Single Channel between two 10 Gb data Muxponders band C

I would like to install a direct trunk link between the trunk ports of two muxponders on a 15454. Does it need any special configuration using CTC or it's automatic? The client ports will be GE abd FC. Should i use GCC Termination ?
Thanks in advance

U have got the answer that u can carry GE/FC over your muxponder card.
My 2 cents regarding access management. From one of your message that u r directly connecting these cards.
So ur r using SONET (SDCC/RSDCC) as ur using this as SONET card not DWDM. These SDCC/RSDCC are accessed through ur ethernet port to manage both equipment.
If u take this muxponder over Normal DWDM box then OSC is used. This is out band management channel (or out band siganlling for management of node) OC-3 rate.
If u take this muxponder over GMPLS ready DWDM box then that box will add GCC (like RDCC of SONET)to this rate. Like RDCC, GCC is also a in band signalling.
"GCC channel does not work like an OSC channel to manage both equipments.
As per my knowledge GCC can manage ur both equipment plus it has feature of dropping GCC to Non ONS node (or third party) and see that non ONS node in ur management.
I think GCC is better than OSC, as in GMPLS network provisioning is much easier and powerful than OSC based network.

Similar Messages

  • How to find particular date lies in between two given dates

    hi,
    i have a problem. i have to find if particular day lies in between two given dates.
    example two dates are joindate and expirydate.
    1.joindate is 1/03/2007
    expdate is 1/03/2008
    now i have to find if 29 feb is in between this joindate and expirydate.
    if any1 has ny idea please reply asap.
    thanks.

    The Date class has a before() and after() method you can use to compare Date objects.

  • Download to excel between two given dates

    Hi All,
    I already implemented Export to Excel funtionality in webdynpro java. Now i have a requirement to download the data to Excel only between two given dates.
    I am taking two dates from the user and based on that it should download data into excel file.
    Guide me on this or send pseudocode for this.
    Regards,
    Dhruv

    Hi,
    If I understand your question correctly,
    you are gettting some data from R/3. You need to filter out that data which is in between  two given dates , export that data to excel.
    If yes, then take one more ValueNode with same structure.
    and bind the filtered data to this node.
    To filter out model node, use
    int size=wdContext.node<outputnode>().size();
    Date stDate=wdContext.currentContextElement().get<startDate>();
    Date endDate=wdContext.currentContextElement().get<endDate>();
    for(int i=0;i<size;i++)
    Date objDate=wdContext.node<outputNode>().get<outputNode>ElementAt(i).get<dateAttribute>();
    if( (objDate.compareTo(stDate)>=0) && (objDate.compareTo(endDate)<=0) )
    // Create element for value Node , set the values  (ie. i'th    record values) and add to ValueNode.
    Long process, but you can use
    Now export the ValueNode to excel
    Regards
    LN
    Edited by: Lakshmi Narayana Chowdary Namala on Sep 22, 2008 12:04 PM

  • SQL - Can u print all the dates between two given dates (Without PL/SQL)

    Hi Friends,
    I want to know if u can print all the dates between two given dates without using pl/sql.
    date1,date2 are given
    write a sql statement to display all the dates lying between those two dates.
    An earlier will be appreciated.
    Thanks in Advance
    Sriram
    null

    Sriram,
    Try this....
    select to_date('01-JAN-00')+to_number(rownum)
    from all_tables
    where rownum < to_date('10-JAN-00')-to_date('01-JAN-00')
    TO_DATE('
    02-JAN-00
    03-JAN-00
    04-JAN-00
    05-JAN-00
    06-JAN-00
    07-JAN-00
    08-JAN-00
    09-JAN-00

  • All Dates between two given Dates

    Hi,
    I need all the dates between two given dates in select-options .
    For example  the range in select-options is 01/01/2007 - 31/03/2007 .
    I need  all the dates between the two given dates .
    How can i do this .Is there any FM for this ?
    Regards,
    Zia

    use this
    CSCP_PARA1_GET_PERIODS
    data:begin of daytab occurs 0.
            include structure scscp_period_str.
    data:end of daytab.
      call function 'CSCP_PARA1_GET_PERIODS'
        exporting
          i_datuv    = r_budat-low
          i_datub    = r_budat-high
          i_timeunit = 'D'
        tables
          et_dates   = daytab.
    here u have to put one more logic.
       loop at daytab where datuv in r_budat.
        endloop.
    So u will get all the dates
    Regards
    prabhu

