Sd/FI integration Please experts

Hi Friends
question related to SD- FI integration.
From SD what is 1) integration with Accouting 2)Revenue recognation
From sales SD two are different things, but from FI point of view lot more.
Very hard to understand from SD , Please any one from FI can guide us ?
Any documentation or functional explonation will help us.
Please help experts.
Thanks
Kris

Kris,
In SD there is a awesome area of configuration called the pricing procedures.   The pricing procedure determines the final price quoted to the customer for a particular product.  This could be a complicated calculation taking into account the base price, any special prices or discounts that may apply to that scenario, taxes, freight charges etc.  These prices or charges are called 'condition types'.  This condition technique is used in a number of areas of SAP.
For now all we need to know is that each condition type is assigned to an account key (or in the case of rebates two account keys).  You can assign multiple condition types to the same account key. There are a number of account keys that are pre-defined in the system. For example:
ERF freight revenues
ERL revenues
ERS sales deductions
EVV cash settlement
MWS sales tax
Now we start getting to the integration by mapping the account keys to GL accounts.  But it is not as simple as that. It can be as flexible (ie: as complex) as you want. Start off with the most simple approach.  Generally if one is using a good sales / revenue reporting tool (eg: CO-PA) then one does not need a lot of flexibility and variety in the GL accounts that are posted to.  The level of detail that you need in GL should be determined by your financial statement reporting requirements - you may end up with only one Revenue account - it is a good bet!
Hope this helps you. Let me know if you need aything else.
Rgds
Manish

Similar Messages

  • Somebody please EXPERT look at this with me and try to explain the problem.

    here is my site.    www.subzerorefrigeration.com I have a template set up for the entire site that is at www.subzerorefrigeration.com/cityweather.html 
    I added two images to the bottom of the template page that say schedule service and one says schedule estimate, they slightly changed color with a mouse over.  I used the mouse over command right from simply was mouse over and change to image 2 that was working fine and all.  Then I ran the W3C validation and it came up with a bunch of errors for the script adobe put on the page. 
    Here is what I was doing.
    I was looking at the schedule and estimate buttons on the bottom of a page.  I do not remember what page I was on, more than likely had several open at the time.
    For some reason I did a validate WC3 page and came up with a bunch of warning errors for the mouse over script in the head of the page for the schedule and estimate button .png photo switch.
    THEN I think I tried to run a browser check or another check on another page and it gave me warnings for the bottom table that said footerblue has already been identified. So when I looked at the code it said Id footerblue class footerblue something like that so I took out the class footerblue and is all that did was made my table squares white again.  Then I said well why don’t I try to remove the code in the head for the schedule and estimate buttons so I removed this script from the code, I would have to sadly say I was working on my template page as I think about it now, 
    Why in the heck am I getting ERRORS from something that ADOBE has easily put into their program. This is not something that I did maybe I do not know where?  I just put a simple mouse over on the photos.
    After that I lost my spry menu bar.  So next I took my index page and opened it and said ok lets just save this as citydata template.  I did that it asked me to save, my spry menu bar came back on all pages but only the index have the working drop downs.  The other pages have background colors I do not ever remember the spry menu having but next I did also try to copy a old spy script to the spry folder.  Then I almost probably nearly had a heart attack and had to lay down after I saw all the pages that were messed up.
    I remember saying to myself why did these pages no update all of a sudden and I wrote them down
    updated illinoisenergyefficiencyloanprogram.html
    updated wellsfargofinancing.html
    updated aboutus.html
    updated scheduleafreeestimate.html
    updated alsip.html
    updated americanstandardcustomersatisfactionsurveys.html
    and more than likely index.html and cityweather.dwt
    These are the pages I am pretty sure I had open in Dreamweaver when this was all happening.
    Do not remember if I changed the name of the menu bar?  Maybe..
    Now I have a spry menu bar that WORKS on the index.html page and all the other menu bars do not work.  Well the ones I have looked at.  HOW can that be looking at a different folder for my spry on the same site?  Also worth noting is I set up a testing server for some php on the contactus.html page the other day that seems to be working now but did not seem to work the other day. 
    I am mainily wonderin how can I have to different / one functional and one semi functional spry menu bars on the same site?  It all goes back to the same folder from what I can see.
    Please take the time to helpme here.  I already redid this one time because the templates did this to me....    I was doing great until I ran the validator again and discovered errors.  I WAS ERROR Free before the two images. except the pages that have the weather widget on them.

