Start, end and duration box in timeline

I use CS4 and wonder why each time I pass the cursor over the CTI,a yellow dialog box indicating start, end and duration of the project, stays visible in the timeline?  The more I pass the CTI with the cursor, the more boxes appear....and stay.  The boxes are in random order but contain only info for the start, end and duration of the project.  I am sure there is a simple answer to this annoying issue.  Thanks.

The Problem persists.  I downloaded the latest update from nVIDIA but that did not seem to work.  See picture of some of the boxes that stay when I pass the cursor over the CTI.  I can clear them by deleting tracks, but they reappear when I work with the CTI.  They apprear not only in the blank area. but on the timline as well

Similar Messages

  • Batch Capture Changes Media Start, End, and Duration

    Hello all... For some reason, when I batch capture from an imported batch list in FCP 4.5, the program changes the media start, end, and duration just slightly once the capture has completed. Does anyone know why this might be occurring?

    OK... I don't believe it has to do with drop frame or non-drop frame issues, and here's why... I ran a series of tests.
    The footage was originally shot with two cameras, an A Cam and a B Cam, which were Jam Synced together. The original A Cam tapes were log and captured normally. But for the B Cam tapes, we exported a batch list to excel, performed a rename function where _B was added to all file names and reel names, and brought the data back into FCP by importing a Batch List at 29.97.
    For the tests, I experimented with only one clip. First, I noted the timecode for the media start and media end when the file was uncaptured. Next, I placed the A Cam Tape in the deck and did a batch capture on the one clip. The program changed the media start and end times upon hitting ok. Here were the results of the first test:
    LOGGED: MS (05:50:39:26) ME (05:51:41:01)
    CAPTURED A CAM: MS (05:50:39:17) ME (05:51:41:07)
    Then, I undid the capture so that the timecode would revert back to the precaptured state. I placed the B Cam tape in the deck and ran the capture again, on the same clip, in Batch Capture mode. The program changes the media start and end yet again, but this time, changed it in a different way:
    LOGGED: MS (05:50:39:26) ME (05:51:41:01)
    CAPTURED B CAM 1st Attempt: MS (05:50:39:16) ME (05:51:41:06)
    So then I undid the capture again to revert back to the logged settings, and put the EXACT same tape in the deck, and ran the batch capture in exactly the same way. This time however, FCP didn't change anything. It logged the clip correctly. I tried it yet again, in the same way, and it did it perfectly again:
    LOGGED: MS (05:50:39:26) ME (05:51:41:01)
    CAPTURED B CAM 2nd Attempt: MS (05:50:39:26) ME (05:51:41:01)
    CAPTURED B CAM 3rd Attempt: MS (05:50:39:26) ME (05:51:41:01)
    So I ask again... what is up with FCP 4.5?

  • Confirmation - start, end and post date

    Hi,
    In the transaction IW41 I need a start,end and post (ISDD, IEDD and BUDAT) of the confirmation order remains the same. Any suggestions?

    I guess, we can achieve by User Exits only.
    CONF0001 Enhancements in order confirmation
    CONFPM03 PM/SM order conf.: Cust. spec. check after op. selection
    Also validate in following user exit.
    CONFPM05 PM/SM order conf.: Cust. specific enhancements when saving
    Regards,

  • Start,end and expert routine in Bi7.0

    Hi,
    Can anyone give real time examples or what you have done in your projects examples to start routine,end routine and expert routine.If possible give example with ABAP code.
    Sridhar

