Dividing the overhead costs to production orders !

Hi all,
This is regarding the overhead costs split to different Production orders.
The scenario is for e.g There are 3 production orders
P-1
P-2
P-3
and the first 2 production orders(P-1 and P-2 ) are assigned profit center 1
and the last production order (P-3 )is assigned a profit center 2.
In the costing sheet configuration the profit centers are defined and profit center 1 is assigned 10% and the profit center 2 is assigned 20%
The overheads/ other direct costs should be split into 3 pdn orders in the % assigned to the profit centers.
Is this possible? if so, let me know the methodology.
Thanks and Regards
Karpagam

absolutelly possible
if you have defined the % per PC in KZS2 and there are costs on the orders (as the basis for %)
than you have to run KGI2 or CO43 (mass)
cheers
matej

Similar Messages

  • Actual cost of Production Order settled to Fixed Assets

    Dear all,
    My client is doing in-house production of moulds (internal order suggestion is not accepted by the client) for which
    they have the following
    1. BOM
    2. Machine hour
    3. labour
    4. overhead etc
    5.plan value
    6. actual value
    Can i settle the actual cost of production order to Fixed Asset ?
    If yes
    what are process kindly give me if any process other then the below
    1.production order created
    2. settlement profile - FA is settlement optional
    3. allocation structure
    4. Asset created
    5 define asset in settlement rule
    Kindly give me your valuable input
    regards
    elango

    Hi,
    Although i am not CO expert , please check with your FICO consultant who are expert before make the final call.
    During settlement to a G/L account or a fixed asset, the system ignores additional account assignments that were manually specified in the distribution rule.
    Based on what i know .
    you can stipulate that settlement may be made to cost centers and orders, but not to fixed assets.
    The Settlement profile is something that you need to create a settlement rule to settle the actual costs of a sender object.
    About the Settlement rule is something that  contains the distribution rules for the sender. It will define how the way to settle the cost.
    Allocation Structure
    In the settlement structure you combine the primary and secondary cost elements into groups, in which debits are then posted to the sender objects. For each group, you specify whether (for settlement to a given receiver type) settlement is performed
    by cost element or using a settlement cost element.
    For example, you might use settlement cost elements:
      To document the purpose of an order (such as, repairs or maintenance)
      To reduce data volumes (you can combine a number of debit cost elements
    under one settlement cost element).
    TQ

  • To see the cost of production order  after settlement to header material

    hello guys,
       In make to stock,we settle the total cost of prodution order on header material,right(if we keep as the default rule( distribution rule in order type)?
         If i want to see that cost of production order which we settled against the header material,where should i check it?should i check in material account or somewhere else?
             Thanking you guys in advance.

    Dear,
    There is a little missunderstanding in your thought.
    If the material of price control S, When you do the GR, the STD cost of material is deducted from production order cost, then when you settle the production order, the variance is settled to variance account/PD account. hence the production order cost balance is zero.
    Example- Production order cost is 60000
    After GR the production order cost balance is 60000-50000 = 10000.
    After settlement production order cost balance is zero.
    Now your question is where can i see the production order cost?
    You can see the production order cost in the production order itself.
    In the production order...cost disply option just filter the origin with test settlement and GR.
    Then total up the cost, then you can see the cost as 60000.
    please come back if you need more help.

  • How to track costing in Production order

    Hello Everyone
    I would like to get some details about how to set the product costs for Finished Goods and also how to track the expenses like packaging, labor, electricity, other charges etc, for individual production order.
    I have created the labor and packaging as a non inventory item and have used it in the BOM, now after the production order is closed, i find these two costs to be in the Actual Additional costs as shown below, till this is great.   
    But the requirement was, when they want to view the expenses or a month, then they require individual split up of costs against each production order. Is this even feasible?
    Please require help from you guys.
    Appreciate your help in this regard.
    Thank You

