We have to stop one job when another job is running

Hi,
I have a new Requirement. There are two jobs running in background one is delta load and another one is Full load. Delta load runs for every two hours( Daily 12 loads) and full load runs on sundays(weekly only one load) for 6hrs. Now what happening is Full load and delta load are running on same time i.e when the full load is running, delta loads are also running on the same time, Full load runs for 6 hrs and 3 Delta loads runs on same time. Now we have a requirement to stop the delta loads when full load is running. Is there any posibility how to stop the delta load.
Rgds
Kishor

hi Kishor,
check this
Re: How to Cancel a ACTIVE background Job scheduled in SM37.
hope it will help you.
thanks
Sachin

Similar Messages

  • TS4036 I have moved from one company to another and they both use iphones I backed my phone up before it was shut down I tried to retrieve contacts from my PC it did not work will it work when I get my new iphone?

    I have moved from one company to another and they both use iphones I backed my phone up before it was shut down I tried to retrieve contacts from my PC it did not work will it work when I get my new iphone?

    I updated my iPhone onto my friend's MacBook
    Why would you do that, and not on your own computer?  See the hassle it caused you?
    can he just email me the folder
    Backup files are too big to email.  Use FTP, DropBox, etc...
    how do I then put all that data back into my current phone from the new computer?
    How to restore iPhone:  http://lmgtfy.com/?q=how+to+restore+iphone

  • How do i transfer music i have bought from one laptop to another?

    how do i transfer music i have bought from one laptop to another?

    Welcome to the Apple Community messilionel.
    The following article(s) may help you.
    Moving your iTunes library to a new computer

  • Is there any way to create a time machine backup to an external hard drive with content already on it?  I have a hard drive that i have used for pictures but when i try to run a backup it says i need to start from a blank drive. Can i get around it?

    Is there any way to create a time machine backup to an external hard drive with content already on it?  I have a hard drive that i have used for pictures but when i try to run a backup it says i need to start from a blank drive. Can i get around it?

    It would be much better if you had separate drives for the pictures and Time Machine backups.....but, if you want to use the same drive for both purposes, temporarily move the folder with the pictures to another location for safe storage.
    Run the Time Machine backup on the hard drive and verify that everything is working correctly. Time Machine will format the disk for you in Mac OS Extended (Journaled) as part of the backup process.
    Then move the folder with the pictures back to the hard drive with the Time Machine backups.
    When you have tested to make sure that everything is working again, then and only then should you delete the folder with pictures from the temporary storage area.
    Again....it would be much better to keep Time Machine backups on a drive just for that purpose, and other data on another drive for that purpose. This is clearly one of those times when the fact that you can do something does not mean to imply that you should do it.

  • Start background Job when another is finished (NOT with the JobSteps)

    Hi guys,
    i need your help.
    I've already searched here in forum, but i wasn't able to find a good solution.
    I have this problem.
    I have a program that create a background job with the FM FM JOB_OPEN.. SUBMIT report with parameters .. JOB_CLOSE.
    I want that if i run this report again (20 secs after for example) it does:
    - Check if there is an already running Job with the same name (means with state 'R') (This task is simply, with a select on TBTO table)
    - If it's found, it have to create a new job with the same name that starts automatically AFTER the first running job is finished (don't care about the end-state of the first job).
    I've already tried with pred_jobcount & PRED_JOBNAME parameters of the JOB_CLOSE FM but it doesen't works!
    The JOB_CLOSE, creates a job in Planned state. But when the first Job is finished, the second job(Planned) doesen't start automatically.
    In this scenario, i CANNOT use endless loops (wait until the first job is finished and then submit the second) Job-steps (one job that contains multiple steps) events (i have to start only one job after the predecessor is finished), because this report could be run many times and each job should be collected like a "stack" (only when the first job is finshed the second "registered" should be started and so on, until the aren't more planned jobs).
    <REMOVED BY MODERATOR>
    Thx a lot for your help.
    Andrea
    Edited by: Alvaro Tejada Galindo on Jun 12, 2008 12:19 PM

