Adding a Logarithmi​c Trendline to an X-Y Graph

In my VI I am taking measurements from a DAQ, calculating phase shift and frequency and writing it to a TDMS file.
After I have this TDMS file I want to make a scatter plot of the data on an X-Y graph with a logarithmic trend line. I am plotting phase shift (Untitled 1) versus frequency (Untitled). I succeeded in graphing the data, but I am having trouble adding the trendline. I have attached the VI in question. I tried to attach the TDMS file, but the forum does not allow such attachments.
Thanks for any help or suggestions that you can offer.
Attachments:
Research- Voltage.vi ‏459 KB

Hi,
I had a little look over the relevant part of your vi. The log fit function returns an array of y values, so you can plot these against x, and add it to your graph alongside the actual values.
One way to do it using the functions you've implemented is like this:
See if this works.
One extra thing that might be helpful, you don't have to open the TDMS file twice, you can just open it once then do as much reading as you want, then close it once. (you can read multiple channels at once too, using an string array as the channel name input to the TDMS read.
All the best,
Ian S
Applications Engineer CLD
National Instruments UK&Ireland

Similar Messages

  • Adding trendline and equation to lv graph in 6.0

    Is it possible to add trendline and equation to a lv graph in 6.0? It is normally done in excel.

    Hi,
    LabVIEW 6.0 does not have any built-in trendline option. However you can use the interpolation functions to achieve the same results. As for adding the equation to the graph, you can do it simply by selecting the "Edit Text" tool from the Tools palette and write the equation in the grid of the graph.
    Hope this helps.
    Ankita

  • Is adding a Billing Server mandatory to view call quality graphs in Prime Collaboration Assurance and Analytics 10.5

    Hi,
    we are in the process of demostrating Cisco Prime Collaboration 10.5 Assurance and Analytics and somehow are not able to pull Call Quality Graphs. The question is Is it mandatory to add a Billing Server to get the missing graphs.
    Thanks in advance
    Kunal

    As per the following guide you should be able to discover and manage endpoints that are registered to Cisco TMS and Cisco VCS with both PCA Standard and Advanced.
    http://www.cisco.com/c/en/us/td/docs/net_mgmt/prime/collaboration/10-5/assurance/standard/guide/Cisco_Prime_Collaboration_Assurance_Guide_Standard_10_5/bk_assurance_standard_chapter_010.html
    HTH
    Manish

  • Line of Best Fit/Trendline

    As part of my Physics class we need to graph data that can only be displayed using a line of best fit (AKA a Trendline) - I can make any graph fine on Numbers but I am at a loss on how to make a trendline.
    Could you please aid me in my search to create a Trendline?
    Thanks,
    Jean-Paul J
    Message was edited by: Jean-Paul J

    Question asked and responded several times.
    Feature unavailable.
    +-+-+-+-+-+-+-+-+
    Worried Life Blues 2008
    Discussions
    +Apple Discussions, launched in August, 2000, have grown rapidly in usage and features. The main features include personalization, subscription capabilities and email capabilities. _For information on how to use Discussions, please visit the Discussions Help Page_. Cookies should be enabled and an Apple ID account is required if you would like to contribute to the discussions.+
    +*What is Apple Discussions and how can it help me?*+
    +
    Apple Discussions is a user-to-user support forum where experts and other Apple product users get together to discuss Apple products. … You can participate in discussions about various products and topics, find solutions to help you resolve issues, ask questions, get tips and advice, and more.+
    +_If you have a technical question about an Apple product, be sure to check out Apple's support resources first by consulting the application Help menu on your computer and visiting our Support site to view articles and more on our product support pages._+
    +*I have a question or issue*—+
    +how do I search for answers? _
    It's possible that your question or issue has already been answered by other members so do a search before posting a question._ On most Apple Discussions pages, you'll find a Search Discussions box in the upper right corner. Enter a search term (or terms) in the field and press Return. Your results will appear as a list of links to posts below the Search Discussions Content pane.+
    +Search tips are available here:+
    +http://discussions.apple.com/help/search-tips.html+
    +-+-+-+-+-+-+-+-+
    Yvan KOENIG (from FRANCE dimanche 28 septembre 2008 15:45:22)

  • How to display current time when the inputs are added together and display intervals every sec?

