2 seperate extractors for order item

is it possible to maintain 2 seperate extraction paths for order Item 2LIS_11_VAITM?
I have a need to go-live for one operating company without impacting the current data.
My thought was to somehow copy this entire data source and related programs to a Z one and then use the two separately...
Is it possible?  or is there some other way to maintain 2 delta queues/set-up tables?

Can you explain what you mean.
I have 2 seperate BW systems
1 is BW 3.1 and has live data for SD with live delta for 10 years of data
2 is a new BI 7.0 system which has new requirements
The source for both of these systems will be the same R/3 system.  Since I am making significat changes to the extractor for #2 I would like to be able to do this without affecting #1.
Is this possible?

Similar Messages

  • Early batch opening for order item is activated in the QM data settings

    Hi Team
    I am not able to generate inspection lot inspite maintaining 04 inspection type in QM view.
    Getting this message - ( Make sure that an inspection type for inspection lot origin (03) or for inspection lot origin 04 with
    early batch opening for order item is activated in the QM inspection data. )
    Please suggest me required settings.
    Thanks

    Hi
    Go to MM02 select the QM view
    Clcik the inspection setup button
    Select the inspection type 04 detail icon in right corner.
    in that screen Control insLot field select the  Y Early lot creation for the order item.
    Save
    Thanks
    S.Murali

  • R12 - API to Create Serial Numbers for Ordered Item in Receipt

    Hello All,
    I got a requirement to create PO Receipt using PL/SQL code. For that i have created PL/SQL code to insert data in following Interface tables,
    a) rcv_headers_interface
    b) rcv_transactions_interface
    After inserting data in Interface table executed Concurrent Program "Receiving Transaction Processor" to process data from Interface table to Base Table. This process is working perfectly fine for "Non-Catalog" requests. But if i try to process any PO having Inventory Item whose Serial Control is set to "At Receipt" then i got following error at Interface table,
    "Fail to validate serials".
    To resolve this issue i need to create and process serial number for Ordered Item selected to Receive. Can anyone guide me regarding how can I generate Serial Numbers using API for PO Receipts.
    Regards,
    Priyanka

    Hi,
    Just populate mtl_serial_numbers_temp table correctly (by specifying transaction_temp_id = RTI.interface_transaction_id)
    and serial number range in fm_serial_number - to_serial_number respectively.
    You may entermultiple MSNT records with same transaction_temp_id.
    You may need to populate PRODUCT_TRANSACTION_ID = RTI.interface_transaction_id and PRODUCT_CODE = 'RCV'.
    Oracle will create all the serial numbers for you when the records get processed.
    Thanks,
    Hrishi

  • M8 140 Acct assgt 01 for order item 45041838 00003 does not exist

    Hi experts,
    when i am trying to create invoice from BAPI_INCOMINGINVOICE_CREATE ii am getting the following error meesage for multi account assignment for non service based  invoice ,service items.
    error message: M8 140 Acct assgt 01 for order item 45041838 00003 does not exist
    Please advice
    Thanks & Regards,
    Narasimha

    Hi,
    Please check the SAP note number : 810917.
    Regards,

  • Extractor for Order Details

    Hi All,
    I have a reuirement to extract Order Item qty. The logic is as follows -
    Go to table AFKO, enter material number and Scheduled Finish date (GLTRS) entered in initial selection screen and get the order numbers. Enter these order numbers in table AUFK  also enter the plant WERKS and get again the filtered order numbers. Now enter these order number in table AFPO and get the value of AFPO- PSMNG Order item quantity.
    I have checked the Extractor - 2LIS_04_P_MATNR, But the records varies w.r.t. AUFK table. In AUFK I have around 245 Order records but the Extractor gives me only 92 records.
    I have one more extractor - 0COORDER_ATTR - an master data Extractor. The extractor provides me the exact order nos as compared to AUFK Order Nos. But the extractor is a Master data Extractor and I require the transaction data - AFPO-PSMNG.
    Request you people to share the info.
    Regards,
    Geeta

    Hi Geeta,
    AFKO has only PP orders. AUFK has PP orders, Internal Orders, Networks, etc. You need to get the order type/catergory for PP orders and run AUFK with that. The data in AFKO and AUFK is not the same. I guess the orders in AFKO are subset of the orders in AUFK. Pls check with functional consultant.
    May be you can compare 2LIS_04_P_MATNR with AUFK (with filter on type/categ for PP orders)
    Best Regards,
    Murali.
    Edited by: Murali Krishna K on Dec 29, 2010 2:06 PM

  • Change Date for Order Item Partner Changes

    When I make a change to a partner on an Order Item the Change Date VBAP-EDATU is not populated.  can anyone recommend a way to have this field filled for all changes to any fields on an Order (header and Item)?

