How can I link a measuring point (not a counter) to the Maintenance Plan?
Currently, I can only link a counter to a Maintenance Plan but not a measuring point.
The reason why I am asking for this is that I would like to trigger automatic creation of a work order whenever a measurement reading for an equipment goes outside the specified upper and lower limit of a measuring point. I would like to define a condition in the maintenance plan for this based on the measuring point say for example temperature.
I believe activating userexit IMRC0001 is just part of the solution. Is there something else that needs to be done?
Thanks.
Giscard
I have already activated userexit.
Is it correct that the userexit is triggered upon saving a measurement reading (tcode IK11)?
Do you have sample code for the userexit so that a Notification or Work Order will automatically be created when the reading entered is outside the upper and lower limit?
But my questions actually is this - Is possible to link a measurement point (not a counter) to a Maintenance Plan?
Similar Messages
-
Measuring points in maintenance planning
Hi,
Can we use measuring point(not a counter) for preventive maintenance planning. for example - i need to perform the operation when a color of oil is changed from yellow to black. is it possible through measuring point?. it is possible means please share that procedures.
Regards
sathishHi Satish,
Yes, it is possible to generate a maintenance notification if the measuring point reading is not as per standards or target value. You require a user exit IMRC0001 to IMRC0005. Also read documentation for these user exits in tcode SMOD.
Regards,
Vaibhav Mishra -
Functional location in Measuring Point and while creating M.plan or differe
Hi,
we found that functional location in Measuring point and M.plan functional location Measuring point are differrent, how to restrict that one ,we need automatically flow of functional location from measuring point to Maintenance plan.
--GaneshHi,
If you created the Measuring Point for the selected FL, then that measuring point will be populated automatically. If you have more than one measuring point, then you can select using Possible entries option.
In this case, I think its not possible to restrict with configuration.
IPRM0004 Maintenance plan / item: Customer check for time "SAVE"
Use this user exit, while saving check for the functional location for the selected measuring point & give error message.
Use tables IMPTT to get Object Number of FL. Use IFLOT to get the FL.
Regards,
Maheswaran. -
Assign particular measring point to Particular Maintenance Plan
Hi,
I would like to know whether it is possible to assign measring point to maintenance plans.
Here it goes the scenario
Equipment= PUMP
I have maintenance plan weekly & monthly
In weekly maintenance plan ( Every Monday)I have to check
1.Vibration,
2. Speed,
etc upto 10 measuring point
In Monthly maintenance plan (30 days) I have to check
1.Bearing Condition,
2.Oil Level,
3. Pressure
4.Temperature
5. Current,
6. Voltage
The above mentioned measuring point is created w.r.t equpt PUMP by T-Code IK01.
Now problem is whenever I get call object i.e maintenance order according to weekly & monthly maintenance plan.
Weekly order- 100001 is generated while confirming (IW41) this Order & its operation activity
I will update measuring point but it is displaying all the measuring point of an equipment.
I want only measuring point pertaining to weekly maintenance plan should only display.
How can I link measuring point to particular maintenance plan?
Is there any solution available or does anyone come across this scenario?
Pls revert back for any more information.
Regards
PradeepHi,
I have been able to see measuring point in a task list since upgraded to EhP4.
I was just trying to assign measuring point to operation But it is throwing error message saying measuring point doesnot exist.
When I press F4 none of the measuring point is existing though I have created Measuring point to equipment?
Can someone help me or guide where am I going wrong?
I have gone through the below link for details on inspection rounds but there is no elaborative & detailed procesure existing
http://help.sap.com/erp2005_ehp_04_sp/helpdata/en/48/689d3dd2613c87e10000000a42189c/frameset.htm
Could you pls tell me the detailled procedure or provide the material?
Regards
Pradeep -
Team,
I am trying to create a measuring point based PM. The requierment is i am checking the wear of an equipment and if it goes below 50 mm, i want a notication to be created. I am sure the IMRC001 is activated in my client. I did the following process
1. Create IK01 measuring point.
2. Create IK11 measuring document
3. Create Tasklist
4. Create PM
But when i create the Plan in IP41, i still see the counter which exists for the equipment , but dont see the measuring point in the plan.
Am i missing something? Please guide me.
Thanks,
NureyaMaheswaran
Thanks for the reply. Why should this wear measuring point should be a counter? I want this as measuring point and set the interval in extras...EX: If the wear is 48 -52 , the system should trigger a notication.