    Hi, I added the values together but the time in the graph is not showing the present time.
    The one that is not displaying the current time is the voltage graph.
    On the x-axis of the voltage graph i want it to display every second interval.
    Thanks.

    You also shouldn't be using the local variables.  Instead, actually add up the signals from the wires.  What you have there is a race condition since you can be reading from the local variables before the terminal is written to.
    There are only two ways to tell somebody thanks: Kudos and Marked Solutions
    Unofficial Forum Rules and Guidelines

  • Add a trend line to a scatter graph

    for my physics work i had to plot a graph and i need to add a trendline to the graph. I have plotted the graph as a scatter chart but dont know how to add a line of best fit, please help

    Search "linear regression' in Numbers Help.
    The FORECAST() function can be used to calculate the end points for the trend line using the minimum and maximum X values in your data set for the x value argument.
    For example, with your data pairs listed in B3:B12 (x values) and C3:C12 (y values), add these values and formulas:
    D3: 0
    E3: =FORECAST(D3, C3:C$12, B3:B12)
    D4: =MAX(B3:B12)
    E4: =FORECAST(D4, C3:C$12, B3:B12)
    The data pair on row 3 mark the y axis intercept of the trend line.
    The pair on line 4 mark the position of the trend line where its x value is equal to the maximum x value of the data set. As plotting this pair may obscure the data point at this x value, you may want to move the trend line point to the right. To do this, add an arbitrary amount to the value in D4. The size of the added amount will depend on the scale of your graph.
    eg. D4: =MAX(B3:B12)+2
    If your data set includes negative x values, replace the formula in D3 with the mirror of the one in D4:
    D3: =MIN(B3:B12)-2
    Again, the "-2" is an arbitrary value used to extend the trend line beyond the collected x values.
    This will allow you to plot these two points onto your scatter graph as a second data set. I don't see a means of making Numbers connect the points, so you will have to add the line manually.
    Regards,
    Barry

