Activating Spare part management in SAP

Hello MM Gurus,
How to activate a new matl type in MM. we have a specific requirement..we have to activate spares management in SAP. Currently we are using some Legacy system. Can anybody give some Guideline?

to create anew material type go to oms2,here either copy or create .
then create number range and assign it to ur new material type.
regards,
indranil

Similar Messages

  • Parts Management in SAP

    Hi All,
    What is Parts Management in SAP terminology called..? please provide me the brief business process for the same..
    sure rewards !!
    Thanks & regards
    Yasar

    Hi Yasar ,
    use the following links for the same
    http://jobfunctions.bnet.com/abstract.aspx?docid=256993&promo=300111
    http://www50.sap.com/businessmaps/B81A533E0D8A4E11B547D7BF1D19D595.htm
    http://www8.sap.com/businessmaps/23F71D42771B4AD08781C31487CE3CB9.htm
    Regards
    Mangesh
    Reward points if it helps

  • Unable to view Spare Part Components in SAP CRM Service Order

    Hello All,
    We are implementing CRM 7.0 Ehp 2.0
    As per the following video it is now possible to integrate the spare part components in the CRM Service Order, using the BOM replication and Product Proposal functionality in SAP CRM
    SAP CRM 7.0 - Integration of ERP BOM Information in the CRM Product Proposal
    However in our case we are not able to achieve the desired results.
    Following configurations are done
    1) The BOM is replicated from ECC to CRM the same can be viewed in commpr01
        Material 4561 is the main product and 4562 is the component
    2) The item category for the main product is YRVS where the customization for structure scope is done
    3) For the Product Proposal customization's, I have created a new method schema
    4) The transaction type and the sales org are assigned to the method schema
    5) However now when I am creating the service order, I enter the sold to party, the product id
    6) Next  I go to the line item to click on product proposal.
    7) The system issues the below message
    Please advice if I am missing on any configurations.
    Kind Regards
    Atul

    Hi Raghavendra,
    Thanks for your reply, appreciate the same, I have now added the relationship objects as per your post above in comm_hierarchy for the particular category
    Now  in the product master , I am now able to view the tabs(screen shot attached)
    Next I create my BOM in ECC with BOM Usage 5 and save the same
    Next I run the initial download for the adaptor object  BOM in SAP CRM
    When I check in commpr01 for the material 4561 the component and the main material have not come.
    Can you please advice further.
    Kind Regards
    Atul

  • Spare Parts Reservation in SAP DBM

    Hi all,
    Greetings..!
    In SAP DBM, if i create the spare parts reservation for service order, i am not able to see who has created the reservation in MB24.
    The column(User Name) is always empty.But if i create the normal reservation through Tcode MB21, the User name is getting appeared
    Any idea to resolve this?
    Regards,
    Rangakarthick

    Hi,
    The username who created the reservation is in field RKPF-USNAM.
    In standard DBM this field is not filled during execution of action RESERV_UPDATE
    when DBM order is saved and reservation is created.
    Therefore in MB24 you cannot select reservations with selection of User name.
    You can try to create customer BADI implementation of BADI /DBM/BADI_OE_ACTION_EXECUTE which should be executed after DBM standard implementation /DBM/ORD_AX_RESERV_UPDATE.
    Find details in configuration book of order engine.
    The username is pouplated e.g. in MS_VBAK_COM-ERNAM of object DBM-order.
    So, if reservation is created with standard implementation you can try to change RKPF-USNAM with the user who is creating the DBM-order.
    Hope this helps.
    Regards
    Joachim

  • Dealer Management System,Dealer Communication System,Spare Part System SAP?

    Hi,
    Can anybody explain me "what are the oppurtunities for Dealer Management System(DMS), Dealer Communication System(DCS) and Spare Part System(SPS) on SAP ? All are for Auto and Track Dealers ?
    Thanks and best regards,
    Behcet Ahmet Aksoz.

