APO GATP : Unable to call APO during ATP check
Question: While creating Sales order in ECC, ATP check in performed in ECC rather than in APO (GATP). Not sure where the issue is.
1. RFC connectivity exisit between ECC and APO server -- Checked
2. Integration model active with ATP flag checked and also ATP customization flag active
Note: The entries in MARC table (field APOKZ) for GATP relevant material shows a value of '3' . I guess it should be either 1 or 2. I am not sure what makes it a value of 1 or 2.
Appreciate your help.
Katrat,
I will assume that you have never attempted ATP in APO on this ERP/SCM pair of systems.
There are so many things that must be set up properly to first turn on ATP, the answer is not really suitable for a forum post. I suggest you follow the Best Practices step by step. When I have followed these steps, I have never been unsuccessful in establishing an initial ATP.
[Connectivity|http://help.sap.com/bp_scmv250/BBLibrary/Documentation/B02_BB_ConfigGuide_EN_DE.doc] (you probably don't need this one, since you say you have already tested your connection successfully)
[Replication|http://help.sap.com/bp_scmv250/BBLibrary/Documentation/B05_BB_ConfigGuide_EN_DE.doc]
[Global ATP|http://help.sap.com/bp_scmv250/BBLibrary/Documentation/ATP_BB_ConfigGuide_EN_DE.doc]
The above will get you to the point of a basic product check in SCM, with the option of RulesBasedAvailability check. I suggest you ignore RBA until you have established a successful basic product check.
Regards,
DB49
Similar Messages
-
Is livecache used during ATP check?
Hello All,
Is livecache used during ATP check.
We are facing log runtime error so want to check : Note :1078198
But before that I want to confirm that livecache is used during ATP check.
Is work process log where it mention "Connect to LCA/LDA/LEA as SIDADM to hostname-SID.
But how can we confirm that it is during ATP.
Please add your thoughts.Thanks.
Regards,
TusharHello Andy,
During Batch determination we are facing error:
we can see that several batches with available stock are found, but the quantity is assigned to none of them.
all the materials having this issue are APO relevant.
Also ATP checks run a log and terminate with TIME_OUT dump.wp process runtime is 6000 sec. Sometimes workprocess enter in PRIV mode.Memory parameters are increased.
Please feel free to add your thoughts.Thanks.
Regards,
Tushar -
User Exit called when online ATP check with GATP
Hi Guys,
I got requirement as below,
Manipulate the GR time defined in the unloading point when the ATP confirmation of sales order is done with GATP online.
I noticed that the online GATP check from R/3 to APO is not going via normal CIF way of communication or at least even i de-registered CIF queue monitoring, the data transfer can still go through properly.
There are two questions popped up:
1. Any body knows the background routine how the data are transferred between R/3 and APO when online GATP is done, and how to debug this process?
2. Which functional module or exit user is called when online GATP check is done from R/3 sales order?
If anyone knows something you are also welcome to share your expertise!
Thanks!
Tonyhi! Tony
These are the Exits in online GATP
EXIT_/SAPAPO/SAPLATPT_001 APO ATP: Set ATP Segment
EXIT_/SAPAPO/SAPLATPT_002 APO ATP: Select Substitutions
EXIT_/SAPAPO/SAPLATPT_003 APO ATP: Initialize ATP Controller
EXIT_/SAPAPO/SAPLATPT_004 APO ATP: Check for the Existence of a Location Alias
EXIT_/SAPAPO/SAPLATPT_005 APO-ATP: Handling of Data at End of Check
Regards
Vaibhav Sareen -
I have looked all over the Apple Store website but there is no obvious email address. I have tried to post feedback and 'follow my repair online' but the are not responding. Thanks anybody who can advise an email address.
Sorry, but Apple does not provide technical support via email, so they have no published email addresses. You will need to find a way to call them. Or make an appointment with the Genius Bar at an Apple Store, if there are any near you, and have them follow up.
Regards. -
3rd party process using product allocation for ATP-check
Hi all,
is there anybody out there who can share experience in setting up the 3rd party process using product allocation on APO for ATP-check? As the documentation is not that impressive any help is higly appreceated.
Thanks
MichaelThis will not be correct forum to reply to your query.