    tedwagner64 wrote:
    I am wonderining why 150 people looked at this post and NOT ONE REPLY am I stupid or something???
    Not really.  It probably helps to ask questions in a less complex way.  I think that on a forum, people who help want to be able to quickly see what it is they can help with and are more likely to spend their time on those questions.  I don't know that for sure but it is my experience.  Sometimes if I try to help someone, I do it when I have a spare 10 minutes so, I will definately focus on the one or two line posts.
    For instance, if you asked, "Why does my HTML not Validate on this page?"  I could tell you that it is because you can only use one instance of  id="" on a single page.  The validator says you have used id="background_blue" more than once.  You can use class="background_blue" as many times as you like.
    Martin

  • I am SD back ground but FI question - Please experts

    Hi
    What is the difference between Account receivables module and G/L account module in FI. -?
    both has different documentation help.sap.com
    As a SD consultant how to understand which one has clinet  implimented -?
    Please any one of FI comunity guys has come accross to this in real time scenario -?
    Thanks
    Madhu

    GL stands for General Ledger.  You prepare a trial balance with the debit and credit balances of all the GL accounts and subsequently you prepare income statement and balance sheet.  Accounts Receivable is a subsidiary ledger.  In simple terms, you transact with a number of customers and those customers are due amounts to you for the goods you sold to them.  These dues are current assets for you, and it is practically impossible to list out balance due from each customer in your balance sheet.  So we assign these customers to a reconciliation account, club all the customer balances into this account (you don't need to do it manually - SAP posts automatically to this reconciliation account as you making postings on customers) and just show this recon a/c. balance in the balance sheet.
    I would say AR sub-module is implemented if your client has customer master and each of those customers are linked to AR (reconciliation) a/c and basic configuration is done for posting on customers.  In the GL sub-module, you define GL accounts for material, mfg. and non-mfg. expenses, interest, taxes, etc. and make other configuration required to enable postings on these accounts.

  • BPM 11g integration with UCM11g using Java Enbedded acitivity

    Hi Friends,
    Can anyone throw some idea how to integration with BPM11g and UCM11g
    We need to have a java code using Java Enbedded acitivity.
    1) How to Connect to UCM 11g using java code any sample Java Embedded Code( we are connecting through RIDC)
    2) How to Fetch the document from UCM using RIDC.
    3) How to Close the Connection.
    Hi friends,
    My requirement was Using BPEL JAva Embedded Acitivity need to connect UCM by RIDC. Got SCAC exception. I could solve this today 3/12/2012... refer below link
    Re: SCAC-50012 Got this exception when using BPEL Java Embedded Activity
    But I have the actual thing.. as per my post..
    Now I need to fetch the doc i.e.,
    In UCM we have pdf documents i need to Download that document and show it in ADF UI using Java Embedded Activity.
    Ie., Using Java Code I need to Download and Decode the PDF file using Java Embedded Activity after Connection with UCM. Save as a file in Local Machine then I need to Encode ads PDF and Show it to ADF UI.
    Please experts its Quite Urgent!!
    ThankQ!!
    Regards,
    Pavan
    Edited by: BPM Fresher on Dec 3, 2012 8:12 PM

    Hi experts...
    Any solution for this.. Can any one help me on this...
    Regards,
    Pavan

  • G/l account reconcialation account question - Please cleaer me FI -xperts

    Hi friends.
    Please read carefully and give me proper answers
    Ex:
    1)  we have 1000 customers. do we need to create 1000 reconcialation accounts -?
    2)the reason I am asking from customer Invoice I am posting prices and deduction to two different G/L accounts for all the customers.
    where do they metioned those two G/L accounts are reconcialation accounts for each customer.
    If my question is wrong Please experts correct me and guide me .
    Thanks
    Krish