  • IMGBurn updated to 2.0.0.0

    See http://www.imgburn.com/
    All-new version of the popular freeware burn utility.
    Changelog:
    * Added: 'Build' mode for creating ISO's from files on your hard disk, or burning them direct to a disc.
    * Added: Capturing Processor usage is now optional.
    * Added: Option to change the thread priority of the 'Graph Data' thread. Might give more accurate results on some PC's.
    * Added: Workaround for Windows Vista where the system tray icon wouldn't display the initial (top most) 'Restore ImgBurn' item because it had the 'Default' flag set.
    * Added: Additional variations of the 'Send Cue Sheet' command when the initial attempt fails.
    * Added: If 'Send Cue Sheet' now fails because the drive is sooooo old it doesn't support SAO burning, the program will revert to TAO.
    * Added: Option to make Verify mode just test readability of the disc itself and not verify against an image file.
    * Added: Verify mode now reports (for all modes) the file mapped to any unreadable sector at a given LBA address.
    * Added: Buffer Recovery (+ user configurable threshold settings) for times when burning and hdd goes mental, meaning device buffer empties. This means less start / stopping for the drive.
    * Added: Option to set read speed for Verify mode (any type of verify, in the case where it's being done after burn etc).
    * Added: 32bit colour Icons to the icon used for 'default' file associations.
    * Added: When the program needs another disc as part of queued burns (and it's not the foreground window), it now flashes the taskbar button.
    * Added: A rating system to the layerbreak positions/screens. Should make it easier to pick the best one.
    * Added/Changed: The 'Wait For +RW Background Format' option into a 'Prefer Properly Formatted +RW' option. When checked, the program waits for background format to finish and will also prompt to format (before writing) any disc that's in the 'Formatted: No' or 'Formatted: No (Started)' states. When unchecked, it will only prompt when in the 'Formatted: No' state (i.e. when it really has to format).
    * Added: 'Mark as Burnt' to the Queue window context menu.
    * Added: New startup screen on OS's supporting layered windows.
    * Added: A new item to the main menu called 'Output'. This is visible in ISO Build mode and lets you switch between building to an image file or doing on-the-fly to a device (drive).
    * Added: '/VOLUMELABEL' CLI parameter for ISO Build mode.
    * Added: '/NOIMAGEDETAILS' CLI parameter for use in ISO Build mode. Does the same thing at ticking 'Don't Prompt Image Details' in the settings.
    * Added: '/OVERWRITE' CLI parameter for use in ISO Build mode.
    * Added: Support for detecting device arrival / removal.
    * Added: 'Copies' to the main window - as such, logic behind queue has had to change (as has the Queue window).
    * Added: '/COPIES' CLI command for use in ISOWRITE mode.
    * Added: Ability to load/save settings to a '.ini' file. File name passed via '/SETTINGS' CLI command or will default to 'ImgBurn.ini' in the exe's directory.
    * Added: 'Eject Tray' checkbox to all the transfer screens. Whatever that box is set to is now what the program does at the end of the burn (or burn + verify).
    * Added: Additional MD5 calculations to Build/Write/Verify modes where I thought they'd be handy - logged when operation completes successfully.
    * Added: Ability to eject the tray after write ONLY when there are additional images in the queue.
    * Added: Copies + speed info to the burn progress screen.
    * Added: Support for '.IBB' files - these are plain text backup project files. See 'ReadMe.txt' for additional information.
    * Added: Support for '/FILESYSTEM' CLI command for use in ISOBUILD mode.
    * Added: Support for CloneCD's updated version of my old '.dvd' file (from DVD Dec days) where it also contains layerbreak information.
    * Added: More image info to verify / write main screens (to fill empty space!) - due to additional real estate needed for 'Build' mode.
    * Added: Files > 1GB and that have sizes divisible (exactly) by 2048 are now just always accepted for burning - regardless of presence of 'supported' filesystems in the image.
    * Added: 'ImgBurn Statistics' to the 'Help' menu.
    * Added: '/LOG' CLI switch to auto save the log to specified file (overrides setting / filename in settings window).
    * Added: '/INFO' CLI switch to save Info panel information to specified file the first time a disc is fully recognised / checked.
    * Added: The installer now writes out the options (Desktop/Quick Launch icon etc) to the registry so those options are preserved if you install again.
    * Added: Ability to Load/Eject disc from Queue window.
    * Added: Improved file association removal code within the uninstaller.
    * Added: List of (supported!) file systems used within an image to the log and to the tooltip on the volume label.
    * Added: Ability to sort the queue asc/desc by clicking on the column header.
    * Added: Workaround for some old drives that wouldn't report a disc as being erasable.
    * Added: Option to ignore IFO/Filesystem layerbreak positions and revert to VOBU/ECC scanning.
    * Added: Option to set the chosen layerbreak position as 'seamless' via a checkbox in the 'select layer break position' / 'create layer break position' dialog boxes.
    * Added: Option to tell the program NOT to update the IFO/BUP files.
    * Added: Verify mode can now collect data / produce IBG files in its own right.
    * Added/Changed: Use of ComboBoxEx for device dropdown lists when running under Vista. The standard customdraw ComboBox didn't theme properly.
    * Changed: Processor performance counters are now initialised earlier to reduce the delay when the 'GraphData' thread starts.
    * Changed: Even when you load the ISO rather than the MDS file, the MDS (with the same name) will still be deleted if you opt to delete the image.
    * Changed: IBG files are now made to version 2 specs. You'll need an updated DVDInfoPro to view them.
    * Changed: Max speed can now be 33% larger than the average value (was 20%) - otherwise it's ignored - probably a spike.
    * Changed: Shortcut keys for modes/log window/queue window have been changed - forced due to nature of keypressing in new 'Build' mode. Old shortcuts do still work for Write/Verify/Discovery modes though.
    * Changed: 'L' and 'E' on Load/Eject buttons have been replaced by some pictures.
    * Changed: Updated 'ReadMe.txt' file with new CLI stuff.
    * Changed: The little picture of the drive in the device dropdown boxes is now greyed out for all devices except the active one.
    * Fixed: Drag + Drop of some items could look like it was going to work (going by the mouse cursor) but then didn't actually do anything (Effected Build mode's 'Source' box, the 'Queue' window and the 'Create DVD MDS File' window).
    * Fixed: When setting SPLIP flag in IFO/BUP files as a result of layerbreak stuff, it now checks the previous cell doesn't have a cell command before doing so.
    * Fixed: MSF values found in the 16 byte header of some CD sectors sizes (as part of internal conversion routines) were being calculated/stored in normal decimal format, not BCD (binary coded decimal).
    * Fixed: Selecting 'Incremental' and burning a CD meant all kinds of weird things happened. As Incremental doesn't work on CD (or at least not in ImgBurn), it'll always force SAO mode burning.
    * Fixed: Transparency problem with the 48x48x32 program icon.
    * Fixed: Unfinalised multisession discs where last session was empty were reported as being totally empty - meaning the program didn't prompt to erase them - meaning the burn then failed.
    * Fixed: Couldn't open read-only files (via the 'Open' dialog box) using Windows 98.
    * Fixed: Problem with non all-numeric OS 'short dates' in IBG files. The export function would bomb out because Borland's Date/Time functions wouldn't convert the string (taken from the IBG) back into a 'TDateTime' object. i.e. '2/July/2006 12:00:00' would fail where '2/7/2006 12:00:00' would work fine.
    * Fixed: Error message boxes shown from within threads did not stop other windows from becoming inactive.
    * Fixed: Problem where freshly formatted +RW media with unreadable sectors (not normal! - probably means burn will fail anyway) was not considered as writable.
    * Fixed: (Workaround) For a problem with Borlands resource compiler where icons have their index's messed up - this stopped the icon for file associations from working properly.
    * Fixed: Problem with Queue sort order not resetting when going between 'sort by name' and 'sort by name (ignore path)'.
    * Fixed: Unnecessary creation of reg keys for file types where association was disabled.
    * Fixed: 'Standard' user accounts got errors when closing the program down (failing to set file associations) - Maybe it is just visible in Vista?
    * Fixed: Problem updating volume labels in UDF filesystem if previously there was no volume label at all.
    * Fixed: Acceleration character (an '_') was shown in the Queue window for images containing an '&' in the volume label or file name.
    * Fixed: IBG CPU % usage stats on non English PC's.
    * Fixed: Incorrect 'Start In' property for shortcuts/icons created by the installer.
    * Fixed: Incorrect conversion of UDF revision field resulted in some weird values being reported.
    * Fixed: Problem where displaying IBG file with minimum required version of DVDInfoPro would show an error.
    * Fixed: IBQ files couldn't be loaded from the CLI and still keep all the correct settings - selected device info was lost.
    * Fixed: The Log window's open/save dialog boxes used the 'filename' path (part of internal structure) as the default folder, rather than the 'initialdir' path - so they didn't default to the correct 'Most Recently Used' folder.
    * Fixed: Compressing the exe with PECompact meant the 2nd application icon was compressed and so didn't show up for associated file extensions.
    * Fixed: Deferred errors caught by the 'WaitImmediateIO' function were not being correctly copied to the parent function - this could cause a crash.
    * Fixed: File Association code wasn't clearing up the registry properly.
    * Fixed: The filesystem parsing code as part of the verify stage could attempt to read beyond the end of the image file if it was a really small image.
    How can you possibly go wrong!

