SNP with handling resource in order to forward PurchReq

I´m using SNP, with standard situation, just a safety stock form Raw material and once Stock Level falls down of SS, system place a PurchReq, I have a problem due to during 3 weeks per year, plant is not able to receive, purchreq, so I need to place them forward till the first date available,
I have used a handling resource but is only detected with Optimizer, the problem is that I am working with a fix lot 155000 m3 but optimizer does not respect this lot
Could you please help me to sort out this issue?
Thanks in advance

Hi Rafael,
You need to create time stream and assigned to respective plant.
Go to /sapapo/loc3 under Calendar tab you need to assign shipping calendar/receiving calendar.
You are done.
Regards,
Harshil Desai

Similar Messages

  • Resource starting order with SC 3.2

    Hi
    I've configured a SC 3.2 with mutiple resources: Oracle, Apache, tibco.
    I want to manage the order when the resources are starting when switching a node.
    I want to set the order to start:
    1. Oracle
    2. Apache
    3.tibco
    And when the cluster switches the node want to stop the resources in this order:
    1.tibco
    2.Apache
    3.Oracle
    How does the SC 3.2 does to set the order of the starting of the resources?
    Should I do this in the Dependecies window? or somewhere else?
    Thanks for your help.

    Then you would use the clrs command as in:
    clrs set --property resource_dependencies=<list of dependencies*> your_resource_name
    * - Here use the appropriate specification from the manual, i.e. any_node, local_node, etc.
    Tim
    ---

  • SNP Heuristics to generate planned orders

    Hi all,
           I have the demand in months for five years & once demand came in i take Heuristics to generate the Planned orders.I have a specific requirement for a specific location  Heuristic that SNP Heuristic should generate planned orders only in month of January to March for all the five years.
    I am using SNP PDS .The PDS do not contain resource.
    Can you suggest a good solution for the above?.
    thanks
    Kumar
    Edited by: Kumar on Jul 22, 2008 10:39 PM

    Hello,
    1) SNP PDS Does not contain resource?
    SNP pds contains resourse in line with PPM. Please check the Resource definition. It may not be of "Mixed type" hence SNP pds is genertaed w/o resourse.
    Plz modify the resource definition & generate PDS afresh.
    2) Order creation for limited period?
    You can control this by using Factory calender assigned to resource or putting doen time for the period for which you want to restrict order generation. Hence Orders will be generated for the period for which resource is workin
    Thanks
    Mangesh A. Kulkarni

  • Setting up SNP with ECC at a macro level

    Hello experts
    What are the different scenarios that can be set up with SNP - ECC - SNP with respect to Distribution planning ?
    Meaning stock transfers , assuming PPDS will be active and will only be used for creating PPDS planned orders.
    We have 10 plants and 34 DC's and regional DC's.
    Thank you.
    Regards
    KK

    HI KK
    This is more an architecture question that has to be addressed at macro level.
    Assuming your demand is coming from DP or somewhere outside, a SNP run either SNP Heuristics or CTM or optimizer could be setup to move that demand from DCs to Plants. Then you run the planing runs at each plant in PPDS producing planned orders in short term and SNP run for medium to long term. If you have external procurement, the system creates purchase reqs.
    If your plants are sourcing your DCs and then to regional DCs, you may want to run this in 3 stages, first SNP from regional DC to DC, then DC to plant and finally at Plant.
    At one of our projects, we separated the SNP runs into Heuristic( where these is no capacity issue) and some into CTM ( where there are more constraints).
    Based on the scenario, you may choose to integrate these planed orders, purchase reqs. from SNP/PPDS to ECC and execute there.
    You may also run a deployment run from the plants to DCs and not integrate these deployment reqs. with ECC ( as you would not execute them yet), then finally convert these deployment reqs. into STOs/POs and then push these to ECC for execution.
    There are infact so many possibilities based your business need. You may take above as a frame work. Hope this helps.

  • Posting with reference to pur. order only possible for integrated whse Message no. L9510

    Hi,
    I´m trying to setup a reversal for movement type 102 trough our Decentralized warehouse but without any luck.
    I have check some of the entries in customizing from the path down below, and also check some of links here on the community but still not getting anywhere
    Logistics Execution→Decentralized WMS Integration→Central Processing→Application→Define Interface to Inventory Management and Delivery-Relevant Data.
    Assign WM movement type references to IM movement types
    Delivery-Relevant Parameters for Reference Movement Type
    I could see from my our own reversal without WMS this setup is by delivery type DOG to pick the part wiht movement type:102 reference to WM.
    However I still getting the error for WMS every time I try from MIGO with reference to Phurchase order, Indbound delivery, or material document.
    Could anyone share me with some knowledge on that area.
    Looking forward to hear from you.
    Added file "picture"
    Regards
    Claus

