Tables for following scheduling agreements and PR data

Hi All ,
Please can you tell me table names if I want the following information
1. Scheduling Agreement Created By, Amended By, Modified Date, Plant
2. Req Created by, Released by, Cost center, plant
Thanks in advance
Vinayak

To view the fields listed in a table go to Tcode SE11 and enter the table name and execute
EBAN  - Purchase Requisition 
EBKN  - Purchase Requisition Account Assignment 
Req Created by Table:EBAN Field ERNAM
Released by- Table:EBAN Field FRGGR
Cost center- Table:EBAN Field FISTL (Funds Center)
plant-Table:EBAN Field WERKS
For Scheduling Agreements following are the tables:
EKEH    - Scheduling Agreement Release Documentation 
EKEK    - Header Data for Scheduling Agreement Releases 
EKET     - Scheduling Agreement Schedule Lines 
EKETH   - Scheduling Agreement Schedules: History Tables
You will find the following list of fields in these tables:
MANDT                          Client
EBELN                          Purchasing Document Number
EBELP                          Item Number of Purchasing Document
ETENR                          Delivery Schedule Line Counter
EINDT                          Item Delivery Date
SLFDT                          Statistics-Relevant Delivery Date
LPEIN                          Category of Delivery Date
MENGE                          Scheduled Quantity
AMENG                          Previous Quantity (Delivery Schedule Lines
WEMNG                          Quantity of Goods Received
WAMNG                          Issued Quantity
UZEIT                          Delivery Date Time-Spot
BANFN                          Purchase Requisition Number
BNFPO                          Item Number of Purchase Requisition
ESTKZ                          Creation Indicator (Purchase Requisition/S
QUNUM                          Number of Quota Arrangement
QUPOS                          Quota Arrangement Item
MAHNZ                          No. of Reminders/Expediters for Schedule L
BEDAT                          Order date of schedule line
RSNUM                          Number of Reservation/Dependent Requiremen
SERNR                          BOM explosion number
FIXKZ                          Schedule Line is "Fixed"
GLMNG                          Quantity Delivered (Stock Transfer)
DABMG                          Quantity Reduced (MRP)
CHARG                          Batch Number
LICHA                          Vendor Batch Number
CHKOM                          Components
VERID                          Production Version
ABART                          Scheduling agreement release type
MNG02                          Committed Quantity
DAT01                          Committed Date
ALTDT                          Previous delivery date
AULWE                          Route Schedule
MBDAT                          Material Staging/Availability Date
MBUHR                          Material Staging Time (Local, Relating
LDDAT                          Loading Date
LDUHR                          Loading Time (Local Time Relating to a
TDDAT                          Transportation Planning Date
TDUHR                          Transp. Planning Time (Local, Relating
WADAT                          Goods Issue Date
WAUHR                          Time of Goods Issue (Local, Relating to
ELDAT                          Goods Receipt End Date
ELUHR                          Goods Receipt End Time (Local, Relating
ANZSN                          Number of serial numbers
NODISP                         Ind: Reserv. not applicable to MRP;Purc
hope this helps!

Similar Messages

  • Exit for role determination via exit for scheduling agreement and contract?

    Hi..
    I have a requirement to fetch the agents in run-time for PO,PR,SCHEDULE AGREEMENT, CONTRACT..
    For PO i am using EXIT : - M06E0005
    For PR release i am using EXIT :- M06B0001
    By using above 2 exits i am getting the agents at run-time...
    Same way i need the EXIT for SCHEDULE AGREEMENT and CONTRACT..
    if there is any EXIT for this please share with me..
    Regards,
    Imtiaz Khan

    Hi Imtiaz,
    Ideally you should have your agent determination logic in workflow itself instead of determinining them in EXIT.
    Can you tell me why you are determining agents in exit and how you are making use of it ?
    Also let us know how your workflows are getting trigger for all these documents.
    Regards,
    Ibrahim

  • Same BO is getting invoked for Pur. Order, Schedule Agreement and Contract

    Hi All,
    My Scenario is like this:
    For Purchase order, Scheduling Agreement and for Contract the Release Statergy are same. For these three scenarios i have created 3 different workflow templates.
    My Purchase order workflow is working fine.
    My problem is :
    When i create a Schedule agreement or a contract, my PO business object is getting invoked and it goes to error.
    I have a doubt:
    For all the three scenario's they are using same number range, will this may be one of reason for the above problem???
    Kindly help me to resolve the issue.
    Thanks and Regards
    Balaji E.