    Hi Veda
    i can tell u but ... some reward points are very appreciated ....
    I'm joking (of course)
    Here the question:
    I have a program (called A) that submit a new program (called B) with the JOB_OPEN .. submit JOB_CLOSE. The program B should start only if another program B (called before for example) is finished.
    Here the solution.
    I add a parameter (with no-display clausole) to the program B. In this parameter i pass to the program, the job number returned by the JOB_OPEN function. 
    When i create the JOB with the function, the "jobname" parameter is set with value 'G_DELIVERY' (Here u can change the name of the job as u want : this is the jobname that u see in SM37 transaction).
    In the start-of-selection of program B i put a "waiting" procedure like this :
    First i save a timestamp of system-date and system-time (called for example r_date and r_time)
    select from table TBTCO all the jobs called "G_DELIVERY" with jobnumber <> from the jobnumber parameter (that means exclude itselfs)  with status running ('R')  -> that have startdate /starttime less than the r_date and r_time <- (this is the key of the selection that solve the problem).
    if it is found (means there is another running job started before this one).
    wait up to 60 seconds. "for example
    repeat the selection.
    endif.
    When the job called before ends, this one programs exits from the loop and continues. If u submit more programs "B", they'll works like a stack.
    I should say to u just one thing.... I solved my problem in another way (because i've changed the logic so this problem was no more) so i didn't implemented that logic, but it should works very good.
    Try it and tell me!
    Bye
    Andrea

  • My computer crashed and I know I lost my music. I have a new one but when I hook my nano itunes wants to delete what I have on the nano. How can I get it to accept the song on the nano and start building my libary again?

    My computer crashed and I lost my music. I have a windows7 now but when I try to connect my nano to it I get message saying it is connected to another libary. I don't want to lose the music on the nano. How can I set it up to a new itune library and start collecting my music again?

    See this older post from another forum member Zevoneer covering the different ways to copy media/content from your iPod back to your PC.
    https://discussions.apple.com/thread/2417169?start=0&tstart=0
    B-rock

  • I have formatted sheet one.  When I go to sheet 2 it is blank.  How do I format this sheet?

    I have formatted sheet one in my spreadsheet. When I Clive on sheet 2 it is completely blank.  How do I format it?

    Connect the device in to iTunes in recovery mode using the instructions in this Apple support document and restore the device.  This will allow you to bypass the passcode.
    iOS: Unable to update or restore
    B-rock

  • Can we restict a transaction when another transaction is running

    Hi All,
    1. Is there any way to trace which particular transaction is running? say SE38, not user specific, globally? It has to be traced programmatically.
    2. Is it possible to restrict another transaction when one transaction is running. For eg. I want that when ST05 will run, SE38 should not run.
    3. Is there any transaction to create custom event that will run autometically to restrict other transaction from running when one particular transaction is running.
    Looking for your valuable suggestion/s.
    Thanks and regards,
    Atanu
    Message was edited by: Atanu Dey

    Hi!
    I appreciate the valuable effort you have given to analyze the problem. I will be more specific with my requirement. It says:
    When we run transaction EA10 to create mass bills or invoice, the transaction is running fine even for multiple users firing lot of data in the production system.
    But, but, when someone is trying to run transaction FPMA to do autometic clearing for some business partner/s the transaction EA10 is throwing error as Mass Block.
    Reason: One table in EA10 transaction is getting locked during updation, more logical. But second transaction is trying to fetch data from same table just hindering the process.
    Probable solution: Do not allow to run transaction FPMA when transaction EA10 is running. After total execution, allow to run the other transaction.
    Both of them are creating background job runtime and processing as well. Stop other job running when previous job is active. SAP program, no change/s allowed. (
    Any more suggestion please. (
    Best wishes,
    Atanu

  • Periodic Background Jobs after another Job finishes

    Hi
    I have to schedule a job 'B' to run after job 'A' finishes.
    When i schedule job 'B' to run after job A , it runs only once , while i need the job B to run periodically after job A finishes.
    1) I cannt make job B as step 2 of job A , because job A is not scheduled by me and i cannt change that.
    Can anyone tell me how to i trigger the job B periodicaly after job A finishes .
    Any solution or hint would be appreciated.
    Looking forward to some helpful replies from the gurus of SAP.
    Regards
    Purva

