Assignment of material to sub-operations
Hi friends,
Please tell me whether we can assign a item from the BOM to a Sub-operation?
I tried to assign it but it is getting assigned to the main operation only?
please throw some clarity on it.
regards
Ramesh
Hi,
A sub-operation is used when a detailed planning of the process to be done in an (main) operation is required. The material component is assigned to the first operation by default.If you want to assign the component to a different operation then you can use component allocation tab.
Hence, there is no need to assign the material to a sub-operation since the main operation is already assigned a material.
Hope this helps.
Regards,
Senthilkumar
Similar Messages
-
Components assignment to Sub operation
Hi Gurus
I have a situation where i need to assign a components to Sub operations. System is not showing any sub operations to assign to BOM components.
My client wants the sub operations to be created and some components assigned to it. So when milestone confirmation is done for the primary operation all the components and the operations should get backflushed.
Please suggest if there is any configuration step needed for this.
Thanks in advance
Quantum.Hi,
Refer below link:
[Assigning Material Components to Operations/sub-Operations|http://help.sap.com/saphelp_erp60_sp/helpdata/en/92/91a815a9d511d189090000e8323492/content.htm]
Regards,
Siva -
Assigning Material Componet to operation in PM.
Hi All,
While creating task list(tcode IA05), i need to assign Componets to operation activity.Now in the componet assignment, the material deatils(material,quantity etc) are to be picked from different storage location of same plant( as same material is present in more than one storage location within same plant).But here the problem is that the storage location field "Sloc" is uneditable i.e grayed.How to select material from multiple storage location?hi
i think you cannot able to assign the storage location in the task list ,since it is used for planning you cannot plan for particular storage location ,you can use customer exit in the maintenance order to determine the storage location
regards
thyagarajan -
How to fetch Routing Sub Operation details
hi all,
I am downloading routing details from tables MAPL PLKO PLPO . But I am unable to find routing sub operation details.
Could you all help me how and from where to retrieve the information
Thanks.Routing
<b>PLPO Routing Operation Details
PLKO Routing Header Details
MAPL Routing Link to Material
PLAB Relationships - Standard Network
PLAS Task List - Selection of Operations
PLMZ Component Allocation
PLPH CAPP Sub-operations
PLFH PRT Allocation
PLWP Maintenance Package Allocation
PLMK Inspection Characteristics
PLAH</b>
Engineering Change Management
AENR Customer and priority
AEOI Revision Numbers
Work Center
CRHD Workcenter Header Data
CRCA Workcenter Capacity Allocation
CRCO Workcenter Cost Center Assignment
CRHH Hierarchy Header
CRHS Hierarchy Structure
CRTX Workcenter Text
KAKO Capacity Header
KAZY Intervals of Capacity
Bill of Material
STPO BOM Item Details
STPU BOM Sub Items (designators)
STKO BOM Header Details
MAST BOM Group to Material
STZU BOM History Records
STAS BOM Item Selection
STPF BOM Explosion Structure
Line Design
LDLH Line Hierarchy Header
LDLP Line Hierarchy Items
LDLT Line Hierarchy Takt Times
LDLBC Takts/No. Individual Capacities per Line
LDLBH Line Balance Header
LDLBP Line Balance Items
LDLBT Line Hierarchy Entry and Exit Takts
PRT's
CRFH PRT Master Data
CRVD_A Link of PRT to Document
CRVD_B Link of Document to PRT
CRVE_A Assignment of PRT data to Equipment
CRVE_B Assignment of equipment to PRT data
CRVM_A Link of PRT data to Material
CRVM_B Link of Material to PRT data
CRVS_A Link of PRT Internal number to PRT External number
CRVS_B Link of PRT External number to PRT Internal number
Thanks
Seshu -
Advantage of sub operations.
Hi ,
Whats the advantage of suboperations.how Is it different in a process?
why cant the sub operation be a regular operation in routing .
what is thebenefit we get by using suboperations technically or is it just a business process.Hi,
you can use sub-operations to assign several people or machine that are required at the same time, to an operation. An sub-operation can be costed, but can only be scheduled relative to superior operation. You can cumulate standard values from sub-operations on the corresponding operation. You can determine whether sub-operations belonging to an operation are copied into the production order.
Example:
When a Object is Passing through A MILLING Machine Or through A AUTO lathe where upon completion the object need to be performed with DE-Burring In this scenario we usually adopt sub-operations
Depending on your requirements, a sub-operation can contain the following data:
1)A control key, which specifies
Whether costs are determined for the sub-operation
Whether the sub-operation is processed internally or externally by a vendor.
Whether, afterwards in order processing, a confirmation can or must be made
2)A wage type for settling incentive wages
3)Standard values, which are planned values for the activities to be performed in a sub-operation.
