Upgrading from 11.5.10.2 to R12.1.1 issue

Hi,
We are upgrading applications from 11.5.10.2 to R12.1.1.
Database: 10.2.0.3
While applying patch u6678700.drv, the LoadMap.class job is running fo very long time.
In all the workers log file, We can see
view name "xxxxxxxxxxxxxxxxxxxxxxxx"
view does not exist in target database
Executing create statement
create statement is
Where xxxxxxxxxxxxxxxxxx is different for different workers.
In alert log file the following errors are seen
ORA-12012: \316\330\303 \335\355 \307\341\312\344\335\355\320 \307\341\302\341\355 \341\341\346\331\355\335\311 383
ORA-12008: \316\330\303 \335\355 \343\323\307\321 \312\314\317\355\317 \307\341\332\321\326 \307\341\343\307\317\355
ORA-04063: \312\346\314\317 \303\316\330\307\301 \335\355 view "APPS.AR_CONTACTS_V"
ORA-06512: \332\344\317 "SYS.DBMS_SNAPSHOT", line 2254
ORA-06512: \332\344\317 "SYS.DBMS_SNAPSHOT", line 2460
ORA-06512: \332\344\317 "SYS.DBMS_IREFRESH", line 683
ORA-06512: \332\344\317 "SYS.DBMS_REFRESH", line 195
ORA-06512: \332\344\317 line 1
Thanks

While applying patch u6678700.drv, the LoadMap.class job is running fo very long time.Please see (How to Troubleshoot "adpatch" Performance Issues: Slow, Hanging or Crashes [ID 756063.1]).
ORA-12012: \316\330\303 \335\355 \307\341\312\344\335\355\320 \307\341\302\341\355 \341\341\346\331\355\335\311 383
ORA-12008: \316\330\303 \335\355 \343\323\307\321 \312\314\317\355\317 \307\341\332\321\326 \307\341\343\307\317\355
ORA-04063: \312\346\314\317 \303\316\330\307\301 \335\355 view "APPS.AR_CONTACTS_V"
ORA-06512: \332\344\317 "SYS.DBMS_SNAPSHOT", line 2254
ORA-06512: \332\344\317 "SYS.DBMS_SNAPSHOT", line 2460
ORA-06512: \332\344\317 "SYS.DBMS_IREFRESH", line 683
ORA-06512: \332\344\317 "SYS.DBMS_REFRESH", line 195
ORA-06512: \332\344\317 line 1Does the view exist in the database?
I would suggest you log a SR and no similar issues are reported on MOS website.
Thanks,
Hussein

Similar Messages

  • Unable to  get the login page after upgrade from 11.5.10.2 to R12

    Hi ,
    We are unable to get the login page after upgrade from 11.5.10.2 to R12, all the services are up and running.
    Pls let me know if someone has come across this issue.
    Thanks&Regards,
    Apps DBA

    Hi ,
    After compile JSP files manually , now we are facing problem after logging.
    Error : You have encountered an unexpected error.
    Thanks&Regards,
    Apps DBA

  • Upgrade from 11.5.10.2 to R12

    Hi,
    We are in the process of upgrading 11.5.10.2 (Database is 10.2.0.4) to R12.We still in dilemma,whether we can go for 12.1.1 or 12.1.3.
    Can anyone suggest on this and please share the supporting documents if you have.
    Regards,
    Thiru