    Hi
    As per the standard SAP, one reconciliation account will suffice for 1000 customers.
    But maintaining number of Reconciliation accounts depends on your Business. ie out of these 1000 customers you may have Domestic , International and Inter Company Customers. Basing on the reporting you may need to maintain 3 reconciliation accounts one for Domestic , International and Inter company each.
    FYI you will not use reconciliation accounts for deductions.
    If the transaction is originating from SD you need to maintain Revenue account ( sales a/c) & deduction accounts maintained in VKOA (SD-FI Integration) and Debtors (account Bal sheet) will be updated which is maintained in the customer master.
    when you are posting a customer invoice from FI the Debtors account (Recon account) will be updated which is maintained in the customer master and the Revenue account you enter in the transaction for the price.
    For the deductions(ie discounts) you need to maintain seperate G/L account in the transaction OBXI.
    Let me know if you need any further help.
    Regards,
    Venkat.

  • LabVIEW Expert in Israel

    I am CLD's with 15 years of ATE & Integration solutions expert. Experience and knowledge of hardware-software integration.

    Please contact me on skype - nitzant55

  • SM58 status text " No service for system SAPERP, client 800 in integr "

    In Idoc to file scenario:
    i have fallowed this blog to configure ALE settings
    /people/swaroopa.vishwanath/blog/2007/01/22/ale-configuration-for-pushing-idocs-from-sap-to-xi
    I have generated one idoc successfuly from sap r/3 system.
    but i didn't find any idoc in xi server.
    control records are
    receiver:A000000036,(RFC DESTINATION->LS_XI_100( Remote login sucessful for xi system))
          LS_XI_100
          LS
    Sender: SAPERP
         LS_SAP_800
         LS
    ID: Adapter specific identifiers are( LS->LS_SAP800, R/3->ERP,CLIENT,800)
    so i have gone to tcode sm58 in sap r/3
       where i found the status text "No service for system SAPERP, client 800 in integr)
    Please help me from this problem.
    Regards,
    Deviprasad.

    Hi Deviparasad,
    please create a techincal system and busniess system of type ABAP in XI SLD if you have already created the techincal system and busniess system  then check whether client 800 is used or not if include client 800.
    please reward points
    Regards
    Sreeram.G.Reddy

  • Help Needed on Integration

    Hello,
      In my scenario, i want to transfer data from R/3 to JDE.
    I have a JDE adapter installed.
      I want information about JDE application call from XI, how to pass parameters to JDE application.
      If anyone knows this or worked on JDE integration please do the needful.
    Useful answers will be appreciated.
    Thanks,
    Pramod.

    Hi Pramod,
    Please go through these threads and see if it helps....
    From where i get JDE adapter
    Re: Postion trial balance to JDE through XI.
    Re: R/3 JDE Connectivity using XI
    Re: Basic things needed to connect JDE One World XE B7333 SP17  to XI?
    They are all there in forum itself... Just give a search and probably you will find more information...
    Regards,
    Abhy

  • SRM  and XI Integration

    hi,
    can anyone provide me some good links,docs and blogs about SRM XI integration please.
    and what would be the scenarios with SRM integrations?I mean are they like
    SAP SRM -XI-R/3(or ECC)
    SAP SRM -
    XI----non SAP systems(i have read onb sdn SUS,EBS systems)
    non SAP---XI---SAP SRM
    SAP r/3(or)ECC--XI--SAP SRM?
    what we need to use on SRM side (sender/Receiver)are they Idocs/RFC/proxies?and what we need to use on SAP R/3 side and thirdparty systems?
    please clear me?
    thank you,
    babu

    Hi Babu
    SAP deliver a lot of XI contents for SRM.
    For this have a look at service.sap.com/xi --> Business content --> SAP XI Content --> XI content delivered by SAP --> mySAP SRM
    Also refer this realtive thread from jin shin
    Re: Http server code 401 reason Unauthorized explanation Unauthorized
    There are business package available for the standard SRM and XI integration. For this you can download from the service market place and you can make use of the standard SAP delivered objects.
    Most of the time senario involves Idoc/RFC and Proxy here
    Some of the docs from SAP service market place are-
    go to https://websmp101.sap-ag.de/ibc -
    >mySAP SRM-->and search
    http://service.sap.com/~sapidb/011000358700002897342004E/CCMConfig10_01_05.pdf
    http://service.sap.com/~sapidb/011000358700003992672005E/Config_Guide_CCM200_640doc.pdf
    http://service.sap.com/~sapidb/011000358700002897402004E/ServiceProcurementNEW.pdf
    http://service.sap.com/~sapidb/011000358700002897382004E/Plan-DrivenwithSInew.pdf
    Cheers..
    Vasu
    Reward Points if found useful **