    Hi Sridhar,
    The basic difference between these routines is.
    Start routine: Here you will access to the source package, but not to the target package. Here you will have the code to filter unwanted records to the target.
    End routine: Here you will not have access to source package but you will have access to the target package. Here you can do the lookups based on the values you receive from the transformations.
    Expert routine: Here you will have access to both Source and Target. Here you can combine the advantages of both.
    The below code is for Start Routine. To send only the record satisfying the below criteria.
    u2022     For Currency Type = u2018B0u2019 and Transaction Type = u2018Bu2019 or u2018Cu2019 or u2018Fu2019
    This is a scenario where data is going from one info provider to another info provider.
        DATA:  wa_srcpkg TYPE tys_sc_1..
        DATA: i_t_srcpkg TYPE STANDARD TABLE OF tys_sc_1.
        LOOP AT SOURCE_PACKAGE INTO wa_srcpkg.
          IF wa_srcpkg-curtype = 'B0' AND ( wa_srcpkg-rec_type = 'B' OR
                  wa_srcpkg-rec_type = 'C' OR wa_srcpkg-rec_type = 'F').
            INSERT wa_srcpkg INTO TABLE i_t_srcpkg.
          ENDIF.
        ENDLOOP.
        SOURCE_PACKAGE []  = 
                                             I_T_SRCPKG[] .
    Hope this is of some help...
    Regards,
    CK
    Edited by: Krishna on Jul 15, 2008 3:06 AM
    Edited by: Krishna on Jul 15, 2008 3:07 AM
    Edited by: Krishna on Jul 15, 2008 3:07 AM
    Edited by: Krishna on Jul 15, 2008 3:08 AM
    Edited by: Krishna on Jul 15, 2008 3:09 AM

  • Primitive APAB editor in start/end routines in transformations

    When editing or viewing ABAP code in BI transformations, for example in a start routine, the editor that opens is very primitive compared to the normal SE38 editor. Some of the limitations include:
    The editor window doesn't cover the whole screen with seemingly no way to increase its size.
    The syntax check doesn't show on which line syntax errors are located.
    There is no option to perform a extended program check.
    There is no way to insert break-points (other than with the ABAP keyword of course)
    These limitations are present regardless of whether i choose the new front-end editor, the old front-end editor or the back-end editor. We're running SAP Netweaver 2004s.
    It is of course possible to create a program in SE38 and copy-paste your start routine code to see the code using the "real" editor, but this is very tiresome and time consuming. Is there a way to make this editor look and behave like the normal editor? I have looked through the setting options an searched SDN without finding a way.

    Hi,
    This is just the settings you need to change to open the start,end, and characteristics routine using the old editor you are comfortable with. No need to go to se38 and check copy the program.
    Go to se38->Utilities->settings->abap editor->editor tab->select the old abap editor.
    To specifically put break point in transformations (start routine..end routine..)..goto transformation (RSA1) and then display the transformation.
    Then goto extra (menu)->generated program. search for start_routine (method now) and put break point in the desired place.
    Then from the DTP enable all 4 break points..in tranformation (this will come when u cange it to debug mode simulation). And u can debug the transformation.
    The new editor is a good handy one. But take some time to get acquented to it. After you may start liking it :).
    Cheers,
    -J

  • Default duration on the timeline of Roll title.

    We are developing a title importer plugin for Premiere Pro CC.
    I want to set a default duration value when I put materials on the timeline.
    However, selector imGetInfo8 is called, if imFileInfoRec8->vidInfo.isRollCrawl=1 is returned, the value of General Setting will be effective.
    It is supplementary as follows:
    1.materials is a roll/crawl title.
    2.The roll/crawl title made by our software.
    3.roll/crawl title has duration.
    4.The roll/crawl title in the timeline already, I want to change the duration freely.
    5.It is not reflected although imFileInfoRec8->vidDuration was tried.
    Is it possible in Premiere Pro SDK ?
    Best Regards.