Still, try following Hyperlink for some understanding,
[Third-Party Order Processing by Product Allocation|http://help.sap.com/saphelp_scm70/helpdata/EN/7c/2b7941601b030de10000000a1550b0/frameset.htm]
Thanks & Regards
JP -
Material Susbsitution in ECC Sales order ATP Check
Hello all,
I have used GATP and implemented Material susbtitutions.
Now i am looking to achieve the following in ECC:
1) During ATP check, ECC should first look for availability on the material in the sales order item
2) If enough supply is not found(ATP Check fails), then system should substitute this material with another material; this substitution should happen only if the ATP check on the customer ordered material fails;
Is ECC capable of doing this? I already tried Material determiantion and all reason codes; But material determination is directly replacing the customer ordered material with the substituted material even though there is enough stock on the sales order material.
thanksIn std, you can achieve this.
In Material Determination, while Creating Condition records in VB11,
maintain appropriate Substitution reason ( for eg:0001)
enter Customer Ordered Material in "Material Entered" field & substitute Material in " Material" field.
now Goto- Alternative materials or Press F2, Enter the another material to substitute Material if the first Substitute material doesnt have enough Stock , Tick the "MRP Indicator" & save the record.
( ref: Help doc of MRP Indicator,
MRP indicator for alternative material in product selection
Material requirements planning (MRP) indicator for automatic product selection.
Use
The MRP indicator displays the alternative material for which a subitem can be created in case a requirement can't be met. Material requirements planning uses the subitem to determine the requirement shortage.
Note:
Only one alternative material can be indicated as relevant for materials planning.)
Test & revert. -
Error on ATP check when Creating a Sales Order
Hello,
I encounter error on ATP check while creating a Sales Order.
The error is when I create Sales Order using material A, with or with out indicating the Plant and Storage Location, the Purchase Order quantity is returned on ATP check, but when I create an SO with out indicating the Plant and Storage Location, no PO quantity was returned. Note that we applied SAP Note # 387482 to automatically determine the Storage Location. I have also checked material maintenance in MM03 of Materials A and Material B and nothing was different, they have the same Availabity check condition.
Is it possible that the SAP note that I applied causes the error?
By the way I have noticed that when I create Material B and manually populate the Plant and Storage Location there is a pricing error(but it returns the PO during ATP check).
Thanks.
NoreenHello,
I encounter error on ATP check while creating a Sales Order.
The error is when I create Sales Order using material A, with or with out indicating the Plant and Storage Location, the Purchase Order quantity is returned on ATP check, but when I create an SO with out indicating the Plant and Storage Location, no PO quantity was returned. Note that we applied SAP Note # 387482 to automatically determine the Storage Location. I have also checked material maintenance in MM03 of Materials A and Material B and nothing was different, they have the same Availabity check condition.
Is it possible that the SAP note that I applied causes the error?
By the way I have noticed that when I create Material B and manually populate the Plant and Storage Location there is a pricing error(but it returns the PO during ATP check).
Thanks.
Noreen -
Dear Expert,
I meet a problem about the ATP check in CRM when create a service order.
We need check the ATP when we create service order with spare parts.But for CRM, there is not any stock information.
It is possible to use BAPI call to do ATP check.But our service order's quantity is huge, it will influence the performace.
I think SAP defined two system, then I has to face this problem.
Any suggestion will be highly appreciated.Stefano,
Do you have a solution for this?
Best regards
Jose Marin -
To Turn OFF ATP check in APO-GATP Instead do locally in ECC.
Dear SAP Friends,
Currently for Sales orders & Deliveries, we have ATP Check (Allocation Check + Product Check) happening in APO-GATP. We would like to turn-off ATP check in APO-GATP, instead want to do only Inventory Check in ECC locally.
We want to do above for few particular model/plant combinations and not for all model/plant combinations. Meaning APO-GATP will still be used for many other APO relevant Model/Plant combinations.
What are the changes required to CIF Integration models u2013 Salesorder+ATP Check, or any other IM. Any changes specific to material master in ECC - like MRP Controller, ATP Group, Strategy Group or any config changes on APO side.
Please guide me with stepwise instructions.
Appreciate your help.