Are you saying, if I use user exit IMRC0001..I don't have to create a maintenance plan in IP41/IP42? Please confirm
Nureya -
Automatic Creation of Maintenance Plan, Measurement plan
Hi Pal
Business : The equipments are procuring for the purpose of supplying into customers.It is installed (via sales delevery) at customer location as requirement. From the installation date rental will start and periodic visit is applicable after every 3 months. The technician will capture some reading In initail installation time, periodic maintenance time.
Requirement : The equipment will be created automatically thro serial no when doing the GR(Its possible) . Automatic creation of Maintenance Plan for the equipment for 3 month frequency, 70% call horizon, early and late completion of 100%. Additionally the scedhule start date need to pick it from the notification end date of its respective equipment.Also measurement points should be generated in automatic way (Its fixed& common for all equipments).
Is there any possiblity to complete this requirement? Please help me and suggest.
Regards
ThennaThere is no suitable BAPI available to create Maintenance plan.
Try for BDC. -
Measuring Point for Tools and Die Maintenance
Dear All,
I am trying to map the following process:-
My client has 10 press machines and around 250 Dies for punching. Dies are assembled to press machines and they produce jobs by punching.
Client has an Preventive Maintenance plan for each Die in terms of number of strokes punched by an Die. for e.g PM is done after every 300000, 600000, 900000, 1200000 strokes. Estimated life is 1200000.
What they want is when production person confirms the production order say for 10000 jobs the counter of the die should increase by 10000.......and so on. When the counter reaches 300000 preventive maintenance call should be scheduled.
What i have done is created an Die as an Equipment with PRT as equipment category. Created an measuring point for that Die, assined Usage formula etc.
I have created an Maintenance plan for that die in which i have assigned the strategy (IP11) which contains the stroke cycles 300000, 600000.........etc.
Assigned the Die as a PRT to the material which is to be produced in the Routing.
When i confirm the production order the counter of the PRT increases which i can check IK13.
What i am expecting is that in IP10 system should update the counter automatically so that when the counter reaches to 300000 maintenance call wil be scheduled and order will be generated.
I would request you to please give me some input on this.
Thanks and Regards,
RashmiHello Rashmi;
I have seen the screen shots & there are problems with the following:
1) Counter overflow reading
You have entered 130; keep it as- 999999 (it is the reading after which system starts counting from 0 value)
2) Formula that you have used;
You have used the formula- SAPF02; do not use this. Create you own formula with following details: SAPF99 (new formula) = SAP_20 * SAP_09
3) You have manually entered the reading for the measuring point; do not use it. System will calculate the measurement reading from PRT usage value.
CREATE a single measuring document with reading as '0'.
4) Also in CA01; you need to assign this PRT in routing with "EQUIPMENT" & not material. Also make sure that in the same screen (assignment of PRT- basic data) maintain usage value as 1 (if this is not maintained, measuring doc. will NOT be updated).
5) Now when you confirm the production order, based on number of units created; system will automatically create the measuring doc.
If there is any problem with CA01, CO01 or CO11n; ask your PP consultant to assist.
Do let me know if there is any problem in this.
Regards
Hemant -
Link between Maintenance plan and measuring document
Hi Gurus,
Is there a way to find out if a measuring document exists for a maintenance plan? IMRG has the measuring document information, but I could not find any link to the maintenance plan. Similarly, in table MPLA/MPOS, I could not find anything. Please help.Greetings Srinivas,
Look in table MMPT, field MMPT-POINT. This will provide you with a link to the table IMRG on IMRG-POINT. If entries exist in IMRG, they correspond to Measurement Documents for that Point.
When displaying the Maintenance Plan in IP03 for example, you can view the Measurement Documents easily using the "Counter Information" icon. -
Triggering of Preventive Maintenance based on Measuring Point
Hi,
I have set measuring point & defined upper range limit and lower range limit. Now I want to trigger preventive maintenance, based on reading enter against measuring point specifically if measuring point reading is above or below defined upper range limit or lower range limit.
Letu2019s say example, If 10 and 5 is upper range limit and lower range limit, now in this case creation of notification / main order if user has enter measuring point value more than 10 or less than 5.
Regards,
Dipen ShroffHi,
You can do it via Condition Based Maintenance ..
