BI project responsibilities

Hi gurus,
we are implementing the BI project can somebody please give me clarification on roles of core team and implementation team like
we have functional specs (what all reports we need)
do we need to give the fields and table names of that reports from client side to implementation team or else is it the roleof the implementing consultant to get them from the technical team what exactly is technical specs in BI
thanks and regards
Neel

Hi Neel kamal,
1). When we work as a implementor then how the work will be divided i.e it will be divided as per department or functions? Do we need to develop reports for all department or only for MM( purchasing and SD?)
Ans: Normally it will divided into modules, when they assign you for you MM only , you have to work on MM related work. You dont need to develop reports for all departments. that is depneds on your project. Some times you may have to work on only cubes and ODS and even you do not get permision to see any reports also.
2.how the work will be allocated to individuals , for example if i am a developer then from where do i need to start and where to focus ( I know the project preparation and blue print phase but need specific idea about project)
Ans: They may ask you to prepare tecnical specs, may ask you to install business contect, may ask create some customer info objects, ods, cubes and reports. these are all depends on the project and you do not need to worry abt all these things.
3). If i start working on purchasing ( SAP MM ) and BW , is it possible i will be given only purchasing related responsibilities?
Ans: you are right.
4). How many customised BW objects do I need to create ? and how and where can I include this object to synchronise them with BC? for ex.I want to add one customised characteristic in purchase data cube then what are the steps?
Ans: This is depends on the projects , howmany they want and no one can tell these many are enough.
Assign points if helpful.
Thanks and regards
Amith

Similar Messages

  • Responsibilities and duties of oracle apps functional consultant in support project

    Dear Gurus and Experience apps functional consultants,
    Experienced apps functional consultants and Gurus, Please kindly tell me.
    " what are the complete set of responsibilities and duties of a oracle apps functional consultant in support project?"
    Thanking You,
    Abdul Baseer

    Abdul Baseer,
    I'm not a functional consultant but what I would suggest is querying projects responsibilities (Security > Responsibility > Define) "search for %Project%" and see which one should be assigned to your projects users.
    Thanks,
    Hussein

  • What are the responsibilities

    1).what are the supproting project responsibilities any one can explain??? plz
    2).in which area we are doing the production supporting??

    Please search the forums before posting

  • API pa_project_pub.UPDATE_TASK is not updating attributes

    Hi All,
    I am facing a strange problem in calling API pa_project_pub.UPDATE_TASK. It updates fields like task name, description etc, but it doesn;t updates attribute8, or any attribute fields. The DFF which is on this table pa_tasks, is context basis, and we are updating it for 'Shipping' context, and I am giving this value means 'Shipping' in attribute_category fields, becasue in table pa_tasks, it stores this value in attribute_category only.
    Below is the code, i m using... Please let me know if I am missing any parameter, becasue this API is giving SUCCESS, so I dont know why the values are not getting updated.
    pa_project_pub.UPDATE_TASK(p_api_version_number => 1.0,
    p_commit => FND_API.G_TRUE,
    p_init_msg_list => FND_API.G_TRUE,
    p_msg_count => l_msg_count,
    p_msg_data => l_msg_data,
    p_return_status => l_return_status,
    p_pm_product_code => 'SERVICE REQUEST',
    p_pa_project_id => '18090',
    p_pm_task_reference => '90000',
    p_pa_task_id => p_task_id,
    p_service_type_code => 'NORDIC_EMLP_PROJECT',
    p_attribute_category => 'Shipping',
    p_attribute8 => 'test1',
    p_out_pa_task_id => p_out_pa_task_id,
    p_out_pm_task_reference => p_out_pm_task_reference,
    p_update_task_structure => 'Y');
    Thanks and Regards,
    Nidhi

    Are you using a vision instance? Which release are you in?
    If the issue is yet to be resolved after checking and compiing the invalid objects, as suggested by Hussein, then you can do the following:
    - Check the responsibility ID of "Projects, Vision Operations (USA)", the one you are using. In vision instances the responsibility ID 20420 (as provided in apps_initialize) is little odd. In 11.5.10.x and R12 vision instances the responsibility ID is normally 56486. Though it can be different in your instance.
    - If the responsiblity ID is correct OR you are using a different responsibility then check whether responsibility Menu is having "Open Integration Toolkit Funtions Menu" submenu (without any prompt) assigned and active (grants checkbox). Please also check within this submenu whether "Activity Management Gateway:Add Task" function is assigned and active (grants checkbox)
    - For seeded Project responsibilities the submenu & underlying function is seeded, but if you using a non project responsibility for creating project/ task etc then that responsibility should have "Open Integration Toolkit Funtions Menu" submenu (without any prompt) assigned and active.
    Thanks
    Supro

  • What are the roles we have in XI ?

    what are the roles we have in XI ?

