ATP for production order

Hi Friends,
Need your help to figure out solution for an issue :
I need ability to substitute alternate component when we do ATP during release of a production order.
As far as I know, we can do this in 2 ways
1) Maintain alternate BOM with the substitute material
2) Use GATP production substitution procedures
Can you think of any other ways of doing this. I do not want to use GATP (within APO) and want to get this done in ECC itself.
Please suggest!!!

Thanks for the reply Suri.
I dont think I can use this as there will be multiple alternates for a product.
Did anybody use GATP for production orders, not CTP or MLATP but vanilla ATP and RBA. Please let me know what precautions should be taken and are there any considerations for using the functionality. I have used GATP for sales orders earlier but never for production orders, I assume functionality should be same except for the business even which would be PP.
Thanks and waiting for replies.
Prod_Planner

Similar Messages

  • How to calculate missing parts for production orders?

    Dear All,
    I have this scenario i'm using collective orders\direct production method in my industry which means that sub assemblies don't enter any warehouses but transferdd directly to its superior order as a component , my problem is i want to know the missing raw material for the finished product , knowing that the FP has a 6 level BOM i want during ATP for production order the sustem checks only for the lowest level of material and takes only the CURRENT STOCK IN WAREHOUSES , what checking group should be used for the FP, Subassemblies and raw materials.
    plz help
    Ahmed Sobhi

    HI,
    If no Av. Check is to be done at all, then specify checking group as KP. But be informed, this will be impactive across all business processes meaning if you plan to sell the SFG & you place a SO for that item, an Av. Check will confirm it immediately as it has av. checking group as KP.
    Now for the checking group maintained for raw mtl, go to OPJJ & check the details of the checking rule to know which receipts/ issues are considered & you may modify the same as per your need.
    I would suggest do a test in your sandbox & if it meets your need, then adopt the same.
    Regards,
    Vivek

  • Collective ATP check for production orders

    Hi Gurus,
    I tried the MDVP tcode, but I can only do the collective ATP check for planned orders. we wanted to do the collective check with production orders, can you tell me how I can do this?
    Thanks.

    I've posted this question but didn't get any response. Can some one please give me an idea how to do the collective ATP check for production orders.
    Thanks
    Vijaya

  • User Exit/BADI for Production Order Availability Check

    Hi PP experts,
    Is there any user exit or BADI which can be used for Production Order Availability Check during order creation/release or while running collective availability check (COMAC) to include additional check conditions such as do not commit quantity (commitment qty = 0) if storage location for a component is missing in the production order due to storage location is not maintained/specified for that component in the material master.
    Note: In this case the availability check is set (configured)  to check at the storage location level.

    Dear ,
    Availablity Check is not Plant Specific or Storage Loaction spefic .ATP does not check the stock for any particualar stock in storage loaction rather it cheks various stocks based inward and out ward movement time through PR/PO/Dependent /Planned Order /Stock Type  irrespective of any Storage Location .
    BAPI which can be used :
    1.BAPI_PRODORD_CHECK_MAT_AVAIL
    can we exclude materials of prod order in availability check
    what is availability check concept  how it is used in SAP
    Check the above if it is useful
    Regards
    JH

  • Alt bom components with ATP check - production order resets usage prob.

    Hello,
    I have searched many threads for this answer.  Here is my scenario
    BOM for finished good X  has the following components
    Component   |    Usage Prob   |    Strategy    |  Alt Item Group   |   Priority
    A          |             55%         |         2         |         1             |              1
    B          |              45%        |         2         |          1            |               2
    When I create the production order for 100 units, components A and B are proposed respectively (per usage probability, as expected)   - like so
    Production Order 
    Component A = 55 units
    Component B = 45 units
    Here is the requirement - Component B at any given time is restricted by federal law to not be used for material X for more than 45% of its make up. Therefore my client cannot build X with more than 45% of component B.  However, we always want to use at most 45%.  IF component B is not available, transfer all or partial confirmation to Component A.
    Issue:
    ATP and usage probabilities will not work.  Whenever I run ATP check for production order, the component with the highest priority get all the reqirements (if inventory permits).  The production order master data is 'reset' by the ATP check (the usage probability on the component will change from 45% to 100%)
    Any help is greatly appreciated!
    ~S
    Edited by: futsol on Jun 29, 2009 10:41 PM

