I use MS Project 2010 and have a lot of repetitive tasks that I enter at summary level. Is it possible to have a template that I can insert in different places within the project?

HFprojects --
My answer is the same with projects saved in Project Server 2010.  If you follow the first set of steps I detailed in my original reply, you should save your template project as an MPP file outside of the Project Server database.  When you want
to insert the tasks from the template file, then follow these steps:
1.  Open a project in which you need to insert repetitive tasks.
2.  Select the cell where you want to insert a block of tasks.
3.  Click the Project tab and then click the Subproject button.
4.  In the Insert Project dialog, select the template project containing the repetitive task list.
5.  DESELECT the Link to Project checkbox option and then click the Insert button.
6.  Expand the new summary section containing the repetitive tasks.
7.  Indent our outdent the new section as needed.
Please note, with my apologies, that I forgot to include step #5 in my original reply, which is a VERY important step.  When you follow the 7 steps listed above, you are not inserted a subproject inside of another subproject.  Instead, you are
inserting the list of tasks from the template project into a subproject, so this will not cause you any problems with your Project Server subproject. 
Hope this helps.
Dale A. Howard [MVP]
VP of Educational Services
msProjectExperts
http://www.msprojectexperts.com
http://www.projectserverexperts.com
"We write the books on Project Server"

Similar Messages

  • [svn] 3120: When you point Flex Builder at a local sandbox trunk build, it couldn' t generate the html-templates folder correctly for new projects so we moved all the html templates up one level and removed the html-templates directory and adjusted build

    Revision: 3120
    Author: [email protected]
    Date: 2008-09-05 10:44:10 -0700 (Fri, 05 Sep 2008)
    Log Message:
    When you point Flex Builder at a local sandbox trunk build, it couldn't generate the html-templates folder correctly for new projects so we moved all the html templates up one level and removed the html-templates directory and adjusted build.xml's to accommodate the directory change
    Modified Paths:
    flex/sdk/trunk/build.xml
    flex/sdk/trunk/webapps/webtier/build.xml
    Added Paths:
    flex/sdk/trunk/templates/client-side-detection/
    flex/sdk/trunk/templates/client-side-detection/AC_OETags.js
    flex/sdk/trunk/templates/client-side-detection/index.template.html
    flex/sdk/trunk/templates/client-side-detection-with-history/
    flex/sdk/trunk/templates/client-side-detection-with-history/AC_OETags.js
    flex/sdk/trunk/templates/client-side-detection-with-history/history/
    flex/sdk/trunk/templates/client-side-detection-with-history/history/history.css
    flex/sdk/trunk/templates/client-side-detection-with-history/history/history.js
    flex/sdk/trunk/templates/client-side-detection-with-history/history/historyFrame.html
    flex/sdk/trunk/templates/client-side-detection-with-history/index.template.html
    flex/sdk/trunk/templates/express-installation/
    flex/sdk/trunk/templates/express-installation/AC_OETags.js
    flex/sdk/trunk/templates/express-installation/index.template.html
    flex/sdk/trunk/templates/express-installation/playerProductInstall.swf
    flex/sdk/trunk/templates/express-installation-with-history/
    flex/sdk/trunk/templates/express-installation-with-history/AC_OETags.js
    flex/sdk/trunk/templates/express-installation-with-history/history/
    flex/sdk/trunk/templates/express-installation-with-history/history/history.css
    flex/sdk/trunk/templates/express-installation-with-history/history/history.js
    flex/sdk/trunk/templates/express-installation-with-history/history/historyFrame.html
    flex/sdk/trunk/templates/express-installation-with-history/index.template.html
    flex/sdk/trunk/templates/express-installation-with-history/playerProductInstall.swf
    flex/sdk/trunk/templates/metadata/
    flex/sdk/trunk/templates/metadata/AC_OETags.js
    flex/sdk/trunk/templates/metadata/readme.txt
    flex/sdk/trunk/templates/no-player-detection/
    flex/sdk/trunk/templates/no-player-detection/AC_OETags.js
    flex/sdk/trunk/templates/no-player-detection/index.template.html
    flex/sdk/trunk/templates/no-player-detection-with-history/
    flex/sdk/trunk/templates/no-player-detection-with-history/AC_OETags.js
    flex/sdk/trunk/templates/no-player-detection-with-history/history/
    flex/sdk/trunk/templates/no-player-detection-with-history/history/history.css
    flex/sdk/trunk/templates/no-player-detection-with-history/history/history.js
    flex/sdk/trunk/templates/no-player-detection-with-history/history/historyFrame.html
    flex/sdk/trunk/templates/no-player-detection-with-history/index.template.html
    Removed Paths:
    flex/sdk/trunk/templates/html-templates/