    Hi,
    You can check this link:-
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/abap/workflow+scenario (based on PO change)
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/crm/action%252bprofiles%252bin%252bsap-crm(reason for more than 1 WF trigger)
    More than 1 WF trigger, could be that there would be a triggering condition that triggers more than 1 WF. Since further the conditions are not satisfied, this could lead the WF in error state.
    Let me know if u still face any issues..!!
    Regards,
    Kanika

  • Contract , scheduling agreement and service order

    Hi all,
          Can anybody tell me about the contract scheduling  agreement and when we can suggest our client to go for schedule or contract agreement ?
    Pls tell me elaborately .
    Also Pls explain me about service order and when can i go for service order . whether it is restricted to AMC ?
    Pls explain me elaborately.
    pls explain me steps for creating contract or scheduling agreement and service order..........................
    points to be rewarded.
    Regards,
    Girish.

    Hi,
    Contract is outline purchasing agreement where you have a contract with the vendor,may be a for a predetermined quantity or predefined value. So everytime you need the matl,  you need to make PO ref the contract asking for the delivery of the matl. In such instance when PO is ref with contract its called contract release orders or call off orders. So Process are ME01, ME11, ME31K with aggnrement type, ME51,ME21 & MIGO,
    Scheduling agreement is a long term purchase agreement, where you will keep issuing the delivery schedules whenever there is a change in requirement or at predetermined time intervals. The delivery schedule can be on hour/daily/weekly/monthly basis. SA is also an agreement with the vendor for the supply of matl, may be a quanity or value. The delivery dates will be maintained in ME38 ref the SA which are called delivery schedules.So you can maintain the delivery schedule and communicate the vendor on Forecase basis or JIT basis. And when you need some more matl then will only create SA deliveries using ME38. SA could be of 2 types:- without release documentation-system will transmit the delivery info to the vendor once you save the document.
    With release documentation- after creating the delivery schedules you need to create SA release using ME84.So Process are ME01, ME11, ME31K with aggnrement type, ME38 & MIGO,
    Service order or service PO is created with item Category "D" and an account assignment category as per ur requirement. U can not enter ur material here only u have to maintain short text of material. Example: You want to clean the boiler and u given contract to your Vendor. Vendor sends quotation mentioning that Rs.100/hr/Man head. Now how you will measure the cleaning activities of furnace? You can pay to contractor based on the hourly basis/ man head spent in cleaning activities. So in this case create the Purchase Order mentioning "Cleaning" in the short text in Item overview(Acc assignment ' K' or “C” or “P” and Item category 'D) and item details " Man Head" Service No , Gross price - Rs.100.00 and unit - hour ( or pick from Service master) and Quantity-number of hours spent by all man head.
    The steps to create Service PO are:
    1) Maintain Item Category as D & account assignment such as cost center “K”or slaes order”C”
    2) Keep material code field blank.
    3) Enter description of service & other fields in the PO Item Overview level. Press Enter.
    4) System will prompt you to maintain services at Item Level. Maintain your service master number / service description & other fields (quantity / rate /)
    5) Save the PO.
    For more follow the links;
    For more follow the link;
    http://esoadocu.sap.com/socoview(bD1lbiZjPTgwMCZkPW1pbg==)/render.asp?packageid=DBBB6D8AA3B382F191E0000F20F64781&id=EB65A89F1AFD4C46AB61C6161BAF
    http://www.sap-img.com/sap-sd/sap-sd-scheduling-agreement-vs-contract.htm
    http://www.copacustomhelp.state.pa.us/infopak/nav/procurement/contracting/file1499/index.htm
    http://www.sap-img.com/materials/what-is-outline-and-scheduling-agreement.htm
    Regards,
    Biju K

  • SCHEDULING AGREEMENT AND SCHEDULING LINE CREATION

    Hello Guys,
    I trying creating a scheduling agreement(SA) for vendor & material combination.
    I have created a Scheduling agreement in ME31L then maintained in ME38.
    In ME38 i have also mentioned the delivery date. when i am checking EKKO for Purchasing document , its created with the delivery date specified.
    My question is how to create a schedule line ? Do we need to maintain a source list of that material, plant and vendor.
    If we have the source list maintained, then what is the next step after SA is created and maintained.
    Do we need to do MIGO? because i tested by creating one SA in ME31L and maintained in ME38. I mentioned the delivery date as today and when i checked EKKO table the Purchasing document is created.
    Do i need to create a Purchase Order?
    If no then do i need to do MIGO? If i need to do MIGO, for what reference do i need to do MIGO???
    My client never maintained a Scheduling agreement, they want the scheduled lines to be created and sent to vendor and we need to receive  the goods on specified delivery date.
    Help will be appreciated.
    Thanks.