    I sent you a solution in you topic Albert.
    Claus, again, no luck, sorry, you should always get informed about the functionalities of decentralized WM before implementing it, if you want to do a return to your vendor here's the process.
    Decentralized isn't the same thing as standard WM, there are a LOT of limitations.
    Here's the process by which you can achieve the required:
    (return delivery to vendor)
    *ERP* Set return delivery type => e.g. RL for doc.type/plant combination here:
    IMG => MM => Purchasing => Purchase Order => Returns Order
    *ERP* XK02 - In account control data, maintain customer in vendor master record for your vendor you are returning the goods to
    *ERP* XK02 - check "Return Vendor" checkbox (purchase view - control data) field is: LFM1-KZRET
    *ERP* Finally you can create the delivery using VL10B based on your PO number
    *WMS* In decentralized WMS, you will get a replica of the OB delivery, process it as usual and you are done.
    Hope it helps,
    Mihailo.

  • SharePoint 2013 Environment Setup with minimum resource

    Hi,
    Could you please advise considering below scenario
    - What would be the minimum resources in order to setup SP2013 Enterprise environment?
    - If we want to buy a single server from DELL as a host for all virtual machines as below, what would be the configuration for that server?
    - How much RAM do we need for the host?
    - How much ram / processor core allocation do we need for the VMs. 
    Requirments:
    USER: 500 Users
    Features : All OOB features / Services will be used in SharePoint 2013 Farm
    Web Application : 3 Web Application, 10 Site Collection
    Total Content : 100 GB
    Virtual Box for entire SP2013 Environment Setup:
    - SQL Server 2012 Sp1 Enterprise
    - SQL Clustering / Mirroring
    - SP 2013  Application Server1 (Enterprise)
    - SP Application Server2 
    - SP Application Server3
    - SP Application Server4
    - SP WFE 1
    - SP WFE 2
    - BI Server 1
    - BI Server 2
    - OWA Server 1
    - OWA Server 2
    - Workflow Manager 1
    - Workflow Manager 2
    - TMG Firewall 2010
    - Exchange Server 2010
    - Microsoft Lync Server 2010
    Thanks
    srabon

    It's all here:
    http://technet.microsoft.com/en-us/library/cc262485%28v=office.15%29.aspx
    Putting that many servers together for a 500 seat company is madness. Go for the text book small farm deployment at most, in reality you'd probably be better off just having three servers total (1 WFE, 1 App, 1 SQL).
    I can't remember how much you should reserve for the hypervisor but if you allocate 1GB for that i think you're ok.
    For a three server deployment you'd probably be ok with 32GB, 8GB for the WFE and App server, 7GB for SQL and one for the hypervisor. 64GB would give you a lot more comfort.
    If you want more options like the enhanced workflows and OWA you'd need servers for each of those as  well.
    You can always overprovision CPUs on the hypervisor but more than 12 Cores would be wasted on a 3 server deployment for 500 users.

  • Problem creating process order with ref of sale order

    Dear all,
    Kindly give solution for this scenerio..............................
    I am creating Process Order with ref of sale order manually in cor1. In the COR1 screen copy from field i gave my ref sale order, so that particualr order and batch is assigned to that order only.
    My problem was suppose if sale order is created for 10 tonns, but my batch size and resource capacity is 2 tonns only. so first time i change my batch quantity 2 tonns instead of 10 tonns and created my order and confirmed.
    if i go to second time the same process i am doing creating process order with ref of same sale order but it comes again 10 tonns instead of 8 tonns. why it comes like this already i confirmed 2 tonns in this sale order?
    my requirement is if any process order is created with ref of any sale order and again if i am creating any process order with ref of same sale order left quantity only system should show.
    for this what i have to do kindly help to this
    regards,
    s.sakthivel

    Dear KK,
    Pls check whether ZKIN, ZKQT, ZKOR have all the properties similar to IN, QT, OR respectively. If they are different, please ensure that you know the reason why they are different. This check has to be done at tcode VOV8
    Some fields like sales document category, Transaction group, screen seq group, Doc pricing procedure need to be similar to the parent document unless you know why you have changed them.
    Once this check is done, check the copy controls in VTAA. Before that try creating these documents separately without reference. This shoudl work fine only after which you need to check copy control. If this is not working fine, then there is some problem with the document type settings in VOV8. Testing this is possible only if Reference mandatory field is left empty. Make sure that is properly configured.
    Once this is done, check copy controls in VTAA. You can just copy the copycontrol between IN and QT and QT and OR and create for ZKIN to ZKQT and ZKQT to ZKOR.
    Once this is done, check whether your item category settings are properly done , also the schedule line settings. The tcodes are VOV7, VOV6, VOV4, VOV5 etc.
    Now check whether your material master and customer master are consistent with the item category settings(Item category group).
    Now create the transaction. It shoudl work fine.
    Reward if this helps.