    I would suggest you upgrade to 12.1.1 then to 12.1.3
    Please refer to these docs/links.
    Oracle Applications Upgrade Guide: Release 11i to Release 12.1.1
    http://download.oracle.com/docs/cd/B53825_03/current/acrobat/121upgrade.pdf
    Database Preparation Guidelines for an E-Business Suite Release 12.1.1 Upgrade [ID 761570.1]
    Many Objects Are Invalid After R12 Upgrade [ID 1205444.1]
    Oracle E-Business Suite Release 12.1.3 Now Available
    http://blogs.oracle.com/stevenChan/2010/08/ebs_1213_available.html
    New Whitepaper: Planning Your E-Business Suite Upgrade from Release 11i to 12.1
    http://blogs.oracle.com/stevenChan/2010/03/ebs_121_upgrade_whitepaper.html
    11gR2 11.2.0.2 Database Certified with E-Business Suite
    http://blogs.oracle.com/stevenChan/2010/11/db_11gr2_11202_ebs.html
    Note: Please search the forum before posting similar questions as this topic was discussed many times in the forum before -- http://forums.oracle.com/forums/search.jspa?threadID=&q=Upgrade+11i+to+R12&objID=c3&dateRange=all&userID=&numResults=15&rankBy=10001
    Thanks,
    Hussein

  • Upgrade from 11.5.10.2 to R12.1.3

    Hi All,
    I am upgrading my 11.2.10.5 instance to R12.1.3,
    To reduce downtime,I have a query,whether we can start R12.1.3 upgrade(patches)immediate after English upgrade driver completion(before configuring/bringingup the service) ,as many requests are getting submitted after bringing up the service and we need to wait for hours for completion.
    Can any one suggest.
    Thanks in advance

    Hi;
    I am upgrading my 11.2.10.5 instance to R12.1.3,
    To reduce downtime,I have a query,whether we can start R12.1.3 upgrade(patches)immediate after English upgrade driver completion(before configuring/bringingup the service) ,as many requests are getting submitted after bringing up the service and we need to wait for hours for completion.I am not so clear about your question but why u do not enable CM or dont open apps services until your all upgrade process done?
    Please see:
    http://blogs.oracle.com/stevenChan/entry/reducing_patching_downtimes_with_staged_systems
    Upgrade Advisor: E-Business Suite (EBS) E-business Suite Upgrade from 11.5.10.2 to 12.1.3 [ID 269.1]
    Regard
    Helios

  • Upgrade from R11.5.10.2 to R12.1.3

    I am currently planning an upgrade from 11.5.10.2 to 12.1.3. I created a new project using 'Upgrade Assistant for Release 12' I have to configure the nodes. I do not have a 12.1.3 node yet. Am I missing something? Can't the wizard produce a report of what steps I need to do with out the presence of R12 environment. Thanks

    Yes it can. You need to manually enter the information for the R12 environment node/nodes as if it were installed. When you do finally get install your R12.1 upgrade filesystem you will have to update any information in the R12 node setup that does not match what you setup initially - for example paths to XML files and such.

  • Upgrade from Weblogic 10.3.1 to 10.3.3    Issues

    Hi
    We are in process of migrating/upgrading from Weblogic server 10.3.1 to 10.3.3.
    A heavily distributed application is being migrated with high volume transaction on clustered environment.
    Have anybody experienced any issues/ concerns when migrating from Weblogic 10.3.1 to 10.3.3?
    Please share your experience.
    Thanks
    Edited by: user4151568 on Oct 28, 2011 8:55 AM
    Edited by: user4151568 on Oct 28, 2011 8:55 AM
    Edited by: user4151568 on Oct 28, 2011 8:55 AM

    Hi,
    Use the below link to  upgrade from 10.3.5 to 10.3.6
    https://gdgprasad.wordpress.com/2014/05/03/how-to-upgrade-web-logic-server-wls-10-3-5-to-10-3-6-in-windows-64-bit/
    http://docs.oracle.com/cd/E24902_01/doc.91/e18840/upgrade_1036.htm#EOHWL193
    How Can I Download Upgrade Installers for Oracle WebLogic Server (WLS)? [ID 1074946.1]
    First try to upgrade your test Environment and then you can see if you face any issue or not.
    Hope it helps