    Hi,
    You need to make a distinction between the scheduling agreement (ME31L/ME32L) and the delivery schedule creation (ME38/ME84)
    With ME31L you create the scheduling agreement. In the scheduling agreement which is created for a vendor you maintain the parts that you will order at this vendor, the target quantity that you will order over a certain period and the price.
    In ME38 you use the scheduling agreement number that is created with ME31L to create schedule lines (manually). These schedule lines consist of a date and an quantity. This is the data that needs to be transmitted to the vendor and against which the vendor is shipping the ordered materials.
    Once the vendor ships the materials you post the goods receipt in Migo against the scheduling agreement number.
    That is the basic working of the scheduling agreement and the delivery schedule.
    Now some remarks.
    You need to set-up the required output conditions for transmitting the data to the vendor either via print, fax, email or EDI.
    You can do this manually in each scheduling agreement and each release but typically you maintain the output condition records.
    For scheduling agreement contract (ME31L) you use transaction MN07.
    For the delivery schedule (ME38/ME84) you use transaction MN10.
    In order for you to be able to post the goods receipt the delivery schedule needs to have been transmitted otherwise you will get a message that not requirement are found when trying to post goods receipt.
    Also the goods receipt can only be posted if the requirements are valid on the day that you are performing MIGO. This means if you would post GR today then the open requirements in the scheduling agreement need to be for today or already from previous dates. The system will not allow you to post GR for quantities that are only due tomorrow (if this is required a user exit needs to be set-up).
    If you want schedule lines created via MRP then you need to set-up a source list using ME01. You have to make sure that the MRP key is set to 2 in orer for the system to generate schedule lines and you also have to make sure that you have the correct MRP parameters set-up.
    You can use ME84 to transmit the delivery schedule lines generated by MRP if no changes are required. With the ME84 you can transmit multiple releases at once, however this transaction can not be used to make manual changes to the MRP proposal.
    The scheduling agreement offers lot's more possibilities but the above should get you going with the basics.
    Hope this will help you on your way.

  • Creation Profile in Scheduling Agreement and Schedule LIne

    Dear Experts,
    Currently I'm working on Scheduling Agreement and Schedule Line.In standard SAP gives the provision of creation profile.I've gone through the SAP help documentation but I'm not clear on that.I've few doubts on creation profile.
    1. I've created a profile say XXXX for 14 days JIT and 6 months Forecast.And I maintain the same on Scheduling Agreement additional data.
    2.I'm creating delivery schedule respect ot Scheduling agrrement.
    3. I maintain the aggregation horiozon in creation profile as 10 days daily aggregation for JIT and 120 days for monthly aggregation for forecast.
    4.I run MRP for the header material and I maintain the necessary SA number in Source list.
    5. After MRP run I'm not getting the respective schedule lines for JIT and Forecast.
    6. What is the use of creation profile in Scheduling Agrrement and schedule line and is it determine ant schedule lines after MRP run.
    Please clarify me on creaion profile.
    Thanks in advance
    PKB

    Dear Experts,
    I'm not getting any response regarding Creation profile which I posted last week.
    Can anybody explain me the use of Creation profile in Schedule line?
    From Standard SAP help documentation I'm not convince.
    Best Regards
    PKB

  • Scheduling agreement and GR

    Hello experts,
    I use purchasing schedule agreement I would like to build a report in which I can see for each schedule agreement, for each delivery (Goods receipt) the date and the quantity and how SAP split this quantity according to schedule lines compared to schduled quantity.
    I tried with SQVI, but I have no result yet.
    If someone can guide  me to build the query it would be fine.
    Thanks a lot