    It can be done by WF, Why you need a warning message?
    Anyhow check badi
    PT_GEN_REQ or PT_ABS_REQ,

  • Standard Compnent for Order Item Selection as Usage in own Component

    Hi all,
    is there any standard component that I can use to select items form orders or quotations?
    I can't use BTFOLLOWUP since this component updates the BOL by themselve - see component usage in
    BT115H_SLSO.
    I need something like this -> BTAdminH as input -> Table with selected items and quantity as output.
    br
    Jürgen

    Hi, Prashanth
    As per my understanding there is no update of quantity in quotation if you reject sales item in sales order.
    only one way is to delete created sales order then quantity of quotation is reset,
    kapil

  • Enhance 0FC_OP_01 datasource for Open Items (FI-CA).

    Hello All,
    I am trying to enhance the business content extractor for open items in R/3 . The data source is 0FC_OP_01. i know this is coming from the table DFKKOP.
    I need to add sub GL ffield rom another table from DFKKOPK .
    Please advise the step by step to enhance the existing structure and add the new field to the extractor.
    Points will be rewarded for any helpful answers.
    thanks in advance,
    AG..

    Hiiii,
    You  have to create project name in CMOD and then enter the name and click on create button and give short text for project name.
    Above u will see 'enhancement assignments' button.Click it and in the new screen add enhancement RSAP0001.
    Save and activate the project.
    Then if u click the components button u will see the 4 user exits..
    1)Transactional data,master data(attributes) ,master data(texts) and master data(hierarchies).
    please go thru this docu..
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/302d4b15-5847-2a10-93bb-9c45d9f06b16
    /people/sap.user72/blog/2005/02/14/logistic-cockpit--when-you-need-more--first-option-enhance-it
    Regards,
    lae.

  • Reset order item's status

    Hi,
    I have a before_change event for order item status. When user change status to suspended, function module assigned to event is called and a popup will appear asking user to enter reason for suspend. If user cancels the popup we want to reset the status back to original. What function module can I use?
    Rgds.

    Hello,
    In your before_change FM, you have to raise the abort exception if you want to avoid the status change.
    Check standard event FM like CRM_STATUS_BEFORE_REJECT_EC.
    Regards,
    Frédéric

  • Extractor for statuses of sales order items

    Hi Experts,
    If I want to report on different statuses of an sales order item which extractor you will use.
    Regards
    nagini

    hi,
    Use the following:
    2LIS_11_VASTH for header status and 2LIS_11_VASTI for item status.
    Cheers..

  • MCEKPO-MENGE issue through 2LIS_02_ITM for Statistical Purchase Order Items

    Hello Everyone,
    I have come across this strange scenario where a given Purchase Order Item in the Source system - SAP R/3 has been changed in the following sequence,
    1. First the PO Item was marked as a Deleted PO - LOEKZ = L which set the STAPO = X (Statistical) and
    2. The Deletion Indicator was removed for the PO Item which means LOEKZ now is not having "L" and the STAPO also has been removed.
    Due to the above scenario, now the Order Quantity in the SAP BW system has 0 as the value whereas the Quantity in the SAP R/3 System shows up as 1.
    I was curious to know if there are any OSS Notes or processes in place to avoid this from happening. As I searched the forum and service place for the OSS notes related to this issue and could not find anything related.
    The Order Quantity in our system is extracted from 2LIS_02_ITM (MCEKPO-MENGE) field.
    Thanks in advance for the help.
    Dharma.