  • Could not find prepared statement with handle 13

    Hi,
    I'm having a terrible problem: When I try to execute a SQL Query the following exception is thrown:
    * "java.sql.SQLException: [Macromedia][SQLServer JDBC Driver][SQLServer]Could not find prepared statement with handle 13."
    This exception is thrown is this line:
    boolean returnResultSet = ((PreparedStatement)sqlStatement).execute();
    The sqlStatement object is a java.sql.PreparedStatement that was received as a Statement in the method definition.
    The following query is being executed in this PreparedStatement:
    SELECT id_promocao, ds_nome, id_tipo, ds_sinopse, dt_lancamento, pt_site, pt_caminho_relativo, fl_ativo FROM TAB_CINE_GM ORDER BY ds_nome
    I'm using Macromedia JRun 4 build 61650 and I'm using MS-SQL Server 2000 as a database server.
    If anyone can help, I'll thanks a lot.
    Helcio Chaves
    S�o Paulo - SP - Brazil
    [email protected]

    There is a common way to check runtime type:
    if (sqlStatement instanceof PreparedStatement)
    returnResultSet = ((PreparedStatement)sqlStatement).execute();
    else
    returnResultSet = sqlStatement.execute();
    }By the way - I can't understand why you're trying to cast sqlStatement to PreparedStatement? It doesn't matter at all due to so-called polymorphism of all Java methods (except static ones). Anyway execute() will run for PreparedStatement but bot for Statement
    Enjoy,
    Pavel

  • Excel cannot complete this task with available resources. Choose less data or close other applications

    Hello:
    I'm using Excel 2010 and when I try to open several workbooks a message "Excel cannot complete this task with available resources. Choose less data or close other applications" appears.  This happens when I open email attachments from MS Outlook
    and files on my C-Drive.
    Thank you for your help

    Hi NFL1,
    Could you tell me which version of office are you using, 32bit or 64bit? You said this issue always happened when open attachments from outlook and files in C-Driver.
    For opening attachments from outlook, it might there is a conflict between the preview pane and Excel. You can try to hide the preview pane as a workaround to solve this issue. Please refer to this link:
    https://support.microsoft.com/en-us/kb/2526883
    It is often the case, if your file is large or contains a large amount of features, it is possible you are running low on available memory resources. If you work with extremely large data sets, the 64-bit version of Office may perform better for you. 32-bit
    office you run are limited to making use of only 2GB of RAM. And this is one of the reasons occur the issue, you can via these links to get more information about this issue and detailed methods to solve this problem.
    https://support.microsoft.com/en-us/kb/2779852
    http://blogs.technet.com/b/the_microsoft_excel_support_team_blog/archive/2012/05/22/quot-excel-cannot-complete-this-task-with-available-resources-quot-after-installing-ms12-030.aspx
    Please try these methods and let me know if they work, I am glad to help and forward to your reply.
    Regards,

  • Importing a WAR project with a resource reference

    Just an observation -
    I'm importing a WAR file in Developer Studio.  My war archive includes a web.xml file with a resource-ref entry for a data source.  In ealrier Java EE 5 preview versions, the import process would create a web-j2ee-engine.xml file entry with a resource-ref entry corresponding to the one in web.xml.  I would then just need to modify the entry to add a res-link entry.
    With the Composition Environment 7.1 trail version, the import process doesn't create a resource-ref entry in web-j2ee-engine.xml.  However if I open web.xml in Developer Studio and then open web-j2ee-engine.xml, the resource-ref entry is incorporated into the file.
    I don't know if this is expected behavior or a bug; it's easy to trigger generation of the entry so I'm just noting the issue.
    Jerry

    Hi Jerry,
    It is possible that the standard meta models of the web project, were not loaded, that is why it may be needed for you needed to open the editor in order to build the DOM tree.
    As you have noticed the resource-refs are not really in the web-j2ee-engine.xml, until they have some JNDI value specified. The sap specific deployment descriptors read from standard descriptors the possible information that might altered in the specific descriptors.
    best regards,
    Dimitar

  • OIM - Users provisioned with different resource form versions

    Hi !!
    we are having some problems with different resource form versions and maybe you can help us.
    We have two different versions of one resource form. One of them has 2 extra fields.
    Some users were provisioned with that resource with the previous form version (no extra fields) and some with the new one (extra fields).
    The problem is that now, if we try to edit that resource for the users with the old version, we are not able to edit or even see the information for those extra fields.
    It seems that they have been associated with the old version and we need to change it in order to make them use the new one. Is that possible? How can we fix that?
    Thanks in advance.

    Alternatively you can manually update the form version in the OIM database.
    If it is a small number of forms it might be easier to do that then to bother with fvc.
    Best regards
    /Martin

  • Provisioning a user with a resource automatically doesn't work!!