    Hi Zac,
    I really appreciate your reply.
    About "roll/crawl titles cannot be initialized with a non-default length".
    -> I Understand. I hope to become able to initialize it in the future.
       *I hope that a new type is added to the 'ImporterDurationType'.
        for example 'imNoDurationVidDurationDefault' ---> use supplied vid duration and duration on the timeline can be changed freely.
    Normal video does not seem to fit as a solution.
    Because I would like to adjust duration freely on the timeline.
    Regards,

  • Calculate duration between start date and end date

    Hi everyone,
    I'm facing with problem when calculating duration between start & end with this function below . This fuction  is working well, but i want to change working time from 8:00 am to 17:30 pm instead of 17:00 , and lunch time from 12:00 to 13:30 instead
    of 13:00 as present . Problem is , i changed data type of start hour and end hour from INT to decimal . But it is still wrong .
    Pls help me . It's very urgent bcoz i need it for monthly report .
    Many thanks .
    Here is function which im using :
    ALTER Function [dbo].[GetWorkingMin](@pStartDate DateTime, @pEndDate DateTime) Returns Int
    AS
    Begin
          Declare @StartDate DateTime = @pStartDate
          Declare @EndDate DateTime = @pEndDate
        Declare @WorkMin int = 0   -- Initialize counter
        Declare @Reverse bit       -- Flag to hold if direction is reverse
        Declare @StartWorkingHour int = 8   -- Start of business hours (can be supplied as an argument if needed)
        Declare @EndWorkingHour int = 17    -- End of business hours (can be supplied as an argument if needed)
        Declare @Holidays Table (HDate DateTime)   --  Table variable to hold holidayes
          Declare @LunchHour int = 12
          Declare @StartHour int = DatePart(HH, @StartDate)
          Declare @EndHour int = DatePart(HH, @EndDate)
        -- If dates are in reverse order, switch them and set flag
        If @StartDate>@EndDate
        Begin
            Declare @TempDate DateTime=@StartDate
            Set @StartDate=@EndDate
            Set @EndDate=@TempDate
            Set @Reverse=1
        End
        Else Set @Reverse = 0
        -- Get country holidays from table based on the country code
        Insert Into @Holidays (HDate) Select HDate from HOLIDAY Where HDATE>=DateAdd(dd, DateDiff(dd,0,@StartDate), 0)
        If DatePart(HH, @StartDate)<@StartWorkingHour
        begin
                Set @StartDate = DateAdd(hour, @StartWorkingHour, DateDiff(DAY, 0, @StartDate))  
                -- If Start time is less than start hour, set it to start hour
                Set @StartHour = DatePart(HH, @StartDate)
        end
        If DatePart(HH, @StartDate)>=@EndWorkingHour
        begin
                Set @StartDate = DateAdd(hour, @StartWorkingHour+24, DateDiff(DAY, 0, @StartDate))
                -- If Start time is after end hour, set it to start hour of next day
                Set @StartHour = DatePart(HH, @StartDate)
                --return DatePart(day, @StartDate)
        end
        If DatePart(HH, @EndDate)>=@EndWorkingHour
        begin
                Set @EndDate = DateAdd(hour, @EndWorkingHour, DateDiff(DAY, 0, @EndDate))
                -- If End time is after end hour, set it to end hour
                Set @EndHour = DatePart(HH, @EndDate)           
        end
        If DatePart(HH, @EndDate)<@StartWorkingHour
        begin
                Set @EndDate = DateAdd(hour, @EndWorkingHour-24, DateDiff(DAY, 0, @EndDate))
                -- If End time is before start hour, set it to end hour of previous day
                Set @EndHour = DatePart(HH, @EndDate)
        end
        If (@StartHour>=@LunchHour and @StartHour < (@LunchHour +1))
        Begin
                Set @StartDate = DateAdd(hour, @LunchHour + 1, DateDiff(DAY, 0, @StartDate))
                -- If Start time is in lunch time, set it to 12
                Set @StartHour = @LunchHour + 1   
        End
        If (@StartHour>=@LunchHour and DatePart(DW, @StartDate) = 7)
        Begin
                Set @StartDate = DateAdd(hour, @StartWorkingHour + 24, DateDiff(DAY, 0, @StartDate))
                Set @StartHour = DatePart(HH, @StartDate)
        End
        If (@EndHour>=@LunchHour and @EndHour < (@LunchHour +1))
        Begin
                Set @EndDate = DateAdd(hour, @LunchHour +1, DateDiff(DAY, 0, @EndDate))
                -- If End time is in lunch time, set it to 13