    hi Dharma..
    Did you find a solution for this post?
    I Have similar issue....
        I Have an issue (I think is issue)...with extractor 2LIS_02_ITM about reversal or deleted indicator….
    Some PO are created on R/3 and mark for deleted some line items… I try or I hope  received a “R” indicator…. But I didn´t receive the indicator…..
         I only receive “X” on this field.. (delete indicator). or in other examples  blank on this field
        What’s the difference between “X” , “R” and blank indicator?... when is posible receive X, R or blank value??
        I was thinking that when on R/3 some lines of PO orders were deleted.. I receive "R" indicator when I extract to  BW (on the PSA)... but I didn't...
       If you know how work this kind of cases or examples, please explain me more.. or let me know where can I find more information please.
        I will assign points to all the answer.
       Thank you
    Alice

  • Extractor for PM process orders

    Hi Experts,
    We are looking for a PM extractor for process orders, this is to get component information (material details), we found 2LIS_04_P_MATNR but it's limited to production orders only, also tried filling setup tables for this extractors but not fetching process orders at all.
    http://help.sap.com/saphelp_nw70/helpdata/en/88/7fc73c0c52085be10000000a114084/frameset.htm

    Is there any clues?

  • Standard  report(for open PO order items) with estimated Delivery dates

    hi friends
    i would like to know if there is any standard  report(for open PO order items) with estimated Delivery dates on it.
    thanks
    alahari

    ME2M (by material)
    ME2L (by vendor)
    ME2N (by number)
    Use selection parameter WE101 for open GR
    and scope of list EINT (scheduling lines)

  • Production Order and Internal Order for each item of the sales order

    Hi
       I am developing Make To Order Report where I have to display the MTO Line Items and non MTO Line Items. For non MTO Line Items I have to display Internal order with Planned and Actual Costs and also Production Order with Planned and Actual Costs. Could anybody tell how to get the Internal order no and production order with Planned and Actual costs for each line item for a sales order.
    Thanks
    Naga