    futsol ,
    Maintainance is not required, it say manual maintainance is possible if required.
    if you set it 1 system will check the proportion and do the reservation accordingly , if even in production order if you check availabity it will not change the quantity proportion, if its 2 , its meant for alloting the 100 % available component.if A is not 100% available it will replace it with B , if B is availabe to cover total quantity and vice versa.
    by giving 1 it gives you option to change proportion as per your wish , if the any of the alternative is not available to fullfill rerquirement., for example in your case component B , if its available you want to use it 45% all the time , but if its not availabe the you can change the proportion or quantity for A in that specific production order only.
    I dont know if there is any other way.
    Check again with strategy 1 .
    Hope it helps you .
    Regards
    Ritesh

  • Error during goods receipt of Finished goods for production order

    hi friends
    pls help me iam struggle this issue and mentioned the issue .
    when i do goods receipt for production order system getting error like
    No price could be determined for material/batch FG/ plant ZTP
         Message no. CK 465
    Diagnosis
         The system could not calculate a price for material/batch FG/ in plant
         ZTP for valuation view 0, because none of the valuation strategies in
         valuation variant 007 was successful.
    System Response
         User-defined error management enables you to specify whether the message
         is an error message, a warning message or an information message.
         o   If you have defined the message as a warning message or an
             information message, the costing item will be entered in the cost
             estimate with a value of zero.
    If you have defined the message as an error message, the cost
    estimate contains an error or errors.
    -   In the case of a material cost estimate, the system sets the
        status KF.
    -   If it is a cost estimate without quantity structure, or base
        object cost estimate (that is, a unit cost estimate),  the
        system cannot proceed with costing until you have corrected the
        errors.
    If the system issues a termination message, the cost estimate cannot
    be processed, and processing is terminated.
    procedure
        o   Check the master data for material/batch FG/ in plant ZTP.
        o   If you have authorization for Customizing, check the valuation
            strategy for materials in valuation variant 007.
        Note
        If the message is a warning message or an information message, there is
        a danger that materials with errors will be ignored by the system.
        If, because of this, you issue a warning message and at the same time
        include materials with a zero value in cost estimates, you can make the
        following settings for these materials in the costing view of the
        material master:
      1.  Enter a very low price in the planned price 1, 2 or 3 fields
          manually, for instance 0.01 USD. These prices are used for costing
          purposes only; they are not read by other applications.
      2.  Enter the highest price unit possible, for example 10000.
          Note: If you enter a new price unit that is higher than the costing
          lot size, the system increases the costing lot size accordingly.
      3.  Change the valuation strategy, such as strategy 4, where you could
          enter the planned price field in which you entered the low price.
          The system now costs as follows:
          Using the valuation strategy, the system finds planned price 1, 2 or
          3. Due to the low price and high price unit, the system rounds the
          value to zero. However, the cost estimate still obtains status KA
          (free of errors), and no error message is issued.
          This procedure can be used for all materials that have caused error
          message CK465 to be issued.
    with regards
    dinesh
    Edited by: code acess on Nov 8, 2010 4:06 AM

    hi ragavendra,
    this is dinesh .i maintained the costing view and planned price. but again i have same error.so please reply me where i missed the data
    with regards
    dinesh
    Edited by: code acess on Nov 9, 2010 4:01 AM

  • Report to check open reservations for production orders where GI not posted

    Hi experts,
    Can we get reservation details from any report/ table for production order where material has not been issued, report should also display the value of the reserved material.
    I could not find desired details in RESB (it has price but not value) and MB25.
    Thanks in advance, useful ansers will be rewarded.
    Thnx
    Anand

    Hello Anand,
    there is no report but you may use the production order info system with list "components" and create a layout contaning the issued quantity and/or the final issue indicator. With a correct sorting, the list should show all orders with non-issued components at the top.
    Regards, Andreas