    Just for the heck of it, I went into Edge and was able to retrieve e-mail for one of my accounts. Don't really understand what 2.0.2 was designed to do.
    From my purely anecdotal experience, I think it's designed to display more bars on the screen Kind of like a Potemkin phone ...
    Well, it's been confirmed. As I type this, I have now received e-mail from both of my accounts ... on Edge ...
    I guess it's back to the drawing board for Apple and AT&T.

  • How can I add a category in the budget template for pages on the iPad?

    I can add a category in the budget tab and it will automatically be added to the pie chart summary and the bar graph actual vs. budget portion, but I can't seem to add an option in the categories column on the transactions tab. Anyone know how I can do that?

    There is no way.
    http://www.apple.com/feedback/macosx.html is the place for feature requests and feedback

  • How can I cache dvt graph results?

    Hello colleagues, I need some help regarding dvt graphs performance.
    In our application we have big amount of data which the user can filter by adding grouping options, time ranges, etc. For the graph to be updated (the query to be re-executed), the user has to press a "Refresh" button each time he changes the query parameters.
    Once the new results are displayed in the graph, the user can change the graph type by pressing either a pie, bar, line or table buttons. As a consequence of this, the query is re-executed and returns the same previous results. This obviously drops the performance of the application.
    So, how we can manage to refresh the type of graph (for example from pie to bar) without re-executing the query. Note that the "Refresh" button should always re-execute the query even if the parameters were not changed.
    I'll appreciate your help.
    Regards,
    Nicolas
    Edited by: 864814 on Oct 14, 2011 6:05 AM

    And by the way how are you switching the graph type? Are you using an af:graph tag and switching just the type? Or are you rendering a complete new graph on your page?