  • Upgraded from 3.0 to 3.1 and have login issues

    I have a simple application that I have developed that requires a login. When I was using 3.0 there was not problem, but now with 3.1 when I first attempt to log in I get the error message below in the error log. When I do a back and try to login again, everything is fine. I can recreate the problem every time by logging out, trying to log in for the first time (getting the error), clicking the back button and then logging in again. The second time I get right in. Below is the version and the error message from the log. Has anyone encountered this behavior before?
    Version: 3.1.0.00.32
    [ecid: 73388049620,1] mod_plsql: /apex/㽦㵰ã±ç°±1 HTTP-404 㽦㵰ã±ç°±1: PROCEDURE DOESN'T EXIST
    Thanks in advance,
    Chris

    Chris,
    Does the login page to the development environment work properly?
    Answer -> This is development. I just started working with APEX so nothing is in production.
    I meant the Application Express development tools like the Application Builder, which require you to exercise a login page.
    Does this one application that fails also fail if you install it into apex.oracle.com and run it there?
    Answer -> I have not tried to do this.
    You may wish to do this to gather more data about the problem.
    What is different between this failing application and other applications you have developed that do not fail?
    Answer -> This is my first application. It started as soon as I upgraded from 3.0 to 3.1
    I guess this was too subtle a suggestion that you should collect more data about the problem so that you could state, for example, that all developed applications fail in this way or that only one fails, etc.
    Who created that DAD? It's very non-standard -- you have a custom documents table and procedure and you aren't using the standard public user like APEX_PUBLIC_USER to connect.
    When you navigate to Home>Administration>About Application Express, this is the "About Application Express" page I meant. Is that giving you this error (?):
    Not Found
    The requested URL /apex/㽦㵰〱簱1 was not found on this server.
    Oracle-HTTP-Server/1.3.28 Server at oraweb2.nabp.net Port 7778
    What is the database version and edition (xe or otherwise) ?
    You may wish to open an SR with Oracle Support as something is very damaged in your installation.
    Scott

  • Upgrade from 11.5.10.2 to R12.1.3 questions

    Hi,
    I want to upgrade my EBS from 11.5.10.2 to 12.1.3 (keeping DB same , i.e., 11.1.0.7). I have MT services running on 5 nodes. All 5 nodes have all the services enabled.
    My doubt is :
    While applying the upgrade patches, Do I have to execute the patches on all the nodes ?
    If yes, Do I have to run them sequentially (one node after another) OR can I run them parallely (simulteneously on all nodes )?
    Do I have to use any special options like 'nodatabaseportion' etc ?
    regards,

    I am follwoing the note : Interoperability Notes EBS R12 with Database 11gR2[ 1058763.1].
    1- Step 2: Apply patch 6400501 to the IAS 10.1.2. Do I really need to apply this patch ?( I am not sure how I can check whether this has already applied or not)
    As mentioned in the doc, if you are on Linux/Unix then you need to apply this patch.
    To verify if the patch is applied or not, it depends on what ORACLE_HOME you are referring to. Please see (How to apply Patch 6400501 to a Release 12 APPS-Tier ORACLE_HOME ? [ID 799907.1]). Since this patch can be applied on the database tier node or on the application tier node, you need to source the correct env file and issue "opatch lsinventory" command.
    2- Step 6: Install Oracle database 11g Products from the 11g Example CDs. Do I need to do this step and please ket me know whre I can get this CD ( I have 2 files : p10404530_112030_LINUX_1of7.zip and p10404530_112030_LINUX_2of7.zip)
    Do I need to download anything extra here to fullfil the step.Yes, it is mandatory and you need to download all files.
    3- Step 8: Apply additional 11.2.0.3 RDBMS pathes :
    Before applying this additional patches, I hv to upgrade the database to 11.2.0.3. Please correct me if I am wrong.
    As per the note, step 13 is to upgrade database to 11.2.0.3. I got confused here, It means, Do I need to apply additional patches on 10.2.0.5 database then upgrade to 11.2.0.3Before the upgrade. As mentioned under the same step "Do not run any of the post install instructions as those will be done after the upgrade.".
    Thanks,
    Hussein

