC. please note that on those lines "yourpassword" is the password you use when you create the certificate and its going to be the same that you have to use for upload to WLC.
    Note that you have to use openssl version 0.9.8 because its the only version thats WLC support
    If you have doubts please contact me.
    Have fun!

Maybe you are looking for

  • What is a container variable in BPM (Exchange Infrastructure)?

    In BPM scenario with Exchange Infrastructure, I have come across container variable. What is this container variable? How it is used in BPM? In another instance I read that to trigger a alert in BPM I have to create a container variable. So I have an

  • Complet delivery reqd by law

    Hello Gurus,     what does "complet delivery reqd by law" for customer master mean? why does it not exist in customer material infor master? thanks very much!

  • Firefox links / icons are a little bit messed up?

    Hi All, This is what my screen looks like: >>moderator edit: Removed large image. Please read Forum Etiquette: Pasting Pictures and Code. Thanks. --fsckd<< Even though I clicked the Firefox Beta in the middle of the screen (I'm using firefox-beta-bin

  • Sending idocs for custom field

    Hi I need to send idocs when i save the data in field , the idocs should be  send automatically when the data saved to field, please provide the solution. Thanks Moderator message: "spec dumping", please work yourself first on your requirement. Edite

  • Tables to layers

    I have a very old site that was built using layers converted to a table. In the CC version under modify, the layout mode does not display. The Adobe help section says this is where convert tables to layers exists. Can anyone tell me how to access thi