Overhead cost in costing run

hi,
costing run is to get the total estimation cost of a finish goods right? for example, in order to build finish goods A, need raw mats and overhead cost.
raw materials is according to BOM which is also defined in cost component structure.
1 may i know what about overhead cost? i can see overhead is defined in cost component structure but it is not defined in BOM. so how to include the overhead cost to the finish goods?
2 to calculate overhead cost, need to use what tcode?
thanks
rgds

Hi
If you want to add the overhead cost to your cost estimate, you need define the costing sheet and assign to valuation variant
In the costing sheet you have to give base for calculating the overhead cost and overhead rate and need to assing the secondary cost element and cost center in to credit key same cost element you need to assign cost component structure also
In the above manner the overheads to be calculated for Cost Estimate...
Regards
Srinu

Similar Messages

  • Mock costing run not updating with recipe changes to labor and overhead

    We have made changes to the labor and overhead values assigned to a master recipe.  We are trying to determine what the new standard cost will be when we do our costing run at the end of the the month.  However,  when we do our mock costing run using CK40N it does not reflect the changes we made to the labor and overhead it still pulls in the old values.  We have tried this in our test system on several other products and it has worked for some materials but not others.  I don't think it matters but the material we are costing is a semi finished good.  Any ideas?

    Problem has been resolved.  Thank you!

  • Short Dump while executing costing run or production orders

    Hi Guys,
    While executing the costing run or production orders saving, we are getting short dump.  it is the debugging is showing its fingers at A035 which is related to maintenance of overhead rates.
    We have maintained the overhead rates correctly. There is no issue.
    This could be some thing related to OSS notes as well.
    Just wanted to know if it has got something to do with OSS notes or something else.
    Please throw some light in this regard
    Thanks in advance

    Hi,
    In what program there is a dump? I mean, what is the log saying?
    Regards,
    Eli

  • Costing Run Error

    Hi All,
    I am currently trying to roll cost for materials but have an error that i can not seem to resolve, i hope someone can assist me and help me understand.
    While rolling the cost for a specific material the MFG Overhead cost is not being calculated correctly, i have looked at the routings for this material and do see where the error might stem from, but i do not think it can be corrected from there.
    The error is that in the routing the cost for MFG Overhead is calculated by adding Labour (1H) and Setup (0.017) and MFG Overhead = 1.017.  The lot size of this material is 300 but when roll up the cost with CK11N per unit the Set up value is 0.003 but the MFG Overhead does not calculate in the same fashion it remains as 1.017 (it should be 1.017/300 = 0.0033 ) This is causing a massive discrepancy in costing.  Now one solution is that the amount can be corrected externally and then update the routing and run the costing, but there will be an issue if the lot size is increased in the future (instead of 300 the lot size is increased to 400, now the routing will have to be change to 1.017/400 = 0.0025).  How can i correct the logic within SAP?  I have tried configuring the costing sheet, but i am not not sure where to change it.  In my costing run i am using costing variant PPC1.
    I have tried being as detailed as possible, and i hope it is coherent.
    I would really appreciate you help and points will be awarded.
    Thanks in advance

    Hi Althea,
    Thank you for your response.
    In the routing we have removed the MFG Overhead and now are using the Costing Sheet to calculate the Overhead.  I think i have updated everything, eg costing sheet, costing sheet components, percentage overhead rates, costing variants.  But now the requirement has changed again!!!! Just when you think you have crawled your way out of a ditch, someone pulls you back in. 
    In the legacy system they were able to calculate overhead in relation to cost centers ( Setup, Labor and Overhead for 403, Setup, Labor and Overhead for 403B and for 407 etc), but in the costing sheet you can only enter one cost center, is it possible to enter multiple cost centers and where would i do that?
    Now i had a cost element for Overhead, but in the cost element category was incorrectly selected as 43 (Internal activity allocation) instead of 41 (Overhead rates) now when i am trying to use select that Cost Element in the Costing Sheet under the credit area it will not allow me to save it.  I have created a new cost element but i am not certain what the impact might be
    Please help!!!
    Thanks in advance

  • Problem in Standard Costing Run

    Hi Experts,
       As per our client requirement we marked price control "S" for all materials. While running the Std costing,  system is showing the Cost components as below
    Direct Material  13.29$
    Material Overheads   1.92$
    Direct Labor   68.19$
    Labor Overheads 79.78$
    The Material overhead percentage rate is 16.9%.
    Now the problem is with the Material cost 13.29$. In this cost the Material overhead cost also included. So please suggest what i need to  change in the config part to get this component (Direct Material) without material overhead.
    As per our requirement the values should be shown as below
    Direct Material  11.37$
    Material Overheads   1.92$
    Direct Labor   68.19$
    Labor Overheads 79.78$
    Thanks&Regards,
    Raja lucky.