                Set @EndHour = @LunchHour + 1
          End
          If (DatePart(DW, @EndDate) = 7 and DatePart(HH, @EndDate) >= @LunchHour) Set @EndDate = DateAdd(hour, @LunchHour, DateDiff(DAY, 0, @EndDate)) -- If End day is Saturday and End time is after end hour, set it to end hour of saturday
        If @StartDate>@EndDate Return 0
        -- If Start and End is on same day
        If DateDiff(Day,@StartDate,@EndDate) <= 0
        Begin
            If (Datepart(dw,@StartDate)>1 And DATEPART(dw,@StartDate)<7)  
            -- If day is between sunday and saturday
                If (Select Count(*) From @Holidays Where HDATE=DateAdd(dd, DateDiff(dd,0,@StartDate), 0)) = 0  
                -- If day is not a holiday
                    If @EndDate<@StartDate Return 0 Else
                    Begin
                                  Set @WorkMin=DATEDIFF(MI, @StartDate, @EndDate)
                                  -- Calculate difference
                                  If (@StartHour <= @LunchHour and @EndHour >= @LunchHour + 1)
                                        Set @WorkMin = @WorkMin - 60;                                   
                            End
                Else Return 0
            Else Begin
                      if (DATEPART(dw,@StartDate)=7) set @WorkMin = @WorkMin + DATEDIFF(MI, @StartDate, @EndDate);
                      Return @WorkMin
            End
        End
        Else Begin
            Declare @Partial int=1   
            -- Set partial day flag
            While DateDiff(Day,@StartDate,@EndDate) > 0   
            -- While start and end days are different
            Begin
                If Datepart(dw,@StartDate)>1 And DATEPART(dw,@StartDate)<7    --  If this is a weekday
                Begin
                    If (Select Count(*) From @Holidays Where HDATE=DateAdd(dd, DateDiff(dd,0,@StartDate), 0)) = 0  -- If this is not a holiday
                    Begin
                        If @Partial=1  
                        -- If this is the first iteration, calculate partial time
                        Begin
                            Set @WorkMin=@WorkMin + DATEDIFF(MI, @StartDate, DateAdd(hour, @EndWorkingHour, DateDiff(DAY, 0, @StartDate)))
                            If (@StartHour <= @LunchHour) Set @WorkMin = @WorkMin - 60;
                            Set @StartDate=DateAdd(hour, @StartWorkingHour+24, DateDiff(DAY, 0, @StartDate))
                            Set @Partial=0
                        End
                        Else Begin     
                        -- If this is a full day, add full minutes
                            Set @WorkMin=@WorkMin + (@EndWorkingHour-@StartWorkingHour - 1)*60        
                            Set @StartDate = DATEADD(DD,1,@StartDate)
                        End
                    End
                    Else Set @StartDate = DATEADD(DD,1,@StartDate)  
                End
                Else Begin
                            If (DATEPART(dw,@StartDate)=7)
                            Begin                   
                                  Set @WorkMin = @WorkMin + DATEDIFF(MI, @StartDate, DateAdd(hour, @LunchHour, DateDiff(DAY,
    0, @StartDate)));
                            End
                            --Set @StartDate = DATEADD(DD,1,@StartDate)
                            Set @StartDate = DateAdd(hour, @StartWorkingHour + 24, DateDiff(DAY, 0, @StartDate))
                                  Set @StartHour = DatePart(HH, @StartDate)
                      End
            End
            If Datepart(dw,@StartDate)>1 And DATEPART(dw,@StartDate)<7  
            -- If last day is a weekday
                If (Select Count(*) From @Holidays Where HDATE=DateAdd(dd, DateDiff(dd,0,@StartDate), 0)) = 0   
                -- And it is not a holiday
                    Begin
                                  If @Partial=0 Set @WorkMin=@WorkMin + DATEDIFF(MI, @StartDate, @EndDate) Else
    Set @WorkMin=@WorkMin + DATEDIFF(MI, DateAdd(hour, @StartWorkingHour, DateDiff(DAY, 0, @StartDate)), @EndDate)
                                  If (@EndHour >= (@LunchHour + 1)) Set @WorkMin = @WorkMin - 60;
                            End   
                If (DATEPART(dw,@EndDate)=7)
                Begin
                      Set @WorkMin = @WorkMin + DATEDIFF(MI, DateAdd(hour, @StartWorkingHour, DateDiff(DAY, 0, @EndDate)),@EndDate);        
                End
        End
        If @Reverse=1 Set @WorkMin=-@WorkMin
        Return @WorkMin
    End

