How to preserve my chained backtrace

Hi friends,
This is a peculiar problem where in the websphere created stub file for my stateless session ejb is creating a
copy of my app's exception(which has chained backtraces due to exception chaining)[i believe that it is doing this for
portability purposes] and setting those backtraces to null, so that by the time i catch this exception in the web tier, i
have no stack trace!
In the stub file for my stateless session ejb auto-generated by websphere 5.1, inside the business method,
Also, am using Local Communication, so the else gets executed.
//if remote communication with ejbs,
if (!Util.isLocal(this)) {
else //if local communication with ejbs
try {
//some exception occurs...
} catch (Throwable ex) {
//The throwable "ex" which is being used to make a copy has chained tracebacks.
//But now, the below statement is creating a copy of "ex" with all the tracebacks being set to null in the chain!
          Throwable exCopy = (Throwable)Util.copyObject(ex,_orb());
if (exCopy instanceof myappException) {
throw (myappException)exCopy; // throwing the copy with the tracebacks set to null to the web tier!
throw Util.wrapException(exCopy);
} finally {
servantpostinvoke(so);
//Inside the business implementation class for my stateless session ejb,
public mybusinessmethod () throws myappException{
try {
          //some exception occurs....          
} catch (Exception e) {
               throw new myappException(e);
So, how to preserve my backtraces from being set to null by websphere's generated stub files and pass them to the web-tier??
thanks a lot

so um I'm moving my files from my computer to my mybook. And i unintentionally removed itunes in the process....so how do i recover all my music and playlists. I have a lot of music and for some reason i have a lot of duplicates. And i do not feel like sitting at my computer for 6 hours deleting every single duplicate and recreating all my playlists. Or do i have to it this way? any help would be great thanks.

Similar Messages

  • I have a MBPro mid 2013 with 1 Thunderbolt port. Just bought a Mac monitor and want to daisy chain a PC monitor to it. Use a Mini DVI to VGA adapter from MBP to PC monitor. How do I daisy chain the 2 monitors?

    I have a MBPro mid 2013 with 1 Thunderbolt port. Just bought a Mac monitor and want to daisy chain a PC monitor to it. Use a Mini DVI to VGA adapter from MBP to PC monitor. How do I daisy chain the 2 monitors?

    Hall Palm Desert,
    if your Mac monitor has Thunderbolt ports, and the PC monitor is on the end of the daisy chain, then you might be able to do it by connecting your PC monitor’s VGA cable to a Mini DisplayPort-to-VGA adapter (e.g. Apple, NewerTech), connecting that cable’s Mini DisplayPort end to one of the Mac monitor’s Thunderbolt ports, and then connecting a Thunderbolt cable between the other port on the Mac monitor and your MacBook Pro.

  • How to find process chain using background job in sm37

    How to find process chain using background job in sm37

    Better is to select the job.
    Select (Define) Step (s) or F6.
    Select the line and Menu Goto>Variant.
    The variant contains the name of the CHAIN and its VARIANT.
    Success
    We faced an old job and via job monitoring we were informed about a cancelled job every 'interval'.
    We noticed that the related chain was deleted but still the job was scheduled each interval again and was cancelled because an event was missing
    We could not find the scheduled job via SM37.
    Via view V_OP, view over tbtco abd tbtcp, we find the related entry.
    We delete these entries via function BP_JOB_DELETE....
    Edited by: Jack Otten on Jul 9, 2010 2:50 PM

  • How to stop process chain, if it is taking too much time than expected.

    Some times if a process chain takes to much time to finish than expected, how I can stop the process chain and execute it again.
    Thanks in Advance.
    Harman

    how I can stop the process chain ??
    If the job is running for a long time ,
    1)GOTO RSMO and SM37 and check the long running job over there.
    2)There you can see the status of the job.
    3)If the job is still running you can kill that job
    4)delete the failed request from data target.
    for more details go to this below link
    how to stop process chain if it yellow for long time
    how I can execute it again ?
    GOto Function module  RSPC_API_CHAIN_START
    and give u r process chain name there.and execute.