    Hi,
    You can get the Production orders, Planned orders, Internal orders generated for Sales order item from AFPO table (use fields KDAUF-Sales order number & KDPOS-Sales order item). Then to identify the order type use order category (AUTYP) from table AUFK.
    Once you have the Production/internal order, you can ge the cost from COSS and COSP table. Use the object number from AUFK to get the cost entries from COSS & COSP.
    You can use the following sample code as reference.
    Hope this is helps.. (Don't forget to mark it... )
    Form GET_COSTS                                                       *
    Get the material cost, labour hours and the labour cost for the      *
    sales order material.                                                *
    There are no interface parameters to be passed to this subroutine.   *
    FORM GET_COSTS.
      DATA V_OBJNR LIKE AUFK-OBJNR.
    DATA v_menge LIKE vbap-kwmeng.
      SELECT SINGLE OBJNR
        INTO V_OBJNR
        FROM AUFK
       WHERE AUFNR EQ AFPO-AUFNR.
      SELECT * FROM COSS
       WHERE OBJNR EQ V_OBJNR
         AND WRTTP IN ('01', '04'). " p_wrttp. "Labour Cost ( Plan, Actual)
        PERFORM GET_VALUES_FROM_COSS.
      ENDSELECT.
      SELECT * FROM COSP
       WHERE OBJNR EQ V_OBJNR
         AND WRTTP IN ('01', '04')         " p_wrttp
         AND KSTAR NE '0000510033'. " EQ p_kstar2.      "Material Cost
        PERFORM GET_VALUE_FROM_COSP.
      ENDSELECT.
    Get the unit cost of the production order by dividing the production
    cost by the order quantity. The result will be multiplied by the
    GL posting qunatity (Delivery quantity) to get the production cost
    for the quantity being deluivered.
      IF NOT AFPO-PSMNG IS INITIAL.
        OUT_REC-LABOUR_HOURS_ACT = OUT_REC-LABOUR_HOURS_ACT / AFPO-PSMNG.
        OUT_REC-ADDNL_LABOUR_HOURS_ACT =
                          OUT_REC-ADDNL_LABOUR_HOURS_ACT / AFPO-PSMNG.
        OUT_REC-LABOUR_HOURS_PLN = OUT_REC-LABOUR_HOURS_PLN / AFPO-PSMNG.
        OUT_REC-ADDNL_LABOUR_HOURS_PLN =
                         OUT_REC-ADDNL_LABOUR_HOURS_PLN / AFPO-PSMNG.
        OUT_REC-LABOUR_COST_ACT = OUT_REC-LABOUR_COST_ACT / AFPO-PSMNG.
        OUT_REC-ADDNL_LABOUR_COST_ACT =
                         OUT_REC-ADDNL_LABOUR_COST_ACT / AFPO-PSMNG.
        OUT_REC-LABOUR_COST_PLN = OUT_REC-LABOUR_COST_PLN / AFPO-PSMNG.
        OUT_REC-ADDNL_LABOUR_COST_PLN =
                         OUT_REC-ADDNL_LABOUR_COST_PLN / AFPO-PSMNG.
        OUT_REC-MATERIAL_COST_ACT = OUT_REC-MATERIAL_COST_ACT / AFPO-PSMNG.
        OUT_REC-ADDNL_MATERIAL_COST_ACT =
                         OUT_REC-ADDNL_MATERIAL_COST_ACT / AFPO-PSMNG.
        OUT_REC-MATERIAL_COST_PLN = OUT_REC-MATERIAL_COST_PLN / AFPO-PSMNG.
        OUT_REC-ADDNL_MATERIAL_COST_PLN =
                         OUT_REC-ADDNL_MATERIAL_COST_PLN / AFPO-PSMNG.
      ENDIF.
    Multiply the calculated Unit Production costs with the GL quantity to
    get the actual production cost of the quantity delivered.
    Calculation for Labour Hours
      OUT_REC-LABOUR_HOURS_ACT = OUT_REC-LABOUR_HOURS_ACT *
                                 OUT_REC-QUANTITY.
      OUT_REC-ADDNL_LABOUR_HOURS_ACT = OUT_REC-ADDNL_LABOUR_HOURS_ACT *
                                 OUT_REC-QUANTITY.
      OUT_REC-LABOUR_HOURS_PLN = OUT_REC-LABOUR_HOURS_PLN *
                                 OUT_REC-QUANTITY.
      OUT_REC-ADDNL_LABOUR_HOURS_PLN = OUT_REC-ADDNL_LABOUR_HOURS_PLN *
                                 OUT_REC-QUANTITY.
    Calculation for Material Cost
      OUT_REC-MATERIAL_COST_ACT = OUT_REC-MATERIAL_COST_ACT *
                                  OUT_REC-QUANTITY.
      OUT_REC-ADDNL_MATERIAL_COST_ACT =
          OUT_REC-ADDNL_MATERIAL_COST_ACT * OUT_REC-QUANTITY.
      OUT_REC-MATERIAL_COST_PLN = OUT_REC-MATERIAL_COST_PLN *
                                  OUT_REC-QUANTITY.
      OUT_REC-ADDNL_MATERIAL_COST_PLN =
          OUT_REC-ADDNL_MATERIAL_COST_PLN * OUT_REC-QUANTITY.
    Calculation for Labour cost
      OUT_REC-LABOUR_COST_ACT   = OUT_REC-LABOUR_COST_ACT *
                                   OUT_REC-QUANTITY.
      OUT_REC-ADDNL_LABOUR_COST_ACT = OUT_REC-ADDNL_LABOUR_COST_ACT *
                                  OUT_REC-QUANTITY.
      OUT_REC-LABOUR_COST_PLN   = OUT_REC-LABOUR_COST_PLN *
                                  OUT_REC-QUANTITY.
      OUT_REC-ADDNL_LABOUR_COST_PLN = OUT_REC-ADDNL_LABOUR_COST_PLN *
                                  OUT_REC-QUANTITY.
    Get the planned material cost from the total of the planned cost of
    the component materials in the production order confirmations.
      SELECT BWART MENGE MATNR SHKZG FROM AUFM
        INTO (AUFM-BWART, AUFM-MENGE, AUFM-MATNR, AUFM-SHKZG)