    The problem is you cannot specify partial hours.
    I think your best bet would be to alter the function sufficiently so it will accept times instead of hours, and where you're making comparisons to the hour, use dates/date functions instead.
    Then, just set the variable as a full time (or datetime, if you need).

  • Scheduling start date and end dates

    Hello Gurus,
    I am trying to understand the schedule start date and schedule end date functionality in Plant Maintenance. I do understand the basic start and end dates. Currently I set up u201C3.Do not adjust basic dates, dep rqmts to order startu201D and set the scheduling type as u201CForwardsu201D . Please note we donu2019t do any capacity planning or leveling.
    So my question is, why the scheduling start date is defaults to the basic  start date  for forwards and scheduling finish date defaults to basic finish date for backwards ? I tried adding couple of operations and save the work order. It did not change anything in schedule dates.
    Do we really need to care about scheduling dates if we donu2019t use capacity planning ?
    Please advise
    Mahee

    Hi,
    As per priority, final dates would be calculated as we will define the duration based on the priprity. Either current date or basic date only applied to Scheduling start date.
    You can change the scheduling start date so that based on priority, final date would be calculated.
    Regards,
    Maheswaran.

  • Preserving tape name and media start/end

    I shoot lots of tapes of random footage to get short general-purpose clips for use later. Years ago when I started, I would preview in the capture window via device control, carefully set log in/out points, and let batch capture make all my little clips. Then I learned how hard that is on my camera's heads, so I got Scenalizer Live and used a new workflow - I captured my whole tape, and then sliced, trimmed, and renamed the "keeper" clips. But since most of my clips don't need audio and SCLive doesn't know how to make a video-only AVI, most recently I've gone back to using PPro for the slice and rename operation, putting the captured video on the timeline, slicing and dicing, and then "exporting to movie" the good pieces to make new AVIs, with only video and with the filenames I want. (Yes, I know there are purists out there who would be concerned about generational loss of methods 2 and 3, but in DV-AVI I just can't see how any mere mortal could tell the difference.)
    But just now I discovered that only my first method preserved the information of where the clip originally came from, i.e. the Tape Name, Media Start, and Media End. All the rest lost that information when I trimmed the clips in either SCLive or PPro. Argh!
    These clips are a lost cause, but for the future, is there a better workflow, one that will preserve both the clip information and my tape heads?

    I agree - the metadata doesn't need to be repeated for every frame - just once for the clip.
    If the clip gets chopped up in PPro (or SCLive or whatever program), it doesn't seem like it should be that hard for the software to just do the math - if I have a two-minute NTSC clip that was originally captured from timecode 12:00:00 to 13:59:29, and I chop it into a 30 sec. clip and a 90 second clip (silly simple example), the resulting two clips should still preserve the Tape Name and other info, and the start/end times should be 12:00:00-12:29:29 and 12:30:00-13:59:29. But instead both PPro and SCLive delete the Tape Name, and the start times of the resaved clips are all zero. Naturally if what is on the timeline when I save is a composite of multiple clips it's a different story, but if the only editing has been to simply put the clip on the timeline and adjust the end points and/or cut with the razor tool, it would be nice if the capture data was preserved.

