Bapi for update Master Data in Production order

Dear All ,
    I am working in a car manufacturing company here production order is made month wise planning qty , but every day its Bom is get changed by Autocad/PLM interface and all changes are being recorded through ECN .
   I have to  generate daily reservation for assemblies for a perticular finish vehical ,so I need to update the Masterdata in production order no through the PLM( VB platform) interface .
  So please suggest me any BAPI so that I can update the master data regular basis in monthly production order  or if you have any better way to map this process into SAP please suggest .
Thanks in advance .
regards ,
Pralay ..

Not sure what master data in production order you want to change. Anyway if it is at header level, then evaluate BAPI - BAPI_PRODORD_CHANGE.
Alternatively evaluate the usage of Order Change Management if it is feasible in your solution. Do a search in this forum you will find many threads on it, also read SAP help & do a test a test in your sandbox. If you face a specific issue then do revert

Similar Messages

  • Strategies for synchronizing master data in production to test environments

    I play a role in facilitating business end user testing.  The business expects master data in the test enviornment to be failry representative, if not identical, to what's in our production environment.  Whether it be a customer (XD03), a material (MM03), output determination(VV33), or pricing condition records (VK13), the business expects it to be there.  Does SAP have any automated mechanism for refreshing a R/3 test system with master data from another R/3 system like production?  The quality of testing is very reliant on the quality of master data, and it's not uncommon to be investing time troubleshooting problems triggered by a trivial difference in master data rather than troubleshooting true problems relating to what is really being tested.  Does anybody know what's SAP's take on this is?

    Not sure what master data in production order you want to change. Anyway if it is at header level, then evaluate BAPI - BAPI_PRODORD_CHANGE.
    Alternatively evaluate the usage of Order Change Management if it is feasible in your solution. Do a search in this forum you will find many threads on it, also read SAP help & do a test a test in your sandbox. If you face a specific issue then do revert

  • How to collective read PP master data in Production order?

    Hi: Guys
    Please tell me how to collective read PP master data in production orders. in COHV, I can find out some collective functions but read PP master data.
    Thanks
    Henry

    Read PP master data is only to update routing and BOM in production order if it is already created to effect the changesmade in routing and BOM.    I think in that collective option is not possible.  
    Regards
    KrishnamurthyDSS

  • Function Module /BAPI for changing the components in Production order

    Hi,
    We are in ECC5.0. We have requirement wherein we want to change /delete the existing component of the production order and add new component through RFC call from an external system. We tried to use CO_XT_COMPONENT_ADD FM for adding new components and when we tested this FM in SM37  with data there were no error messages . When we checked the Production order ,no changes were made to the production order component. Tried to use Commit statement and there is no change in the system behavior.Can some one help me to  understand the system behavior . If possible kindly suggest me some alternate FM/BAPI .
    With regards,
    Joseph Anand B

    Dear,
    Please check this link,
    ADD COMPONENTS TO PRODUCTION ORDER
    Regards,
    R.Brahmankar

  • Inbound idoc for updating delivery date of purchase order

    Hi All,
    Our vendor sends a delivery file consisting of delivery date and quantity(could be partial) for line items of a purchase order.
    I need to update the Purchase order line item with the delivery date and quantity sent from the Vendor. It should add a new confirmation line with custom confirmation category in the confirmation tab of the line item in the Purchase order.
    Each time we get a delivery file we need to add a new confirmation line in the confirmation tab of the purchase order line item.
    How can I get this working using inbound idoc processing? Which Idoc type should I use to solve my issue. Will ORDERSP work for my scenario?
    Thank you,
    Sonali.

    >
    sonali ashi wrote:
    > We have all EDI set up done for ORDERSP idoc in our system. Problem when I use this idoc type by default system is always adding confirmation catgeory 'AB' but we want our custom  category to be added instead of 'AB'.
    > Edited by: sonali ashi on Dec 23, 2010 9:47 PM
    Confirmation category used for order acknowledgement is define in configuation. You can change that from AB to your custom condition and EDI should pickup that.
    SPRO->Material Management->Purchasing->Confirmation->Define Internal Confirmation Category
    >
    sonali ashi wrote:
    > I have also noticed that 'AB' confirmation accepts only full quantity order acknowledgement through Idoc processing.
    > Manually I can add a "AB" confirmation for partial quantity but in the idoc processing it fails.
    > Edited by: sonali ashi on Dec 23, 2010 9:47 PM
    Check tolerance limit defined for confirmation category in 'Conformation Control' Node in SPRO at same level as above.
    Regards,
    Pawan.

