Hi,
I would like to know whether it is possible to assign measring point to maintenance plans.
Here it goes the scenario
Equipment= PUMP
I have maintenance plan weekly & monthly
In weekly maintenance plan ( Every Monday)I have to check
1.Vibration,
2. Speed,
etc upto 10 measuring point
In Monthly maintenance plan (30 days) I have to check
1.Bearing Condition,
2.Oil Level,
3. Pressure
4.Temperature
5. Current,
6. Voltage
The above mentioned measuring point is created w.r.t equpt PUMP by T-Code IK01.
Now problem is whenever I get call object i.e maintenance order according to weekly & monthly maintenance plan.
Weekly order- 100001 is generated while confirming (IW41) this Order & its operation activity
I will update measuring point but it is displaying all the measuring point of an equipment.
I want only measuring point pertaining to weekly maintenance plan should only display.
How can I link measuring point to particular maintenance plan?
Is there any solution available or does anyone come across this scenario?
Pls revert back for any more information.
Regards
Pradeep
Hi,
I have been able to see measuring point in a task list since upgraded to EhP4.
I was just trying to assign measuring point to operation But it is throwing error message saying measuring point doesnot exist.
When I press F4 none of the measuring point is existing though I have created Measuring point to equipment?
Can someone help me or guide where am I going wrong?
I have gone through the below link for details on inspection rounds but there is no elaborative & detailed procesure existing
http://help.sap.com/erp2005_ehp_04_sp/helpdata/en/48/689d3dd2613c87e10000000a42189c/frameset.htm
Could you pls tell me the detailled procedure or provide the material?
Regards
Pradeep
Similar Messages
-
How can we know a particular maintenance plan is stopped
Hi All,
Suppose a particular maintenace plan BP-P-0108 which is monthly recurring plan is created in 01/01/2008 and scheduled from 01/01/2008. Subsequesnly, the maintenace plan was stopped in 01/01/2011.How can I know this maintenance plan is stoppped from scheduling?
Thanks
ebenalfaHI Pete,
Thanks for your response.
I am in the process of migrating maintenance plans which has been created already in the past 10 to 12 years. During this period, many maintenance plans were cretaed and scheduled. Some of the maintenance plans might have become obsolete and need not be migrated. The maintenance plans may not have scheduled in the near past. How can I know that these are not scheduled in the near past?
If the user sets deletion flag or deactivate it. i may not have the scheduling happen.
Apart from these two statuses of maintenance plan, is there any way I can identify a stopped maintenance paln schedlue ?
If so, Which SAP table will give me the required information
Thanks, ebenalfa -
Maintenance plans for Backward counter
Is it possible for having a preventive maintenance plan for a measurement point that counts backwards?
Your inputs on this will be appreciated!Help !
I am looking for help with Counters and Timers and using them with a Maintenance Plan. We have about 10 count down timers mounted in one of our facilities. These timers are tied to the machine and measures the time until a mini or major PM will occur. These count down timers were previously used with the old CMMS system to assist in the scheduling of maintenance activities. We have recently converted them from the old CMMS to SAP PM but I am struggling with getting the count down timers to work in SAP. These timers are reset at 5000 hrs and as the machine operates, time is removed from the timer. A technician periodically reports these times to the system for scheduling purposes.
I have created the Measurement Point for a Functional Location.
I have identified that it is a counter.
I have it identified that it Counts Backwards.
When I try to assign this measurement point to a Maintenance Plan, I get the error "Only counters that run forwards can be entered"
How can I use the countdown timers to create pre configured (PM) work orders?
Thanks in advance. -
Maintenance Item assignment to a Maintenance Plan
Dear Expert,
we need some help about the following scenario.
Currently we are working on preventive maintenance in SAP ECC 6.0 system. We have created several maintenance items without assignment to maintenance plans in order to use them like models: to make quickly the creation of a maintenance plan our users can choose the suitable maintenance item from a range.
In these items we have inserted only strategy and maintenance task list but we have not insert the technical object.
We carry out the following steps:
1. we run transaction IP42;
2. we insert the maintenance category and the strategy;
3. in the tab "Item" we press the button "Assign more items";
4. system runs report RIMPOS00 (Display Maintenance Item: Selection Criteria) in order to select the item to insert in the maintenance plan. In this screen the followin fields are locked (we can not change them):
- "Maint. plan cat.";
- "Maintenance strategy";
- "MaintPlan assignment" and the radio botton is set on "without".