  • Query to search between two specific dates and time period

    Hi,
    Need a query to search between two particular dates and time period
    Like i want to search table having one date field .
    Suppose the date range is '01-JUL-06' and '01-AUG-06' and time frame
    is 23:00:00 to 08:00:00
    i.e i want to search between dates 01 july to 01 aug and also within the time frame i.e 23:00 to 08:00 hrs only

    The general principle is
    SELECT * FROM your_table
    WHERE some_date BEWTEEN to_date('01-JUL-06') and to_date('01-AUG-06' )+0.99999
    AND  ( some_date <= trunc(some_date)+8/24
               OR  some_date >= trunc(some_date)+23/24 )
    /Cheers, APC

  • Org unit Hierarchy structure between two  Key date s

    Hello Friends,
    We have an issue with displaying HR Org unit hierarchy structure between two calendar months.
    The BI Report has a selection parameter to select Org unit hierarchy , Calendar month From and Calendar month To
    The BI Report is to display the no.of sick absence days for employees in a chosen Org unit hier.
    Employee A had a sick absence of 5 days in the month 04.2011 in the Org unit X . The same employee had a sick absence of 4 days in 05.2011.The Org unit X then delimit in 05.2011 , the Org unit X is no longer in Org structure from 05.2011.
    When we run the report for 04.2011 to 04.2011 , the employee A is showing absence under Correct Org unit ie X with correct Org structure .
    When we run the Report for 05.2011 to 05.2011 , the employee A is showing absence under hierarchy Org unit Not assigned which is OK .
    But the issue is when we run the Report from 04.2011 to 05.2011 , The employee A absence days 9 (5 +4 ) showing under Not assigned Org unit hierarchy structure which is the latest Org unit .
    When I deactivate the Org unit hierarchy and choose tech name of Org unit , It is showing correct Org unit key
    But The user would like to see 5 days under org unit X and 4 days under Not assigned with Correct Org unit hier structure when we run the Report from 04.2011 to 05..2011 .
    We have a user Exit variable for the Key date in the Bex Report which seems to be taking only one date at any time .
    Is there any way to get the correct figures under Org unit hier structure where employee had absence in when we put range of calendar months on a selection screen ?
    Any advice appreciated.
    Thanks.

    Hi
    Yes, we can display the same by using time dependent hierachy's i.e. your org is converted to time dependent so that respective employee shows with respective of time.
    Regards
    Jagadeesh.M

  • How to calculate the no. of weekdays between two active dates

    Hi all,
    I need to calculate the no. of weekdays between two days.
    For Example:
    If i want to know the number of weekdays between 17-NOV-2008 to 7-DEC-2008 its 10 excluding sat and sun.
    how to do that if the period is more?
    like 1-JAN-2006 to 12-APR-2007
    Thanks in advance..
    Regards,
    Manoj

    NEXT_DAY(start_date - 1,'SUNDAY') is first sunday >= start_date. NEXT_DAY(end_date - 7,'SUNDAY') is last Sunday <= end_date. Therefore:
    (NEXT_DAY(end_date - 7,'SUNDAY') - NEXT_DAY(start_date - 1,'SUNDAY')) / 7 + 1 is number of Sunday's between start_date and end_date. Same way:
    (NEXT_DAY(end_date - 7,'SATURDAY') - NEXT_DAY(start_date - 1,'SATURDAY')) / 7 + 1 As a result, number of weekdays between start_date and end_date is:
    business_day_count := end_date - start_date + 1 -((NEXT_DAY(end_date - 7,'SUNDAY') - NEXT_DAY(start_date - 1,'SUNDAY')) / 7 + 1 + (NEXT_DAY(end_date - 7,'SATURDAY') - NEXT_DAY(start_date - 1,'SATURDAY')) / 7 + 1) or
    business_day_count := end_date - start_date - 1 -(NEXT_DAY(end_date - 7,'SUNDAY') - NEXT_DAY(start_date - 1,'SUNDAY')) / 7 - (NEXT_DAY(end_date - 7,'SATURDAY') - NEXT_DAY(start_date - 1,'SATURDAY')) / 7 or:
    SELECT end_date - start_date - 1 -(NEXT_DAY(end_date - 7,'SUNDAY') - NEXT_DAY(start_date - 1,'SUNDAY')) / 7 - (NEXT_DAY(end_date - 7,'SATURDAY') - NEXT_DAY(start_date - 1,'SATURDAY')) / 7 FROM DUAL; The above code assumes business day count between two dates includes both start and end dates. Keep in mind, the above code is NLS dependent.
    SY.