    Dear Team,
    Job ES_RPTMC_CREATE_CHANGEPOINT_AUTH  ran only once where as SEC:INDX_UPDATE_FOR_STRUCT_AUTHS ran daily.
    CAUSE:
    “The start condition "Start after job" is internally mapped by means of "Start after event SAP_END_OF_JOB with the parameter <Jobname><Jobcount> of the predecessor". The pair <Jobname><Jobcount> is the unique key for a job.
    If a job is executed periodically, the SAP_END_OF_JOB event is always triggered with different parameters.
    The successor in turn waits for SAP_END_OF_JOB with just one particular parameter (this is the parameter with <Jobname><Jobcount> from the first predecessor). When the successor is rescheduled, the key fields from the next predecessor must therefore always be known in advance, something which is not always technically possible.”
    SOLUTION:
    This task can be completed with the new ABAP program Program  BTC_EVENT_RAISE.
    The program is delivered by Support Package for Basis Releases 640 and 700, and is included in the standard system in all subsequent releases.
    The program is used to trigger a batch event. Existing programs do not therefore have to be changed. The BTC_EVENT_RAISE program has several parameters in the selection screen, including the event (and parameters) that is to be triggered.
    PROCESS:
     Go To SM64
     Click on Create
     Create two events.
    Our Case:
    We created Z_ES_CP_AUTH and Z_SEC_AUTHS
     Go to SE38
     Give the event name as BTC_EVENT_RAISE
     Select Variants and click on Display
     Give the variant name as the one you created.
    Our Case:
    Z_ES_CP_AUTH
     Click on Create
     Give in the details for variants
     Click on attributes and give the details for attributes
     Go to the job which needs to be run first
    • Select the job in released status
    • Job->Change
    • Step
    • Add BTC_EVENT_RAISE as the last step of the job with the parameter as the variant created
    Our Case:
    Step: BTC_EVENT_RAISE, Parameter: Z_ES_CP_AUTH
     Go to the job which needs to be run next
    • Select the job in released status
    • Job->Change
    • Start Condition -> After Event.
    • Give the BTC_EVENT_RAISE parameter of the first job as the event of the second job.
    Our Case:
    After Event: Z_ES_CP_AUTH
     Save the changes.
     The jobs will start running one after the other with the given frequency.
    Thanks
    Joginadham U

  • Executing a job by another job using exec command

    Hi All,
    I have  a requirement as follows,I am triggerring the jobs from one parent job,where triggered jobs should run in  parallel.Below code waits for Job_Test_1 to complete and then triggers the Job_Test_2.But what I want is Job_Test_2 also should start when Job_Test_1 is running.How to achive this in SAP BODS.
    [$G_JOB_NAME]=Job_Test_1;
    print('The job is [$G_JOB_NAME] ');
    exec('D:\Installation_folder\Data Services\log\[$G_JOB_NAME].bat','',1);
    print('Failed job [$G_JOB_NAME] triggered');
    [$G_JOB_NAME]=Job_Test_2;
    print('Second job triggered ');
    exec('D:\Installation_folder\Data Services\log\[$G_JOB_NAME].bat','',1);
    print('The job second job triggered');
    Thanks for your help in advance.
    Indira

    Hi Indra,
    Request you to go through the below link in which anoop has beautifully explained the various ways to schedule the jobs.
    http://scn.sap.com/docs/DOC-34648
    In particular, I would request you to go through "Scheduling using  Web service" Part. In this part, Anoop has shown how to publish the jobs and in the subsequent steps showed us how to call the webservice in the Query transform.
    In his example he took two query transforms to execute the job sequentially.
    If you wann to execute the jobs parallel then just check by calling both the webservices in a single query transform.

  • Will Sql Server Agent start job when previous instance is running?

    Just as an example, I have a job that is set to run every 5 minutes. The job takes 30 minutes to complete. So sql server agent executes the job at 9:30AM. Will the job run again at 9:35AM even though the previous instance hasn't completed?
    In my case, I would like to reproduce what Task Scheduler already has, which is to
    not begin a new instance until the previous instance has completed. When the previous instance completes, then 5 minutes later, the job will be run again.
    Thanks.
    VM

    Apparently, it will skip it until the job is completed: http://stackoverflow.com/questions/865042/will-a-sql-server-job-skip-a-scheduled-run-if-it-is-already-running
    VM

  • Stop music playing in one swf when another swf starts

    Hello Flash developers please help me here.
    On my main SWF Home  File i have 2 swf files are loaded into my (main home swf)  and everything is runing smooth BUT the problem is when i want to  watch the video the music is still playing i have to click on the button to stop music playing.
    what i want is when i click on the video to play i want automatically the music to stop playing with out me clicking the mp3 button to stop the music playing.
    NOTE
    Keep in mind i have 2 SWF files that are loaded in to the main swf file ...
    Home SWF is the main file
    MP3 SWF   <<   Loads on Home SWF
    Video SWF <<    Loads on Home SWF
    All i want is when the video is playing automatically stop the music and when the video is finish the music automatically continuing from where it was left.
    Thank you so
    AKAoshi1

    I don't know how to do this. I have 4 files. file one calls file 2 when the Next at the end of file one is clicked, file 2 calls 3, etc. The reverse is true with the first Previous for files 2 - 4. Can I get some guidance?
    Thanks