In this way if a maintenance item has been already assigned to a maintenance plan users can not select it for the current plan.
In your opinion could we open the radio buttons for the field "MaintPlan assignment" ? Could anyone help us ?
Thank you very much for your help.
Kind regards.Hi,
Pl.try following path in SPRO,
Plant Maintenance and Customer Service..Maintenance Plans, Work Centers, Task Lists and PRTs..
Maintenance Plans..Set List Editing for Maintenance Items
After clicking on Execute button u will get a pop up " Customising list editing "Double click on selection do the changes & save.
It will work i think.
Pl.try.
Regards,
Amit -
How to assign particular PLD format to particular vender or customer
Hi Friends,
I have 3 groups of customer and 2 groups of vendor so and my payment terms and PO or Sales order format is different for every group so please help how to I assign particular format to particular vendor or customerHi Naveen,
As Bala has already said...
When you click on "Set As Default" button you will land on to a window "Default Template", where you will have the following options:
1. Set as Defau< for All Users
2. Set as Defa&ult for Current User
3. Set as Default for Specified Users
4. Set &as Default for all BPs (for whom a Default Template has not been assigned)
5. Set as Default for Specified BP
The last option might work for you. Check and post back.
Regards,
Rupa -
How to assign particular concurrent requests to sparate concurrent managers
How to assign particular Users concurrent requests to custom or Sparate concurrent managers
OS : Linux
Apps: 11.5.10.2Hi,
This can be done via "Specialization Rules".
How to Create a Custom Concurrent Manager [ID 170524.1
How to Split the Load of Work to Many Concurent Managers [ID 473310.1]
Oracle Applications System Administrator's Guide - Configuration (zipped) -- Page 7-14
http://download.oracle.com/docs/cd/B25516_18/current/acrobat/115sacg.zip
Make sure you bounce the CM once you are done.
Thanks,
Hussein -
Measuring Point in Maintenance Plan
How can I link a measuring point (not a counter) to the Maintenance Plan?
Currently, I can only link a counter to a Maintenance Plan but not a measuring point.
The reason why I am asking for this is that I would like to trigger automatic creation of a work order whenever a measurement reading for an equipment goes outside the specified upper and lower limit of a measuring point. I would like to define a condition in the maintenance plan for this based on the measuring point say for example temperature.
I believe activating userexit IMRC0001 is just part of the solution. Is there something else that needs to be done?
Thanks.
GiscardI have already activated userexit.
Is it correct that the userexit is triggered upon saving a measurement reading (tcode IK11)?
Do you have sample code for the userexit so that a Notification or Work Order will automatically be created when the reading entered is outside the upper and lower limit?
But my questions actually is this - Is possible to link a measurement point (not a counter) to a Maintenance Plan? -
Measuring points in maintenance planning
Hi,
Can we use measuring point(not a counter) for preventive maintenance planning. for example - i need to perform the operation when a color of oil is changed from yellow to black. is it possible through measuring point?. it is possible means please share that procedures.
Regards
sathishHi Satish,
Yes, it is possible to generate a maintenance notification if the measuring point reading is not as per standards or target value. You require a user exit IMRC0001 to IMRC0005. Also read documentation for these user exits in tcode SMOD.
Regards,
Vaibhav Mishra -
Assign Maintenance Planning Plant to Maintenance Plant
Hi All,
What is the purpose of the configuration node "Assign Maintenance Planning Plant to Maintenance Plant"?
What happens if we don't maintain this configuration?