    Hello,
    This solution is not fitting to my expextation.
    I explain again :
    I would like, for each purchasing scheduling agreement, to see for each delivery (goods receipt) the quantity enter in stock and for which scheduling line it matches.
    For example, sometimes we can have one delivery wich cover more than one schedule line, it means that for each schedule line I expect to have one line per delivery till the quantity fit to the delivery line, and the date of the delivery.
    I would like to build it with a query if it's not available in standard Tcode.
    Many thanks

  • BAPI or FM for Sales Scheduling Agreement

    Hi ABAPers,
    I need to transfer the Sales Scheduling Agreement (T-code: VA31) data into SAP. I am sure that it is not possible by LSMW and BDC methods as I have to upload Header and Item texts for the scheduling agreement.
    So, I am trying to find any BAPI or FM to create the same.
    Any helps regarding this would be appreciated.
    Thanks in advance,
    Asif Ali Khan

    You can use BAPI-BAPI_SCHEDULE_MAINTAIN
    Short Text
         Maintenance of Scheduling Agreement Delivery Schedule Lines
    Functionality
         The BAPI_SCHEDULE_MAINTAIN is used to create or change scheduling agreement delivery schedule lines.
    Further information
         The parameter PURCHASEDOCUMENT and the scheduling (delivery schedule line) data in POSCHEDULE and POSCHEDULEX are to be passed on to the interface. These three parameters are defined as mandatory.
    Hope this helps.
    Regards
    Vinayak

  • LPET Output equivalent for LPA Scheduling Agreements?

    I am trying to capture the creation schedule lines on a Scheduling Agreement Delivery Schedule to communicate the demands to Third Party Carrier.  I would like to use an Output with Special Function (Type 8) to gather data from the Scheduling Agreement and call our XI system (via Proxy) to generate a communication to the Third Party Carrier.  My problem is that I don't want to communicate at the Release level, since it will be aggregate information.  I am looking to communicate at the Delivery Schedule Line level. 
    The LPET output looks like a good choice, but it doesn't work for LPA Scheduling Agreements.  Does anyone know of a way to configure the LPET Output to work with LPA documents?  Or is there a different Delivery Schedule / Schedule Line Item Output that can be generated for LPA Scheduling Agreements?
    Any help you could provide would be appreciated. 
    Thanks-
    Ron

    Hi,
    LPA SA will only work as far as I am concerned with LPH1 (for FRC schedule releases) and LPJ1 (for JIT schedule releases).  Is there any particular reason why the SA without release documentation can't work for your particular case?
    Cheers,
    HT

  • Scheduling Agreements and relevant schedule lines configuration !

    Dear Sapients,
    I request you all to help me in providing the configuration steps for Scheduling Agreements and relevant Schedule lines configuration.
    Its urgent please help me !!
    Regards,
    Sreedhar.
    kodalisreedhar----
    com

    Hi Sreedhar,
    Scheduling Agreement with Delivery Schedules
    Definition
    An outline agreement that is created for one or more materials and outlines the overall expected quantity of the material(s) to be delivered to the customer over a specific period of time.
    Use
    The scheduling agreement is used as a basis for delivering a material. The customer sends in scheduling agreement releases, referred to as delivery schedules, at regular intervals to release a quantity of the material.
    Structure
    The structure of scheduling agreements with delivery schedules resemble that of other sales documents in the R/3 System, in particular the standard scheduling agreement.
    Data that applies to the entire document appears in the header; data about materials appears at item level; and delivery dates and quantities appear in the schedule lines within the delivery schedule. Additionally, the system maintains a history that permits you to compare and contrast various generations of delivery schedules.
    Integration
    Data in scheduling agreements comes from three sources:
    The customer sends in requested quantities and dates, normally by Electronic Data Interchange (EDI)
    The component supplier enters data manually
    The system automatically copies data into the scheduling agreement from master records
    Please go through the below link for further information
    http://help.sap.com/saphelp_47x200/helpdata/en/93/7439fb546011d1a7020000e829fd11/frameset.htm.
    Please Reward If Really Helpful,
    Thanks and Regards,
    Sateesh.Kandula