  • Comapre 2 same channels from two different dat filea

    Hi ,
    I want to compare the wave forms of two same channels names (in my sample data which is in attachment, the same channel names are S1KNSLLE00H3DSZP) from different dat  file(S2100044 and S2100041) .
    Load the 2 dat files from navigator.
    Come to report and open two 2d axis systems to see the wave forms of two different channels ( Like in attachment result.jpg)
    I need an autosequence to do the same for all the channels for 2 dat files automatically.
    Attachments:
    cmp.zip ‏1967 KB
    result.JPG ‏158 KB

    Hi RSH,
    I appreciate you posting 2 data files and the jpg, but I'm afraid I still have lots of questions before I can advise you.  You sent 2 *.dat files which each had 1 channel in them named "Data", which is different from your email text and the jpg you posted.  Will your data sets typically have many channels in them?  Your posted *.dat files had no time channel and the "Data" channel was not a waveform channel, yet the 2 different "Data" channels were different lengths.  Do you want to plot your channels vs. the array index all the time (as is shown in your jpg)?
    Do you want to have N sheets in REPORT, one for each channel?  Why don't you want to have both "S1KNSLLE00H3DSZP" channels as curves with different colors on the same graph-- wouldn't that make it easier to compare them?
    When you drag over the data channel onto a REPORT graph, you will get a reference like "[1]/Data" or "[2]/Data", which is exactly what you want to compare the "Data" channel from 2 arbitrary data files (note that the file name does not show up in the channel references).  So it seems to me that the REPORT layout you sent a jpg of already satisfies what you're asking us to create for you.  Why do you need a script at all?
    Brad Turpin
    DIAdem Product Support Engineer
    National Instruments

  • Copy single table between two servers

    Hi... I perform a remote copy (SCC9) yesterday, a few months i did another copy and exclude some tables, in the expert setting, now in my copy, we need a table that was excluded in the last copy (yesterday).
    Do you know how to copy that table??
    Thanks in advance..

    Hi
    Check this out
    [Link1|http://sapbasis-security.blogspot.com/2008/04/copying-tables-entries-between-two.html]
    [Link2|http://books.google.co.in/books?id=ASekwAiAXdMC&pg=PA426&lpg=PA426&dq=howtoCopysingletablebetweentwoserversin+sap&source=bl&ots=BS7d2sSz4C&sig=9QWwA7Mlg_7Q6tj_lS4lcMqZz4k&hl=en&ei=T1xVSuTyK6bU6gPh6oXCDw&sa=X&oi=book_result&ct=result&resnum=1]
    Regards
    Uday

  • Calculate number of days between two festival dates in payroll schema

    Hi Experts,
    According to my company policy:
    If an empl termination happens before Eid festival of the current year, then the pro-rated Eid bonus (yearly) is based on:
    (The duration between Eid Festival date of previous year - Eid festival date of current year.)/350 days
    Time Evaluation is not implemented in the system. Only payroll is implemented.
    My question: How can I capture the number of days between (Eid Festival date of previous year - Eid festival date of current year) in the payroll schema ?
    Regards,
    Somdeb.

    Hi,
    You can try using date specification. If you update last year eed holiday date for the employee then you can use the operand F along with NUM to get days between last eed holiday and current payroll period last day.
    i.e NUM=FaaT 0
    F is operand to query date specification.
    aa is the date specification.
    T is for unit and it gives number of days
    next space is for current payroll period last day and 0 will reset alternate date to zero if no date specification is mentioned.
    Basically this will give number of days from date mentioned in date type aa to current period last day. For more info you can go through documentation on operand F for NUM.
    Let us know if this helps.
    Regards,
    Poorvi.

  • Sharing target application between two external data connections

    If I want to create two BDC connections to two separate external systems (let's say one is for HR system and one for IT admin system), can I use the same Target Application in the secure store service section if both of them use the same authentication? 
    Let's say both external systems allow access for 'admin1' user.  Then, when setting up the external data connection I use 'impersonate windows identity' and create a target application in secure store service to map a set of users to that 'admin1' account. 
    When I create these two external data connections can I specify the exact same 'target application' or should I create two separate ones, one for each external system?
    thanks,

    Hiya,
    If you want to use impersonate, you do not need to use Secure store. Impersonation is granting the service account delegation permissions. This is part of the Kerberos authentication protocol, which needs to be configured separately.
    All secure store does, is to store a set of credentials encrypted. These stored credentials can be used wherever, as long as they are valid.