    Hi Behcet Ahmet Aksoz.,
    Please check the subject of the forum. This forum is only for SAP Business One user. Please close your thread.
    Thanks
    Gordon

  • Mapping Spare part kit planning in SAP

    Hi,
    We have below requirement in Spare part Kitting process
    1)
    Client  makes compressors, which obviously have a lot of components, where one of the prime part is valve.
    2)
    Valve Kit is a finished product having components which are used in regular unit production also, where MRP Type can be VV or PD.
    3)
    This valve kit sold as a spare part.Customers buy these kits and typical assembly time is 1 day.
    4)
    This kit is not kept in stock and is assembled after receiving an order.
    5)
    To be ready for customer orders, client forecasts these kits (about 10000) and drives the demand for lower level components.
    6)
    When customer places an order, legacy system promises the dates based on availability of components. Date is promised to the customer based on the availability of the components. Also the requirement is passed on to the floor to assemble and shipped the same day.
    7)
    To meet above requirement, we proposed to use Forecast based planning, where system will create planned order for Kit assembly & component can be planned.Knowing there is a back drop i.e. planned order created thru forecast can be converted into production order.
    8)
    Then demonstrated “ATO – Assemble to Order” functionality in SAP. This uses strategy group 81 for the kit material XX-XXXX-XX. When a sales order is created for a material with strategy group 81, system immediately creates a planned order and as per component availability, proposes the next available date of the assembly.
    9)
    Since ATO is an MTO process, Planned order is tied to Sales Order and when production order goods receipt is done, stock is received into Sales Order stock. Hence Sales Orders do not consume the forecast.
    10)
    Question here is how to consume the forecast? When sales order is shipped system is not updating consumption data? This is important as today they use the consumption values to execute the forecast.
    If any one has come across similar requirement, please give other options keeping below points in view
    1. We should be able to plan valve kits may be thru forecasting or PIR's. This to start procuring components.
    2. When sales order is created, system should do availability check at component level.
    3. Consumption data should be updated if we use forecasting to plan kit or if we use PIR's, sales order should consume the demand. Consumption of forecasting requirement is also required.
    Thanks in advance.
    Hari

    Hi ,
    Looks like problem is due to
    - Need to do ATP at componnent level  which is only possible with Planning  strategy 81,82. You cannot use planning strategy 40( 40 considers forecast , sales order & consumption)
    - 81 ,82 planning strategy doesn't consume forecast for End item(Sales order entry material)
    You could use Sales order BOM function. It is provided for selling Kits. BOM is exploded in sales order & kit items are put as seperate sales order items ( 20... 30... 40 ) Here are steps.
    -  Create BOM with usage 5- Sales order relevancy of bom components is Ticked
    - Create Sales order with item which is BOM header. System will explode BOM & all items will be part of sales order as item.
    - You can configure Sale Price at End FG level, Inventory management( DO issue) at item /components level .
    - Forecast will be consumed at end item level.Need configuration
    - ATP check can be performed at componenet level
    Only thing is you will not have Plan order for doing assembly & there is no cost captured for assembly . Kitting donot involve much labor time.
    Hope it helps
    Jatin

  • SAP PM-MM Linkage for spare parts planning

    Hi
    I need to know the linkages between SAP PM-MM for the spare material... do any one came across this concept ?
    - Pithan

    1.If you create PR for spare part from Maintenance order , when goods receipt comes to stores automatically notification gets created ,this setting is done in Material Master record.
    2.You create Equipment BOM & attach it to equipment , for easy way of putting this into order during planning.
    3.You can check Material Availability in Maintenance Order.
    4.You can define the scope of Check in "Availability Check for Material" , in Spro Customize , you define check should include Material in PR , PO or Quality inspection & other.
    5.From Task list which you have planned , you can check how much quantity is currently available or when to procure.
    6.You can define default external profile settings for external mat in SPRO settings
    regards