Regards,
Devasenapathy.KHi ,
Maintenance Planning Plant and Planning Plant are different
In Logistics you define Plant which has to be distinguished as Maintenance Planning Plant . In these Plants you will plan for all your maintenance tasks
You can plan and created
1. Task list
2. Planning and scheduling of Maintenance Plans
3.creation of Notifcations
4. Execution of Maintenacne Orders
Maintenance Plants are also termed as Plants in which your technical objects are installed
For example, if an equipment X is installed in the Plant 0001 then Plant 0001 is called as Planning Plant and this plant on its own cannot plan for maintenance activities unless it is created as Maintenance Planning Plant
if this Plant 0001 is created as Maintenance Planning Plant, then this plant is responsible for Planning and execution of tasks for maintenance
this is where your assignment is needed, if not Maintenance and execution cannot happen
hope it is clear
thanks -
Create settlement rule for Maintenance plan
We have a requirement to create a maintenance plan and assign a settlement rule to the same. I was able to create the maintenance plan using MPLAN_CREATE. I created the settlement rule using the function module K_SRULE_SAVE_UTASK. My problem is when I go to IP03 to check if the settlement rule has been created for the maintenance item, it is not found. When I go to IP02 and click on create and go into the settlement rule maintenance screen, I'm able to see the settlement rule created using the function module.but in the MPOS table, I don't see the indicator IND_ABRVO ( settlement rule indicator ) being maintained.
Can you please help in finding out what I'm missing.
Edited by: Sujay Venkateswaran Krishnakumar on Dec 31, 2009 11:34 AMSri Vas,
Is this specific to a particular WBS element or does it happen for ANY WBS element? The WBS element may not have been setup properly.Check the same WBS element directly by going to the WBS element change transaction.Also check the account assignment and status of the WBS element that Ramesh had suggested. If the WBS element has been defined properly,Try changing the settlement rule to a cost center and see if you still get this error.
Regards
Narasimhan -
Tcode for checking the Maintenance Plan
Hello,
I want the transaction code for checking the list of maintenance plan for a particular plant. I went thru tcode IP03, IP16 but could not find the option of plant there..
Kindly guide..
Regards,
NarenNaren,
As stated above, there isn't a plant field in the maintenance plan (only maintenance item, hence the reference ot IP17)
However, it is quite common to use the maintenance plan Sort field as a plant field by customising the table settings for each plant.
PeteA -
Table for maintenance plan and maintenance cycle and Unit
Hello,
I need to know the table where the values are stored for maintenance plan, maintenance cycle and Unit.
I know that we can get the maintenance cycle and unit from MMPT table.
Question 1
If the maintenance plan has only a single cycle then the data is stored in above table MMPT, but if a maintenance plan has mutiple cycles like 1 maintenance plan has maintenance cycle as 364 Days and 1092 days then the data is not stored in MMPt table.
Question 2
Requirement is I need to develop a report where in I need maintenance order, maintenance plan and the relevant maintenance cycle and unit. Supose an maintenance order is created for the above maintenance plan which has 2 maintenance cycle how can I identify for which maintenance cycle the order is created.
Regards,
NarendraHi,
Please review PM tables
PM/SM/SD Tables
MPOS Maintenance Items
AFAB Network - Relationships
PLKO Task list
PLAS
AFFH Operations
PRT assignment data for the work order
AFFL Work order sequence
AFFT Order process instructions
AFFV Order process instruction values
AFFW Goods movements with errors from confirmations
AFIH Maintenance order header
AFKO Order header data PP orders
AFPO Order item
AFRC Table of planned changes to conf.: Automatic goods receipt
AFRD Default values for collective confirmation
AFRH Header information for confirmation pool
AFRU Order completion confirmations
AFRV Pool of confirmations
AFVC Operation within an order
AFVU DB structure of the user fields of the operation
AFVV DB structure of the quantities/dates/values in the operation
MPOS Maintenance ITEM
AFWI Subsequently posted goods movements for confirmations
AUFK Order master data
AUFM Goods movement for order
MPLA Maintenance Plans
BGMK Master warranty header
BGMP Master warranty item
BGMS Text item master warranty
BGMT Master warranty text
BGMZ Warranty counter information
CRHD Work Center Header
CRTX Text for the Work Center or Production Resource/Tool
EQKT Equipment short texts
EQST Equipment link to BOM
EQUI Equipment master data
EQUZ Equipment time segment
HIKO Order master data history
IFLO Functional Location (View)
IFLOT Functional location (TABLE)
IFLOTX Functional location: Short texts
IHGNS Plant maintenance permit segment
IHPA Plant Maintenance: Partners
IHSG Object-related permits in Plant Maintenance
ILOA PM object location and account assignment
IMPTT Measuring point (table)
IMRG Measurement document
KAKO Capacity Header Segment
KONP Conditions (Item)
KONV Conditions (Procedure Data)
OBJK Plant Maintenance Object List
QMEL Quality notification
QMFE Quality notification - items
QMIH Quality message - maintenance data excerpt
QMMA Quality notification - activities
QMSM Notification - Tasks
QMUR Quality notification - causes
STPOA Name is does not have an A at the end; BOM items
T001 Company Codes
T001L Storage Locations
T001W Plants
T077D Customer account groups
T003O Order Types
T352R Maintenance revisions
T353I_T Maintenance activity type description
T356 Priorities
T357G Permits
T357G_T Table 357G texts
T370A Activity category for PM lists
TINCT Customers: Incoterms: Texts
TVKO Organizational Unit: Sales Organizations
TVKOS Organizational Unit: Divisions per Sales Organization
TVKOV Org. Unit: Distribution Channels per Sales Organization
TVTA Organizational Unit: Sales Area(s)
VIAUFKST Order selection view
MMPT Cycle detail
Regards
Carlos -
MRP for Scheduled Maintenance Plan
Hello here!
