Unplanned goods issue table level
Hi all
Whan I make unplanned goods issue , i would like to know for which table level it is linked
Please revert back to me.
regards
Prabhu
Both planned and unplanned consumption will Post in table MSEG and AUFM
Planned consumption have both link with order no (AUFNR) and reservation no (RSNUM) In table MSEG and AUFM.
But unplanned consumption have link only with order no, not with reservation no. IN MSEG and AUFM, you can find blank in reservation field (RSNUM).
Similar Messages
-
Hi ,
How to do unplanned goods issue of those components which are not in the BOM of production order. In migo we can do it by 261 and choosing others.till here its ok but against what document migo will be done. I mean to say there should be some document which the shop floor guy must give to the stores so that he can do the migo( unplanned goods issue) in SAP.
I thought i can address this problem by creating a reservation and then take a print of that reservation and print out can be the document for the stores.
So I tried to create a reservation in MB21 , movement type 261, but couldnt create the reservation because of following error:
"Manual reservation for order category 10 not allowed"
Please help to resolve..
Is there any other to create a document without creating a reservation??
I want to see a report of unplanned goods issue VS planned goods issue.Is it available or has to be developed?
RegardsHi,
I know thru MB1A or migo 261 i can issue goods to prod order and that will flow as unplanned goods issue. But if the worker or supervisor on shop floor goes and tells stores to issue him goods which are not in the Goods issue slip, then will the stores do this above mentioned transaction?? no he will not. he will ask for some hard copy.
we should think from business point of view also.
What i am asking is: the way we have reservation print out or goods issue slip print as a document to enable stores to issue planned goods, what is the document to issue unplanned goods ??
Please help.
Regards. -
Trouble with unplanned goods issue for process order
Hi experts,
Please help me to solve this problem:
I have a process order with auto created reservation. Then I do GI against this process order, GI is not done at once for total required material quantity but in several times.
For one specific material, the quantity is not sufficient in one batch, so I have to insert a new line for additional quantity from another batch.
Then this issue occurs: In some GI, the additional line is recorded with move type = 1 (planned goods issue); in other GI, it is recorded with move type = 2 (unplanned goods issue) although the (Total withdrawn quantity + Quantity in this GI) is smaller than required quantity in reservation.
I think this issue has nothing to do with order confirmation as these two steps are independent.
Can any one explain why this happens? and how to solve it? Because if unplanned goods issue is not recorded in Reservation, then there's an inconsistency between withdrawn quantity in reservation and actual withdrawn quantity in MB51 or COOISPI.
Thank you very much for your help.I assume that you do t-code MIGO with GI to order. However, the additional line you enter will not be link to reservation, therefore will be record as unplanned goods issue.
Two thing you can do; first configure batch determination in MM (OMJJ) and set up batch determination record (MBC1). You can then click the button stock determ. beside qty. The system will select the batch based on your requirement.
Alternatively, you distribute the quantity using another button (it looks like the X sign near the copy content button). Then you can distribute qty based on the same item. You can enter the qty, sloc, batch in there.
Don't use the New Items function. -
Dear friends,
Can anybody tell what is unplaned goods issue for production order, and please give step by step procedureHi,
Goods Issue with Reference to an Order
Use: - When withdrawing components for an order, the system distinguishes between the following types of goods issues:
Planned Goods Issue (for Reservation/Order): -
With this type of withdrawal the system automatically creates a reservation for the components planned in the order. When you enter the goods issue, you can reference the order or the reservation. The system determines all components to be withdrawn.
Unplanned Goods Issue:-
With this type of withdrawal, it is determined during the production process that an additional material or an additional quantity of a component already withdrawn is required for an order. This withdrawal is unplanned because there is no reservation to be referenced. You enter this withdrawal as a goods issue without reference.
Entering Goods Issue Without Reference (Unplanned Goods Issue): -
Entering a goods receipt without referencing a document involves the following steps:
1. MIGO - Goods Issue > Others (Here use movement type "261")
2. Enter all details like; material, qty, plant, storage location, etc...
3. In "Account Assignment" Tab enter "Production Order No"
Note: - If U select Goods Issue > Order and enter Order No and system defaults the materials and qty then its planned. -
RF Interface for Goods Issue - IM Level
Hi Experts,
We have a requirement for barcode. Standard RF is not having any interface for GI transaction at Inventory Management level. Only at WM level, for confirming TO we have STD RF interface. We want to introdue RF interface at IM level thru development but for this the pre-requisite should be the TO generation.