4)External processing data, which form the basis for externally processing sub-operations
5)User-defined fields with any customer-defined data
Where as You cannot assign material components, production resources/tools nor inspection characteristics to sub-operations, only to operations.
pavan -
Re-costing of header material when Sub-item material BOM is updated
Hi ,
A sales order is created with a header material (HM) and coressponding sub items (SM1 & SM2 ) got populated automatically from the BOM.Now the costing for this three line items happened as expected i.e.,
For example :
Header Material : HM
Sub item1 :- SM1
Sub item2 :- SM2
MAP of Sub item 1 > SM1 = 20 USD
MAP of Sub item 2 > SM2 = 30 USD
Costing in the main line item appears as 50 USD ( 20 + 30 USD) .
Now business go to the transaction CU51 and make the changes in the sales order BOM subitem1 ,material SM1 by adding or deleting items in the BOM. After that they are trying to re-cost the sales order and it is observed that only the corresonding sub item (SM1) is getting re-costed with new value.But the header item HM is not getting updated with the new values it still have the old values .
It would be really helpful if you can let me know what is the issue for this.
Thanks!
Regards,
Dileep.Dear Pushpalas,
IF my understanding is correct then the sub-items is only to split up the exact component quantity and it's usage in the exact
production or assembly process for information or understanding purpose.
Sub-items have no operational function in the BOM. They are not copied to the production order. However, you can use sub-
items to help you create programs for your company (for example, automatic assembly programs).
http://help.sap.com/erp2005_ehp_05/helpdata/EN/ea/e9b1aa4c7211d189520000e829fbbd/frameset.htm
Regards
Mangalraj.S -
How to Assignment between Material and Account Assignment Group
Hi,
When we are creating a sales order with material ABCD, then in material line item -->under Billing Document Tab --> in Accounting screen, there is field Acct asgnmt grp (Account Assignment Group).
From where we can assign between Material and Account Assignment Group, after that it automatically pick in sales order creation.
Please guide..Please refere to below link it may help.
Re: how to configure new account assignment group of material
Thanks Dev. -
Need to restrict view of DIRs assigned to material, vendor, and customer
Hello,
SAP standard, version ECC 6.0. Different plants in use with requirement for differnt authorizations.
I know that DIRs can be assigned to material master. However, the problem is that it's client level data. Now there is a need to implement DMS with materials, vendors, and customers.
Problem is that company operates in different countries and with different plants. One material/customer/vendor is created and then extended to cover different plants.
Material 1111 has a specification assigned to it, e.g. document type ZSP with DIR 1000001111, this document is at client level.
Person A from plant 1000 can display and maintain it (1000001111) but person B from 2000 must not see this, she has DIR 10000011113 instead (and person A should see this).
If person A has authorizations which are limited by the plant type because of the usage of MM already, do these restrictions apply also to DMS? I haven't found a definite answer for this.
I cannot set a authorization object based on document type and maintaining different uthorization groups is the last option because of the vast number of users.
The same question is for customer. if there is e.g. a contract assigned to customer, can the view be restricted by distribution channel or another field provided by SD (standard solution).
Vendor master is the 3rd major issue. How to limit access to documents?
Help is highly appreciated.
Thanks in advance,
PiaHi,
Can you please elaborate what is the object you mean. I have serious problems with system and cannot check it.
Thanks,
Pia -
Use of field "design documents assigned" in material master
hi,
kindly help me to use the field "design documents assigned" in material master. whenever i creat material master (MM01) in basic data2 view this field comes with grey/black No Link indicator. how to use this and for what .
regards
roshan s.Hi Roshan,
Insted of using this field u can assign Document directly to the Additional Data tab.
TO attach the document to Material Master go to Additional data ---> Document data, assign Document.
You can confirm it by pressing F1 key by selecting that Field.
Regards,
Dhaval
Edited by: Dhaval Choksi on Jul 10, 2008 3:26 PM -
Block Material for all operations
Hi gurus,
I need block a material for all operations. In material master, field X-plant matl status is ok with all possible blocks that system offers. But, I can still do inventory, and other operations...
How Can I block for all operations a material???
Thank you
I will reward with points all answersIn IM it is possibel to block but in WM it isn't (according to my best knowledge).
WM-inventory > block WM inventory booking of materials that are out of use
http://www.sapfans.com/forums/viewtopic.php?f=6&t=291342
Edited by: Csaba Szommer on Jun 12, 2008 11:43 AM -
Key Operation and Sub operation PM order
Hi,
What is the key (table - field) which determines the relationship between the main operation and the sub operation?