  • BAPI for Depriciation simulation data of Internal order(Investment tab K01)

    Hi experts,
    I am new to asset accounting.
    I have to a requirement where in the Asset class(ANIA-ANLKL) and capitalization data(ANIA-AKTIV) will be provided to me in an input file for a particular internal order(AUFK-AUFNR) and through my custom ABAP code i have to create Depriciation simulation data  for that internal order.
    is there any BAPI/FM by which Depriciation simulation data   for internal order can be created ??

    Hi Heidi,
    I also have the same requirement as yours above. have you had an answer already? If yes, could you please share how can you deal with this requirement?
    Appreciated your help,
    Huyen

  • Need exit or Badi for updating Warranty data in IE02 while Prod Order conf.

    Hi All,
    I need a user exit or Badi for updating the Warranty data in IE02(Equipment Master) while production order confirmation(CO15)?
    I need to update the Begin guarantee date from Production order and warranty master type in IE02 while confirming the production order.
    Thanks,
    Sudha

    Hi,
    Are you saying first create notification,then service order
    and then Sales order.
    But the requirement is create notification then sales order and when you go in va02 and while modifying the sales order and create service order.
    Thanks & regards,
    chetan.

  • FM for Updating Installation date in Contracts + sales orders Item level

    Hi
    Plesae give any FM for Updating Installation date in Contracts + sales orders Item level for contracts tab.
    Thanks and Regards,
    Vishnuvardhan....

    Have used the billing transaction to set a Default Billing date at time of blling.

  • Bapi for updating data

    I am using a bapi for getting data into infotype BAPI_EMPLOYEE_GETDATA.
    Is there any BAPI for updating data ?
    regards
    Balaji

    these links might be useful...
    http://help.sap.com/saphelp_nw70/helpdata/EN/44/b78765378b56a5e10000000a1553f6/content.htm

  • Exit to be used for hr to update master data

    Hi,
    Can anyone tell me which exit shud be used to update master data in HR module.
    My extraction structure is  HRMS_BW_IS_ATTENDANCE.
    i have to append 'ndays' n to fill this field which exit shud be used.
    Thnx,
    Regards,
    Nishu Gupta

    Hi,
    Transaction Data:
    EXIT_SAPLRSAP_001
    Master Data:
    Attribute:       EXIT_SAPLRSAP_002
    Text:             EXIT_SAPLRSAP_003
    Hierarchy :     EXIT_SAPLRSAP_004
    Happy Tony

  • Updating master data for time dimensions from front end

    Hi Experts,
    I am sure this must be handled in a very straight forward way. Just want to know the best practice here. We are working on a copy of appset and want to completely revamp the time dimension papers as per client's fiscal year which is april to march every year.
    When we have deleted all the existing memebers from the time dimension master data from BPC front end and replaced with new memebers, the task is getting completed successfully.
    But when I check back in BI for the master data, it has not replaced all the existing members. How best to handle this?
    The transaction data is deleted from all the application cubes. Are there any checks to be performed?
    Thanks,
    Santosh

    Closing the thread as I could not replicate the problem. The problem is resolved.
    Thanks,
    Santosh

  • How to change operation dates in Production Order /Capacity Leveling

    Dear Experts ,
    We are using ECC 5.0 .In production order , scheduling happing as Backward  based on the Sales Order Delivery Date .I am doing the following :
    1.Demand as Sales Order with Delievery date : 20.03.2010
    2.Running MRP with Lead Time Scheduling -2  in md02 and converting the Planned Order to Production Order .
    4.Production Order have following dates :
             Basic Finsish Date : 21.03.2010
             Basic Start : the day Pl.Or--Pr.Ord
             Schedule Start : 15.03.2010
             Schedule Finsish : 17.03.2010
            Schedule Release : 13.03.2010
    5.In schedueling margin key :  Float Before Production : 3    , FAP : 3 , Release Period : 2
    6.In material master : Work Scheduling View : Setup : 3 days , Processing : 4 ,Interoperation : 2 for one Base Qty 1
    7.In operation : Op1  : Start Date  : 15.03.2010    Finish Date: 15.03.2010
                             Op2 : Start Date : 16.03.2010      Finish Date : 17.03.2010
                             Op2 : Start Date : 17.03.2010      FD : 17.03.2010
    Question :
    1.How to change the Operation dates  in Production Order Operation over view screen ? Today,  operation over view screen , Start date and Finsih Date  of individual operation are not changable with in Production Basic Start /BF date  or beyond .It is only changing based on the Standard Value : Labor
    2.How to change/re-schedule operation dates d in CM21 (Graphical view -Work Center Capacity load as per   Production Order and Operation combination ) based on capacity availale in advance dates? I am using  Time Profile : SAPSFCZ002 -SFC Graph midterm-3 motnhs and Planning  ,
    How to solve this above issue in scheduling operation and capacity distribution .
    Regards
    JH