Thank
Satish
Edited by: SatishW on Jun 18, 2010 9:33 PMHi Satish ,
I am not an expert on GATP but logically what I can suggest following steps :
1.As you want ATP check to happen in APO for few codes, you will have to Select/Tick 'Material Independant Object' - ATP Customization in CIF IM , so that ATP customizing settings are transferred to APO from ECC.
2. But at the same time you need this ATP check to happen in ECC locally and not in APO for certain products, then in other CIF IM you have to select 'Material dependant objects '- ATP Check where you can set the filter/exclusion on those codes so that the ATP check does not take place in APO.
3. Also like as R/3's backorder processing, in order itself you can set as the ATP check to occur in R/3 and not in APO.
Hope this helps...
Regards,
Digambar -
SAP APO : GATP:Ruled Based ATP check :Location
System look for best CDD plant out of 3 plants
For example, there are 4 plants (P1, P2,and P3, ). All can not meet the RDD (say 1st July) of the customer, however lets say P2 can give the best CDD (5th July). System should choose P3. (May be in another inventory situation P3 can give the earliest CDD, system should then choose P3).
CDD:Commited Delivary date
RDD:Requestion Delivary Date
Let me the configration seting in ruled based ATP check and how to go about??Hi,
maintian the following settings in the SCM APO Master data - Rule Maintenance -/SAPAPO/RBA04 - Integrated Rule Maintenance Maintain the following things here
By going to Profile and parameter
Maintain the Rule control, maintain rule control in this maintiain top from list for Location.
Maintain the location determintion activity here maintain Check mode and Business event.
Come back to first screen and maintain the
location dermination substitution here in the first line maintin the actual plant and maintain the remining plant in the follwing lines.
maintain the rule here maintain for the location determination procedure.
lastly you need to maintain create rule determination for the plant and rule.
Hoping you maintained al the SPRO settings
Regards,
T.Muthyalappa. -
ATP Check: R/3 and APO
Hi All,
My Query related to an Earlier Post (GATP: Unable to check ATP (in GATP) when creating sales order in R/3).
I would like to change the settings for ATP Check from APO system to R/3, I.E, the ATP Check for Business Rule should be triggered in R/3 and not in APO.
In the earlier post, inputs were provided for the following:
- Activation of ATP in external system: this is done in SPRO in the data transfer section.
- Another common point is cheking rule: In SPRO see that your business event(SO) is enabled for ATP check.
As per my information, the 'ATP Check' tick is possible at the level of Checking Group and Schedule Line Category in R/3
Could someone please provide inputs as to where in SPRO can we check the above 2 points mentioned?
regards,
SudhirHi Sudhir,
The following are the points where changes are required for ATP check in APO.
The presumption is that there already is a active CIF connection.
1) MRP type of the material has to be 'XO'
2) Define an integration model for ATP checks of those materials.
3) Define Checking Group. SPRO -> S&D -> Basic Functions -> Availability Check -> Availability check with ATP logic.(Here you define 02 - individual requirement)
4) Define Check Control: the path is same. (Note that the combination of 02 & A is added)
5) Define Requirement Class: the path is same. Here you put the availability check tick. Use 050 & check availability check & transfer of requirement for them.
6) Next you define procedure for the schedule lines.( hope this is what you were looking for.
7) Go to SPRO -> integration with other SAP components -> APO -> Basic settings for data transfer -> Change Transfer -> Change Transfer for master data -> Activate change pointers Generally and tick it.
You are now ready to for ATP of SOs from R/3 in APO.
All setteings required in APO for GATP is clearly mentioned in APO help docs.
Sure it will work for you.
All the best
Regards
Santanu Dawn -
GATP: Unable to check ATP (in GATP) when creating sales order in R/3
Issue:
When doing ATP check (sales order) in R/3, I am able to see only availability screen of R/3 and not APO ATP screen. In other words ATP check is performed in R/3 and not in APO (GATP).
Simulation ATP check in APO works fine.
Environment: ATP is enabled in APO, Relevant ATP categories, ATP groups and master data transferred from R/3 to APO. CIF models to transfer SO data and other master data set up.
Appreciate your inputs.Hi Madhu,
There can be multiple reasons why it does not go to APO.
Two of the most common overlooked points are:
1. ATP tick in integration model.
2. Activation of ATP in external system: this is done in SPRO in the data transfer section.
Another common point is cheking rule: In SPRO see that your business event(SO) is enabled for ATP check.