    Hi Durga prasad,
    HI
    XI Developer:
    Starts from technical specification
    Create design and configuration objects- execute unit tests
    Support integration/stress tests
    Document the developments
    Responsibilities for a support project :
    Responsibilities for a support project depends on Project.
    But in general u have to Monitor SXMB_MONI, SMQ2, SMQ1 & RBW for Error Message.If there is any error u have to find the reason of error.
    Then either u can resend it or u have to cancel it.
    In IDOC scenarios most of the time Error comes bcoz IDOC comes with blank values for required Fileds & then Mapping fails........... in such cases u have to cancel that message & tell R3 ppl to resend the IDOC.
    Then some times messages get stuck in queuesu have to resend them.
    SAP XI AUTHORIZATIONS :
    Role: SAP_XI_Developer
    u2022 SAP_XI_DEVELOPER (Composite)
    u2022 SAP_SLD_DEVELOPER
    u2022 SAP_XI_DEMOAPP
    u2022 SAP_XI_DEVELOPER_ABAP
    u2022 SAP_XI_DEVELOPER_J2EE
    Notes:
    No access to the Administration of the XI Tools URL,
    ABAP
     SXI_CACHE to view the cache but not refresh it
     SXMB_MONI
     SPROXY
     SXMB_IFR
     SXMB_ADM
     SLDCHECK
     SLDAPICUST
    SLD
     create/change Technical /Business System
     create Software Catalog (Product/Software Component Version)
     create/change Development (Name Reservation, Content Browser, Class Browser).
    REPOSITORY
     import SWCV (Software Component Version) from SLD
     create new namespace under a SWCV
     create/change new or existing Integration Scenarios and Integration Processes because the Software Component cannot be changed
     create/change new or existing Interface Objects because the Software Component cannot be changed
     create/change new or existing Mapping Objects because the Software Component cannot be changed
     create/change new or existing Adapter Objects
    DIRECTORY
     transfer integration scenario from Repository
     create/change Party
     create/change Service Without Party
     create/change Service Receiver Determination
     create/change Service Interface Determination
     create/change Service Sender Agreement
     create/change Service Receiver Agreement
    RWB
     Component Monitoring
     Message Monitoring
     Performance Monitoring
     Alert Configuration
     Alert Inbox
     Cache Monitoring Role: SAP_XI_Configurator
    u2022 SAP_XI_CONFIGURATOR (Composite)
    u2022 SAP_SLD_CONFIGURATOR
    u2022 SAP_XI_BPE_CONFIGURATOR_ABAP
    u2022 SAP_XI_CONFIGURATOR_ABAP
    u2022 SAP_XI_CONFIGURATOR_J2EE
    u2022 SAP_XI_DEMOAPP
    Notes:
    No access to the Administration of the XI Tools URL
    ABAP
     SXI_CACHE to view the cache but not refresh it
     SXMB_MONI
     SPROXY
     SXMB_IFR
     SXMB_ADM
     SLDCHECK
     SLDAPICUST
    SLD
     create/change Technical /Business System
     create Software Catalog (Product/Software Component Version)
     create/change Development (Name Reservation, Content Browser, Class Browser).
    REPOSITORY
     import SWCV (Software Component Version) from SLD
     create new namespace under a SWCV
     create/change new or existing Integration Scenarios and Integration Processes because the Software Component cannot be changed
     create/change new or existing Interface Objects because the Software Component cannot be changed
     create/change new or existing Mapping Objects because the Software Component cannot be changed
     create/change new or existing Adapter Objects
    DIRECTORY
     transfer integration scenario from Repository
     create/change Party
     create/change Service Without Party
     create/change Service Receiver Determination