For example when I create any reservation against cost center, Maintenance order, Project etc. The system should able to generate a TO in backgroud. This should happen before actual GI, i.e. just immediately after creating a reservation.
Appreciate if you can let me know whether it can achieved thru configuration settings or any other parameters.
Pls suggesst.
Regards,
VenuHi Venu,
There is a work around you can follow if RF scanning is not available at IM level.
You must be scanning the RF or Barcodes before issuing them to cost center or project or production order at the end of scanning you must be getting a scanfile with material its EAN/UPC Numbe, batch number and quantity. You can use this file and using some suitable BADI for Goods Issue. I guess by this you will avoid unnecessery Zdevelopment and even GI will be automated.
Hope it helps
Regards
Shrinivas -
Unplanned goods issue for order
Hi,
W
Hi,
When I am trying to issue an unplanned component through migo (movement TYPE 261,A07 Goods issue,R10 other)
I am getting error "enter reservation number".As its an unplanned material how can i enter a reservation no for the same?
Regards
ebinHi Maheswaran,
I am using 26i movement type and enetering the order no also.
But system is asking the reservation no.Since its not planned at all there is no reservation for that.SO how can I tackle that?
Ebin -
What is the reference for unplanned goods issue?
Hi,
Gurus
I have qurry on material issue .
normally we issue the material to the production order through Picklist.here it is the planned issue.up to here it is ok.
But if we want extra material against prod.order which is not in prod. order,we are not getting the reference like sales order.
also management is interested in the material like this which issued as unplanned.how can we do it?
Sir its very urgent.
Regards
vilashi,
shrikant,
no that is not my qurry.
in our scenario our store person see the hard copy of picklist,and then he ll issue the material to production order.here up to this it is ok.
but suppose at the last moment if they required some extra material for that particular fert item for that order,but that extra material is not in std bom.then what ll be the subseqent document ,on that basis store person ll issue the material.becos that material ll not be in std pick list,becos that ll be unplanned issue.
regards
vilas -
Hi Gurus,
For creating a query, I need to know the table where I can find the components issued against an order along with the valuation class of the components.
Thanks in advance!!HI
For Material usage against order check table S026 LIS -- Material Usage and for material valuation use table MBEW
Hope it will help u
Regards
Anupam Sharma -
Any BAPI or FM to update Goods Issue tables In SD
Hi All,
Is there any function module or BAPI which can update the tables LIKP LIPS. I am trying update the some fields in this table which are coming from legacy system.
Please assist
waiting for your reply
BadariHi,
check out this :
CSO_P_DLVRY_GOODS_ISSUE_CREATE,
MAP2I_BAPISHIPMENTDLVITEM_LIPS,
MAP2I_BAPISHIPMENTDLVHDR_LIKP.
Regards,
Jagath -
Need to Post Components in Production Order in MB1A through BAPI as Planned Good Issue
Hi ,
I have created a Program to upload data s for MB1A through BDC , it works fine, but for huge data s it takes more time. alternatively created one more Program which updates through BAPI Function Module "BAPI_GOODSMVT_CREATE". It works fine , but one issue noted, after posting through Function Module , components are posted as Unplanned Goods Issue. I need to post the components as " Planned Goods Issue" instead of "Unplanned Goods Issue " . This can viewed through Tcode : C003
Below are the inputs passed for BAPI Function Moduel
**&------Header Contents of bapi Upload-------------------&*
header-pstng_date = sy-datum. " Posting date
header-doc_date = sy-datum. " Document Date
header-header_txt = '000001002280'. " Header text
header-pr_uname = sy-uname. " User Name
header-ref_doc_no = '000001002280'. " Header Ref. Doc. No.
CONCATENATE sy-uname sy-uzeit c_method INTO header-ref_doc_no_long SEPARATED BY '-'. " Refer Text
*Item Data
wa_item-material = '000000000010000800'. "Material
wa_item-plant = '3910'. "Plant
wa_item-stge_loc = 'WIP'. "Storage Location
wa_item-move_type = '261'. "Movement Type
wa_item-entry_qnt = '1'. "Quantity
wa_item-entry_uom = 'PC'. "Unit
*wa_item-res_item = 1. "Reservation Item
*wa_item-reserv_no = " Reservation Number
wa_item-batch = '0000011027'. "Batch No
*wa_item-mvt_ind = 'F'. "Movement Indicator
*wa_item-stck_type = 'F'. "Stock Type
wa_item-orderid = '000001002260'. "Order ID
wa_item-prod_date = SY-DATUM.