  • How to add one item when another item get added into the iProcurement Cart

    Hi,
    Please help me to do the following customization in iProcurement Cart:
    Requirement-1:
    1. Login to iProcurement and add one Item ITEM1 to Cart.
    2. Make another Item ITEM2 mandatory or get added automatically when Item ITEM1 gets added into the iProcurement Cart
    OR
    Requirement-2:
    1. Login to iProcurement and add one Item ITEM1 to Cart.
    2. Go to Cart and click Checkout.
    3. While checking out Item ITEM1, we need some validation to make another Item ITEM2 mandatory or get added automatically with Item ITEM1.
    Thanks in Advance,
    SB

    Hi tiff512:
    The way is:
    SAP NetWeaver > General Settings > Check Units of Measurement.
    The help documentation says the following in relation to the creation of new units of measure:
    "If required, define new units of measurement according to the international system of units (SI) with the menu function Unit of meaurement -> Create.
    Here you have to make make specifications for:
    Display (including a descriptive Units of measurement text)
    Conversion (not applicable to units of measurement without dimensions)
    Data exchange (EDI) (optional)
    Application parameters"
    I hope it is helpful to you.
    Regards,
    David

  • AIR 3.3 stop background audio when another audio app is launched?

    I currently have audio playing in the background in my AIR app for iOS. My problem is that when you have the audio playing in the background, and you launch any other audio app on your phone...the audio starts to overlap because my AIR app does not stop playing audio. So when you open Pandora, Music, IHeartRadio, Youtube, etc...the AIR audio still plays.
    Is this fixed in the AIR 3.3 release with the <executeInBackground> tag? Or is there another way for my AIR app to recognize that another audio app is launching? All the afformentioned apps play nice together like that.
    I would think this would be grounds for not being accepted in the iTunes store.
    I really need some answers because my app is set to go live soon and this will be a game changer if I cannot fix it. I will probably have to try and create it in objective C
    Thanks in advance for any help!
    -- I posted this in the wrong place last night and meant to post it here. --

    Thanks a lot for the reply!
    It is very unfortunate that there is not a solution to this. It seems that building an audio/music player app via AIR for iOS is not really feasable due to this limitation.
    I would think the use case would be larger for my case because typically, when you launch a game on your iPhone, the background audio application stops the music. Or maybe just have a listener that could detect if another app was launched at least, so you could stop your AIR audio by choice. That would be great.
    Do you see this as grounds for an audio app being rejected? If the background audio does not stop unless you physically go back into the app and pause it?
    Thanks.

  • Downloaded IOS7 on iPhone 4, have sprint as carrier, now when another Sprint phone sends a text to my sons iPhone, Im getting a copy of the texts being sent to him.  Plus when I send a text, it shows as coming from my sons.  What's up, how can I fix this?

    I have downloaded ios7 on iphone 4s, Sprint is my carrier.  When I send a text to anohter iphone ALSO using sprint, it shows as coming from my sons phone.  When he gets a message from another iphone using sprint, I get copies of his messages.  Go figure.  It seems to be only other IPhones and Sprint users.  Hasnt' happend with android phones texting him, or him texting to androids or carriers that are not sprint.

    The fact that the problem only occurs when iphones are texting you leads me to think that iMessage may be the culprit. The fact that it is only iphones using SPRINT however is weird. Try turning imessage off on both yours and your sons phones to see if the problem persists. If it does, it may be a carrier problem.

Maybe you are looking for

  • Can IIS be used to proxy to 1 cluster?

    I am running under Windows 2000 AS, with Weblogic 5.2 service pack #6.           I have configured two websites under IIS. Each site uses a directory (2           separate copies) that contains iisproxy.dll and an iisproxy.ini file that is           

  • Missing iPhotos app on iCloud

    I have My Photo Stream set up on my iPad and it shows I have several photos saved to my iCloud account, but I don't even have an iPhotos app on my iCloud account. Why is that? How can I get the app on my iCloud account?

  • Windows 8 and installation of wireless printer

    Just purchased new laptop with Windows 8 and tried to install my wireless HP printer, Photosmart all in one D110.  Everything indicates installation was success and test printed out.  When I try to print something the hpeprint box appears and says I

  • Bubble Chart

    Hi! Is there any way to control the bubble size in a chart? I would like to make the bubbles smaller because they're too close. The actual size makes a bubble occupies a piece of another bubble. I have changed the value of bubblePercentSize in XML (A

  • Dictionary won't open in 10.5.2

    I just updated to 10.5.2, and went to look up a word from Safari only to notice it keeps crashing and never opening. Anyone else getting this?