  • Enterprise Portal integration with E-Sourcing Portal

    Hi,
    Has anyone done Enterprise Portal integration with E-Sourcing Portal.How can we use the E-Sourcing portal url in Enterprise Portal?
    Thanks,
    Rajani

    Hello Rajani,
    For Connecting  web based Application we have to use AppIntergator Application.
    Please go thorugh the blog and implement the same thing its many connect to your java portal.
    blog is Integrating your Web Front-ends into the SAP Enterprise Portal using the Application Integrator
    Please go through the below blog where its define how to pass user and password it the url iview.
    SP12/SP20: Setting URL Dynamically in URL iView
    Thanks
    Chittya Bej
    Edited by: Chittya Bej on Apr 5, 2010 11:31 AM
    Edited by: Chittya Bej on Apr 5, 2010 11:33 AM

  • How to map this scenerio..... please help

    Hi Experts,
    Please tell me how to map this scenerio.
    We want to produce 1000pc of plastic bottles. After production in this 1000 pc, assume that 100 pc of plastic bottles are having scraches on there surfaces but these bottles are not considered as scrap and we want to call this as B Grade materials. Similarly another 100 pc are also found same type of problem and we want to call this as C Grade materials. And remaining 800 pc , We want to call this as A Grade materials.
    But all 1000 pc we want to sell, only the thing is with different price for A,B and C grade materials
    Material is same i.e., Plastic Bottle (FERT) but depending on grades My client want to differentiate it.
    Please Experts Clear me and help me how to map this in pp.
    Thanks and Regards,
    sap pp

    Hi
    You Maintain Split Valuation No need to maintain Diffrent Material code , U maintain Diffrent Valuation Type With Diffrence price , and Maintain Diffrent Batches with batch number as Grade, assign the valuation type to batch , at the time of confirmation based on the grade you selct the batch number and confirm , it will be saved with diffrent grade with diffrent valuation.
         What is Split Valuation?
    Split Valuation means managing a material as several partial stocks. Each partial stock is  valuated separately.
         Why do you require Split Valuation?
    Split Valuation is required for certain materials in order to valuate them separately.
    Following can be the reasons for opting for split valuation:-
         1) Different origin of the material
         2) Different grades of the material
         3) Different statutes of the material
         4) Differentiation between in -house production and external procurement
         5) Differentiation between deliveries
    IMG -> Materials Managementà Valuation and Account Assignment-> Split Valuation-> Activate Split Valuation
    IMG à Materials Managementà Valuation and Account Assignmentà Split
    Valuationà Activate Split Valuation à Configure Split Valuation
    IMG à Materials Managementà Valuation and Account Assignmentà Split
    Valuationà Activate Split Valuation à Configure Split Valuation
    2.2 Create Valuation type
    IMG à Materials Managementà Valuation and Account Assignmentà Split Valuationà Activate Split Valuation à Configure Split Valuation
    2.Allocate Valuation type to Valuation categories
         IMG ->Materials Management-> Valuation and Account Assignment-> Split      Valuation-> Activate Split Valuation -> Configure Split Valuation
    2.4 Allocate Valuation categories to Valuation areas
    IMG à Materials Managementà Valuation and Account Assignmentà Split  Valuationà Activate Split Valuation à Configure Split Valuation
    2.5 Default Valuation type per plant
    IMG à Materials Managementà Valuation and Account Assignmentà Split Valuationà Activate Split Valuation à Configure Split Valuation
    Create Manul batch number tcode- MSC1N Eg : A - Grade , B - Grade like that ,assign the Valution type to batch IN MSC1N Or MSC2N,
    I hope this will workout.
    Madhu