  • Scheduling agreement and material availability

    Hi all,
    I have this problem:
    For the material AABBCC I have an availability of 60 pieces.
    in transaction VA32 I have the following scheduling agreement for the material AABBCC.
    01.07.2010           q.ty  10
    01.08.2010           q.ty  10
    01.09.2010           q.ty  10
    01.10.2010           q.ty  10
    01.11.2010           q.ty  10
    01.12.2010           q.ty  10
    If today I try to place an order for 5 pieces of the same material the application tells me that there is no availability,
    why ? It seems that all the quantities provided in the schedule have already committed quantities in stock.
    I thank you in advance.
    Edited by: valpacav on Jun 16, 2010 5:06 PM

    Hi
    I hope the schedule you mentioned here is your forecast schedule. We have also the similar issue. SAP schedule agreements are confirming the all forecast requirements. Because these forecast requirements, we are unable to confirm our daily delivery schedules. We are using APO for ATP check.  We modifications our user exit to block these forecast requirements for APO ATP check.
    I hope this will help you
    Venkata

  • Comparing two columns in two tables using partial text strings and copying data between tables

    I have two tables:
    The Vendor table is supplied by a clothing manufacturer and lists product data by row with a column that contains a unique manufacturer ID, such as T5C4.  In this table is a short product description and a long product description that I need to find and copy into the second table, Inventory.
    The Inventory table is an export from our Magento store.  Each row contains a unique inventory number in a column that includes but does not match the unique manufacturer ID from the Vendor table.  For example, the unique inventory number could be T5C4-W12, or RED-T5C4W12 or some other variation.
    For each product in Inventory, I need to find the matching product in Vendor, and then copy the short description and long description from Vendor to Inventory.
    Any tips?  Thanks!
    Karl

    Karl,
    Here's a start, as you requested.
    The formula for Our Inventory Row is:
    =IFERROR(MATCH("*"&A&"*", Our Inventory :: A, 0), "n/a")
    The formula for Brief Description in the inventory table is:
    =IFERROR(INDEX(ABC Products :: $A$1:$C$9,MATCH(ROW(), ABC Products :: $D, 0), 2), "n/a")
    The formula for the Full description in the inventory table is:
    =IFERROR(INDEX(ABC Products :: $A$1:$C$9,MATCH(ROW(), ABC Products :: $D, 0), 3), "n/a")
    The Manufacturer's table knows the concise product numbers, so it has the ability to search the Inventory table for it's product id's using wildcards and it then displays the line number of the item in the inventory table. The Inventory table can then search the manufacturer's table for its row number and can reference the brief and full descriptions.
    This approach has a serious limitation. It will only find the first occurrence in the inventory. Now, if you want to accept this, you can sort all the found descriptions and pull them out of the inventory table, and then the next product in line will display it's description too.
    I wish I could do better with this, but it's all I can come up with at this point, knowing only what you have told me.
    Jerry

  • MD04 - How to create a requirement in MD04 for a scheduling agreement

    Hi,
    Pls advice How to create a requirement in MD04 for a scheduling agreement. pls mention the steps and t codes.
    thanks in advance.

    Hi Prajit,
    Sales people will create sales scheduling greements through VA31 T-Code (normally for finished products).In that they define forecast schedules as well as JIT schedules.After creation, these will be appeared in MD04 screen as requirement for that finish material.
    In MRP run,system will create procurement elements (planned orders for example) for these requirements.
    Regards,
    Raja.

  • Change Schedule Lines values for Each Item for a Scheduling Agreement ?

    Hii
        I want to change the Schedule Line Schedule Qty for Each Line item for a
    Scheduling Agreement .
    I cannot use BAPI_PO_CHANGE as this is for PO only and gives error for
    a scheduling agreement.
    I am on 4.6c so i SAP does not have BAPI_AGREEMENT_MAINTAIN .
    Please help me out on using a BAPI or FM to do this.
    Regards
    Gaurav

    Hi,
    isn't the Schedule Line a special case of SALES order  that might be changed with a BAPI_SALESORDER_MAINTAIN.... If ther is no BAPI for this in your system, you might create new contracts with reference to existing ones using BAPI_CONTRACT_CREATEFROMDATA.
    Regards,
    Clemens

  • I am having trouble finding the Accept button for my licensing agreement and would like to accept.

    I am having trouble finding the Aceept button for my licensing agreement and would like to accept.

    Well, it's probably below the table... Sounds like you didn't consider the system requirements and installed on a system with too small screen resolution. If so, only using a larger res may possibly revela the magic button...
    Mylenium

Maybe you are looking for