  • How to schedule Process chains in Bi Admin Cockpit

    Hello friens,
    I am working on installing Bi cockpit.
    After installing the info providers, i have to schedule the process chains for Bi admin Cockpit.
    I know the transaction is RSPC.
    But I dont know how to schedule process chains for Bi admin cockpit.
    How to schedule Init and Delta
    If you can send me step by step documents.
    Or any good sap note number.
    Or any good links i will really apreciate it.
    I want to schedule process chains
    Content Master Data
    Data Load Statistics # Delta
    Data Load Statistics # Init
    Query Runtime Statistics # Delta
    Query Runtime Statistics # Init
    System Master Data
    Please advise

    Hi,
    Please check out this document:
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/8da0cd90-0201-0010-2d9a-abab69f10045
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/36693695-0501-0010-698a-a015c6aac9e1
    Hope it helps.
    Thanks
    Mona

  • How to change process chain in SAP APO, in RSCP tcode.

    HI SAP APO Experts
    I am from SAP ABAP background, I need to change a 'AND' operator in process chain in RSCP tranaaction in SAP APO.
    I dont have any idea how to change process chain.
    Could you please help me how to change process chain in SAP APO in RSCP tcode.
    Appreciate your help or comments.
    Sandeep..

    Hi Sandeep,
    The t-code RSCP does not exist in SAP APO.  The correct t-code is RSPC. 
    Step 1:- In RSPC t-code, select the process chain which you need to change. 
    Step 2:- Double click on it. 
    Step 3:- It will display the various programmes attached to the process chain.  Go to change mode by clicking on the change indicator (Control + F9)
    Step 4:- Select the programme area where you need to do the correction or change.  Double click on it.
    Step 5:- It will take you to the programme and its selection contents.  Make the relevant changes.  You can directly carry out the change in se38 also if there is variant kind of changes for that particular programme.
    Step 6:- Once the changes are done, save the changes and press F3 button which will take you to the home page of the process chain
    Step 7:- Save again so that the change in the programme alongwith the process chain will get saved.
    Regards
    R. Senthil Mareeswaran.

  • How to create Process chain in BI 7.0

    hi,
        I dont know how to create process chain in BI 7. If any one have document step by step process to create process chain. help me. thank u.

    check these links..
    http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/00a1f389-ec7c-2c10-04bc-9d81b3084171
    http://wiki.sdn.sap.com/wiki/display/BI/Processchainscreationandmonitoring
    http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/900be605-7b59-2b10-c6a8-c4f7b2d98bae
    http://wiki.sdn.sap.com/wiki/display/BI/FiveWaystoEnhanceBIFunctionalityUsingABAP--PartV--ABAPinProcess+Chain

  • How to enable Conference Chaining - CUCM 6.1.5

    How to enable Conference Chaining on CUCM 6.1.5?
    Currently, when Phone A conferences Phone B and Phone C , then Phone B & Phone C cannot conference anyone.
    They get the message - "Key is not Active" .
    How can we change this behaviour ?

    Found the answer - Need to "Enable Advance Ad-Hoc Conference" under service parameters.

  • How to preserve manually maintained Hierachy?

    Gurus,
    How to preserve manually maintained Hierachy in parenth1. We are maintaining some much data manually for BPC only with hierarchy. Problem is every time when we load the hierarchy from BW system the manually maintained hierarchy gets wiped out.
    We don't want to maintain BPC only hierarchy as seperate parenth2. I read this article Understanding how to Preserve Manually maintained Alternate Hierarchies with the new BPC Data Manager Package to Load from BW Hierarchies but this is maintaining as seperate parenth2 or 3.
    Please suggest.
    Thanks.