    Hi Experts – IHAC trying to configure OIM to provisioning a user with a resource automatically (via OID connector).
    As reviewed, the membership rules (rules designer) and access policies already configured with correct param. So I would say everything should work fine.
    But when they create a new user with proper attribute. The resource didn’t perform an automate process as expected.
    In the log file show only 2 lines of error message.
    <Apr 25, 2013 2:49:46 PM ICT> <Warning> <oracle.iam.callbacks.common> <IAM-2030146> <[CALLBACKMSG] Are applicable policies present for this async eventhandler ? : false>
    <Apr 25, 2013 2:49:47 PM ICT> <Warning> <oracle.iam.callbacks.common> <IAM-2030146> <[CALLBACKMSG] Are applicable policies present for this async eventhandler ? : false>
    However, manual add resource works well.
    Environment Info:
    - OIM 11gR1 (BP6)
    - OID Connector 9.1
    - AIX 7.1
    Is this consider as bug on AIX platform ? Or any inputs would appreciated.

    Just check if the rule satisfy, user is getting the role.
    --Hari                                                                                                                                                                                               

  • Payment Posting with Reference to Purchase Order

    Dear Experts,
    I've created a Purchase Order with reference to a purchase requisition. Now I want to post MIRO with reference to this Purchase Order Number to give payment to Vendor mentioned in Purchase order. But when I going to post miro amount not coming which I mentioned in Purchase Order!!
    How can I post MIRO with reference to Purchase Order Number? Is it possible?
    Best Regards.
    Ripon

    >
    riponkp wrote:
    > Dear Experts,
    >
    > I've created a Purchase Order with reference to a purchase requisition. Now I want to post MIRO with reference to this Purchase Order Number to give payment to Vendor mentioned in Purchase order. But when I going to post miro amount not coming which I mentioned in Purchase Order!!
    >
    > How can I post MIRO with reference to Purchase Order Number? Is it possible?
    >
    > Best Regards.
    > Ripon
    Seems like you are doing MIRO before GR. If GR is done, it will pick the amounts, if GR is not done, the amounts are not picked. You enter the amounts manually with reference to PO.

  • Report for gl accounts with reference to purchase order

    hi
    experts
    Is there any report which can give the gl accounts with reference to purchase order
    thnx

    Use t code ME2N and click 'Account Assignment" from application tool bar or press Shift + F12 to view PO with GL code. If GL code is not showing select from the layout.
    Rgds,
    Vijay

  • Everytime I open Safari on my MacBook Pro a pop-up window from my Finder menu, with the Applications highlighted on the left in the favorites column with the Resources folder highlighted comes up and locks my Safari page until I manually close the Resourc

    Everytime I open Safari on my MacBook Pro a pop-up window from my Finder menu, with the Applications highlighted on the left in the favorites column with the Resources folder highlighted comes up and locks my Safari page until I manually close the Resources window then I have to refresh the internet search address line at the top of Safari. Can someone tell me how to stop this. It started after a software upgrade. It didn’t do that before. Thank you.

    A few thoughts for diagnosis/testing purposes:
    Have you recently run the disk utility and repaired HD and permissions? If not do so.
    Boot into the Safe mode - hold down shift key on boot - and see if the problems are still there. Some functions won't work but see if anything odd happens.
    Check your startup items. Get rid of them temporarily.
    Create a new user account and see if the problems occur with the new account.
    Lastly, be sure your backup is up-to-date.

Maybe you are looking for

  • Nokia Issues in the Enterprise

    I have (2) Nokia clients that are unable to connect to the enterprise WLAN. Client Data: Nokia N8 Symbian Belle Nokia N900 running Maemo5 Wireless Setup: WiSM2s running 7.0.230 APs: 1142 & 3500 WPA2 Enterprise AES PEAP/MSCHAPv2 Certificate is with Ge

  • How do I restore data from recovered hard drive?

    In a nutshell- Hard drive failed. We had it replaced, and recovered data from old hard drive, put it on an external hard drive. Now we want to put that data onto the new hard drive. Is it as simple as dragging it over? We're missing most of the softw

  • Include and call an .exe file inside my jar file

    Hi. I want to include an exe file and call it inside my jar file. this is the code. InputStream is = getClass().getResourceAsStream("/native/my.exe");           int[] line = new int[is.available()];           File myFile = File.createTempFile("my","e

  • Missing tmp file

    Using OSX Server 10.5.3 on a Mac Pro. End of the school year, so I wanted to run my server updates, as I am behind. I get an failed install message, "the installer could not create the folder "private/tmp/MacOSXServerUpd10.5.4.pkg.1849c19JVv" Sure en

  • While saving the notification

    Hi Guys, I have one requirement like this when a notification is assign to an order and before save i neen to check wheather the planner groupe in the notification(iw22)in the header data  should be equll to the planner groupe in the work order(iw32)