Dear experts,
We are using below cost component structure (CCS) for materials:
- Direct materials
- import duty
- import handling
In which, all those above CCS are achieved through below condition type in Purchasing Info Record. When doing the standard cost estimate through costing run, we have successfully grouped all those condition types into their respective CCS. The problem is, while executing the standard report of "result of costing run" (S_ALR_87099930), the sytem groups all those three CCS into CCS "Direct materials" only.
I have tried different standard layouts, but still got no way to show all those CCS separately in the standard report.
Please kindly suggest what approach should i take
Thank you very much
BR, Erwin
@edit
Solved.
Edited by: Erwin Hartono on Nov 16, 2011 9:16 AM

Hi
Check cost elements assigned to structure.  For this go to transaction code OKTZ and select your CCS and double click on Assignment Cost Component-Cost element interval.
Srinivas

Similar Messages

  • Standard report for the cost of raw materail in production of finished good

    Is there any standard report for calculation of raw material cost from the production order of finished goods.?
    plz help in this issue.
    Thanks.

    closed

  • Standard reports for materials begning,purchase,sale,closing stock

    Dear Experts,
    Is there any standard report for
    Opening stock
    Purchase
    Sale
    Closing stock
    in terms of QTY and value for all materials.
    regards
    RR

    Hi
    you can use MB5B (with Non hierarchial Display) and MB5L
    br, Ajay M

  • Standard Report for Procurement Costs by Cost Centre

    Hi Experts,
    Is there a standard report available in SAP that shows the procurement costs according to the Cost Centre?
    Regards
    Lindsay

    Hi
    I dont know what do you mean by Proc costs...
    if you mean Account assigned purchases - Then use MB51 and after you get the output, change the layout and include Cost center in the layout
    Else, you can also see the Costs by GL in FBL3N or S_ALR_87013611
    br, Ajay M

  • Standard report for subcontracting cost

    Hi, Is there any std report exists for total sub-contracting cost dorn over a period of time in PP? Pls advise.

    Hi,
    The sub contracting cost you can't see through PP module. You can try using MM or FICO module.
    Regards,
    V. Suresh

  • Difference between cost component structure and cost component split

    can anyone explain me the difference between cost component structure and cost component split with simple example
    thanks
    santosh

    Hi ,
    cost component structure
    Definition
    Number that identifies the structure.
    Use
    In Product Cost Controlling, the cost component structure determines how the results of material costing are updated. The cost component structure groups the costs for each material according to cost component (such as material costs, internal activities, external activities, and overhead). If the material is used in the production of another material, the cost component split (which breaks down the costs according to material costs, internal activities, external activities, overhead, and so forth) remains in the system when the costs are rolled up.
    In the cost component split, you also define the following for material costing:
    Which part of the costs are fixed costs
    Which costs are
    cost of goods manufactured and what are sales and administration costs
    Which costs are relevant for stock valuation, commercial inventory valuation and tax inventory valuation
    When the cost component structure is assigned to the organizational units, you can specify that two cost component splits are created:
    Main cost component split
    This is the principal cost component split, meaning that it is used in the standard cost estimate, which can be used to update the material master. The main cost component split can be a cost component split for cost of goods manufactured or a primary cost component split.
    Auxiliary cost component split
    This can exist in addition to the main cost component split, and is not used in the standard cost estimate. It can be used for analysis purposes, in that it can be displayed with the cost estimate and passed on to Profitability Analysis.
    In Cost Center Accounting, the cost component structure determines how the results of the activity price calculation are updated. The cost component structure groups the costs for each activity type of the cost center according to components (such as material costs and labor costs). If an internal activity allocation is carried out, the cost component split (which breaks down the costs according to material, labor costs, and so forth) is retained at cost rollup.
    If the cost component split is not to be retained, you can create a switching structure for the cost component structure for Cost Center Accounting. In the switching structure, you specify which sender cost component goes into which receiver cost component.
    <b>require a cost component structure to calculate prices using cost component split.</b>
    For each cost component structure you define a component such as energy, personnel, or raw materials. The components combine all costs occuring for a particular cost element area. In this way, you ensure greater cost transparency in activity price calculation when putting together the activity type prices - for example, it becomes easier to find how much of the activity price is taken up by the material costs.
    In activity allocation, the cost component structure remains constant, meaning that the receiver takes on the sender cost elements and that the allocated costs are posted in the same cost components in the receiver as in the sender.
    A cost component structure can have a maximum of 40 defined cost components.
    Cost components are assigned to cost elements. You thereby determine which cost elements go to which rows in the structure, and how these components are updated in price calculation.
    Hope ths helps
    Please rewad points
    Sunil