  • In SharePoint Calendar lists, fields [Start Time] and [End Time] do not exist at the Site Column level.

    <header style="box-sizing:border-box;color:#777777;line-height:1;font-size:13px;padding-right:46px;margin-bottom:3px;font-family:'Helvetica Neue', arial, sans-serif;">
    </header>
    I'm doing SP app development and have the following problem.
    I need to check Start time and End Time in SharePoint Calendar using CAML query and then add a new event to Calendar list using the Start time and End Time that user has entered in 2 datapickers
    in the form.
    function AddCalendarListItems() {
    var SD = document.getElementById("datepicker1").value;
    var SThh = document.getElementById("St1").value;
    var STmm = document.getElementById("St2").value;
    var ED = document.getElementById("datepicker2").value;
    var EThh = document.getElementById("Et1").value;
    var ETmm = document.getElementById("Et2").value;
    var T = document.getElementById("Title").value;
    var S1 = SThh;
    SD = SD.slice(6, 10) + "-" + SD.slice(0, 2) + "-" + SD.slice(3, 5) + "T" + SThh + STmm + ":00Z";
    ED = ED.slice(6, 10) + "-" + ED.slice(0, 2) + "-" + ED.slice(3, 5) + "T" + EThh + ETmm + ":00Z";
    //alert("SD= " + SD + " , ED= " + ED);
    var siteUrl = SiteCollurl + "/SharePointApp11";
    var clientContext = new SP.ClientContext(siteUrl);
    var oList = clientContext.get_web().get_lists().getByTitle('Calendar');
    var ListItemCInfo = new SP.ListItemCreationInformation();
    var newEvent = oList.addItem(ListItemCInfo);
    newEvent.set_item("Title", T);
    newEvent.set_item("EventDate", SD);
    newEvent.set_item("EndDate", ED);
    newEvent.update();
    clientContext.executeQueryAsync(Function.createDelegate(this, this.onQueryAddCalendarSucceeded2), Function.createDelegate(this, this.onQueryAddCalendarFailed2));
    function onQueryAddCalendarSucceeded2(sender, args) {
    alert("Success");
    function onQueryAddCalendarFailed2(sender, args) {
    alert('Add new item to the calendar failed. ' + args.get_message() + '\n' + args.get_stackTrace());
    But I receive the following error:
    Add new item to the Calendar failed. Column 'Start time' does not exist. It may have been deleted by another user.
    I've checked and 'Start time' does exist. So it seems in SharePoint Calendar lists, field [Start Time] and [End Time]  exist but do not exist at the Site Column level.
    Please advise.

    Hi Khojasteh,
    Use “EventDate” for Start Time field, and “EndDate” for End Time field. They are the internal name of the two fields, you can check it in the column settings page url like “Field=EndDate”.
    If it isn’t the issue, please debug the code, in which line the error occurs.
    Thanks,
    Qiao
    Forum Support
    Please remember to mark the replies as answers if they help and unmark them if they provide no help. If you have feedback for TechNet Subscriber Support, contact
    [email protected]
    Qiao Wei
    TechNet Community Support

  • Fixed start date and variable end date

    I'm using Project 2010 Standard. Task A has already started. It can't end until 2 weeks after the completion of task B. The only way I can make Project schedule this task is by doing so manually, allowing Project to calculate the duration. But then if the
    end date of task B changes, Project reschedules the entire task based on the duration without regard for the start date. If I add a % complete to task A, then the end date doesn't change if the end date of task B does. Project seems to fix the duration
    once it's calculated. I need the duration to be flexible based on the fixed start date and the end date of task B. This project file is stored in SharePoint so I can't make task A a hammock task. I get the error "You cannot create links from a project
    file that exists on a Web folder to another file" even though it's the same file. Any suggestions would be greatly appreciated.