  • Weblogic upgrade from 8.1 to 10.3.6 - WLW_IDE.jar issue

    Hi
    We are in the process of upgrading our applications from Weblogic 8.1 to 10.3.6. Since WorkShop IDE has been decommissioned since Weblogic 10.3.2 we don't have the WLW_IDE.jar any more in the fusion middleware installation. The build is dependent on this JAR. Would like to know if there is an alternative to WLW_IDE.jar which can be used to make the build or how we can remove the dependency on WLW_IDE.jar - we don't want to rewrite the code.
    <taskdef name="wlwBuild" classname="workshop.core.WlwBuildTask" classpath="${weblogic.home}/workshop/wlw-ide.jar"/>
      <target name="build">
        <wlwBuild work="${app.dir}/${work.file}" serverclasspath="${server.classpath}">
           <build outputdir="${output.dir}" outputfilename="${output.file}"/>
        </wlwBuild>
      </target>
    Rgds
    Srini

    Hi Srini,
    it supports but you need to upgrade correctly.
    follow this link
    Beehive Applications
    after upgrade if you found some error like classnotfound error.
    If those are the errors you were also experiencing, then please follow one of these options to resolve this issue:OPTION
    1:Identify all the JARs that contain the beehive classes and explicitly add the jar files to the classpathOPTION
    2:When you created the domain (if you used the Config Wizard), do you make it a "Workshop" domain? If not, try that.That should deploy the Workshop framework (Beehive controls, NETUI, etc) libraries as shared libraries. Then these libraries should be referenced in your applications weblogic.xml and weblogic-application.xml.
    regards,
    Kal

  • After upgrading from Prosight V6 to V7.5 we are having issue with API's

    Team,
    Current version 6 of prosight upgraded to version 7.5. We are having our external webservice consumes Prosight webservice which defaulted installed under ProsightWS virtual directory. After up gradation we are running into issue in external application ,application unable to communicate to Prosight new version webservices. Fails in the time of calling in Login method itself in the psPortfoliossecturiy service.
    Exception as follows:
    “System.Web.Services.Protocols.SoapException: Could not create Security Token for specified User and Password at ProSight.Portfolios.WebServices.WS.psPortfoliosSecuritySOAP.Login(String sUser, String sPassword, Int32 lTimeOut) “
    Our web application uses a dedicated user account to interact with Prosight webservice and it runs under windows authentication. Application build on ASP.NET 2.0 and later.
    The sad part here is , our web application running perfectly with Prosight v6. :( I would appreciate if anyone could help us to resolve this issue. This is blocking our up gradation from 6 to higher version of prosight.
    Thanks for your valuable time
    Regards,
    Jithesh

    Here is the offical documentation from version 8.0 on the backward-compatability of the APIs. This document comes the version 8 installer. Not sure this helps you with the 7.5 issues, but hoping it will help:
    Considerations for applications using the PPM Open API via COM
    Applications which use the Primavera Portfolio Management (PPM) Open API via any interface (COM, SOAP/RCP or Document/Literal) and were developed and used with previous versions of PPM will continue to operate without the need for recompilation, as Primavera Portfolio Management 8.0 provides full binary backwards compatibility for all of the Open API interfaces. New functionality is available only to applications that are written to take advantage of such functionality.
    Note however that any process can only load and use one version of the Microsoft .NET Framework. Therefore, applications developed with the .NET Framework 1.1 cannot use APIs to communicate with software developed using the .NET Framework 2.0 if this would cause the same process to need to load both versions of the .NET Framework.
    This means that if any part of an application that uses the Open API which was developed using .NET Framework 1.1 communicates directly with PPM using the COM API (which is in-process), that part of the application would need to be recompiled to target the .NET Framework 2.0. If on the other hand, the application developed using .NET Framework 1.1, only communicates with PPM using SOAP RPC or Web Services (which are out-of-process) then there is no issue.
    Instead of recompiling, it is usually sufficient to ”force” the existing executables to actually use the .NET Framework 2.0 instead of the native version of the .NET Framework for which they were compiled (1.1). This can be achieved by using an application config file with the following content:
    <?xml version ="1.0"?>
    <configuration>
    <startup>
    <supportedRuntime version="v2.0.50727" />
    </startup>
    </configuration>
    The application config file can easily be created using Notepad or something similar. It does not need to be compiled in any way. It should be named with the exact same name as the executable file plus the suffix “.config”. For example: if the application executable file is called “Tester1.exe” then the config file must be named “Tester1.exe.config”. It must be placed in the same directory as the executable file.
    The config file “forces” the application to use the .NET Framework 2.0, which would mean that even when using COM (in-process) Open API calls to PPM, there would still be only one version of the .NET Framework involved in the process (.NET 2.0).
    ----------------------------------------------------------------------------------------