    Hi Rau Moder,
        We have created the cost component Material overhead seperately and assigned respective cost element to this component.
    For the component Direct Material we assigned only consumption accounts not material overhead cost element.
    Thanks&Regards,
    Raja lucky.

  • Overhead costing sheet in easy cost planning

    Hello,
    I have created a overhead costing sheet (having base as material cost elements where a %age is defined to be applied on the material cost) and attached it to the valuation variant of easy cost planning in PS module.
    Now for a given project when I am checking the easy cost planning, it is showing all individual lines of resources like material etc. along with its qty, price and value but I can not see the effect of the %age specified in overhead costing sheet.
    Kindly suggest what is to be done.
    Also pl. let me know whether I can see the cost component structure of easy cost planning.
    With Thanks and Regards
    Ratna

    Hello,
    Thanks for your reply.
    But when I run CJ46 for a particular WBS element, it says "The object is not relevant for processing".
    I have created the costingsheet as per the process mentioned below.
    For overhead costing sheet, base is created with raw material cost elements range and origin group range.
    Overhead rate is defined with dependency D020 - Overhead Type/Plant as 1.5% with proper validity period.
    Credity key is defined with secondary cost element with category 41 and cost center and fixed % with default "*".
    The above costing sheet is attached to the valuation variant of easy cost planning in PS module.
    There is a cost component structure 10 which is attached to costing variant PS06.
    Still CJ46 gives message as "The object is not relevant for processing" when I run it for particular WBS element.
    Kindly suggest whether I m missing any other step.
    With Thanks and Regards.
    Ratna

  • Dividing the overhead costs to production orders !

    Hi all,
    This is regarding the overhead costs split to different Production orders.
    The scenario is for e.g There are 3 production orders
    P-1
    P-2
    P-3
    and the first 2 production orders(P-1 and P-2 ) are assigned profit center 1
    and the last production order (P-3 )is assigned a profit center 2.
    In the costing sheet configuration the profit centers are defined and profit center 1 is assigned 10% and the profit center 2 is assigned 20%
    The overheads/ other direct costs should be split into 3 pdn orders in the % assigned to the profit centers.
    Is this possible? if so, let me know the methodology.
    Thanks and Regards
    Karpagam

    absolutelly possible
    if you have defined the % per PC in KZS2 and there are costs on the orders (as the basis for %)
    than you have to run KGI2 or CO43 (mass)
    cheers
    matej

  • Overhead Cost Element not update

    Hi,
    I have created Cost sheet , assigned to Production plant, for FG Material,
    Overhear updated when run SCE, and production order also updated but after settlement secondary GL a/c with Credit cost center not update. in system show no value in particular overhead
    Please help me
    Thanks & regards.
    Vinu.

    Hi Ajay,
    Yeah I have maintained  inventory valuation (Fixed and variable costs)
    overhead cost should be calculate, Fixed and variable cost so i have maintained (Fixed and variable costs)
    in cost sheet i have maintained only plan rate  not actual.is it ok ?.
    Thanks & Regards.
    Vinu,
    Edited by: vinutha1010 on Oct 25, 2010 7:37 PM

  • Cost item in costing run

    hi,
    the costing run is to get a standard cost for a finished goods item.
    may i know if the costing run besides calculate the cost incurred from raw material consumption, material overhead, manufacturing overhead, will costing run also cover sales overhead or distribution overhead cost?
    or put it this way, the costing run cover cogm only or until cogs in order to get the standard cost of finished goods item.,
    thanks
    rgds

    Hi,
    It always depends on the settings made in costing sheet and cost component structure. If you have maintained for admin and sales overhead in costing sheet and cost component structure then it will pick in costing run.
    Regards,
    Sreekanth