    Closing the thread

  • How to use LSMW on CRM for bulk master data creation?

    Hello Experts,
    I need your help to able to use LSMW on CRM for bulk master data creation. Below is described my detailed requirement; -
    We have CRM 2007 integrated with SAP ISU (ECC6.0). As per business process all Business Master Data (BP details, Business Agreement details etc) and Technical Master Data (Connection Object, PoD etc.) is created in CRM and then it is replicated in ISU. We are going to start Assembly Test soon. Now we need to have all master data in place. Tool we want to use is LSMW.
    Now can you help me right from scratch on how to use LSMW for bulk master data creation in CRM?
    Please give me documents / links etc that is relevant.
    Regards,
    Rohit

    Hi,
    I have looked into your query.
    These are some information which might be useful to you.
    What is LSMW?
    Legacy System Migration Workbench or LSMW is SAP standard program that can be used to easily load / change master data or transactions in SAP without any programming at all. It can be used to upload data at cutover, such as: open orders, contracts, materials, vendors, stock on hand. It can also be used in a production system to make changes to existing data. Very limited authorization checks are available on the transaction, so the use of it must be very well controlled.
    One input file can be used to create all the views of the material master. For all the material types. Even if different views and fields are used for the different materials.
    Steps to take
    1. Create text file with data to be loaded
    2. Set up and run LSMW
    The following link will provide good information on LSMW Idoc method:
    [http://help.sap.com/saphelp_nw04/helpdata/en/ad/2d54a41d7011d2b42e006094b944c8/frameset.htm]
    I hope this helps.
    Regards,
    Venkat

  • How to get change date in Production Order ?

    Dear Friends,
    I want to know it, how to get change date in Production Order "Administration-TAB".
    F1-Help, It is displayed with "Change date for Order Master". and Structure table "CAUFVD".
    But, CAUFVD is not Transp. Table.
    Which table should I read ?
    Thanks in advance
    Yamazaki-H

    Dear Friend
    Thank you for an answer.
    It was settled.
    Best regards.

  • Message Type for Material Master Data Changes

    Hi all
    I'm managing Message Types for Material Master Data extraction from R\3 system to BW system, in order to load on BW only the changes done to some fields of MARA table that are delta relevant.
    Now from R/3 BD50 Transaction I can see that there is a message type that refer to changes done on MARA fields: RS0044.
    I would like to replace this message type with another one (RS0020) in order to align different systems.
    Now changes to material master data in R/3 system are recorder with both message types but only those with RS0044 message type are processed and loaded into BW system.
    So I would like to know:
    1. How is the message type related to the DataSource 0material?
    2. is it possible to replace a message type for BW?
    3. if yes, how can I do it?
    Thanks in advance.
    Elisa
    mail: [email protected]

    Hi Oscar!
    At the moment I'm using Delta queue of 0MATERIAL. I know that in the queue there are all the new and changed records.
    But I would like to be able not to load all the changed records, but only those that refer to some fields of MARA table.
    E.g. if the gross weight of a material is modified I don't want to load this change on BW with Delta loading .
    I've seen that from R/3 Transaction BD52 you can set only delta relevant fields referred to a specific message type and to delete the other fields.
    As I'm able to do this directly in the Development system and Test System, I haven't got the authorization of doing it in the Production system.
    That's why I need to include this setting in a CR and then ask to transport it from Test to Production system.
    But message types referred to MARA field changes are different between the two systems.
    And it seems they are automatically created.
    Is it true?
    Thanks
    Elisa