    Hi,
    You can not maintain the hierarchy in BPC and load from BW, it will be wiped out every time.
    What we did was that we created a new custom hierarchy in BW with the extra nodes.
    Andy

  • How to create Process chain for Aggregate for Master data

    Hello friends,
    I created Aggregates on Navigational Attributes.
    Now they are working fine, but i need to know that how shall i create the Roll up for Aggregates on Navigational Attributes.
    The point is the master data changes frequently a lot of time for e.g. for 0customer etc.....
    So if any one can send me the step by step documents so as to know how to roll up the Aggregates for Navigation attributes or for aggregates created on Master data....
    How to create process chains for the same ?????????
    Because if master data changes, then rolling up the aggregates straight forward will not help.
    So we need to write a process chain so that it deactivates the aggregate and reactivate again and fill up again..........
    If i mis interpreted something please rectify it.......
    Please advise

    Hello,
    the changerun that you have to schedule in order to activate the master data will adjust the aggregates automatically.  There is no need to deactivate them after master data loads.
    Best regards,
    Ralf

  • How to create process chain ?

    hi all,
    will you please simlify how to create process chain if anybody has a screen shot or slide show about pc creation it will definatly help me a lot.
    rewrd point for sure,

    This may help:
    [http://help.sap.com/saphelp_nw04s/helpdata/en/67/13843b74f7be0fe10000000a114084/content.htm]
    [https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/8da0cd90-0201-0010-2d9a-abab69f10045]
    Regards,
    Jordi

  • How to create process chains,and how to use process like and or xor

    Hi,
    How to create process chains,and how to use process like and or xor.
    can any one please give me a example in each.
    Thanks,
    cheta.

    Hi Cheta,
    Here is step by step procedure to create process chains
    Process chain is nothing but executing a process ..(or) loading the data any process we can do in background.. that means.. automatically we can execute our process based on Time or any event..
    Creating Process Chains
    Prerequisites
    If you want to include a load process in the process chain, you need to have already created an InfoPackage.
    You cannot load flat file data from a client workstation in the background. For this reason, you have stored your data on an application server.
    Creating Process Chains
    You have the option of creating a process chain in the process chain maintenance screen directly or by using a maintenance dialog for a process:
    Creating a Process Chain Directly in the Process Chain Maintenance Screen
    You are in the BW Administrator Workbench.
    1. Click on the Process Chain Maintenance icon in the AWB toolbar.
    The Process Chain Selection dialog window appears.
    2. Choose Create.
    3. Enter the technical name and a description of the chain, and confirm your entry.
    The Add Start Process dialog window appears.
    4. Create a variant for a start process.
    1. a. On the Maintain Start Process screen, choose whether you want to schedule the chain directly or whether you want to start it using a metachain.
    2. b. If you choose to schedule the chain directly, enter the start date value for the chain under Change Selections and save your entries.
    The Maintain Start Process screen appears again.
    3. c. Save your entries, return to the previous screen and confirm your entries in the Add Start Process dialog window.
    You are taken to the Plan View of the process chain maintenance screen.
    In the left-hand area of the screen, a navigation area is displayed. In the right-hand area of the screen, the process chain is displayed.
    5. Use the drag-and-drop function to add the relevant processes into your process chain.
    You use the Process Types function to select the processes. This sorts the process types according to different categories. You can also call up InfoPackages and processes for the data target from the separate InfoSources and Data Targets navigation trees.
    Hope this helps
    Regards
    Karthik

  • How  to  create  adhoc  chain  in process chain

    how  to  create  adhoc  chain  in process chain

    hi,
    ad hoc process chain is also the process cahin which will run seperatly from main chains.
    as you do for process cahin create it also.
    Process chain creation
    http://help.sap.com/saphelp_nw04s/helpdata/en/67/13843b74f7be0fe10000000a114084/content.htm
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/86/6ff03b166c8d66e10000000a11402f/frameset.htm
    Ramesh