  • Report for Landing cost

    Hi SAP Guru's,
    Do we have any standard report for Landing Cost in the procurements, please suggest.
    Thanks,
    Reddy

    Hi Manish,
              We need to get one report with the total cost of material procurement which includes the excise, transportation and insurance.
    Thanks,
    Reddy.

  • Differance betwen Variable & Fixed and Variable in Cost Component Structure

    Dear All,
    What is the difference between the Variable and Fixed and Variable for the cost component for the Cost Component Structure.
    why we have to take Raw Material Cost Componennt always Variable.  Is any help?
    Regards

    fixed cost is irrespective the level of production the cost remains same. or upto certain level of production the cost the cost will ramain same and after the cost may increase.
    example: rent of the factory building or office buildings remains same irrespective of the operations level.
    variable is with every change in the level of production the cost change.
    example: raw material used in manufacturing finished product. The more finished products the more is the consumption of raw material.

  • Cost component structure in CO-OM Reporting

    Hi there,
    we want to run cost center reports, that show us the balance on a cost center per primary cost element, after we have allocated some of the costs from the cost center into production orders.
    I thought this can be achieved by having the tariffs we use for the internal activity allocation been broken into their cost component structure so that on the cost center, the respective primary cost elements are debited by the activity allocation.
    However, this is not happening in my system. While the activity tariffs are correctly calculated with a component split (according the 1SKS-001 report), the standard cost center report still shows the debit on the cost center with the secondary cost element of the activity.
    Does this mean I cannot see the component split of my activities in normal OM reporting?
    Thanks
    Kai

    Hi
    Make cost splitting structure and assigne to Production Cost Center.
    Run Cost splitting KSS2 for cost splitting according to activity types.
    bukhari

  • Cost component structure in copa report

    HI Gurus
    1We are doing REM Process and costing variant "PREM"
    2. We are going for moving average price for all Material type there is no standard cost estimate
    3. My client want to see the  cost component structure in copa reports like
      sales
      exice
      ram material
      packing material
      labour
      overehad
      selling and distributioh overhead
    I have done all necessary setting in costing key
    I have done pa trasnfer structre also
    But Cost component spill is not happening in copa report
    Can we get cost component struture in copa report with moving average price if yes
    Please advice  me how to geneate the report
    Thanks & Regards
    KISHORE

    Hi Aravind
    Thanks for your reply, But in our  business process there is not Standard cost estimation,bcoz, Price control in material master is MAP. Can we get cost component strudcture in copa  if we are going for MAP in MM.
    I have done all the Setting IN KE4R also. But i am unable to see the values in COPA report
    Thanks
    KISHORE

  • Cost component structure - cost elements for FERT and HALB (TC:OKTZ)?

    Hi all,
    our cost component structure has the following structure (TC: OKTZ):
    1 Raw materials
    2 Human ressources
    3 Production
    4 Material Overhead
    5 Production overhead
    6 external activity
    (this settings are conform with SAP standard - copy from cost comp. structure 01)
    To cost comp 1 "raw material" we assigend the relevant (primary) cost elements (consumption raw mat, e,g, steel, wood...).
    My question is: In case we insert/post e.g. a semi-finished product to the production order from stock (accor. bill of material), where (in which cost comp.) do I have to assign the relevant cost element? I guess this should be the account "inventory change unfinished product? (maintain in TC: OBYC for transaction BSV according val. class)
    Is it correct to assign this cost element to cost comp structure "raw material", because actually it is a semi finished product which is picked up from stock to convert /process further? To problem is, if this cost element is not assigned I get an error in CK11N/CK40N
    I hope my wording is not to abstract...
    Thanks in advance...
    best Regards

    Hi..
    You don’t need to consider the cost element of production order settlement and production notification.
    Cost component structure need the cost element of production order’s debit.

