We have a maintenance plan for an equipment. It has a task list with 2 operation: Operation 0010 is 1 month interval and Operation 0020 is 6 month intervals.
Currently when the preventive maintenance plan is release, 2 work order are created for every 6 months.
Is it possible to combine the One month interval and 6 month interval task to a single Work Order?
Thanks.

For 1 month freq, orders will be created every month. In 6th month, order will be created with one month & 6th month operation together.
If you want to suppress one month operation while order is getting created with 6th month operation, mention higher hierarchy for 6 month freq in strategy. This means, mention hierarchy 1 for 1 month freq & 2 for 6 months freq. While both the operations are due, operation with higher hierarchy only will be taken over to the order.
I guess, this what you expect. Please confirm.

Similar Messages

  • How to exclude certain operations in PM order from task list?

    Hi Experts,
    we have number of operations in task list and being attached to in maintenace plan. While scheduling Miantenance Plan system is creating order as per requirement with set of all operations present in the task list. we would like to restrict certain operations needs to be appeared in the maintenance order? any enhancement will work for this kind of user requirements?
    suppose if task list is having 100 opeartions. when we do scheduling by using this task list through maintenance plan system is defaulting 100 opreations in the order as per standard. we would like to restict certain operations not to appear in the order, even it is present in the task list!
    Thanks in advance
    Regards,
    Krishna

    Hi ,
    If you could convert this order type as Service order you will get a field called Service Product. Then you can use Classification and Characteritics for the service product and the Tasklist to choose the required operation in the service order created by the system. You need to use the techniques of varinat config to achieve this functionality.
    AlexPr

  • Two notifications attached to single work order

    Hi..
    I have a scenario where two notifications are attached to single PM work order. The user created two notifications for the same functional location and created a work order for the first notification using IW34. Now this work order has both the notification attached to it and in the change log of the notifications, i can see the order was attached to both notifications on the same time.
    If someone could provide a valid explanation, it would be much appreciated.
    Thank you

    Greetings Mina,
    It's perfectly possible to create an Order for multiple Notifications, although only one Notification can be assigned to the Order header. The additional assignments are through the Object tab, as Jogeswara Rao Kavala observed.
    It is a valid scenario, for example:
    - two operations workers report two Notifications in different objects, which have the same root cause and will be fixed by the same maintenance work (for instance, no medium in the piping along the installation can be because a particular pump that feeds the piping is malfunctioning)
    ...or
    - the same fault is independently reported on multiple Notifications (for example, operator on the 2nd shift registers a Notification for the pump; then on the 3rd shift the other operator registers the same fault, not having noticed there's one Notification already; on the day shift, the Maintenance supervisor sees the 2 Notifications and creates a common order for both).
    This allows you to better track Notifications against the Orders that are resolving them.
    It is possible to do this in several ways:
    - in IW22 by the menu option "Assign order"
    - in IW28 by selecting many Notifications on the ALV list and selecting "Create Order" icon
    - in IW32 from the Order object tab

  • Print of work order before release

    Hi,
    Is it possible to print a work order before releasing it. What customization/changes can be done to do this ?
    Regards,
    Vivek

    You can do that using standard t-code BS22.
    After calling t-code BS22 double click on system status I0001 - CRTD – Created.
    Then search for, so called business transaction ‘RMDR - Print Order’ and choose function Allowed.
    I have just done it in my sandbox and now I’m allowed to print  shop papers for work orders in status CRTD but as per default shop papers should be printed in REL status please analyze possible impact before changing anything in BS22.

  • My serial number for Logic Studio doesn't work. I used one from a different box and it worked. How can I get a new number?

    My serial number for Logic Studio doesn't work. I used one from a different box and it worked. How can I get a new number?

    http://support.apple.com/kb/TS2005
    http://support.apple.com/kb/HT1861
    https://ssl.apple.com/support/proapps/serialnumbers/

  • When Creating a Work Order Import Standard Operations

    A client is requesting the following functionality when creating a Work Order: Create the first nine operations with different work centers and number operations 0001 u2013 0009.  For operation ten continue numbering with 0010 and increase by 10, ie, 0020, 0030, etcu2026 .   And operation 0010 would default header data.
    Can this be accomplished through standards configuration or would this entail a user exit?
    Thanks in advance!!
    JAM

    It can be possible, depending on how you create the Work Order.   If these operations are used often and are in a task list, you can create a work order and import the task list operations by using the menu "extras -> task List selections" inside the work order.    If it is part of a preventative maintenance plan, you can configure that your task list is automatically copied to the notification/work order when generated by your maintenance plan.  Of course in the task list you could save all the increments and work centers as you want.   But this would never be a dynamic check to your header data, it would only be as accurate as your task list.