  • "print" command in Mathscript not saving plots in BMP format!

    Hi guys,
    i am trying to create a vi that will automatically generate a pdf report for my project. I found a way to save the report directly as pdf (that is, i "print" my report to a virtual PDF printer (PDFCreator) that saves the file automatically to a specific folder with the date/time as its name. So this was the first step to making the procedure automatic).
    I am stuck in the next level, which is adding to the report not labview's bad-looking graphs, but the plots generated through the Mathscript.
    So, after adding as input "a" my data to the mathscript node, i use the following commands:
    figure
    plot(a)
    print image
    Now, what this sequence does is make a nice plot of my data and then save it as "image.eps" in the default folder.
    However, the eps format is not at all useful to me as i cannot import the plot with the "Append Image To Report.vi". This vi supports only BMP, GIF, WMF, EMF and JPG formats.
    So, i want to save the plot from mathscript as BMP. This is supposedly possible, however i have not been able to find a way. The "print" command help for Labview 2011 Mathscript reads:
    http://zone.ni.com/reference/en-XX/help/373123B-01/lvtextmath/msfunc_print/
    Syntax
    print
    print(a)
    print(file)
    print(a, file)
    Description
    Print the plot window or save it into a file in either BMP or EPS format. If the plot window to save is an image plot or a 3D plot, the file must be in BMP format. For other kinds of plots, both BMP and EPS formats are supported.
    There is no way for me to choose which format i want and it automatically chooses eps. If i use the command
    print image.bmp
    it gives me back an error. So, adding the .bmp ending is not the way to go.
    All in all, it is crucial for me to export the plot in BMP format (so as to import it in the report generation), but i cannot find a way, althouth it is supposed to work.
    Any ideas????
    Thanks
    PS. I run Labview 2011 SP1
    Solved!
    Go to Solution.

    Thanks a lot ttrr!!

  • Auto Click On Graph embeded in a Region.

    Hi,
    I have a parent page (.jspx) and in it i have two taskflows added as a region .
    First Task Flow : A graph (.jsff)
    Second Task Flow : Graph Properties(.jsff)
    Now my requirement is to transfer the clickEvent of graph of frist taskfow to the second taskflow without any click on the graph means on the load only.
    By using the contextual events i am able to send clickEvent but only after clicking on the graph. Graph has a clickListener which sends the clickEvent to the EventBinding->EventMap->Consumer Object.
    But i need to make this on fly , means as soon as document(of .jspx) is loaded clickEvent (on DVT Graph in frist Task Flow) should be sent to EventBinding.
    I have tried using the Java Script . Since "load" even can only be trigger from the document and .jsff can`t have a document tag. I even apply load on (.jspx) and call a inline javascript associated with
    graph.jsff but unable to get the "id" of the Graph component(dvt graph) on which i want to click .
    var graph = AdfPage.PAGE.findComponentByAbsoluteId("mygraph");
    //AdfCustomEvent.queue(graph,"myaction",{},true);
    graph.click(); /// NOT WORKING
    Also there is no Client Component " attribute for dvtGraph.
    Is it possible with Java Script to click on dvt graph automatically or is there any other solution by adf only??
    Thanks,
    Mangal
    Edited by: mdev on Feb 7, 2011 12:10 PM

    Hi,
    or is there any other solution by adf only ?
    To answer this, we would need to know about the use case. Note that clicking a graph from JavaScript doesn't help if you don't know where to click on (just clicking anywhere in the graph may not be what you want). Since you use ADF regions, contextual events seems to be a good choice. If you added the JavaScript code to a trh:script tag at the end of the fragment, you could call an af:serverListener tag to call a managed bean to raise the event when the fragment loads. However, my impression is that you are trying to set a default value to the dependent region, which may be easier to achieve using an input parameter to the bounded task flow.
    Frank

  • Chart data set size

    I only occasionally use numbers 08. When I make a bar chart from a data set the size of the data set seems limited. That is, after a certain size, if I add one more data value to the data set then the chart displays the new item but does not include the first item in the set. Is there a solution to this?