    Remember that Arch Arm is a different distribution, but we try to bend the rules and provide limited support for them.  This may or may not be unique to Arch Arm, so you might try asking on their forums as well.

  • Can I summarize data from a line item ODS into a higher summary level?

    Hello friends,
    1) Can I summarize data from a line item ODS into a high summary level and store the results into another ODS?  If so, can you discuss the approach at a high level...i.e. whether or not a start up routine is needed?
    2) Once data is stored in an ODS, can a routine be written to update specific fields in the ODS after the data has already been loaded into the ODS.  As a simple example, is it possible to write a routine that simply multiplies "Field A" by "Field B" and stores the result in the ODS as "Field C"?  (Most of the time I would do this calculation in Bex, but in this one case, I have the need to calculate and store "Field C" in the ODS.)
    Thank you.

    1.- Yes, you can sumarize data in other ODS. Connect both ODS and use aditions for key figures intead of overwriting.
    2.- You can do it in load time, in update rules, is not necesary to wait for ODS was loaded

  • Data at summary level

    Hi All,
    In my reports, we have to display both detail and summary level data.
    Detail column - Director, Region, Employee, Application Id,product id, Decision date, Avg Qty
    Summary Column - Director, Region , Employee, Avg Qty
    Issue - Data in summary level is incorrect.
    Approach - In summary level, when we pull product id and decision date we get correct results but data will split for each product& decision date. how do we achieve this in reports
    Request inputs
    Thanks,
    Nithya
    Edited by: 973422 on Mar 24, 2013 8:30 PM

    Hi Nithya,
    Would you please provide more information
    "In summary level, when we pull product id and decision date we get correct results but data will split for each product& decision date."....Not Clear
    Provide some sample data with Issue Explanation
    Thanks
    NK

  • More than one summary level for a matrix with group

    Hello friends at www.oracle.com ,
    I have a report where I need to create a summary level for each row and column. In the Report wizard, it works finely, creating the summary for the 1st matrix group level.
    However, if I have some extra matrix group levels - that is, a 2nd or a 3rd level -, it seems that Reports doesn't create its summary levels.
    How can I create other summary levels at the matrix, outside the inner matrix?
    Best regards,
    Franklin Goncalves Jr.

    Hello petpandian,
    I have a little example that intends to demonstrate what I really need. Hope it is clear enough.
    (Below you can see the output I am looking for)
    ..................MONTH/YEAR
    CITY REGION 04/2005.....05/2005
    AA.....BB......$ 10,00.....$ 15,00
    ...............$ 11,00.....$ 16,00
    Totals for BB: $ 21,00.....$ 31,00
    ..................MONTH/YEAR
    CITY REGION 04/2005.....05/2005
    AA.....CC......$ 30,00.....$ 11,00
    ...............$ 40,00.....$ 15,00
    Totals for CC: $ 70,00.....$ 26,00
    Totals for AA: $ 91,00.....$ 57,00 <-- Totals separated for each region and month/year.
    As you can see, I need a matrix with group(s) around it. 1st group level is the city (AA), and I have its regions BB and CC. After showing BB values, I have BB totals for each month/year. Same applies to CC totals.
    However, I expect that these results can be showed for its outside group (in this example, CITY AA), and what I have in return is the sum of all values in a single field:
    Totals for CC: $ 70,00.....$ 26,00
    Totals for AA:.....................$148,00 <--- The sum of all totals: it's not separated as above.
    I think I should have a matrix inside a matrix, so I would have totals for each region, and totals for each city, separating by its regions and month/year.
    The only solution I found was to calculate it manually via PL/SQL and inserting it into a temporary table. However, I think it is not the ideal solution because PL/SQL instructions have to handle the totals, something that Reports should do, and that's why I need help.
    Your help will be greatly appreciated. Thanks in advance.
    Best regards,
    Franklin Goncalves Jr.