  • How to manage spare parts and production parts seperately

    Hello,
    I want to keep some spare parts for services only ,though some of them also used in production .
    then how can I implement this in SAP system,how the stock of spare parts not influence the forecast of the production( means these parts only can be used in services)
    how to separate these parts in Warehouse in system and physically.
    Thanks,
    Helai

    Helai,
    If it were MY company, I would
    1.  Put the spares into a diff storage locn
    2.  Enter Safety stock for the quantity I want kept in 'spares' inventory
    3.  Use an availability check in which Safety stock is not relevant for ATP for these parts.
    However, this does not meet all of YOUR stated business requirements.  For this, you have to use MRP areas, and have the 'spares' storage location assigned to a different MRP area.  You can then plan them completely separately from your production parts.
    [MRP Area|http://help.sap.com/saphelp_erp60_sp/helpdata/EN/c4/106956ae8a11d1a6720000e83235d4/frameset.htm]
    Regards,
    DB49

  • Error in solution manager; no active task list exists in sap change manager

    Hi,
    i have created a correction in Solution manager but when i want to set it in status in development i receive the message below
    No active task list exists in SAP Change Manager
    could you please help me?
    thanks
    C.

    cmarrone wrote:Hi,
    This says taht your ChaRM configuration is not complete. You need to rectify these errors to work in ChaRM.
    >
    > listed below the detail of the errors:
    > Error in background job for program RSGET_SMSY error message No active job found
    1. Please activate the Landscape fetch job for RSGET_SMSY from SPROSolution ManagerBasic Settings-- Schedule Bgd jobs.
    > No RFC connection for system CIA client '000'
    Please maintain a connection from solution manager to the transport domain system . I belive this is CIA.
    > No CTS projects found for project ARC_AM_001
    Recheck the transport configurations.
    Rajeev

  • How to use spare part from damaged equipment to a new equipment in SAP

    Hello Gurus,
    Sometimes we use a spare part from a discarded equipment to make the present equipment functional. How would this be documented in SAP?
    Thanks & Regards
    Raghuvarun

    Hi Raghuvarun,
    There will be several methods depending upon the your final objectives of such requirement.
    In case you want to just maintain the spare part and the Equipment from which it has been removed, then use Catalog Codes. In the Object part Catalog maintain the Spare part in the Code part and the Equipment number in Item Text.
    This method is hassle free.
    In case the requirement's like physically identifying the spare-part etc., then the process would be very complex. You need to opt for not only Material Codes but also the Serialization of all these spare parts.
    So you need to first consolidate your objectives of the requirement you have asked for. Then post a Query in detail explaining the objectives.
    In most of the cases such requirements are satisfied with ideas like the 1st case I proposed, i.e., Catalogs & Codes.
    Jogeswara Rao K

  • How to change spare part item price in sap

    Dear All,
    Can you tell me how to change spare  part item price in sap ,
    like in our company hike new price of spare part item so how can update a new price in bluk order
    thankx and Regards
    Pritpal

    Hi,
    Try MR21 & MR22.
    First assign the appropriate G/L account against the account key for the same.
    Regards,
    Sourabh

  • Issue regarding implementing the PM Spare Parts Scanning process

    Dear friends,
    I have the following issue. It seams that the client, who want to implement the scanning procedure for the PM Spare Parts, can not do this with wireless scanners if the maintenance of the spare parts is done with Inventory Management means and has requested to implement Warehouse Management integration. The fact is that I know that IM can be use. And I know, also, that the basic needs for IM use is that the materials have activated the Batch Management and, the scanning is based on batch bar code/material bar code, together with - for GR - PO bar code and, for GI - the WO bar code. But the issue regarding the wireless baffles me. Please, can you tell me what is the way for setting the wireless connection for the scanners in IM? Thank you very much for your kindness.
    Sorin

    hi,
    It basically depends how your business process is designed for producing Spare Parts before they are reworked.
    rework order can be cerated without material with reference to original production order whcih is responsible for proeducing that SFG.
    consider below lonks:
    http://help.sap.com/bp_bl603/BBLibrary/HTML/151_EN_US.htm