  • Create a new standard layout for the cost report of a sales order

    Hi,
    I would like to create a new layout to view costs in a sales order.
    path: view sales order (VA03), mark sales order item, go to environment cost report. At the moment the SAP standard layout 1SAP01 is shown.
    first question: how can I assign this layout as default layout?
    second question: how do I create the new layout, via report painter? can you give me a path or transaction code?
    thanks.

    i found it myself. You define the groups in the cost component structure. this structure is assignen to the costing variant of each cost object.
    thanks

  • SAP Standard Report for Cost Element Category

    Hi All,
    I just wanted to know that if there are any report(s) involving Cost element categories. Say for example, if the cost element category is provided the report fetches the cost elements associated with the category and the documents posted.
    Thanks and Regards,
    Gnanasambanthan.V

    Hi,
    There is no standard report based on cost element category, but of course, you can use, for example, KSB5 and give the selection of the cost elements you want to present. I presume, you have different number range for each category and it could be easily distinguished in the selection screen.
    Regards,
    Eli

  • Can it be  a seperate cost component structure for each company code?

    Company Code No 1 Setting:
    Company Code XXXX with Chart of accounts X(Quantity + Value updation in material type)
    In the existing company code(XXXX) ,Cost component structure is defined as
    All company code---->All Plants----> All Costing Variants -
    >Cost component Structure AA
    Company Code No 2 Setting:
    Scenario:
    Now  I am creating a new company Code YYYY) which is  is allowed  for quantity updation  alone and  trying to create a product cost collector to carry out Production confirmation through Repetetive manufacturing (."Error = Cost object component split costed with Value of Zero"
    Can it be possible to have a seperate cost component structure for each company Code?
    Company Code YYYY with Chart of accounts Y which is different from Company code 1(Quantity  alone in material type)
    If possible ,Can anybody provide a procedure to do the configuration of Cost Component structure

    Hello,
    As I understand your question, All the thing which are releted to costing are done only at the controlling area level not at company code.
    As your req diffrent cost componenet for diffrent company code is depend up on how you define the controlling area.
    Hope it will clear you
    Regards
    Ravi

  • Activity Price in Cost Component Structure

    Hi,
    After costing run I have updated Activity Price in KP26.. I want to see latest activity price in Cost component structure e.g. Labour Activity and Machine Activity..cost for this a)  Is it require re-costing run? b) how can we calculate activity price? e.g. total base qty/confirmed qty *no.of hrs.  can you please corret me my formula I have maintain in KP26 capcity 500 and fixed price 10. I am able to see machine hrs. 6 in Resource data..
    Thanks
    Srinu

    Hi Srinu,
    Do you mean that, just after changing the KP26 values, u are expecting the same to reflect in your cost component structure of materials? KP26 is only to plan the price of an activity type in a cost center. This will be applicable for the future period. ie when operations are confirmed in production orders in future, this costs will be absorbed to the production order.
    Use  S_ALR_87013611 or similar reports for actual activity prices(debits) and actual activity quantities. Former divided by later will give you the actual per unit activity price for the last period.( in case of 1 to 1 relationship between cost center and activity).
    Best Regards
    Vimal

Maybe you are looking for

  • HR-ABAP-Infoset-creation-getting default value-standard-ss

    Hi All, Here I am having the requirement that I need to create a new infoset with specified infotypes in the HR-ABAP .For this I have used SQ01,SQ02,SQ03 T.C's and I have selected tables-fields whatever I required. But I am not able to get a default

  • Does the sender SOAP adapter support multiple operations per interface

    Hi guys, does the sender SOAP adapter support multiple operations per interface? (interface type of 7.1)? Thanks, Andrzej

  • Javascript function did't get item value

    Hallo, I setup the HTML Form Element Attributes from an select list: style="width:265px" onclick="javascript:load('&P3_LOAD.')" The problem is that the javascript function "load()" did't get the value of the item P3_LOAD. Maybe I forgot some '' ? Tha

  • Load balancing in OC4J

    I have a configuration where I can see in the EM two instances of the xmlpserver (I am not sure how this was done). Is there load balancing in OC4J itself, where a request would be directed to either instance? If this is happening, then I assume that

  • Why won't apple mail save signatures?

    When I am copying a signature I create in a mail into the Signatures database, It doesn't seem to save as it was built...sometimes it removes/adds carriage returns.  Other times it won't copy the graphics with the text.  Is there a way to make sure i