  • Query not able to Retrieve Summary Level Member

    Dear all,
    I have created a Planning application on BPC Netweaver 10.0.
    I am trying to retrieve the Planning Data via BEx Query in Dashboard.
    My Account dimension is hierarchical and I want the dashboard users to be able to select summary account when viewing the dashboard (Refer to Look.PNG)
    However, the limitation is that only bottom level members are available in the list.
    So I try to edit the query to summary level accounts available to choose from.
    Query.PNG is my existing design where I can use the filter and prompt for values.
    However, if I apply the setting in Query2.PNG, I can select SOME summary level account but the filter is not available anymore.
    Is there anyway to allow users to choose summary account they would like to see?
    Is the problem related to how the query was set in query designer? Why it drills down to bottom level automatically?
    Thanks,
    Winson

    Hi all,
    When I look back and think about why the query does not give summary level members, I realized that in BPC Microsoft Version, Summary level data are dynamically calculated and the data were not stored in the database. They are instead calculated every time we have to retrieve the data.
    Would that be the reason why the BEX query cannot return Summary level member?
    Anyone who has met this issue before can share how they solve the problem?
    Thanks,
    Winson

  • What is summary level concept in data warehousing?

    I am new to data warehousing.
    can anybody explain about the summary level and higher level concepts in data warehousing?

    If I understood your question:
    Data warehouses are intended for analytic processing (OLAP). Basically, It's based on queries that would take too long in OLTP (transactional processing). So you build a new Database, with a relatively denormalized model (you probably have heard about Star-Schema modeling, etc).
    Look for Bill Inmon (Building the Data Warehouse) and Ralph Kimball (The Data Warehouse Lifecycle Toolkit : Expert Methods for Designing, Developing, and Deploying Data Warehouses) Data warehousing concept books. Mr. Inmon and Mr. Kiball pretty much "created" the Data Warehousing concept. You'll also find a Book from Oracle Press, named "Oracle XX Datawarehousing Guide" (XX = DB Release).
    Also, you have plenty documentation about how to create a data warehouse in OTN. See thread below:
    OLAP and cubes tutorials
    Hope it's useful for you!
    Regards,
    Marcos

  • Tracking the project at Task Summary level

    I want to plan the Project detailed, but because the fact that resources often do not return actual work at the right tasks, I just want to enter the actual work at the summary Level. I do know that they are working in the right area, but not on a specific
    task. I can update the actual work, but if the tasks belonging to the summary task finished in a less work I am not able to update that. Then MSP will copy work into actual work. It seems that work and remaining work is locked. Is there any way that I can
    track my Project this way? For information, all tasks are fix duration. I need the right numbers to make a proper "earned work" report. Not cost, but work. (we do not use cost in Our Project plans) Somebody that have a good idea for me?
    Thanks, Knut fr

    Knut,
    When you say that "resources often do not return actual work at the right tasks", probably the update strategy for your plan should be revised or the decomposition of workpackages into activities in your schedule. Today you are updating assignments
    (actual and remaining work) so you have to use the Resource Usage or Task Usage view to do the updates using the assignment approach. Apply the work table in these views and include Baseline Work and Actual Work in the timesheet. Ok, fixed duration is the
    right type at this moment of the project.
    As Dale said, never update the summary task! The summary task, as the name already says, consolidates the data you provided in the activities.
    Alexandre Paiva, PMP, PMI-RMP, PMI-SP, MCTS, ITIL
    Project Manager +55 (21) 8887-3645 [email protected] www.gerentedeprojeto.net.br

  • Ms project 2010 - grouping how to show the duration between dates at the summary level