IMRC0001- U can use this User exit
http://help.sap.com/erp2005_ehp_04/helpdata/EN/a7/fa4c988f6611d29e8a0000e8323350/frameset.htm
regards
pushpa -
Maintenance Order through Measuring Point
Dear all,
I want to know whether it is possible to create the maintenance order on the basis measuring point .
I know how to create the order on the basis of measuring counter.
Is there any procedure to create the maintenance Order through measuring point as done in case of counter?
kindly provide the solution for Creation of Maintenance Order using Measuring Point..Really very thanks for the solution.
I have one more query, we can create the measuring point using the t.code IK01.As you told we have to create the measuring point with upper and lower range.
Is that we have to create 2 measuring point for upper as well as lower range or in one measuring point it is possible to accumulate both the upper and lower range.
If it is possible to accumulate both the upper and lower range in one measuring point then kindly provide the procedure.
Thanks in advance. -
Measuring points finding by maintenance plant
Dear Expert,
Is there any way to find the list of measuring points or documents searching by maintenance plant?
Thanks & regards,
TusharAHi Tushar,
Run the transaction IE07 : Multi-level Equipment List
Select the dynamic selection displayed at application bar. Select the plant from PM Order node displayed in dynamic list. Copy the same for selction. Enter the plant number in selection screen.
Also tick mark only 'Measuring Point' from filter screen.
This way you can get the all mesuring points from selected plant.
Same way you can get the list of measuring documents by selecting from filter screen.
Sundar -
Measuring point as counter mass maintenance
Hi,
I have created some 500 equipments through BDC. But I forgot to put a tick (X mark in template) against field u2018Indicator to Show that Measuring Point Is a Counter.
How to put a tick on that field in mass?? Other wise I will have to go to T code IE02 500 times and put a tick manually.
Pls guide.
Regards.Hi Dear,
You can use the LSMW for the T-Code IE02, Recording Methord.
That can serve your Purpose.
Regards,
Yawar Khan -
Plant Maintenance - Measuring Point Counter Replacement
Dear Expert,
I had created Measuring Point which is cumulative in nature and the Counter Overflow reading is 999999. Suppose the last reading was 999900. Now my today reading is 500 then system is showing total counter reading 10000400.
My question is "how system will replace the counter reading as 401 automatically instead of 10000400". I don't want to replace the counter manually. Please guide me where i have to do configuration for this or what is best way to do it.
Thanks & Regards
Rajiv RanjanHi Thyagu,
Thanks for your reply and valuable suggestion.
My question is how the Total Counter Reading will become zero and start from zero when it overflow.
For example :
Lets Counter Over Flow Reading is 100
total counter reading on 8th august is 90.
on 9th august the difference is 40, then Counter reading become 30 and TotalCtrReading is 130. I want TotalCtrReading should show 30 instead of 130. how to do it?
Regards,
Rajiv Ranjan -
Table for maintenance plan and maintenance cycle and Unit
Hello,
I need to know the table where the values are stored for maintenance plan, maintenance cycle and Unit.
I know that we can get the maintenance cycle and unit from MMPT table.
Question 1
If the maintenance plan has only a single cycle then the data is stored in above table MMPT, but if a maintenance plan has mutiple cycles like 1 maintenance plan has maintenance cycle as 364 Days and 1092 days then the data is not stored in MMPt table.
Question 2
Requirement is I need to develop a report where in I need maintenance order, maintenance plan and the relevant maintenance cycle and unit. Supose an maintenance order is created for the above maintenance plan which has 2 maintenance cycle how can I identify for which maintenance cycle the order is created.