  • Costing run of SFG and FG by using 2 costing variant In Same c codeandplant

    Dear CO Experts,
    I Have Semi Finished Goods (SFG) and Finished Goods (FG)
    At the time of Costing Run I don't want to add Admin& Selling Distribution Expenses for SFG.
    For FG, I want to add Admin& Selling Distribution Expenses. So I created 2 Cost sheets and Assigned to 2 Costing Variants through 2 Valuation variants.
    For Example
    SFG Cost Sheet1
    Material                       100
    Internal Activity Cost       10
    SFG Cost                    110 (By using 1st Costing Variant)
    FG Cost Sheet2
    Material                         10
    SFG                            110
    Internal Activity                5
                                       125
    Add: Admin& Sd Exp      25
    (125*20/100)             -
    FG Cost                       150 (By using 2nd Cost Variant).
    How to run  Mark and Release in Same Perid two costing variants. Please give you valuable inputs.
    Thanks&Regards
    Anil Kumar C

    Hi!
    To determine an overhead percentage rate using the overhead key, you
    need to
    1.  assign a costing sheet to your order or valuation variant for
         costing.
    2.  enter in the assigned costing sheet, overheads that use the overhead
         key field. based on over head keys, over head rates can be defined.
    3.  assign the overhead key to an overhead group.
    4   enter the overhead group in the material master record for the
         material to be produced.
    I think the above process will work for you.
    regs
    ramesh b

  • Regarding Overhead Cost Calculations

    Hi,
    Please explain me the caluculations for Overhead costs (per unit) in CK13N and the activities values  (like Set up, Cycle & labour hours) from where it is captured?

    Activity:
    - every work center (CR02) has a standard value key with up to 6 parameters (setup, labour, ...)
    - in every operation of the routing (CA02), standard values are entered for every parameter (hours of setup, hours of labour, etc.)
    - every work center has a Tab Costing with reference to a cost center and activity type for every parameter. In the cost center, activity prices are entered thru KP26
    - When running the costs estimate, hours of each standard value times actiivity price gives the total costs of each activity.
    Overhead
    - the material master of the product (MM02) has an overhead group in the costing Tab
    - the overhead is related in the CO Customizing to some prices charged to every production order (or cost estimate) based on some criteria (such as material costs, machine or labour hours, etc.)
    Regards

  • SKF as a Tracing Factor for an Overhead Cost Assessment to PA

    Hi,
    I am trying to use a Statistical Key Figure as a user defined tracing factor for a periodic settlement (KEU5) of overhead costs into PA.
    However I am running into difficulties trying to configure this.
    Has anyone out there know how to do this and give me some pointers
    I am getting an error message GA733. Incidentally I get the same error message when trying to perform a similar settlement in CCA using KSU5.
    Im using ECC6.0
    Many thanks.

    Hi Dawn
    Not clear about your requirement... You have captured expenses in IOs? or In Cost Center?
    Your question is bit confusing as you want to capture SKF against IO, but you said you want to allocate cost centers.. So, I am confused
    You can capture SKF against IO in KB31N... If you want to allocate expenses from IO based on SKF to COPA - use note 605281 so that IOs can be used as senders in assmt or dist cycle...
    Regards
    Ajay M

  • Overhead cost template allocation

    Hi All,
    Can anyone please provide overhead cost template allocation configuration steps with print screens.
    Regards,
    Vijay