    Hi we have a ms project plan where we have used grouping to present the task breakdown in a different structure.
    This works great we get at the summary level the start and finish dates correctly but the duration gives us only the Maximum value for the durations of the tasks within the group. (is it possible to change the maximum calculation?)
    We would like to be able to determine the duration at the summary level. Of note if we use functions such as projdatediff(start,finish) this only gives the result at the detail level and does not show at the summary level - even if we check the do the
    calculation for the task and group levels 'use formula' radio button.
    is this a bug???.
    If we use a numeric calculation such as finish-start we get a figure that allows  us to repeat the calculation at the group (summary) level. but firstly we do not actualy know what the numeric value represents. i.e (Finish-Start)*10000 for
    a duration of 0.5 hours = 208.33 ,1 hr= 416.67,1.5 hrs =625, but 8 hrs is giving 10833.33 which is 24 * the 1 hour figure
    duration  finish-start  start           finish
    0.5hrs     208.33    Tue 31/01/12 Tue 31/01/12
    1d          10833.33 Tue 31/01/12 Wed 01/02/12
    8 hrs      10833.33 Tue 31/01/12 Wed 01/02/12
    0.19d     625          Wed 01/02/12 Wed 01/02/12
    1.5 hrs   625          Wed 01/02/12 Wed 01/02/12
    0.13d     416.67     Wed 01/02/12 Wed 01/02/12
    1 hr        416.67     Wed 01/02/12 Wed 01/02/12
    Anyhow looking for suggestions on how to get a calculation of the difference in two dates as units (pref days) into the group level summary.
    Many thanks Mike

      Hi John ,
    This is better ..... Now the Text1  column is the correct duration .. Is it possible just to display the Text 1 Column instead of Duration Column ? is it a right practice in using Microsoft Project or scheduling ? This is an alternate solution
    ...Do you think that there is a solution to  that problem ?
    Task Name
    Text1
    Duration
    % Complete
    Start
    Finish
    F10E ( Level 10 )
    273
    40d
    0%
    10 Apr '12
    10 May '13
    Hospital Admin
    40
    40d
    0%
    10 Apr '12
    05 Jun '12
    Hospital Move- Vacate F10E
    40
    40 d
    0%
    10 Apr '12
    05 Jun '12
    Eastern/Kelson
    238
    40d
    0%
    30 May '12
    10 May '13
    Investigate Above Ceiling Conditions
    20
    20 d
    0%
    30 May '12
    26 Jun '12
    Hoardings
    5
    5 d
    0%
    06 Jun '12
    12 Jun '12
    Demolition (All)
    20
    20 d
    0%
    20 Jun '12
    18 Jul '12
    HVAC- main duct Work, Fire dampers
    40
    40 d
    0%
    19 Jul '12
    14 Sep '12
    Layout Partitions
    5
    5 d
    0%
    19 Jul '12
    25 Jul '12
    Steel stud Framing & Hollow Metal Frames
    30
    30 d
    0%
    17 Sep '12
    29 Oct '12
    Ceiling and Bulk Head Framing
    10
    10 d
    0%
    30 Oct '12
    12 Nov '12
    Mechanical Rough-In to Ceiling
    25
    25 d
    0%
    13 Nov '12
    17 Dec '12
    Taping,Drying & Sanding
    20
    20 d
    0%
    04 Dec '12
    03 Jan '13
    Ceiling and Bulk Head Drywall
    10
    10 d
    0%
    04 Dec '12
    17 Dec '12
    Painting
    15
    15 d
    0%
    04 Jan '13
    24 Jan '13
    T-Bar and Acoustic Ceiling Tile With Devices
    11
    11 d
    0%
    22 Jan '13
    05 Feb '13
    Head Walls system
    7
    7 d
    0%
    25 Jan '13
    04 Feb '13
    P-Lam Corridor Canopy Ceiling
    15
    15 d
    0%
    25 Jan '13
    14 Feb '13
    P-Lam Corridor and Room Canopy Ceiling
    10
    10 d
    0%
    25 Jan '13
    07 Feb '13
    Steel Doors, Wood Doors, Hardware
    15
    15 d
    0%
    08 Mar '13
    28 Mar '13