  • How to handle single quote between two single quotes in ABAP?

    Dear SAP Gurus
    I have a question regarding handling a string data.
    Say I have a string  ABCD'\&%$!!ABC'AAA123.   Please notice that there are single quotes in my string.
    I am writing a parser code in ABAP and getting into problem with if statement to check if the character read is a single quote.
    When I type the following with a singleQuote between 2 singleQuoes as below, it gives error.
    If CHAR = '''.
    ENDIF.
    How do I handle that? I searched for escape sequence and couldn't get any useful info.
    Any feedback will be highly appreciated.
    Thanks
    Ram

    Or just use string literals
    if char = `'`.   "note that ` is the "backquotation" mark not a regular quotation mark '
    Regards
    Marcin

  • 8Gig Port Channel between two 6509s

    Hey all,
    I have two 6509s that I'm trying to configure an 8 Gig trunk/port channel. I have an 8 port fiber module in slot 3 on both switches. When I use the following command: "set port channel 3/1-8" on it seems to take the command, but if I do "show port channel" it shows two groups:
    3/1-4
    3/5-8
    Is there a limit as to how many gigs a port channel can be? If not, why does it split it like this?
    I should also note I'm using dot1q for the trunks using Auto mode on one switch and Desirable on the other.
    Thanks,
    Scott

    I did a show port cap on the interfaces and I didn't see any sort of restriction. I decided to run the command again 'set port channel 3/1-8 on' and for some reason it seemed to work this time. Not sure what changed, but it's working now.
    Thanks for your help!

  • Sql query : sum of feild between two conditional date

    hi
    I have a table whit 3 field like below. I want to Find the
    total number of hours in mode "run" after the latest mode "decoke".
    field time is for every day and its unique.
    id -- time  --  mode -- hour
    1  --1/1/1 -- run  --  24
    2  -- 1/1/2  -- off  -- 24
    3  -- 1/1/3  decoke  -- 24
    4  -- 1/1/4  -- run  -- 24
    5  -- 1/1/5  -- run -- 24
     this query should add row 4 and 5 , the latest "run" after "decoke"

    Create table #temp
    [id] int identity(1,1)
    , [time] date
    , [mode] varchar(50)
    , [hour] int
    Insert into #temp
    Select '1/1/1' , 'run' ,24
    Union
    Select '1/1/2' , 'off' ,24
    Union
    Select '1/1/3' , 'decoke' ,24
    Union
    Select '1/1/4' , 'run' ,24
    Union
    Select '1/1/5' , 'run' ,24
    -----Here is the Query-------
    ;With Cte_TotalTime
    As
    Select Max(time)[Time] from #temp Where mode = 'decoke'
    Select SUM(a.hour) TotalRunHours from #temp a
    Inner join Cte_TotalTime b on a.[time] > b.[Time]
    And mode = 'run'
    Drop table #temp
    Please mark as answer if it is helpful to you.
    Thanks

Maybe you are looking for

  • Ip source guard feature and dhcp DHCP scope exhaustion (client spoofs other clients)

    Hi everybody. A dhcp server assigns ip adress based on mac address carried by client hardware field in dhcp packets. One potential attack is when a rogue host mimics different mac addresses and causes dhcp server to assign the ip addresses until no i

  • Want the table for PDF outputs in AR

    Hi all, I want the table which stores all the prdf output paths. In general 'fnd_conc_req_outputs' table stores all the details of the path of specific concurrent request. But for my case concurrent request id is not presented in this table. To be sp

  • Logic can't save document error

    Logic is giving serious problems. I had my project file, a large piece for orchestra, complete balanced in mixing and was just on the point of bouncing when I got error messages that Logic could not save the document. I tried to save it as a new file

  • L220x: dead reddish pixel in center of the screen

    I bought this and another L220x 4 months ago from a lenovo reseller. Now there has appeared a slightly red-tinted dead pixel to center of the screen. Do you know whether this display has a warranty that covers it or whether I can get that dead pixel

  • MultiProviders views in HANA

    Hello Experts, I'd like to ask something about the MultiProvider of BW in HANA. I have created a multiprovider in BW.  then I switch to HANA which is the DB of the BW app.  In the BW schema, column views, I found there are two similar column views.