  • Create URL to specific Business Object for a CRM using Portal integration

    Hello CRM Community,
    we're using the CRM Portal integration. To update our business users with tasks we use the standard functionality to send Alerts using the function module SALRT_CREATE_API. It allows to specify a URL that is added to the E-Mail created in the alert using the Table parameter IT_ACTIVITIES. This URL should be filled with a direct link to the business object that must be changed. For the stand-alone CRM there is the static Method CREATE_URL of the class CL_CRM_WEB_UTILITY to build such an URL. But I was not able to find a similar class/method/function module when the CRM is used integrated in the portal. Has anyone a simmilar requirement and was able to solve it?
    Best regards
    Gregor

    Hell0
      Gregor Wolf 
    Yes   i have also same doubt regarding   class this integration , Please share this stuff  with me !!   Nice Question !!
    Thanks  & regards
    Asish

  • Please answer me quickly .........

    Will Siri support iPad 2 in iOS 6
    Please experts answer me , but a sure answer please.

    No.  Read for yourself what Apple says at the very bottom of
    http://www.apple.com/ios/ios6/siri/

  • SAP QM PP Integration

    hi ,
    Actually i am an MM Guy and i am newly assigned for QM field and i already maintained SAP QM and MM integration , please suggest what the thing i mantained, edit and add so that i done the QM with PP module integration too
    Your suggestion is very appriciable
    Thanks
    Maashish

    hi
    I cannot talk much about QM PP interlinking but MM QM yes I can throw some points
    In material master you have to in purchasing tab check post to inspection stock, QM tab is activated. In QM again check the quantity is to be posted to inspection stock. Moreover fgive the entery for QM key as 007. You have to maintian the inspection criteria eg 001, 0101, 0102 and check the preffered type.
    As you do the GR inspection lot is created. You have to give usage decision in QS11 as accepted stock, and if not accepted record the defects with reason. The keys of selection have to be created in customising.
    You can also do 221 or 551 as the case may be for the rejected material through QM.  I hope the solution may provide some light on QM MM intergration.

  • SAP QM SD integration

    hi ,
    Actually i am an MM Guy and i am newly assigned for QM field and i already maintained SAP QM and MM integration , please suggest what the thing i mantained, edit and add so that i done the QM with SD module integration too
    Your suggestion is very appriciable
    Thanks
    Maashish

    Hi Maashish
    If you are doing QM then you need to maintain the Quality management view also in the MMR . Now First of all in SD QM point of view when we do Post Goods Issue (PGI) system will block PGI  for checking  for the QM  purpose .Now QM consultant has to release that block then Post Goods Issue (PGI) can be done 
    In the same way SD-QM integration takes place , when the Goods are being returned  to the company's storage location  by the customer then at the time of Post Goods Receipt (PGR) system will block for QM purpose and once it is checked , it has to be released by the QM consultant and then only the Post Goods Receipt (PGR) can be done and the stock can be taken back to the company's storage location
    Regards
    Srinath

Maybe you are looking for

  • HP Photosmart D110a wireless printer keeps going offfline, unable to print

    No changes were made to the system.  The printer was working a couple a days ago and now it is not printing at all.  The wireless network test report is ok.  The network diagnostic utility is ok.

  • Three Finger Swipe to change Spaces

    Hi, I was wondering if there's any way to set up my macbook air to change spaces using a three finger swipe in the finder. I know I can use a three finger swipe to go forward and backward in safari as well as do some other things and I want to be abl

  • Oracle 10.1 + query optimization

    Hi all, I would have to optimize this query : SELECT CO_ID , CH_SEQNO , CH_STATUS , CH_REASON , CH_VALIDFROM , ENTDATE , USERLASTMOD , REC_VERSION , REQUEST FROM CONTRACT_HISTORY x WHERE x.CH_SEQNO = ( SELECT max( z.CH_SEQNO ) FROM CONTRACT_HISTORY z

  • OEM - showing blank page

    Hello all. First a introduction.. Right now I have about 1 week of oracle database experience. Farting around with 11g on my CentOS virtual machine. Learning lots. its fun. I recently inherited someone elses mess or a 10g box on Solaris 10. Its a pro

  • String to column

    Hi experts, The data is as follows sno 1,2,3,4,5,6,7,8,9,10 I want to display it as SNO 1 2 3 4 5 6 7 8 9 10 Please provide me the SQL query. Thanks in advance.