  • Numbers Question - How to create an input template to summary spreadsheet

    I've done this type of sheet in excel and access years ago, but have no clue on how to do it in numbers. Example, I have a spreadsheet that summarizes specific actions for specific individuals in a specific event over the course of many events. What I want to do is create an input template that populates the summary spreadsheet so I can update on the fly such as from my iPad while at the event. I'll use a soccer game as an example. My summary spreadsheet captures goals, shots and assists for each player for each game and sums it up for a season. For capturing multiple stats at a game (event), select the (action) from a radius button or drop down from a pre-defined cell content (e.g. goal or assist), Then pick the player who performed the action from a pre-defined cell content drop down. Hit an execute button and the data populates the spreadsheet behind it, or something similar to this. Does anyone have any ideas on how this front end input template could be executed in Numbers? I currently manually track this manually and its a pain, would love to drop this into the iPad and do it on the fly. Maybe numbers is'nt the right tool? Thanks

    Might try that one on the Numbers Forum here
    http://discussions.apple.com/category.jspa?categoryID=202
    Regards
    TD

  • Ignoring negative values at summary level

    Folks,
    I have a number of branches that have a number of customers each. I want a report at branch level (no customers detail in the report) that will ignore any negative values.
    i.e.
    Branch 1...Cust 1...10
    Branch 1...Cust 2...-20
    Branch 1...Cust 3...10
    Total Branch 1.....20
    If I have Customer in the row of the report I can achieve this with an IF formula, however I want a summary report. Have looked at aggregations on key figures and not getting anywhere.
    Any wise people who might have some ideas on how I might achieve this?
    Thanks
    Gill

    Hi,
    Branch 1...Cust 1...10
    Branch 1...Cust 2...-20
    Branch 1...Cust 3...10
    Create a formula based on Key Figure i.e. 10,-20,10 keyfigure and then write simple IF i.e. If Keyfigure <0 then 0 else value as it is.
    Then in use the summation on above formula.
    Branch 1...Cust 1...10
    Branch 1...Cust 2....0
    Branch 1...Cust 3...10
    Result = 20
    Thanks
    Reddy

  • Defaulting Expense Template on Responsibility Level

    Hi All,
    I am trying to use personalization to default expense templates at the responsibility level in iExpense, but it doesn't seem to be working. I typed the expense template name in the Initial Value field of the messageChoice item for Expense Template, but this does not default to the appropriate template even after apache is bounced. The expense template defaults to the original expense template that was there and does not default to the new template that we added. I've tried this at the site and responsibility levels but neither seem to work.
    Is there a way of doing this through personalization or does it require extension?
    Thank you.

    Hi,
    Actually Defaulting on OA Framework also has a Hierarchy.
    Hierarchy is:
    Highest level Level 1 : Default(or initial value) values through Controller
    Level 2 : Default(or initial value) values through Personalizations.
    level 3 : Default(or initial value) values through initial value property at design time.
    level 4 : Default(or initial value) values through View Object
    Lowest level Level 5 : Default(or initial value) values through Entity Object create method.
    Refer to this link : http://oracle.anilpassi.com/defaults-in-oa-framework-concepts-and-practical-approach-2.html
    In your case i think the Default is done through Controller thats why it is not getting overridden through personalizations.
    In this case you need to extend the controller.
    Thanks,
    Gaurav

  • TEMPLATE FOR ORGANIZATION LEVEL ROLE

    HI.
    I HAVE MYSAP ERP VER 5.1 . BUT I DONT HAVE HR OR IDM IN MY SYSTEM.
    I  CREATED A ROLE FOR TRANSACTION FK01 AND FK02. IN THE AUTHORIZATION OBJECTS PUT VALUES 01 AND 02 FOR ACTIVITIES FIELDS AND ORGANIZATION LEVEL WERE LEFT WITH BLANKS.
    I CREATED OTHER ROLE WITH THE SAME AUTHORIZATION OBJECTS CREATED MANUALLY WITH ORG LEVEL IVALUES IN THE AUTHORIZATION OBJECT AND NO VALUES IN ACTIVITIES FIELD
    THE OBJETIVE IS MERGE BOTH ROLES WITH ADDITIVE EFFECT IN A USER ACCOUNT TO REDUCE THE NUMBER OF DERIVED ROLES.
    BUT THIS DESIGN IS NOT WORKING PROPERLY. I NEED TO NOW WHY?