  • Upgrade from Director 10.1 to 11.5 embedded font issues

    I just upgraded to 11.5 for Mac. When I opened an existing file I developed in 10.1, the embedded fonts went bizarre. I had Times embedded and it did some strange substitutions like the "i"s are in a totally different font as are the question marks. The whole font sets were embedded. No subsetting. Can someone enlighten me as to what is going on?

    One of the new features in Director 11.x is a new text engine that does Unicode.  Whether it is an improvement or not is up in the air.  Anyway, it has new problems.  It is quite common to have embedded font problems with projects updated from Director 10.  Generally, you can fix them by deleting the embedded font and re-embedding it in Director 11.  Just keep the same menber name and it should be fine.

  • Business Folder Upgrade from 11i to R12

    Hi,
    We are upgrading from 11.5.10.2 to R12.
    In the process, we have to upgrade discoverer folder also.
    To undergo the change, we are testing one report from 11i to R12.
    The report has the business folder as po_vendors in 11i, which is taking data from PO_VENDORS table from PO schema.
    As the PO_VENDORS table is obselete in R12.
    We are trying to change the PO_VENDORS table to AP_SUPPLIERS table and we are changing schema from PO to AP.
    We were able to do that in Disco Admin, but when I run the report from Desktop, we are not able to get the data.
    Where in SQLInspector we can that the query is changed, one more interesting thing is when we run the query from backend for exact set of parameters, its returning data.
    Is there anything which we need to take care, are we doing anything wrong.
    Please help.
    Thanks,
    S