    WhoKnows,
    I'm afraid without a hammock task the only way to do what you want is either with a manual reschedule or a macro to recalculate the duration of Task A when Task B moves.
    Update: Okay, after playing around here is a little trick that might work.
    1. Break Task A into two parts (e.g. -1 and -2)
    2. Set the predecessor of Task A-2 to be finish-to-start with Task A-1 and finish-to-finish + 2w with Task B
    Depending on the nature of Task A you may still need to do a little manual adjusting but it will effectively allow the start of Task A to be fixed and the finish to be variable depending on the status of Task B. Does that work for you?
    John

  • Do i need separate videos to enable a user to 'Play All' (From start to end) and select certain sequences (e.g. Ceremony, Reception Speeches that start at the chosen sequence and end at the end of the rest of the video and not the sequence)?

    Hi - I am obviously new to Encore but this is what I want to do.
    In a wedding video I want them to be able to:
    1. Play the movie from start to finish.
    2. Select a sequence (say Speeches) that plays from the start of the sequence until the END of the whole video.
    So do I need 1 video for the play all one, as well as the 4 sequences - Reception, Cake, Speeches, Dancing?
    Colin

    You can use separate videos, or a single video. The single video is easier for your desired navigation. You will find more people asking how to get the "chapter" or scene video to back to a menu when it ends, and also have a play all. So ignore the advice on those.
    Single video:
    Your single video goes on one Encore timeline. "Play all" is a button to the timeline, and the timeline has an end action of "last menu."
    Chapter menu has 4 buttons (plus a fifth to go back to the main menu), going to each respective chapter marker. There are no end actions on the chapter markers, so when another chapter is reached, it keeps playing through just like the play all.
    Multiple videos:
    Each video goes on its own timeline. The end action of video one timeline is video two timeline etc. Play all is a button that goes to timeline one. The chapter menu also has a button going to chapter one, and it works the same as the play all. Each of the chapter buttons go to their respective chapter timelines.
    Encore can have some issues with lags, but I don't think they affect either of these workflows. Do not rely on the Encore preview; burn a test disk and play on a DVD player.

  • Difference between Start Routine  and End Routine in Transformations

    Hi  Friends,
      I'm using BI 7.0... here in Transformations step  we have two options..that is START ROUTINE... and END ROUTINE... What is the Difference between Start Routine  and End Routine in Transformations..
       When  we go for Start Routine.. and when we go for End Routine..
    Plz clarrify... points will be rearded..
    thanks
    babu

    Hi,
    One real time scenario for End Routine.
    We have a scenario where in a datasource field is mapped to three infoobjects on the datatarget side. There are 2 key figures which need to get data after these these Infoobjects are filled. The best place for this to happen would be in a End Routine, where in we would loop through the results package and using the values of the infoobjects from the data target ( Cube in this case).
    Hope this helps,
    HD

  • HT2955 The problem with the above is this: If a chapter end is reached at the same time as the CD space is filled, iTunes goes to EOJ, ejects that CD and pretends it's done. Other than entering start:end manually you are screwed. iTUnes just ***** for bur