    Product Costing
    The cost of a FIFO or moving-average product is the sum of its component costs and additional costs (such as labor and overhead). To ensure accurate calculations of product cost, even if the components were issued manually, SAP Business One uses the cost of the items issued to production order and not the cost of the items currently in inventory. This avoids differences between the actual cost of components used in the order and the value of the product.
    Note
    The cost calculation method described here is relevant only for standard and special production orders, but not for disassembly for companies managing perpetual inventory.
    In the case of disassembly the components enter the inventory with the same cost as the items currently there. If the component is managed by FIFO, the cost of the oldest layer is used.
    The cost of returned components does not change; it is the cost of the last one that was issued.
    The product cost calculation is determined by the item management method.
    Standard – When the product is managed by standard cost, no calculation is made, and the cost is copied from the item master data upon report completion.
    Moving Average – When the product is managed by moving average, two figures are required for product receipt into inventory: receipt quantity and total value added to the inventory. The total value is the product cost, which is the sum of all component costs used for those products.
    FIFO – When the product is managed by FIFO, each report completion opens a new cost layer for the product in the inventory. The quantity in the layer is the quantity of the products just reported as completed. The cost of the products is the sum of all component costs used for the completed products divided by the quantity of the products.
    On every report completion, the system checks the following three quantities for each manually issued component:
    Issued Quantity – The quantity already issued to the production order.
    Used Quantity – The quantity already used for the completed products (completed products multiplied by the base quantity of the component).
    Needed Quantity – The quantity needed for the products that were just reported as completed (quantity of products reported as completed multiplied by the base quantity of the component).
    If the Used Quantity is greater than or equal to the Issued Quantity, this means that all items issued for the production order have already been used, and the Needed Quantity is yet to be reported as issued from the warehouse. Since the cost of the items that were actually used for the products is unknown, SAP Business One takes the current prices from the inventory.
    If the Issued Quantity is greater than the Used Quantity, SAP Business One finds the cost of the components that were issued and not used, and uses them in the calculation of the product cost. When finding those components, the issuing order of the components is taken into account, meaning that the first components to be issued are the first to be used. The components following those that were used are the first to be used for the cost calculation.
    If the sum of Needed Quantity and Used Quantity is greater than the Issued Quantity, meaning that not all needed quantity was issued, SAP Business One needs to make an assumption for those items’ costs, so it takes the current prices from the inventory.
    Upon the completion of a production order, on the Production Order Window: Summary Tab, you can check the product cost figures of the production order.
    Regards
    Kennedy

  • Difference Aetween Overhead Cost and Product Cost

    Sir,
    What is the difference between Overhead Cost and Product Cost
    Thanking You
    Juhi

    Product cost indicates the cost of making a product which includes
    1) materials (contained in the BOM)
    2) labour  (specified in the routing)
    3) Overheads (charged via costing sheet).
    1) and 2) are directly identifiable to the product made.
    3) is not possible to directly associate to a making of product. This is more a common cost. Eg. Material handling charges. The material handling department, say, employs a few workers to do material transfer from warehouse, their cost is hard to associate to a particular production order.  Hence, usually a percentage is applied , where in the order is charged proportionate to use of materials in that order. The corresponding credit is given to the Material handling departmnet/cost center.

  • T-code to confirm the Overhead cost  ?

    Hi
    Can any one let me the T-code to confirm the Overhead cost in a plant maintenance order.
    I have some overheads under plan cost. How can i bring the Plan cost to Actual cost for overheads.
    venkat

    hi
    on what basis the overheads are calculated
    say 100 $ is actual cost in order what is the overhead on order
    what is the formulae to be used & set this formulae
    Regards
    chandrashekhar

  • Material cost in production order plan cost

    Dear all,
    -we are in sales order cost object with non-valuated stock...
    -we have created two production orders from MRP run. First one is for semi finished material and second one is for finished material.
    Issue-1
    Both production orders not showing material cost in production order plan cost...
    Issue-2
    When i consumed raw material against semi-finished material production order (261-E), system not gnerated any document and material cost not updated either in production order or sales order...
    where should i do changes in configuration to get updated material cost in the production order...
    Best regards
    Kishore

    Hi
    Issue 1 : Check Whether Standard cost is present for header material of prod order, and under control tab of order costing variant for plan is present.
    Issue 2 : Use 261 instead 261E.
    Rajneesh

  • How to see cost componentwise production order actual cost-not planned cost

    Hi,
    Can anybody tell me how to see cost componentwise production order actual cost ?
    Thanks,
    Bijay

    Hi,
    CO03->Goto-> costs-> Anlysis
    or use the std. report KKBC_ORD
    std. reoprt MCRI
    KVBI - Actual Costs
    Regards,
    R.Brahmankar

  • Operation wise cost through production order

    Hi Experts,
    Is There any standard report to get Operation wise cost through production order.if it is there please provide the details.
    Thanks & Regards,
    Prabhakar

    HI,
    I don't know a standard report but table CKIS contains the costing details line item wise with the corresponding operation number (CKIS-VORNR).
    So a query/quick view using KEKO + CKIS should be sufficient.
    Best regards, Christian

  • All default routing value has to be changed, while changed the work center in production order

    Dear friends,
    our client they want to change the work center in production order.according to production version work center also they are changed.so while change the WC,all the default value has be changed as per routing what we maintained in routing.At present we have to enter the manually change the W.C as well as set up time and operation time enter manually.Any other option to do the automatically capture value from routing while change in Work center in production order.pl help me on this.
    Thanks&Regards
    Sabhapathy R

    Hi Rahul,
    Thanks for reply. I am maintained in diff value  maintained routing , Ex :First routing i have  work center 'X' value maintained as a setup time in 15 Min's and operation time 10 Min's
    second work center 'Y' I have maintained as set up time 10 Min's and operation time 30 Min's,
    Now I want to change the work center in production order as a 'Y' so whatever value maintained in routing , it has to be changed automatically (10 min's and 30 Min's), but system will not change only old value only picked (15Min's AND 10 Min's).
    Now I think you get to know what the client requirement, kindly do the need full.
    Regards,
    Sabhapathy R