    Hi,
    We are using 3 views and a materialized view.
    Object names are
    1) AP_INVOICES
    2) AP_INVOICES_DISTRIBUTIONS
    3) AP_SUPPLIERS
    now when we change the views to base tables for e.g. AP_INVOICES to AP_INVOICES_ALL and AP_INVOICES_DISTRIBUTIONS to AP_INVOICES_DISTRIBUTIONS_ALL then our report is givng data.
    PFB the query.
    SELECT DISTINCT o215482.SEGMENT2 as E215623,o215482.SEGMENT2_DESCRIPTION as E215625,o215476.ATTRIBUTE5 as E216133,o215482.SEGMENT4 as E216142,o215482.SEGMENT1 as E216190,o215482.SEGMENT3 as E216208,o215482.SEGMENT3_DESCRIPTION as E216210,o215476.INVOICE_DATE as E216817,o215476.PAYMENT_STATUS_FLAG as E217125,o215473.PERIOD_NAME as E217133,o215487.VENDOR_NAME as E217379,o215487.SEGMENT1 as E217385,(SUBSTR(o215476.INVOICE_NUM,1,12)) as E217632,as215592_217133_OLD as as215592_217133_OLD,o215473.AMOUNT as E215705,NVL(o215476.INVOICE_AMOUNT,0) as E216800
    FROM APPS.AP_INVOICE_DISTRIBUTIONS o215473,
    APPS.AP_INVOICES o215476,
    APPS.JS_GL_CODE_COMBINATIONS_MV o215482,
    AP.AP_SUPPLIERS o215487,
    ( SELECT o215509.PERIOD_NAME AS as215592_217133_OLD_2, MAX(o215509.START_DATE) AS as215592_217133_OLD FROM ( SELECT gl.period_name ,gl.start_date ,gl.end_date ,gl.period_set_name FROM gl.gl_periods gl ) o215509 WHERE (o215509.PERIOD_SET_NAME = 'JS_GL_Calendar') GROUP BY o215509.PERIOD_NAME)
    WHERE ( (o215476.INVOICE_ID = o215473.INVOICE_ID)
    and (o215482.CODE_COMBINATION_ID = o215473.DIST_CODE_COMBINATION_ID)
    and (o215487.VENDOR_ID = o215476.VENDOR_ID)
    and (o215473.PERIOD_NAME = as215592_217133_OLD_2(+)))
    AND (o215482.SEGMENT6 LIKE :"Project Parameter 1")
    AND (o215482.SEGMENT5 LIKE :"Category Code Parameter 1")
    AND (o215482.SEGMENT4 LIKE :"Business Unit Parameter 1")
    AND (o215482.SEGMENT3 LIKE :"Cost Centre Parameter 1")
    AND (o215482.SEGMENT2 LIKE :"Account Parameter 1")
    AND (o215482.SEGMENT1 LIKE :"Company Parameter 1")
    AND (o215473.PERIOD_NAME LIKE :"Period Name Parameter 1")
    AND (o215487.SEGMENT1 LIKE :"Supplier Number Parameter 1")
    AND (o215476.CANCELLED_DATE IS NULL )
    AND ( ( UPPER(o215473.LINE_TYPE_LOOKUP_CODE) = UPPER('ITEM') OR UPPER(o215473.LINE_TYPE_LOOKUP_CODE) = UPPER('FREIGHT') ) )
    ORDER BY o215482.SEGMENT1 ASC , o215482.SEGMENT3 ASC , o215482.SEGMENT2 ASC , o215482.SEGMENT4 ASC , o215487.SEGMENT1 ASC , o215487.VENDOR_NAME ASC , (SUBSTR(o215476.INVOICE_NUM,1,12)) ASC ;
    Kindly help.
    Thanks,
    S

  • Issue with SAP GUI 7.30 launching with users upgrading from 7.10

    We started rolling out SAP 7.30 GUI Final 7300.3.7.117 out to people, and we've ran into this error with people who had upgraded from SAP GUI 7.10.
    Our environmental variable uses saplogon.ini (SAPLOGON_INI_FILE) and points to c:\windows\saplogon.ini
    I don't know why the program is trying to search for saplogontree.xml.
    I've tried uninstalling, rebooting, reinstalling. Deleting some of the %appdata% SAP folders.
    I need some guidance as people who upgraded from GUI 7.20 do not run into this issue.

    This popup would make sense Jason,as the path C:\Windows\SapLogonTree.xml would not be a valid path to this file.
    Really, 7.10 should not have been used at all as an upgrade path as this had finished support in 2009
    If you have a small number of users with 7.10, it's recommend to remove it via add/remove programs in the OS, then install a clean 7.30 gui.
    The environment variable should not point to C:\Windows\ at all since this is a restricted folder in
    Windows Vista and higher, and will only cause further trouble later on in the updates
    See note http://service.sap.com/sap/support/notes/1409494
    Jude

  • How to handle the interfaces in upgradation from 4.6c to ECC6.0

    we are going for the upgrade from 4.6c to ECC6.0
    actually we are using n number of interfaces like webmethods, informatica powercenter, ALE, EDI....
    powercenter was created some programs in SAP R/3, when we are upgrading from 4.6c to ECC6.0, what kind of issues we will face regarding this informatica. what is strategy we have to follow to upgrade this informatica in SAP, if anyone have the documents regarding informatica powercenter please help me and guide me
    if anyone have documents regarding this interfaces upgradation or procedures bestpractices, common issues please forward me
    thanks,
    chandra

    thanks

  • Upgrading from Tiger to Leopard on and external (FireWire) drive...