  • Spare parts -DIGI business procedure

    Hi everyone,
    I'm testing how to use spare parts-DIGI direct issues goods.
    I have create and release a service order ,but no following-up document is created automatically.
    At the same time ,I try to find if there is any documents in Customer Demand View.there's nothing.
    I try to check if it's already issued in Outbound Delivery View.It's also nothing and inventory has no change.
    So I try to make confirmation. This reduced the inventory and create a Good and Activity confirmation document automatically.
    But the status of service order is still in process and order pipeline is still not started.
    what should I next?
    Could you please tell me correct procedure in system  that  I should do in SAP step by step?
    thank you very much.

    Hi David,
    DIGI parts in service orders are not relevant for supply planning. So will not see them as a demand. You also do not get any ATP info for DIGI parts. You have to first release the order to service execution, then you can do the confirmation. In the confirmation UI you can specify the logitics area, from which the part will be taken. After service confirmation the inventory is then automatically reduced by the quantity of the DIGI part.

  • Spare Parts on consignment at no cost during warranty period

    With new equipment being installed, several vendors have agreed to provide us with spare parts on a consignment basis without any consumption cost during the warranty period. When the warranty ends we'll either purchase the spares or return them to the vendor. Is there a standard SAP process for these parts? I've look into consignment processing but did not find a clean way to do this without an accounting entry. We are on ECC 6.0.

    Jody,
    Try asking the same question to the [Materials Management|SAP ERP - Logistics Materials Management (SAP MM); guys.
    PeteA

  • Problem with BI activation in Solution Manager

    Hello SAP experts.
    I have problem with BI Content Activation in Solution Manager solman_workcenter - test management - settings - Bi reporting
    The customizing in client 010 is ok. I have BW client 001. RFC connections
    are ok. After activation of BW content in workcenter only new job in sm37
    has been planned but the button Status Report has not appeared. I installed
    newest add-on SAPK-70405INBICONT.
    Detailed description:
    After customizing in:
    SPRO-Basic Data-BW Setup
    and
    SPRO-Scenario-Specific Settings - Test Management - BW-based Reporting.
    The Activation of BW content in transaction solman_workcenter - Test
    Management - Settings - BI Reporting Settings the message appears:
    "Test Workbench Reporting - BI Content not active", after pressing save:"Settings of Test Workbench Reporting saved"
    and
    "Activation of BI Content for Test Workbench Reporting started".
    In test evaluation the button Status report doesnt show. After repeated
    activation appears the same message as in beginning: Test Workbench
    Reporting - BI Content not active.
    Thank you

    Hi Marian,
    Could you please provide me with details on how to setup test workbench reporting. I have a BW system external to Solution Manager. I have setup the RFC conncections and all is okay. I have also setup the source system in BW and installed the web templates. However, when activating the content via solman_workcenter - test management - settings, I get the following error:
    Content Activation Log
    Log for Setup ID 20100819135323
    20100819 135323[ERROR ]: Current Status: ERROR
    20100819 135323[INFO ]: Job CCMS_BI_SETUP successfully scheduled
    20100819 135323[ERROR ]: Incorrect system setting: standard transport is active
    20100819 135323[ERROR ]: Change system settings or set user parameters RSOISCONTENTSYSTEM and RSOSTANDARDCTOACTIVE
    20100819 135323[ERROR ]: Prerequisites check failed
    20100819 135323[ERROR ]: Jobname/count: CCMS_BI_SETUP 13532300
    I am sure there is something wrong in my setup but I cannot figure out what it is. A step by step help on how to do it will be greatly appreciated.
    Regards,
    Rue.

Maybe you are looking for