*wa_item-GL_Account = '610000'. "GL Account
*TRANSLATE wa_item-batch TO UPPER CASE.
*APPEND wa_item TO it_item.
c_code = '03'.
CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
EXPORTING
goodsmvt_header = header
goodsmvt_code = c_code
TABLES
goodsmvt_item = it_item
goodsmvt_serialnumber = it_sno
return = return.
CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
EXPORTING
wait = 'X'.
commit work and wait.
Even i tried to pass "Movement Indicator , GL Account etc" , Still not able to fix the issue. Can anyone suggest how to post the Production Order components as "Planned Goods Issue". I am not sure any other values to be password.
BR,
MuraliI have made something like your :
* Alimtentation de la BAPI de mouvement de stock MM.
move : sy-datum to ls_header-pstng_date ,
sy-datum to ls_header-doc_date ,
* Indique le code mouvement
'03' to lw_code. " 03 normalement, mais je veux que ca plante
loop at lt_ltap
into ls_ltap.
move : ls_ltap-matnr to ls_item-material ,
ls_ltap-werks to ls_item-plant ,
ls_ltap-lgort to ls_item-stge_loc ,
'261' to ls_item-move_type ,
ls_ltap-vsolm to ls_item-entry_qnt ,
ls_ltap-meins to ls_item-entry_uom ,
i_ltak_vb-benum to ls_item-orderid ,
i_ltak_vb-rsnum to ls_item-reserv_no ,
ls_ltap-rspos to ls_item-res_item ,
ls_ltap-rsart to ls_item-res_type.
append ls_item to lt_item.
clear ls_item.
endloop.
I have to put the reservation number to have it works.
Fred -
HI
I have given to a client CO27 - as they wanted goods issue for multiple production orders.
I have a problem in posting period.For 2 days some entries are pending in December month.Due to this we didnt open the period for january.Iam trying to isue for december month with CO27 screen but iam getting a posting period error.
Client is not interested to use MIGO / MB1A they are very specific on Co27 and in CO27 there is no option to change Posting date / document date so system takes current date and throws error.
Kindly give me suggestion how to reslove this error.
Regards
Jayshankar.ADear Brahmankar
I have tried with MB26 it works fine but it takes the reserved components for the production order.
They have some unplanned goods issues.
In MB26 we dont have the option to add Components actually consumed.
Thanx for your reply i was able to fetch it to COGI screen was able to clear the error. But i found this yesterday through SDN. i have this problem of unplanned goods issues.
In Cogi when we click on we get all options in the goods movement screen.Can we get that screem anywhere are can we get that screen through USER exit so that this issue can be permanently resolved.
Regards
Jayshankar.A -
Problem with MIGO goods issue to a Service Order
Hello All
I have checked through out the forum as well as google and can not find the answer to my issue. Please read the below details and advise....
In MIGO; when trying to perform a goods issue to a service order (created in IW31) I get an error message the document does not contain any selectable items. I can not get passed this. When I use the transaction MB11, it works just fine. I went to the allowed transactions in OMJJ to ensure MIGO was listed as an allowed transaction... and MIGO is listed so I know that is not my issue. It is not related to the service order not being released as it is and plus if it was not released it would not work in MB11. I need this to work for the transaction MIGO....Please someone guide me in the proper direction of what is missing.Hi Kimberly,
When you post the goods issue as an unplanned goods movement against the order, the reservation is not even read, so it is never updated.
The data that you enter manually in this unplanned goods issue does not even need to match with the data in the reservation: the material, the plant... evrything can be different. The order is just a CO Account Assignment in this case and the reservation is not processed in any moment. This way, it is not possible to close the reservation when posting this kind of unplanned goods issue, as the reservation is not even considered (and, therefore, never updated).
It is only when you post the planned goods issue referencing the order directly when you really post your goods issue with reference to the reservation behind the order. Only in this case is when the data in the posting is checked against the reservation (the material, the plant, etc cannot be changed because they are taken directly from the reservation). Also, it is only in this case when the quantity in the posting is checked against the quantity in the reservation. If we issue the total reserved quantity, the reservation is closed automatically.
In the first case for the unplanned goods issue there is never an automatic update of the reservation because the posting does not even consider the reservation. It is only when you post the goods movement with reference to the order (in MB1A using "To Order..." and in MIGO "Goods Issue + Order") when the reservation is taken into account in the goods movement and, therefore, updated.