I mean how can you detemrine that suboperation X is indeed a sub operation of this particular operation Y? You have AUFNR, AUFPL, but i'm missing somethin...
regards,
bertthanks,
APLZL of main operation and SUMNR of suboperation -
Hi, what is the control key used for sub-operations for which we do not want seperate confirmation. when main operation confirms, the sub-operation should get confirm automatically. please advise.
hi,
You can use PP03 or *PP05 * or any other which dont have tick for confirmation required.
only thing is that , other details also you need to check for.
Depending on your requirements, a sub-operation can contain the following data:
A control key, which specifies
Whether costs are determined for the sub-operation
Whether the sub-operation is processed internally or externally by a vendor.
Whether, afterwards in order processing, a confirmation can or must be made
A wage type for settling incentive wages
Standard values, which are planned values for the activities to be performed in a sub-operation.
External processing data, which form the basis for externally processing sub-operations
User-defined fields with any customer-defined data
Check and revert back
regards
Ritesh -
Copy control for material determination sub item
I had created material determination sub item(TAPS) correctly on sales order, but when I use VL01N, the sub item does not copy into the outbound delivery.
My item level of delivery copy control configuration (VTLA) is as below:
order requirement: 101
item date: 110
Does anyone offer some suggestion?
Thanks!Our case is:
standard sales order type "KB":
item_number item_category material_number Qty
10 TAX A 10
11 TAPS B 1
12 TAPS C 9
but the result of standard outbound delivery "LF" that I created from foregoing order is:
item_number item_category material_number Qty
10 TAX A 10
20 TAPS A 10
I would like to know where the configuration should I make a modification for correct delivery to resemble the following:
item_number item_category material_number Qty
10 TAX A 10
20 TAPS B 1
30 TAPS C 9 -
Assign equipment to work order operations
What configuration is needed to be able to assign a equipment to work order operation ?
I already have few equipments assigned to a work order (displayed on the objects tab) but I need to assign some equipments to certain operations.Sveinn,
You would need to be in ECC6.0 to be able to do this. This should be available through SPRO under PM> Maintenace and service processing > Functions and setting for order types > Define notification and order integration.Within this you would need to enable the assignment of operations to object list for specific order types.
Hope it helps.
Regards
Narasimhan -
TIME TICKET CONFIRMATION IS NOT EXICUTING AT SUB OPERATION
Hi,
We are trying to post Time ticket Confirmation at sub-operation level
through standard web service. Up to Operation level,standard web
service is working fine but problem arises when we do posting at sub-operation
level.Web service is not working for sub operation level.
Please find attached step wise details of the process which we
are following.Dear Sir,
As per your reply I have set the Act. Data in OPK4. Screen areas in OPK0 for Dates were already set open. After doing the OPK4 settings if I am setting execution start and finish time for a phase in COR6N as 10:00:00 and 10:15:00 accordingly in the order for that particular phase in the details screen start and finish time (in the Dates tab) is updating but in the Qty/activities tab the confirmed time is not updating to 0.25 hrs (it is showing 0). Even during COR6N after putting start and finish time in the Dates tab the activity in the u201DTo confirmu201D tab is not updating . When I click actual data in COR6N screen, that activity(time) is picking up the value as per the scheduling through recipe. And only if I manually change that time to 0.25 hr, then it is updating in the Qty/activities tab in details screen of that phase in the order. But I want to select the Execution start and Finish time in Dates tab of COR6N and want the system to update the figure in Activities tab of COR6N as the calculated difference between start and finish and the same updated value should be transferred to the Qty/activities tab of the phase details in the order. Please suggest how to achieve this....
Regards,
Sunit
Maybe you are looking for
-
Hi All, I plugged my iPhone into my laptop and I was asked to upgrade my iTunes software. It took more than seven hours and just to be told that my SIM card does not appear to be supported. Since then I can not use my iPhone. I am lost plse help. Jam
-
BPM Collect Message dependent AND time dependent
Hi I have a IDOC to file scenario where I have to collect all the IDOC until I receive a stop IDOC. Once the End collect IDOC is received I have to do a n:1 transformation and write the file to the FTP. The problem is, at times the IDOC which is supp
-
I have been using this tablet for now 18 months without any problem until today. I need some help here. I powered my Hp Tx2000 tablet and it just wont power up. It shows the power LED light for 2 seconds and fails to power up. I have tried to troubl
-
Hi Experts, Basically I am Functional Consultant but I have client requirement where I need to Call BDC thru Z-Transaction. Here my requirement is to Define Shipping Data for Stock Transfers Between Storage Locations by uploading Excel File SPRO Path
-
Sales Order Error No customer master record exists for sold-to party
Hi, I am trying to create a sales order in IDES. Unfortunately it is showing me error: No Customer master exists for sold to party. Now I have already checked my assignments, combined sales area in vor1 and vor2. Checked PDP ( In PDP I have creates p