    Hi all,
    I'm pretty sure this has been discussed somewhere on the www but after several hours of research, I'm embarrassed to admit I'm ready to call it quits (unless someone more tech savvy than I can help <:o)
    I've been running my OS on a WD 500GB FireWire for the past couple of years. Switched to it shortly after realizing that the 80GB HD on my MacBook was insufficient for my needs.
    Now I'm getting ready to upgrade from Tiger to Leopard and I've got some issues. Most importantly, when I launch the installer and it requires me to restart my system, I do so through both methods (holding down the "option" key to start up using the external HD and also by just allowing a normal boot under the old drive). In neither situation do I ever get the option to select where I'd like to install the new OS. In fact, when I allow the normal start without the "option" key being pressed, I don't even get to see the option to begin an installation. When I hold down the "option" key, I get the Mac OS X Install DVD screen (directory on the DVD), but it never gets to the point where I can start the installation.
    I'm at a loss and getting a little frustrated (which has been my problem since I started with Macs--been a long time PC user and I'm always looking for the difficult way of doing things--so I'm probably just being PC-stupid as usual >;o)
    Any assistance with getting me on the path to continued righteousness would be greatly appreciated. Thanks very much in advance!
    Ali T. Borahan
    http://www.alisails.com
    PS: Despite the fact that I'm PC-literate and Mac-stupid, I've managed to convince almost a dozen people to switch to Mac, simply because I'm hooked and love how the Mac community sticks together and helps one another (and also because I can't stand the Microsoft kingdom!!! <:o)

    Insert the Leopard DVD in the optical drive and restart the computer. After the chime press and hold down the "C" key until the dark gray Apple logo appears on the screen. After the installer loads select your language and click on the Continue button.
    When the menubar appears select Disk Utility from the Utilities menu. After DU loads select your startup drive's entry (mfgr.'s ID and drive size) from the the left side list. In the DU status area you will see an entry for the S.M.A.R.T. status of the hard drive. If it does not say "Verified" then the hard drive is failing or failed. (SMART status is not reported on external Firewire or USB drives.) If the drive is "Verified" then select your OS X volume from the list on the left (sub-entry below the drive entry,) click on the First Aid tab, then click on the Repair Disk button. If DU reports any errors that have been fixed, then re-run Repair Disk until no errors are reported. If no errors are reported click on the Repair Permissions button. Wait until the operation completes, then quit DU and return to the installer.
    If DU reports errors it cannot fix, then you will need Disk Warrior (4.0 for Tiger, and 4.1 for Leopard) and/or TechTool Pro (4.6.1 for Leopard) to repair the drive. If you don't have either of them or if neither of them can fix the drive, then you will need to reformat the drive and reinstall OS X.
    Continue with the installation process until you reach the point where you must select a Target drive. Select your Target drive then click on the Options button in the lower left corner of the dialog.
    Select the Archive and Install option.
    An Archive and Install will NOT erase your hard drive, but you must have sufficient free space for a second OS X installation which could be from 3-9 GBs depending upon the version of OS X and selected installation options. The free space requirement is over and above normal free space requirements which should be at least 6-10 GBs. Read all the linked references carefully before proceeding.
    Your target drive must have repaired OK when you repaired it. Otherwise do not continue.
    You have an option to preserve users and network preferences. Only select this option if you are sure you have no corrupted files in your user accounts. Otherwise leave this option unchecked. Click on the OK button and continue with the OS X Installation.
    Upon completion of the Archive and Install you will have a Previous System Folder in the root directory. You should retain the PSF until you are sure you do not need to manually transfer any items from the PSF to your newly installed system.
    After moving any items you want to keep from the PSF you should delete it. You can back it up if you prefer, but you must delete it from the hard drive.
    You can now download a Combo Updater directly from Apple's download site to update your new system to the desired version as well as install any security or other updates. You can also do this using Software Update.

Maybe you are looking for