  • Print out documents attached to a work order before Releasing a work order

    Team
    Requirement is given below. Need some advice.
    How to print out documents attached to a PM work order before the order is set to released status?
    Further the same documents have to be printed again after the order is released.
    Regards
    Sunil

    I think there is an OSS Note on this one - have a look there.
    There is a work-around where you do the following:
    - Enter IW32 and RELEASE the the order (but do not save)
    - Print out whatever you require
    - Exit the order without saving (therefore the RELEASE is not saved)
    Note: for one client we put a PRINT button on the Enhancement tab (user-exit IWO10018) for this purpose.
    Prometheus Group also provide a solution called Print Manager
    PeteA

  • Complete work orders without complete notifications from Overall Completion

    We have a work order assigned to a notification type and we need to complete the work order from the overall completion transaction  (IW42) without completing the notification when clicking on technical completion button.
    Is it possible?

    You can check with your netweaver team if this could be controlled from user authorizations. Do check if the following Business Transactions are available against the tcode "iw42"
    PMM2     Put notification in process     
    PMM4     Complete notification     
    PMM6     Put notif. in process again     
    I hope this will help.
    Regards

  • Operations in Task list

    Hi dudes,
    I want to create task list (IA05) in SAP but I have a limit in entering operation descriptions. because the length of this field is just 40 words but the as maintenance members of the company said, they have much more tasks than 40 characters.
    is this 40 characters fixed or it can be changed.
    thanks in advance

    It is fixed and can't be changed.
    It might be a typo or a language barrier thing but you said "they have much more tasks than 40 characters"  as if they are doing more than one task per operation.
    Typically an operation should relfect a single discret amount of work.  Hence the description should also be short.
    For instance, the following example:
    Disassemble dryer, scrap sides of drum and inspect for fatigue, clean and dry, reassemble
    Should be broken up into maybe 9 or 10 operations.  Not one.
    It's not an exact science but trying to use one operation to cover a multi-step process is not recommended.
    FF

  • HT204655 Order prints as gift from Mac Photos app and make sure no receipt included.

    I want to order some print products from the Photos for Mac (prints and photo book) as gifts to friends and family. I just want to make sure that my friends receive the products without any receipt showing the costs.

    Update - it started uploading "items" to iCloud.

  • Assembly and Task list : storage location defaulted from task list

    Hi all,
    Can anyone tell me the different steps (with details) required in master data (assembly, task list,...)  to get the 'storage location' filled by default in the general maintenance task list : how assembly is used in that process?
    Thanks,
    P.

    Hi Pete,
    In the component overview for a given operation,  when assigning a component : further on the right, there is a storage location field.
    Pete.

  • How to restrict users working on Windows 7 clients from accessing Windows Explorer and other systems in the network through Group Policy with a domain controller running on Windows Server 2008 r2

    Dear All,
    We are having an infrastructure setup of around 500 client computers managed through group policy.
    Recently the domain controllers have been migrated from Windows Server 2003 to Server 2008 R2.
    Since this account requires extremely strict environment, we need to figure the solution for restricting the users from access anything locally.
    It would be great if you can assist me with the following query.
    How to restrict users logged on Windows 7 clients from accessing Windows Explorer and browsing other systems in the network through Group Policy with a domain controller running on Windows Server 2008 r2 ?
    Can we disable Network Tab on the left hand pane ?
    explorer.exe is blocked already, but users are able to enter the Windows Explorer by clicking on the name which is visible on the Start Menu.