Regards,
NarendraHi,
Please review PM tables
PM/SM/SD Tables
MPOS Maintenance Items
AFAB Network - Relationships
PLKO Task list
PLAS
AFFH Operations
PRT assignment data for the work order
AFFL Work order sequence
AFFT Order process instructions
AFFV Order process instruction values
AFFW Goods movements with errors from confirmations
AFIH Maintenance order header
AFKO Order header data PP orders
AFPO Order item
AFRC Table of planned changes to conf.: Automatic goods receipt
AFRD Default values for collective confirmation
AFRH Header information for confirmation pool
AFRU Order completion confirmations
AFRV Pool of confirmations
AFVC Operation within an order
AFVU DB structure of the user fields of the operation
AFVV DB structure of the quantities/dates/values in the operation
MPOS Maintenance ITEM
AFWI Subsequently posted goods movements for confirmations
AUFK Order master data
AUFM Goods movement for order
MPLA Maintenance Plans
BGMK Master warranty header
BGMP Master warranty item
BGMS Text item master warranty
BGMT Master warranty text
BGMZ Warranty counter information
CRHD Work Center Header
CRTX Text for the Work Center or Production Resource/Tool
EQKT Equipment short texts
EQST Equipment link to BOM
EQUI Equipment master data
EQUZ Equipment time segment
HIKO Order master data history
IFLO Functional Location (View)
IFLOT Functional location (TABLE)
IFLOTX Functional location: Short texts
IHGNS Plant maintenance permit segment
IHPA Plant Maintenance: Partners
IHSG Object-related permits in Plant Maintenance
ILOA PM object location and account assignment
IMPTT Measuring point (table)
IMRG Measurement document
KAKO Capacity Header Segment
KONP Conditions (Item)
KONV Conditions (Procedure Data)
OBJK Plant Maintenance Object List
QMEL Quality notification
QMFE Quality notification - items
QMIH Quality message - maintenance data excerpt
QMMA Quality notification - activities
QMSM Notification - Tasks
QMUR Quality notification - causes
STPOA Name is does not have an A at the end; BOM items
T001 Company Codes
T001L Storage Locations
T001W Plants
T077D Customer account groups
T003O Order Types
T352R Maintenance revisions
T353I_T Maintenance activity type description
T356 Priorities
T357G Permits
T357G_T Table 357G texts
T370A Activity category for PM lists
TINCT Customers: Incoterms: Texts
TVKO Organizational Unit: Sales Organizations
TVKOS Organizational Unit: Divisions per Sales Organization
TVKOV Org. Unit: Distribution Channels per Sales Organization
TVTA Organizational Unit: Sales Area(s)
VIAUFKST Order selection view
MMPT Cycle detail
Regards
Carlos -
Maintenance plans for Backward counter
Is it possible for having a preventive maintenance plan for a measurement point that counts backwards?
Your inputs on this will be appreciated!Help !
I am looking for help with Counters and Timers and using them with a Maintenance Plan. We have about 10 count down timers mounted in one of our facilities. These timers are tied to the machine and measures the time until a mini or major PM will occur. These count down timers were previously used with the old CMMS system to assist in the scheduling of maintenance activities. We have recently converted them from the old CMMS to SAP PM but I am struggling with getting the count down timers to work in SAP. These timers are reset at 5000 hrs and as the machine operates, time is removed from the timer. A technician periodically reports these times to the system for scheduling purposes.
I have created the Measurement Point for a Functional Location.
I have identified that it is a counter.
I have it identified that it Counts Backwards.
When I try to assign this measurement point to a Maintenance Plan, I get the error "Only counters that run forwards can be entered"
How can I use the countdown timers to create pre configured (PM) work orders?
Thanks in advance.
Maybe you are looking for
-
Keyboard Error on OS X 10.10.3
When I type Volume up button (F12) it should be increasing my volume on Mac but what my mac do is Show the desktop just like spreading with thumbs and three fingers on trackpad. I dunno what is happen right now. Please somebody help me to fix this pr
-
Mortgage Servicing Sold and 16-18 point hit occurs
I wasn't happy with Ocwen servicing and some of their tactics, but I am even more unhappy with Nationstar at this point.I have 2 mortgages on 2 properties.I was past the 740 mark with TU 08 and quickly approaching 740 with EQ 08 and EX 08. Ocwen sold
-
Urgent: want info abot JCP exam
hi I want to give the JCP exam. i want the comlete info about the exam. can i give direct j2me exam or first i have to pass the core java exam? Is it neccessary to give papers sequencially? please if any one having idea then tell me... Thanks
-
Problem with a key figure restriction
Hi, I have a problem with one key figure in report: in infocube, this key figure is aggrigated for all the profit centers (summation). In infocube, there is a value '150' for each profit centers (100 pieces) and in the report it is counting 150*100=1
-
MacBook can't see Airport Express when waking from sleep
Hi, I have an airport express unit specifically for using with air tunes. I am find that every time my macbook wakes from sleep although it reconnects to my wireless network ok it (and therefore itunes) can't see the AX anymore. Rebooting the AX unit