    Hi,
    As per your query you create a new role and assign to these objects value in the new one.
    Anil

  • How To: ServerSide ?TEMPLATES? - Expert level help needed

    I dont know what this is called or how to search on it.
    But what I want is the ability to make changes to a template,
    upload JUST the template and have the files on the server get their
    structure etc from the template - WITHOUT having to download all
    files in site, then apply template to pages, then reupload pages. I
    know it can be done - I have seen it done.
    How? Please

    Server-side includes....
    Murray --- ICQ 71997575
    Adobe Community Expert
    (If you *MUST* email me, don't LAUGH when you do so!)
    ==================
    http://www.dreamweavermx-templates.com
    - Template Triage!
    http://www.projectseven.com/go
    - DW FAQs, Tutorials & Resources
    http://www.dwfaq.com - DW FAQs,
    Tutorials & Resources
    http://www.macromedia.com/support/search/
    - Macromedia (MM) Technotes
    ==================
    "Acts7" <[email protected]> wrote in message
    news:e69gq5$5qu$[email protected]..
    >I dont know what this is called or how to search on it.
    > But what I want is the ability to make changes to a
    template, upload JUST
    > the
    > template and have the files on the server get their
    structure etc from the
    > template - WITHOUT having to download all files in site,
    then apply
    > template to
    > pages, then reupload pages. I know it can be done - I
    have seen it done.
    > How? Please
    >

  • PWA 2010 - Displaying summary task levels in the Timesheet

    LS
    We use 2 summary task levels for some projects and I am strugging to get the summary task info displayed in the timesheet (needed for clarity to distinguish between same tasks under different summary tasks).
    to display summary level one (of one) I use the task hierarchy field successully (if and only if I so the first project publish from the client - not from the browser).
    With 2 summary levels present in the project plan, I can't get the task hierarchy field to display anything - if it did display what should I expect it to show - task summary 1, or 2, or both?
    All help appreciated (what if i could just get those pesky PMs so simplify their GANTTS :) - working on that too...)
    A reluctant Texas Tonie

    My company just upgraded from Project 2003 to Project 2010. In PWA 2003 timesheet view, we were able to see our summary tasks, as well as the Task IDs. I cannot find a way to display either in PWA 2010. I've read the above notes, and I have to believe that
    there is some way to create a custom view or change the existing Timesheet View to allow the display of where each task is in the plan. I've tried creating a custom Timesheet View, using the "Timesheet" template, but that doesn't provide an option to select
    either field (Summary task or Task ID).
    Here's the deal: I have a project plan that has over 1,800 tasks, many of which repeat multiple times within each phase and across phases, and the resources are also repeating the work across the phases. This plan has up to 6 levels of tasks in various places.
    So now, my resources see dozens of the same task name in their timesheet views with no context as to where each task falls in the plan.  The Task Hierarchy column is NOT a sufficient solution for my needs.
    I would appreciate any and all help in figuring out how to display Summary Tasks and Task IDs in the Timesheet View.
    Thanks and happy planning!

Maybe you are looking for

  • Place multiple columns (from a word doc) in a document?

    Hello, I am trying to place a word document with three columns of text in an indesign document. I tried changing the settings to "three columns" but that didn't help, the document shows up as one long column that of course runs off the bottom of the

  • FI Accounts Payable Cycle

    Can I get a list of various cycles which are possible in Accounts Payable: Eg. Vendor DP(F-48) --> Invoice Booking(FB60) --> DP Clearing(F-44) --> Invoice Payment (F-53) Same way I want other cycles which can cover scenarios like BoE, LC, Retentions

  • Using "not in" in where clause yields unexpected results

    I'm running against a 10gR2 database, recently upgraded from 9i. I'm running queries in a 3rd party tool (not SQL Plus). I confirmed the behavior with the following query. The query returns no rows, although I'd expect it to return the 2. So "NOT IN"

  • How to use T-Code QP01/QP02  FM CZ_CL_S_MTK_CREATE to assign material?

    I guess the function can hep me to assign material to the insepection plan? Any body can give me a sample code ? When i use this FM CZ_CL_S_MTK_CREATE as follow: It respond an error message 'Header invalid'. Any thing wrong? How Can i solve it? Or ca

  • Density percentage

    Hello, I run program SAP_INFOCUBE_DESIGN in se38. This programm shows list of cubes and number of records per each cube. Does somebody know what density percentage mean? (It has white colour and harly ever to see)