  • IDOC/BAPI for Production order creation from Legacy system

    Hi all
    We are using an interface to create Production orders from legacy to SAP. Would you recommend an IDOC or a BAPI to create Production orders. If IDOC or BAPI then could you please mention which one?
    thanks a bunch

    Hi John,
    For your purposes, please use BAPI for production order creation from legacy system. There is no standard inbound IDoc available to use. SAP has an IDoc for outbound interface only (message type LOIPRO).
    If there is an inbound IDoc available, I would recommend to use an IDoc.
    IDoc technology has excellent error handling and will allow you to reprocess an error (if any).
    BAPI is also good approach to use and fast in term of  processing.
    For BAPI approach, you can use BAPI BAPI_PRODORD_CREATE.
    Hope this will help.
    Regards,
    Ferry Lianto

  • How can I add a new line item for production order?

    HI all,
    How can I add a new line item for production order through BAPI/FM? Thanks in advance.

    Hi Mil,
      Unfortunetly SAP is not in front of me.
    But if possible go to BAPI transaction , check for any production order's bapi for CHANGE purpose. Where you will be able to add your new line.
    Reward if useful!

  • Different GL accunts during GR for PO and GR for production order

    Hi
    For posting GR for PO and GR for Production order we use movement 101 only then how we can define or e different GL accounts for both the transactions ?

    Hi,
    As per my undestanding
    If you want to hit different GL for same material type for e.g. GR for PO and GR for Production order.
    you can define split valuation, Suppose material A has two Split valuation External Procurement or Inhouse Production.
    Now For valuation type External Procurement assign valuation class 1000 and for Inhouse Production 2000.
    Now in GBB for valuation modifier BSX assign two separate GL
    Like
    GBB     BSX     1000           120000(External Procurement)
    GBB     BSX      2000           130000(Inhouse Production)
    Solution 2 :-
    Define other movement type for Production create and create a new event key and assign GL to that one.
    Hope HElp U !
    Regards,
    Pardeep Malik

  • How to restrict the GR for Production Order when Goods Issue is not done

    Hi Gurus
    How to restrict the GR for Production Order when all the required components for production order are not issued with all required quantity. Even for partial issue system should not allow GR with 101. The user status with RMWA, RMWF & CGFB is not working.
    Pls suggest best solution.
    Abhijit.

    Hi,
    You can club together the GI nad GR at the time of confirmation..
    I.e Backflush for the components and auto GR for the Product.
    So that you can stream line the Process.
    The best Option would be to use the User Exit:
    Enhancement - MBCF0002
    Functional Module - EXIT_SAPMM07M_001
    Include - ZXMBCU02
    Refer below link for further details..
    How to stop the goods receipt before issueing the goods for production orde
    Regards,
    Siva

  • Early Inspection for a Goods Receipt for production order

    Dear Experts,
    This  is with respect  Early Inspection for a Goods Receipt for inspction type 04.( 03 is also active in material master)
    We made partial confirmation  250 qty for production order using t code co11n ( total qty of production order is 1000).
    made the usage decision with an acceptance and posted all open stocks. to unrestricted.
    Now  in second partial confirmation prodn order  of 250 qty was made . This suppose to be rejected .  but sytem will add this 250 qty directly to unrestricted stock .  how to over come this .
    Regards
    Sandeep

    Don't make the UD until all stock has been receipted?
    You basically approved the batch.  So why wouldn't the system put the stock to unrestricted?
    Why would you make a UD when you still have stock to be posted anyway?  You can post stock without without making a UD so why not just post some if you need it, and wait on making the UD?
    Craig

  • Error in scheduling parameters for production orders

    Hi Guys,
    Greeting for the day u2026u2026u2026.
    I am trying to create production orders creation for own order  type ex MM01, but I am getting error message as u201C scheduling parameters are not defined for the order type u201C even though I have maintained following parameters as below,
    Production scheduler      -
    xxxxx,
    Detailed scheduling -
    check box of scheduling ticked,
    Rough cut scheduling    --- scheduling id u201301, scheduling and generate capa requi,, boxes     ticked,
    Adjust scheduling  -- requi to operation  date,
    Scheduling control for detailed scheduling ---backwards and check box of auto scheduling ticked
    Operation segment ---setup,
    All operation in order will be reduce
    Do not reduce,
    Could any one light on this issue,
    Thanks in advance,
    Mohan