  • Function module for calculating planned and actual cost of production order

    Hi ,
    Do we have any standard function module for calculating planned and actual cost for production order?
    i need to implement this in a Z-report.
    Thanks
    Srini

    Hi,
    try below function module
    CRMCO_GET_PLAN_ACTUAL_COSTS
    CO_IH_GET_PLANNED_COSTS_TOTAL
    Regards,
    Sankaran

  • Limit the number of open production order

    Dear PP experts,
    I am working on discrete scenario where client want to limit the number of open production order per work center. The more elaboration is like, for one work center the only specific number of production should remain open (e.g. 5 production order in assembly shop) when user is trying to open 6th production order system should restrict that.
    Does any standard functionality available in system or needs development?
    Regards,
    Shekhar

    Dear,
    You can do it with avilability check for materail and capacity.
    In OPJK do the for your production order type as no release if materail and capacity i missing.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • How to enter a specific vendor for  the delivery costs in purchasing order?

    Now I want to create a purchasing order including planned deliver costs such as Freight, Coustoms ect, as the vendor of such planned deliver costs is different from the goods supplier, then How to enter a specific vendor for  the delivery costs in purchasing order? That means the partner for invoice partner will be two vendors at least in one purchasing order. thanks very much.
    <i>
    <b>No one would like to answer this question?</b></i>
    Message was edited by:
            King Qi

    hi, 
    You can have vendor at each condition record level.
    try it out.
    cheers
    Rav

  • How to add the long text in Production order through FM

    Hi,
    Iam having custom program which has BAPI (BAPI_PRODORD_CREATE) inside it and this program is used to create Production orders with the details of Sales order Number,Line item,Plant,Order type,Quantity and Start date. This program is scheduled in Background.
    Now client wants to add the Long text (seperate TAB in production order and they want to update the VC details of Sales order in the Long text area).
    One option is after creation of Production order, through BDC(calling CO02 and update the long text) we  can update the long text and client doesn't want this option.
    Another option is after creation of Production order, using Function module SAVE_TEXT, Update the Long text in Production Order and this is not working in Production order (already my ABAP consultant checked it ).
    If any one of you came across this requirement, pl share with me how you addressed it.
    Regards
    A.Sureshbabu

    Hi,
    The method is quite simple, i presume you're quite well versed with doing recording, so the key thing to keep in mind is how to prepare the input file.
    At my end i had about 5 lines of data which needed to be uploaded, hence i had a tab-delimited file with the order nos. in the first column & the five lines of text in five different columns (Refer format below)
    Order No.
    Line - 1
    Line - 2
    Line - 3
    Line - 4
    Line - 5
    12345
    txt - 1
    txt - 2
    txt - 3
    txt - 4
    txt - 5
    67890
    txt - a
    txt - b
    txt - c
    txt - d
    txt - e
    Now provide this input file for your lsmw or bdc program & it will work. You can work with your abaper if you're not so comfortable with LSMW or BDC programming he / she should be able to easily make it work for you.
    Regards,
    Vivek

  • How to change the status of a production order

    Dear All,
    May i know how to change the status of a production order.I want to de-active the status like OPGN (Operation generated).This status is updated as there was no routing assigned to that particular production order during its creation
    Thanks and Regards,
    Varun Siddharth

    Dear,
    When you create a production order, an operation created by the system is generated automatically if no routing is used for the creation. As a result the order header receives the status HOGAN; the operation created automatically also has this status.
    If you delete the operation created automatically and then do not have the status HOGAN.
    To avoid this maintain the Routing for the material or delete the setting of default operation from OPJG.
    Regards,
    R.Brahmankar

Maybe you are looking for

  • Mac Pro has strange display problems

    Hello, i have a strange problem with my new Mac Pro. since maybe 1 week the 2 TFT Displays, connected to the nvidia Geforce 7300 GT went black for 2-5 seconds. The 2 Screens display "No signal" during that time. Is there a way to test my GFX Card ? a

  • New Mac Mini / DVI / Apple 17" Studio Display

    Greetings all. I am contemplating purchasing new Mac Mini. Currently using Mac mini / DVI adapter/ older Apple 17" studio display. I do not intend monitor change at present. Question is, which display adapter would allow me to use older DVI adapter/A

  • Why can't my pics match color of the screen when printed?

    Hi there.... Please help me with my frustation.  I am using LR 2.6 and printing on a HP Photosmart B8550 on a MacBook laptop.   I can't get the colors on the printer to match the screen.  I have tried several profiles in the Color Management section

  • HANG on the halfway of internet software updating

    Hi, My new MacPro facing a Big problem.HANG on the halfway of software updating after system disc installed completely!!! Maybe you'll suggest me to re-install it again,unluckily,i've repeat and repeat the installation and then software updating as u

  • IPhone 6: The iPhone could not be restored. An unknown error occurred (53)

    Hello, I have iPhone 6 and iTunes says while restoring: The iPhone could not be restored. An unknown error occurred (53) After this fail iPhone only invites to connect to iTunes and then restore. I tried DFU mode, I have last version of iTunes and OS