  • How to preserve database user details before cloning

    Hi Experts,
    How to preserve database user details before cloning,
    I am cloning the test database with the prod database, so my concern is how to preserve the users details which they have in TEST database( like roles, privilges, profiles , passwords, etc.....). Because that all gone after cloning from PROD.
    Thanks
    Sam

    use the following script to take the backup of roles,pwd & other  details of DEV . after cloning  execute the scripts back in DEV to restore the old values....
    set head off
    set lines 200
    set pages 9999
    col owner for a20
    col db_link for a30
    col username for a15
    col host for a40
    col created for a12
    spool db_details.lst
    select * from global_name;
    select * from dba_db_links;
    select name from v$controlfile;
    select member from v$logfile;
    select file_name from dba_data_files;
    select file_name from dba_temp_files;
    spool off
    spool create_db_links.lst
    select 'create DATABASE LINK '||owner#||'.'||NAME|| ' connect to '|| userid || ' identified by '|| password || ' using '||''''|| host ||''''||'; ' FROM sys.link$ order by owner#;
    select username,user_id from dba_users where user_id in (select distinct owner# from link$);
    spool off
    spool alter_user.lst
    select ' alter user '||username||' identified by values ' || chr(39)||password||chr(39) || ';' from dba_users;
    spool off
    Set verify off
    Set space 0
    set feedback off;
    set echo off;
    set pages 1000;
    set lines 150;
    spool create_synonym.sql
    Select 'CREATE SYNONYM '||owner||'.'||synonym_name||' FOR '||table_owner||'.'||table_name||'@'||db_link||';' from dba_synonyms where db_link is not null and table_owner is not null;
    Select 'CREATE SYNONYM '||owner||'.'||synonym_name||' FOR '||table_name||'@'||db_link||';' from dba_synonyms where db_link is not null and table_owner is null;
    spool off;
    Spool profile.sql
    select ' alter user '||username||' profile '||PROFILE||';' from dba_users;
    spool off

  • How to preserve battery life ~ used to last all day, now it runs out by lunchtime

    How to preserve battery life ~ used to last all day, now it runs out by lunchtime

    I would advise updating to iOS 7. It might improve your battery and the bugs are worked out by now.
    If not wanting to update because of the new look, here are some tips:
    -Turn off bluetooth when not needed.
    -Connect to wifi and turn off cellular data when possible.
    -When not around wifi, turn wifi off.
    -Keep your screen at around 50% brightness.
    -Disbale certain apps or features in Settings<Privacy<Location Services if they are not necessary.
    -Close out of apps in the multitasking bar.
    -Enable airplane mode when you plan on not using your phone for a while.
    Hopefully these tips help you. If your battery does eventually get too bad, you can get it changed out by apple. If youve had your device for under a year, you can take it into an Apple store and theyll give you a new phone in return. Have a good night and good luck!

Maybe you are looking for

  • Internet issues after update to OS X 10.9.5

    Hi, I'm getting lots of issues since my update to OS X 10.9.5 on my new iMac. This is a new computer but it takes forever to launch new webpages. I have tried both, Safari and Firefox and both take a larger than usual time. Moreover, in some cases th

  • Tiger on eMac = Disaster!

    I have upgraded a dual G5 to Tiger (10.4, 10.4.3 etc..)...no problems. Tried to do the same on an eMac (2nd Gen w/ATI) - DISASTER! eMac freezes afer several minutes of use (AND I MEAN A TOTAL FREEZE - HAVE TO PHYSICALLY SHUT IT DOWN). I tried, system

  • Installing SSD and Flashdrive boot

    I recently bought a SSD from Samsung (840 Pro 256 GB). When I connect the SSD through USB, the windows reconizes the SSD. However, When I replace the original HDD by the SSD, the system doens't reconize the SSD, in the boot options the HDD option has

  • TS3048 is there any chance that apple will support bluetooth4.0

    what are the chances of apple ever supporting bluetooth4.0

  • Bulk collelct problem

    TYPE empno_tab_type IS TABLE OF emp.sal%TYPE; TYPE ename_tab_type IS TABLE OF emp.ename%TYPE; l_empno_tab_type empno_tab_type; l_ename_tab_type ename_tab_type; cursor etest (l_deptno IN NUMBER) is select ename,sal from emp where deptno =l_deptno; in