       WHERE AUFNR EQ AFPO-AUFNR.
        CHECK AUFM-BWART NE '101'.
        READ TABLE I_MBEW WITH KEY MATNR = AUFM-MATNR
                                   BWKEY = AFPO-DWERK.
        IF SY-SUBRC NE 0.
          SELECT MATNR BWKEY ZPLPR LPLPR PEINH
            FROM MBEW
            INTO I_MBEW
           WHERE MATNR EQ AUFM-MATNR
             AND BWKEY EQ AFPO-DWERK.
            APPEND I_MBEW.
          ENDSELECT.
        ENDIF.
        IF SY-SUBRC EQ 0.
          IF I_MBEW-ZPLPR NE 0.
            IF AUFM-SHKZG EQ 'H'.
              OUT_REC-PLANNED_MATERIAL_COST =
              OUT_REC-PLANNED_MATERIAL_COST +
                           ( I_MBEW-ZPLPR * AUFM-MENGE / I_MBEW-PEINH ).
            ELSE.
              OUT_REC-PLANNED_MATERIAL_COST =
              OUT_REC-PLANNED_MATERIAL_COST -
                           ( I_MBEW-ZPLPR * AUFM-MENGE / I_MBEW-PEINH ).
            ENDIF.
          ELSEIF I_MBEW-LPLPR NE 0.
            IF AUFM-SHKZG EQ 'H'.
              OUT_REC-CURRENT_MATERIAL_COST =
              OUT_REC-CURRENT_MATERIAL_COST +
                           ( I_MBEW-LPLPR * AUFM-MENGE / I_MBEW-PEINH ).
            ELSE.
              OUT_REC-CURRENT_MATERIAL_COST =
              OUT_REC-CURRENT_MATERIAL_COST -
                           ( I_MBEW-LPLPR * AUFM-MENGE / I_MBEW-PEINH ).
            ENDIF.
          ENDIF.
        ENDIF.
      ENDSELECT.
    Get the Future material cost per Unit by deviding the calculated
    Future material cost above with the goods reciept quantity to, then
    multiply the unit cost with the GL quantity to get the Future material
    Cost for the Quantity delivered. (Quantity in the entery from GLPCA
    Table).
      IF NOT AFPO-WEMNG IS INITIAL.
        OUT_REC-PLANNED_MATERIAL_COST =
           OUT_REC-PLANNED_MATERIAL_COST / AFPO-WEMNG * OUT_REC-QUANTITY.
        OUT_REC-CURRENT_MATERIAL_COST =
           OUT_REC-CURRENT_MATERIAL_COST / AFPO-WEMNG * OUT_REC-QUANTITY.
      ENDIF.
    ENDFORM.                               " GET_COSTS
    Form GET_VALUE_FROM_COSP                                             *
    Get the Material cost from COSP table.                               *
    There are no interface parameters to be passed to this subroutine.   *
    FORM GET_VALUE_FROM_COSP.
      FIELD-SYMBOLS: <FS> TYPE ANY.
      DATA: V_COMPONENT TYPE I.
    Cummulate the posting values of all the 16 period buckets as to get
    total production order cost. This is to handle the aprtial posting of
    prodction order values in diffrent periods.
      V_COMPONENT = 15.
      DO 16 TIMES.
        ADD 1 TO V_COMPONENT.
        ASSIGN COMPONENT V_COMPONENT OF STRUCTURE COSP TO <FS>.
        IF COSP-WRTTP EQ '04' AND COSP-KSTAR EQ P_KSTAR2.
          ADD <FS> TO OUT_REC-MATERIAL_COST_ACT.
        ELSEIF COSP-WRTTP EQ '04'.
          ADD <FS> TO OUT_REC-ADDNL_MATERIAL_COST_ACT.
        ELSEIF COSP-WRTTP EQ '01' AND COSP-KSTAR EQ P_KSTAR2.
          ADD <FS> TO OUT_REC-MATERIAL_COST_PLN.
        ELSEIF COSP-WRTTP EQ '01'.
          ADD <FS> TO OUT_REC-ADDNL_MATERIAL_COST_PLN.
        ENDIF.
      ENDDO.
    ENDFORM.                               " GET_VALUE_FROM_COSP
    Form GET_VALUES_FROM_COSS                                            *
    Get the Labour cost and Labour hours from the COSS table.            *
    There are no interface parameters to be passed to this subroutine.   *
    FORM GET_VALUES_FROM_COSS.
      FIELD-SYMBOLS: <FS1> TYPE ANY,
                     <FS2> TYPE ANY.
      DATA: V_COMPONENT1 TYPE I,
            V_COMPONENT2 TYPE I.
    Cummulate the posting values of all the 16 period buckets as to get
    total production order cost. This is to handle the aprtial posting of
    prodction order values in diffrent periods.
      V_COMPONENT1 = 15.
      V_COMPONENT2 = 111.
      DO 16 TIMES.
        ADD 1 TO: V_COMPONENT1, V_COMPONENT2.
        ASSIGN COMPONENT V_COMPONENT1 OF STRUCTURE COSS TO <FS1>.
        ASSIGN COMPONENT V_COMPONENT2 OF STRUCTURE COSS TO <FS2>.
        IF COSS-WRTTP EQ '04' AND COSS-KSTAR EQ P_KSTAR1.
          ADD <FS1> TO OUT_REC-LABOUR_COST_ACT.
          ADD <FS2> TO OUT_REC-LABOUR_HOURS_ACT.
        ELSEIF COSS-WRTTP EQ '04'.
          ADD <FS1> TO OUT_REC-ADDNL_LABOUR_COST_ACT.
          ADD <FS2> TO OUT_REC-ADDNL_LABOUR_HOURS_ACT.
        ELSEIF COSS-WRTTP EQ '01' AND COSS-KSTAR EQ P_KSTAR1.
          ADD <FS1> TO OUT_REC-LABOUR_COST_PLN.
          ADD <FS2> TO OUT_REC-LABOUR_HOURS_PLN.
        ELSEIF COSS-WRTTP EQ '01'.
          ADD <FS1> TO OUT_REC-ADDNL_LABOUR_COST_PLN.
          ADD <FS2> TO OUT_REC-ADDNL_LABOUR_HOURS_PLN.
        ENDIF.
      ENDDO.
    ENDFORM.                               " GET_VALUES_FROM_COSS