You can also refer to the SAP Library:
[http://help.sap.com/saphelp_erp2005/helpdata/en/a5/6337db43a211d189410000e829fbbd/frameset.htm]
It says:
"This withdrawal is unplanned because there is no reservation to be referenced."
An unplanned goods issue with the movement 261 and the order (working as CO account assignment object) is more or less the same as a 201 for a cost center. The cost center and the order are just CO Objects in this scenario.
I hope this helps you further!
Best regards,
Esther. -
Hi Friends
Scenario: There are 2 components with quanity of 100 each for header material (10 qty) .Both teh components have backflush indicator.
User iwants option of doing Goods issue through MB1A also.Suppose 20 qty each is issued through MB1a by using Mvmt type 261 ,the reamining qty that needs to be issued is 90 each.(reservation is not reduced )
When user does confirmation of order by CORK for 10 quantites the quanity that comes in Goods movement overview is 100 qty.
Why the quantity that si already issued is not taken into account.?Sachin,
As you said you have set the backflush indicators for both the components. Then if you try to issue the components with MIGO or etc system will issue error message 'Documents contain no selectable items.' if the order contains these two components only.
So it's clear that the GI against the order with t code MB1A is not against the reservation created by the system & will be treated as unplanned goods issue.
That is the reason system proposes the whole quantity while confirmation.
Also if you set BF indicator then you can not issue & you are not supposed to issue the component without confirmation. There is no exception
Hope this helps you.
SmanS -
I need one formatted search for Goods Issue
Hi Experts
I need one formatted search for Goods Issue
ex. I have Issued One item on 20/07/2011
In Goods Issue Line Level one column LstIssDt
when i issue for the first Item My document Date Will be my Ige1.LstIssDt(LastIssueDate)(linelevel)
Now
the Same Item Iam issuing on 23/07/2011
Now In Goods Issue Line Level LstIssDt column shud come as 20/07/2011 when i click formatted search
Similarly For all the Other Items
can anyone help me in these
Thanks & regards
Jenny
Edited by: Jennifer Anderson on Jul 23, 2011 7:57 AMHi Jenifer.....
I think it should work as it is working on my DB
Select Top 1 T0.U_LstIssDt From IGE1 T0 Where T0.ItemCode=$[IGE1.ItemCode.0]
Order By T0.U_LstIssDt DESC
Do execute this just save and Apply this on Goods Issue for. So when you select the Item this will bring the Last Issue Date of this Particular Item on which field you applied this FMS.......
Is that an UDF of Last Issue Date or standard field?
I modified above FMS and please now try.....
Regards,
Rahul -
Goods issue error at batch level stock
Hi Experts,
In MMBE for Material 12121426 Plant 6348 storage location 0001,batch 4065634891 in storage
location level have stock is 12.000 EA and batch 4065634891 level stock is
4,164.000 EA
User is performing Goods issue through MB1A 261 movement type For 4,164.000 EA EA but showing error
is Deficit of SL Unrestricted-use 4,152 EA : 12121426 6348 0001 4065634891
Please suggest any one why batch level stock not updated to storage location level and why system not allowing batch level stock in MB1A How to rectify this error
Regards
MohanYou probably have to contact SAP. There is hot news about inconsistencies between batch stock and storage location stock: 1930161 - Stock inconsistencies in table MCHB for batches
See as well KBA 1963022 - More details on the stock inconsistencies situation mentioned in Hot News 1930161
Maybe you are looking for
-
Currency value in BAPI_ACC_DOCUMENT_POST
Hi All; in order to post payments i use BAPI_ACC_DOCUMENT_POST. There are many payment lines (posting key 40) and one vendor line (posting key 31). i have filled in tables header, account_gl, accounts_payable and currency-amount accordingly. When i r
-
Mac for Office: de-install and install
I'm getting a new macbook pro and have office for mac on my existing powerbook. Only have one license and assuming I can't load on both so....can I de-install from the powerbook and then install on the new pro? If so, how do I de-install? Powerbook G
-
Ability to maintain multiple simultaneous program versions
We have a client that will be implementing the FS-CD module over the coming year. The time line for the project is aggressive and currently has multiple independent test events occurring at the same time and overlapping with each other. I am interest
-
Delivery status notifications Code Samples
Hi, I'm looking for some code samples on how to use javamail Delivery status notifications. Please, are there any code samples? ngocthan
-
Hello, Trying to install cf 7.0 on my vista development machine. I've successfully installed cf, however I can not process any cfm pages. I've followed instruction on file handler in IIS, but still no luck. Can someone please help. Thanks, Jimmy