Please help me.
I customised MRP type VB (Manual Reorder Point Planning).
Then I created monthly Task List with some components from materials.
In next step i assigned my Task List to my Maintanance Plan.
I Scheduled and Started my Maintanance Plan (from 30.07.2011).
If I run MRP(01.08.2011) and Work Order was created (30.07.2011) - everything work great. MRP will create Purchase Requisition.
But i need to customise MRP for posibility of creating Purchase Requisition for future Work Order's(30.08.2011, 30.09.2011 etc)
It is posible?
Thanks you and sorry for my english.Work Order (Maintenance Order) will be created based on scheduling. In case of any stock items, Maintenance order will create the reservation.
If you run the MRP for that material, based on stock availability, MRP run will create PR.
As you are using Reorder Point Planning, system will consider that material only when the available stock comes below the Reorder point.
So you can keep safety stock by considering future orders as well, so that MRP will create PRs for future work orders. -
How to change of Messge classe assigned to Call point?
Dear friends
I have defined one validation, in line item call point - 2, I have defined one message class. Now I want to change the message class assigned to call point 2 ie. line item.
Please help me how to change the message class.
Thanks in advance.
Regards
Kiran Ahi
Message class cannot be changed ... As message class is for one particular submodule
eg: message class for account receivable /account payable
message class for asset accounting.
So if you have created a validation you might have created for account receivable so message class for account receivable would be displayed by default you cannot change it to message class for asset accouting . you have option for changing message no but not message class. -
Calibration Order from maintenance plan
Hi All,
We have assigned inspection point 300 in task list. And inspection type 14 is assigned to the order type.
When I create the order manually by IW31 then I am getting the inspection lot but when creating the Maintenance Plan with the same order type and task list, the lot is not generated.
Pls suggest is there any QM or PM setting missing ??
Thanks,
SanjayDear Sanjay,
Make sure you have assigned the inspection characteristic and sampling procedure for your individual task list operations.
Please do confirm the same and do reply.
Regards,
Chintan
Maybe you are looking for
-
How do I pass a parameter from one page to another page?
Hi, There are two JSF pages(a.jspx and b.jspx), when click a link(e.g...b.jspx?parameter=123) on a.jspx, it will forward to b.jspx, my question is that how can i get the parameter=123 in b.jspx? i use adf 10g. thank you very much! Edited by: Yitao Li
-
Sequence settings for digibeta anamorphic capture?
I will be capturing from digibeta where the image is 16x9 anamorphic, using an AJA Kona card. What capture settings and sequence settings must I use to properly deal with the anamorphic image? I am renting the editing suite so I do not have access to
-
Dear Experts, I Need to carry out Disaster Recovery Test( By Bringing up the SAP application on the standby system host) for BW system. As part of precheckes I just checked for the force_logging option,both in production and the standby systems. In p
-
I can't access After Effects from OX.
When I try to open After Effects from my Mac, the programs will not run without OX 11.0.2. But Mac only has 10.9.2 available. Please help. Rob
-
Acrobat is triying to open my others applications
I just installed the acrobat XI pro and when I try to open my Outlook, I get a window with a message that says can not open outlook.exe from acrobat