    DavidLewis wrote:
    I only occasionally use numbers 08. When I make a bar chart from a data set the size of the data set seems limited. That is, after a certain size, if I add one more data value to the data set then the chart displays the new item but does not include the first item in the set. Is there a solution to this?
    I didn't notice this problem with a data set that started with 10 items and then had 15 more added to it.
    Expanding that to a bar graph starting with about 40 items in the data set, then adding items to a total of 362 was a slow process, but did not exhibit the problem you describe.
    The chart is a bar graph showing values of Sine(n°) for integer values of n from 0 to 361.
    How many items are in your set?
    How are you adding one more data value to the data set to be included in the chart?
    Regards,
    Barry

  • XY graph with N axes and translate it into a picture

    Hello - The VI has two windows diagrams (lower, narrow) is possible to unite them in one picture? - The VI (top left window graphics) have a common axis, but its hard to see the first graph "PLOT0" because he has little value compared with the values ​​of graphics "PLOT1", to avoid this problem, adding even more axis "X and Y '(top right graph window), now both graphs are visible, but they overlap each other, how to spread these graphs relative to each other. (In the diagram where one axis is obtained by adding a factor to make a Slider and Slider1), and the graph with 2 separate axes do not get how to be? - Is it possible to programmatically make up the axes of the "Duplicate Scale"? Thank you.
    Attachments:
    Ex.vi ‏21 KB

    now both graphs are visible, but they overlap each other, how to spread these graphs relative to each other. 
    You can move the secondary axes to the other side of the graph by right clicking on it and selecting "Swap Sides."
    Is it possible to programmatically make up the axes of the "Duplicate Scale"?
    I don't understand this question. Do you want to programmatically set the Max and Min of the axis? Please clarify the question.
    Nathan S.
    Applications Engineer
    National Instruments

  • Straight line on semi-log graph

    hi, I'm trying to graph an array of 500 points on a semi-log graph. The line look right on the Linear Scale but it curves a little bit when I changed to Logarithmic scale. How can I make it a straight line on the logarithmic scale? please see attachment
    Attachments:
    graph.vi ‏53 KB

    There's nothing you can do short of changing the data--or the scaling of the x axis. What you're seeing is an effect of the y-axis scaling.
    Mike...
    Certified Professional Instructor
    Certified LabVIEW Architect
    LabVIEW Champion
    "... after all, He's not a tame lion..."
    Be thinking ahead and mark your dance card for NI Week 2015 now: TS 6139 - Object Oriented First Steps

  • 11g Production and Fusion Order Demo

    In Part 5 of the Fusion Order Demo, the cue cards describe how to add a bar graph to browseOrders.jspx. Unforutnately, when the graph is added and the orders-flow.xml is run, the graph does not appear and the table "orderItemsTable" displays "No rows yet." for any order in the system. I thought maybe I had made a mistake someplace, but I started the demo over from scratch and encountered the same problem the second time through. Has anyone else encountered this? If not, how do I debug this? What needs to be done to enable JDBC SQL logging to the console? Thanks in advance.

    Well, after attempting to make the new view object exactly mirror the old one, the old view object 'magically' began working. I'm not sure what happened or if something was corrupted, but the demo works and the view returns results in the BC Tester. Thanks for all your help Shay!
    Edited by: Jonathan Cone on Oct 22, 2008 10:47 AM

Maybe you are looking for

  • Hierarchy In Report

    Hi All i am in a situation that we have 2 materials with a same name and different node names in a same node level EX: > LEVEL 1------:  A Node Name 01 >LEVEL (2)-----: D Node Name 02 >LEVEL (3)----:G Node Name03 :I---Node Name06 :E--Node Name07 :E--

  • Inability of charts to appear on Emails sent to PC recipients

    Prior to upgrading to Snow Leopard, I could copy a chart including text from an Email sent to me and paste it on another Email I was sending to another party. I can no longer do this. I now have to mouse point on the chart ony (text OK) in the first

  • Retrieving error information while connecting to JCO

    Hello, I'm programing in Java using JCO to connect to SAP. Everything works fine when I introduce good data in the createClient method. The problem is that if I introduce a wrong user/password it do not connect but I get no error code so I don't know

  • Updating numeral list in a column after changes

    Hi there, I have created a simple table (with two columns) for a list of movies. The first column is a 3 digit numeral number and the second column is the title of the movie as per example: 004 Star Wars A New Hope 005 Star Wars Return Of The Jedi fo

  • My iphone 4 has been stolen. icloud is not activated. but still ringing pls help me to track it

    My iphone 4 has been stolen at Nagpur /Maharashtra /India . icloud is activated but internet is off . but still ringing pls help me to track it