  • Result analysis for sub-items on SD-order

    Hello,
    I would like to know, whether also the document flow for subitems is being checked while executing result analysis.
    Example:
    We have got an SD order, a higher-level item and a sub-item.
    Both of them have assigned the same result analysis key. Within this key it is defined in customizing (OKG3), that the Sales Order Structure is A-"Summarize Plan and Actual Data of Subitems on Highest Item"....so the result analysis for the sub-item is being performg via the higher-level item.
    The higher-level positions is already completed - the delivery is made and also the invoice is created.
    The sub-item is not completed - neighter delivery is made nor the invoice.
    While executing the result analysis for the higher-level item, the status FNBL (final billing) is recognized and all cost are settled from WIP to CO-PA.
    As far as I know, the document flow should be checked withitn the result analysis and based on this the status should be recognized.
    Therefore It seems, that only the document flow from the higher-level item is being checked. If also the document flow from the sub-item is checked, there would be no way to get the status FNBL as the sub-item is not complete.
    Is it SAP standard delivered behaviour?
    Thanks in advance
    Peter

    Thanks Waman,
    I have tried to delete the result analysis key from the sub-item, but still the same result in result analysis...
    Could you tell my the consequences from the 1A setup from the note? It is adviced withitn the note to not use the 1A setup. But we use this and it works fine. Just some messages during the result analysis, that it could not be performed for sub-items, but this has no influence on the values.
    Regards
    Peter
    Edited by: Peter Jankech on Jun 9, 2010 8:57 AM

Maybe you are looking for

  • Sped up clip after capture in FCP 6.0

    Everything I capture in FCP 6.0 from my JVC GRD 850 is sped up. I'm using OS X.4.11 All of my settings seem to be OK. Any idea what's going on?

  • Rating Scale in PM

    my existing rating scale that was define last year had 9 levels now i want to add one more level in and make it 10 but when i am trying to do so on the Career Management >Rating Scale window system gives me the following error: APP-PAY-51480: You can

  • How to view/open excel file in EBS

    Hi , I have a requirement to open an excel file by clicking a link in EBS. Does anyone know how to do it, pls consider that i have a file named xyz.xls locally on a windows machine and i have to deploy it on EBS instance and view it by logging in. Ju

  • How do i permanently delete texts from my 4s?

    How do I permanently delete texts from my 4S?

  • RMA Probl

    Hi,? I sent my?ZEN VISION:M 60GB?off to get what I hope to be a new hard dri've but when i try and log into the RMA Status checker and my phone number isn't getting recognized, is there anyway of getting around this, I have all the details about my Z