    Hi Vijay,
    Templates are nothing but a tool for complex calculation of formulas . 
    Templates can be used for formula planning , activity allocation or overhead cost allocation . Enviornment of template tells you what you want to do with a template .
    If you want OH Calculation to product instead of a Costing Sheet .. use enviornment "1" for Plan and "9" for actual.
    You have lot of pre-defined SAP complex formulas available in the templates which you can use..
    Template Creation
    Enviornment varies with requirement and config will also varry , considering you are using templtes with enviornment 1 and 9 ( for Cost Allocation to Product )
    Transaction CPT1 :-
    1. Enter the name of the template and environment 001 2. Inside the template Type = Cost Center / Activity Type
    3. Description = as you please
    4. Object =   Use  the sender object .. either cost enter or combination of CC and AA whatever you need :
    SenderCostCenter = 'XXXXXX' AND
    SenderActivityType = 'AAAA'
    or you can use the screen in bottom right to input the formula
    5. Plan Quantity =  Use the screen bottom for formula or use your own one ..
    BomItemAlternativeQuantity( AlternativeQuantityUnit =
    MaterialBaseQuantityUnit, ConditionField = BomItemComponents,
    ComparisonValue = 'XXXXXX' )
    6. Plan Activation = ACTIVE
    7. Actual Quantity =  Use your own formula using predefined SAP formulas
    OrderMaterialQuantityConf( Material = 'XXXXX' )
    6. Actual Activation = ACTIVE
    Assignment of the Template
    1. Create a OH Key using SPRO > Controlling > Prod Cost Controlling > Product Cost Planing > Basic Settings for Material Costing > Overhead > Define OH Keys
    2. In Transaction OKZ2 Create OH group and assign that to the OH Key created in 1
    3. Create Cost Sheet (only code and name) in SPRO > Controlling > Prod Cost Controlling > Product Cost Planing > Basic Settings for Material Costing > Overhead > Define Costing Sheets
    4. In Transaction KTPF assign Controlling Area : Costing Sheet : OH Key : Template Environment : Template
    5. In material master costing 1 view assign the OH group to the material (standard cost estimate reads this)
    6. In the master data of the order assign the costing sheets and OH key etc so that the actual template allocation can happen.
    Execution
    Plan template is not required to be executed. At the time when you run CK11N or CK40N it is taken care of.
    Actual Template allocation can be done with transaction CPTA - Individual Processing and CPTD - Collective Processing
    I hope you would find this useful and you can further explore templates for the various formulae that you can define using th bottom right hand side in the screen of CPT1 to create magic in allocation. What I told here is very basic.
    Thanks
    Rafi

  • Difference in last year and current year Cost Run (CK11N)

    Hi Experts,
    I am getting the difference in Costing Run as explained below,
    1, Costing Run of year 2009 is not picking the two overheads as against 2008.
    What may be the couse, all overhead keys are extended to year 2009.
    Waiting for your reply.
    Sham

    Hi,
    Please check the validity of those 2 overhead rates. Probably the validity is till 12/31/2008, that's why it is not picking. In that case you can create another row with validity dates from 01/01/2009 to 12/31/2009 or 12/31/9999 as the case may be.
    The path for the same is mentioned below:
    IMG>Controlling>Product Cost Controlling>Product Cost Planning>Basic Settings for Material Costing>Overhead>Costing Sheet:Components>Define Percentage Overhead.
    Thanks,
    Prithwiraj.

  • No Error Log generated in 'Costing' step in Costing Run (CK40N)

    In the Costing Run, when the 'Costing' step is run (after 'Material selection'  and 'BOM Explosion' steps), it gives a hard stop when it encounters the 1st error, instead of completing the 'Costing ' step and giving an Error Log with material information and nature of errors. This makes it very cumbersome to resolve all the errors.
    In the Costing Variant setting in config, the u2018Save Error Log' indicator has been checked.
    Please let me know if I am missing something.
    Venkat

    Hi Vimal,
    Your proposal does not resolve the issue. I found OSS Note 375901, which addresses this issue - see below
    :In Customizing for the costing variant (Transaction OKKN) in the tab "Misc.", you chose "Messages online" for the Error Management option.
    Solution
    Change the error management for the costing variant to
    "Log and Save Messages..."
    Many thanks for your inputs.
    Venkat

Maybe you are looking for

  • How to read data from a router by using labview

    I am a  beginner labview. How to read data from a router by using labview ? 

  • Video i took on iphone 4 will not open. can i recover this video?

    i took several videos over the last two days. all are fine except one that says it cannot be opened. not sure why it won't, it was only maybe 3-4 mins long. anyone know if there is any way to recover this video? it was for a band that just won a huge

  • How to use a VHD file in VMWare

    I have received a backup of the VMware files that is a vhd file. is there a way I can import these into VMware so I can view and use the files contained within the vhd file. I am running VMware XP mode in Windows 7. Please help.

  • Eliminating points of failure...

    Hello Everyone, I am looking into a SAN system for a client and wanted to get some feedback regarding the current status of XSAN 1. First and foremost, Lion server OS and XSAN 2, is this combination something that is production ready? Should I presen

  • Calculate stay duration in Answers

    Dear Reader, I trying to solve the following problem and am blocked: We have a set of objects (1,2,3,...) and a set of knot (A,B,C,...). Each object is going from one knot A to knot D, then staying at knot D for a time period and is going to knot K (