Also you can go to transaction CO09 for ATP simulation in R/3 .
Hope it helps. Otherwise you can revert with specific questions.
Regards
Santanu Dawn -
GATP-CRM, ATP check is called, but doesn't get saved in the sales order
Hi ,
We have integrated CRM with APO t do ATP check. We are using rule based availablity check.
Under rule based check we are using location determination procedure.
Our scenario is sales from Stock.
Following example
Example:In our case SKu1 stoick is present in location A & B.
Stock in A: 1000
Stock in B: 500
When we create a sales order in CRM of quantity 1000, ATP check is called and the 1000 qty gets confirmed and can successfully save this order..
The ATP works fine in this case.
But if the order exceeds than the stock present in any one of the plant we face following problem:
Sales order qty is 1500:
the availalibilty check is done, qty confirmed from A:1000 & B is 500.
But when we save this order, the confirmed qty becomes zero.
Need your suggestions on this.
Regards,
ChetanaWhen you are in the APO-Avail check screen, as described you will see that both 1000 from plant A and 500 from plant B is visible, However can you check to see if the CUMULATED CONFIRMED QTY is 1500 or 0
From your description, looks like it is 0 because of which the confirmation is 0 qty
To solve this, please check the following and do one at a time and see which one works
(1) ATP GROUP in APO----- Change CUMULATION to """"CUMULATIONN OF CONFIRMED QTY"""""""
If this does not work, check the CHECK INSTRUCTIONS
(2) in check instructions under RBATP--- check the box for "" Create SUB ITEM"""
Please post us which one worked as it will be helpful for others in the future
Thanks
Kumar -
Hello All,
Two questions about the Global ATP check :
1. Could i get documentation about this functionnality? How does it work? What does the Global ATP check allows us to do?
2. Is it possible to get the Global ATP check without APO?
Thanks for your answer.Christophe
The end objective of GATP is the same as that of regular ECC ATP - provide customers with committed dates and quantities. Having said that, GATP provides a HUUUGE improvement in functionality compared to the ECC ATP check - for example, rules based ATP check for product/ location substitution, multi-level ATP check, capable-to promise, etc.
Because of these dramatic improvements in functionality, GATP has the potential to do a lot more than order promising - depending on the business requirement, it can reduce inventory, improve customer service, improve fill rates, ....
GATP is executed in the APO system and is a module of APO. Best place to start with documentation is SAP help.
Rishi Menon -
GATP Check in R/3 not go to APO screen for Checking & not consuming Pro. Al
Hi
I have Material for which the Product allocation is not being consumed. We analysed the issue is that when the sales order is created and ATP check carried out the system will do the ATP check in R/3 and will not go to APO for CTP check which in turn will not consume the Allocation. We have checked the Master data for the material which is same. Please let us know what is the seeting we have to check for the CTP check to be carried out in APO. Waiting for the response.Hi
I am not asking about the configuration setting. The issue is only with this material and is working for all the materials. The material has a Planning type X0 and is their any other settings required for the material for this.The R/3 is integrated and it is working for all the material expect for this material.
Maybe you are looking for
-
Logical Block corruption - not enough RMAN backups
I have to deal with logical block corruption but these guys do not have enough rman backups to go back enough to recover blocks. All bad blocks are in SYSAUX and it seems because of it EM doesn't work as it's suppose to do. I dropped and recreated EM
-
How do I sort alphabetically?
I inadvertantly asked this in the iTunes for Windows community, so I'm reposting here. When I select Genre, how do I sort the Album titles, or song titles, or artists alphabetically? When I select the Albums view, how do I sort them alphabetically? T
-
After updating to IOS 7.0.4 iPhone (which I now regret), when I open the Dropbox App, I get a warning "Connect to iTunes to use Push Notifications". When I push OK, it pops up again, constantly, so I can't even close Dropbox. Is there a fix for this?
-
We are using OC4J 9.0.4 version. I deployed an application and the problem is we get "Internal server 500" error intermittently. The application runs fine usually but it does not run on few occasions. Any ideas?
-
While browsing a variety of site, while running no movies at all, I receive the following message:"A script in this movie is causing Adobe Flash Player to run slowly. If it continues to run, your computer may become unresponsive. Do you want to abort