    If you use iTunes to burn Audible CDs you better hope the book is only one CD long. Otherwise iTunes craps-out without warning and cannot be easily restarted. It just goes to EOJ and pretends it's all done with the entire burn. Often this can cause (will cause) the user to waste many many CDs trying to get a burn completed. If a CD-end is reached at a chapter-end point, iTunes assumes the burn is done and ends. The user must manually enter start:stop for each CD, pay constant attention to what's going on, and hope everything goes right. And even if you do all that you WILL find a chaper point at CD end and will have to go manually adjust the start-stop of the next CD and HOPE... that's their strategy: Hope.  iTunes was never designed for books, for audio content that is multi-volume, and it really ***** at it. And if you are unlucky enough to want to burn long books (Truman -48 CDs, or Atlas Shrugged - even more), be prepared to throw away many tens of CDs as you try to get it done; pretty soon it's just cheaper to go buy the book in audio form and dump Audible entirely. (Maybe this is why Amazon made the switch from working Roxio to non-working iTunes... nahhh.. you'd have to be too cynical to believe that...)  If, that is, you don't just give up in frustration and terminate your Audible subscirption as I did a couple of years ago. Audible keeps your paid-for library, but downloading a long book again just brings you to the same point: trying to burn multi-volume CDs on a tool not designed to do so. Maybe amazon bought lots of Apple stock at the same time and just wants you to be walled-in to your iPod and never again use a CD.. maybe they bought the car companies, too, so you can't have an old car and must buy a new one with an ipod attachment in order to listen to your books..... The worst part is that Audible used to use Roxio, which handled all of this with no problem at all. When it was tasked with a multiple-CD burn, it told you how many you'd need, began recording, when it reach end-of-CD, it told you to put in the next one - regardless of whether there was a coincident end of chapter, and kept burning until the book was completed. For unknown - and seriously stupid - reasons, audible decided to use iTunes, and the problem continues. My research across the web indicates I am not the only FORMER customer of Audible that feels this way, or who cancelled their subscription because of this stupefyingly dumb decision - to make the primary customer interface tool WORSE that it had been.

    AC, Thank you for you reply.
    Even though it is supposed to be a 'simple' home video system it has so much potential!
    And i mean i know there is an solution since i know the Caribbean cruises are using apple as media centers onboard their ships. have to admit that i do not know if they are using frontrow or some other application created buy some other company.. i just know that some one must know how to get around it all and make it work..
    Just wish i had someone to get in contact with that is working hands on every day with this product, and get strait, good, final answers.. no "pro support" since im not happy with their answers anymore..
    I know i start to sound desperate.. but thats because i am..

  • My iphone 4 started displaying a message box with the following message: "This accessory is not optimized for this phone. You may experience noise and loss of battery."  My question is: how to fix this?

    My iphone 4 started displaying a message box with the following message: "This accessory is not optimized for this phone. You may experience noise and loss of battery."  My question is: Why is this happening and how do I fix it? (I'm losing battery power precipitously). Thanks in advance for any assistance with this question.

    Thanks Kilted Tim, you solved the problem. I'm mightily impressed at the simplicity of the solution!
    Jaded Kane

Maybe you are looking for

  • Does dv6-6153cl support SATA III HDDs?

    I'm having trouble with my laptop and I think I've narrowed the problem down to the HDD. I want to replace it, and upgrade it, but I'm not sure what HDDs I can use. I'd like to know if I can install a SATA III HDD into my dv6-6153cl laptop. From what

  • How do I get photos out of iphone and in PC

    I have a PC. How in the world do I get my 90 photos out of the iphone and onto my pc without having to email them one at a time to myself. Can someone please help me. I am sure I am overlooking something very simple. Perry

  • Vector and Jtree 4Duke

    hi i am having poblem with my jtree as i am not able to show the object in my vector as a different node {each object is node of my tree} unfortunately they all appear flat in the root, and in sequence{as one node} ?? i have done everything but still

  • Sony Bravia XBR-55HX929 internet TV looses wi-fi n...

    I have a Sony Bravia XBR-55HX929 internet TV.  Experiencing home network connectivity issues only when using Skype. Skype video calls end 2 to 3 minutes into the call with network connectivity error. Network is fine. When this happens it hangs up all

  • How to make a particular column bold in alv?

    Dear  Experts, I have searched many threads on this. I have used control break events to get the subotals and totals. The requirement is to make the text and the figure of subtotal and total bold. I am still not able to find the thread to make a part