    >   * explorer.exe is blocked already, but users are able to enter the
    >     Windows Explorer by clicking on the name which is visible on the
    >     Start Menu.
    You cannot block explorer.exe when you do not replace the shell - the
    desktop you see effectively IS explorer.exe...
    Your requirement sounds like you need a custom shell:
    http://gpsearch.azurewebsites.net/#2812
    Martin
    Mal ein
    GUTES Buch über GPOs lesen?
    NO THEY ARE NOT EVIL, if you know what you are doing:
    Good or bad GPOs?
    And if IT bothers me - coke bottle design refreshment :))

  • Displaying task in timeline webpart based on view from task list

    I have added one custom column in task list called category and created different view based on different values of category.
    when I display a view and select show timeline, it display all the task and does not filter the task based on view. Is there any possbilty to achieve this?

    Hi Ashish, if you click to modify the view, scroll down to "Style." You'll see the different styles in there, and below those, you'll see "Show timeline above the view." Select that box and the timeline will be included with your view.
    cameron rautmann

  • Add JavaScript file to ALL existing Task List pages and to newly created list pages

    We have several OOTB task lists that are in use on several subsites.  We want to add JavaScript to the NewForm.aspx and EditForm.aspx for these task lists. These lists have not been customized, they are based on the standard Task Content Type.
    Since there are several lists already created and in use, it would be far too much work to manually add a Content Editor web part to each page.
    We put the JavaScript file in the top-level site style library.
    Is there a way to programmatically attach a script reference to each existing page in all the subsites AND have the script reference placed on any NEW list pages created from the OOTB Task content type? Or, add a CEWP to all existing list pages using a feature?
    I could not find any examples of this.

    Hi,
    A solution would be like this: Add your script into a Content Editor Web Part in a page, then add this Content Editor Web Part into the NewForm page of these Task lists using
    SharePoint Object Model.
    More information:
    Use
    SPList.Forms property to retrieve the URLs of the specific form of these Task lists:
    http://sharepointcore.blogspot.com/2011/08/sharepoint-listitem-new-edit-and.html
    With
    SPLimitedWebPartManager object, we can retrieve the web parts of a page, choose one and add into another
    page:
    SPLimitedWebPartManager.WebParts
    property
    SPLimitedWebPartManager.AddWebPart
    Another two links about this for your reference:
    http://www.stefangordon.com/add-web-part-to-page-programmatically/
    http://sharepoint.stackexchange.com/questions/9442/how-to-programmatically-add-a-webpart-to-a-page
    Thanks
    Patrick Liang
    Forum Support
    Please remember to mark the replies as answers if they
    help and unmark them if they provide no help. If you have feedback for TechNet
    Subscriber Support, contact [email protected]
    Patrick Liang
    TechNet Community Support

  • Displaying Tasks in Weekly and Monthly Views

    Hi,
    According to the on-line help for oracle calendar 9.0.4, tasks cannot be viewed in the weekly and monthly views - when using the web client. I was wondering whether anyone has found a way to work around this - apart from usinng the 'view task' icon.
    Thanks
    Naqi

    Hi All,
    I am closing this thread as I have raised this in wrong module.
    Apologies for the incovienence
    Regards,
    Laxminarsimha

Maybe you are looking for

  • View RSOP data for logged on user that is not administrator

    When troubleshooting group policies I use GPResult and RSOP.msc a LOT!  Since we started deploying Windows 7 I've been having the worst time trying to use these utilities. Normally when a user is not getting policies I can just run rsop.msc and see i

  • Mapping AD users in BOE XI 3.0

    Hi, I have a requirement where i need to add the AD group in the following format. 1) Basically Group A has two sub groups -> B and C where Group A should be local and sub groups B & C Global. --> Group X has two sub groups -> Y and Z where Group X s

  • Unable to uncheck contol account tick for a G/L Account

    Hi All,              I have created a G/L Account (Control account tick box selected) and posted a Deposit entry. When I tried to uncheck contol account tickbox , System is not allowing me to do.................How do I uncheck this tick box as I hav

  • CSS or JS Navigation Bar with inline Styled Search Field

    Does anyone know of a good tutorial on how to create a CSS or JS navigation bar that would contain a matching styled search field box? I have tried creating something like this a couple of times using the old JS Navigation Bar wizard in DW, but can't

  • How to move photoshop cs6 to a new computer

    how to move photoshop cs6 to a new computer