    Hi,
      This error will come if you have not maintained Define scheduling parameters for production orders.
    Check this order type whether linked with respective plant in OPU3.*And give production scheduler * mark ie, all.*
    And in Define production scheduling profile - OPKP, link your order type in the page below.
    In material master work scheduling view, input production sch profile or prod scheduler.
    Regards,
    Dharma

  • How to use the selection profile and status profile for production order?

    Hi expert,
       I want to know how to use the selection profile and status profile for production order. what's the usage for these two selection profile and status profile ?
      Please help me.
      thanks in advance.
      george.shi

    Hi George,
    There are are two types of statuses.One is system status and second one is user status.These statuses will tell us current situation of an order.
    We can't change system statuses.But we can create our own statuses through status profile.With this profile we can control user statuses.
    In this status profile,
    1.We define the sequence in which user statuses can be activated,
    2.We define initial statuses
    3. Allow or prohibit certain business transactions.
    Selection profiles are used to select the objects (say production orders) with different status combinations.We assign status profiles to selection profiles in BS42 T-Code.
    Regards,
    Raja.
    Edited by: Rajarao on Oct 30, 2008 6:21 AM
    Edited by: Rajarao on Oct 30, 2008 6:22 AM

  • Error during Goods Receipt for Production Order

    Hi All,
    When using MIGO to post Goods Receipt for a Production Order, I got a customize message saying that the posting is only available between 2010.08.25 to 2010.08.27.  I have checked in Business Add-in using SE19 but there are no implementation present.  I know that in Logistic Verification MIRO there is a transaction OMRM to set messages.  I would like to ask is there anything similar for MIGO.  
    Or is there any other place in Configuration which allows me to add these Customize message.
    Thanks.
    Edited by: jamison2004 jordan2004 on Jul 9, 2010 9:09 AM

    Hello Jiaul,
    Sorry I may have mislead you.  The actual error message is "Goods Receipt for Production Order XXXX can only be made on 2010.08.25 to 2010.08.27".  These two dates are the Start Date and FInish Date for the Production Order in CO03, 
    The Basic Start Date for the current Production Order is  2010.08.25
    The Basic Finish Date for the current Production Order is 2010.08.27
    I think what it means is that you can only Post Goods Receipt for the Production Order only after the Basic Start Date of the Production Order.  Do you know where I can find the configuration for this message?
    Thanks

Maybe you are looking for

  • How Do I Filter a Report Using a Multi Select List Box and Specifying Date Between Begin Date and End Date

    Hope someone can help.  I have tried to find the best way to do this and can't seem to make sense of anything.  I'm using an Access 2013 Database and I have a report that is based on a query.  I've created a Report Criteria Form.  I need the user to

  • Stored procedure for exec. multiple insert queries

    Hello everybody, I am running on select banner from v$version; Output: Oracle Database 10g Enterprise Edition Release 10.2.0.4.0 - 64bi I am a new to oracle and I need some help. I have to populate a table on monthly basis, for which I am required to

  • Laptop shutting down? Fan overheating?

    Hi all. I have read many topics on this forum about the fan on any laptop not working, the laptop overheating or the laptop seemingly randomly shutting down. I have had this problem for about three months. I tried propping up the laptop so the fan (s

  • Log Format & Max connections

    HI, Can any one let me know, how to include the server response time in the web server access log Eg: for Apache we use to do that in httpd.conf with %T what is the equalent of max connection in Sun one web server? Thanks in advance...

  • Menubar won't redraw with yosemite mirrored displays

    Anyone know why my menubar won't redraw now that I've upgraded my MacPro (Early 2008) to Yosemite?  The 10.10.1 update didn't help either.  The menu bar will stay on System Preferences (and the rest of its menu titles) when you turn-on mirrored displ