     create/change Service Interface Determination
     create/change Service Sender Agreement
     create/change Service Receiver Agreement
    RWB
     Component Monitoring
     Message Monitoring
     Performance Monitoring
     Alert Configuration
     Alert Inbox
     Cache Monitoring
    Role: SAP_XI_ADMINISTRATOR
    u2022 SAP_XI_ADMINISTRATOR (Composite)
    u2022 SAP_ALM_ADMINISTRATOR
    u2022 SAP_ALM_CUSTOMIZER
    u2022 SAP_SLD_ADMINISTRATOR
    u2022 SAP_XI_ADMINISTRATOR_ABAP
    u2022 SAP_XI_ADMINISTRATOR_J2EE
    u2022 SAP_XI_BPE_ADMINISTRATOR_ABAP
    u2022 SAP_XI_DEMOAPP
    Notes: Has access to the Administration of the XI Tools URL (This should be Basis Only)
    ABAP
    u2022 Has access to SXI_CACHE to view the cache but not refresh it
    u2022 Has access to SXMB_ADM
    u2022 Has access to SXMB_MONI
    u2022 Has access to SPROXY
    u2022 Has access to SXMB_IFR
    u2022 Has access to SLDCHECK
    u2022 Has access to SLDAPICUST
    SLD
    u2022 Can create/change Technical /Business System
    u2022 Can create/delete Software Catalog (Product/Software Component Version)
    u2022 Can create/change Development (Name Reservation, Content Browser, Class Browser).
    REPOSITORY
    u2022 Can import SWCV (Software Component Version) from SLD and delete from Repository
    u2022 Can create new namespace under a SWCV
    u2022 Can create/change new or existing Integration Scenarios and Integration Processes
    u2022 Can create/change new or existing Interface Objects
    u2022 Can create/change new or existing Mapping Objects
    u2022 Can create/change new or existing Adapter Objects
    DIR
    u2022 Can transfer integration scenario from Repository
    u2022 Can create/change Party
    u2022 Can create/change Service WithoutParty
    u2022 Can create/change Service Receiver Determination
    u2022 Can create/change Service Interface Determination
    u2022 Can create/change Service Sender Agreement
    u2022 Can create/change Service Receiver Agreement
    RWB
    u2022 Can access Component Monitoring
    u2022 Can access Message Monitoring
    u2022 Can access Performance Monitoring
    u2022 Can access Alert Configuration
    u2022 Can access Alert Inbox
    u2022 Can access Cache Monitoring Role: SAP_XI_CONTENT_ORGANIZER
    u2022 SAP_XI_CONTENT_ORGANIZER (Composite)
    u2022 SAP_SLD_ORGANIZER
    u2022 SAP_XI_CONTENT_ORGANIZER_ABAP
    u2022 SAP_XI_CONTENT_ORGANIZER_J2EE
    Notes: No access to the Administration of the XI Tools URL
    ABAP
    u2022 No access to SXI_CACHE
    u2022 No access to SXMB_ADM
    u2022 No access to SXMB_MONI
    u2022 No access to SPROXY
    u2022 Has access to SXMB_IFR
    u2022 No access to SLDCHECK
    u2022 No access to SLDAPICUST
    SLD
    u2022 Can create/change Technical /Business System
    u2022 Can create/delete Software Catalog (Product/Software Component Version)
    u2022 Can create/change Development (Name Reservation, Content Browser, Class Browser).
    REPOSITORY
    u2022 Can import SWCV (Software Component Version) from SLD and delete from Repository
    u2022 Can create new namespace under a SWCV
    u2022 Can create/change new or existing Integration Scenarios and Integration Processes
    u2022 Can create/change new or existing Interface Objects
    u2022 Can create/change new or existing Mapping Objects
    u2022 Can create/change new or existing Adapter Objects
    DIR
    u2022 Can transfer integration scenario from Repository
    u2022 Can create/change Party
    u2022 Can create/change Service WithoutParty
    u2022 Can create/change Service Receiver Determination
    u2022 Can create/change Service Interface Determination
    u2022 Can create/change Service Sender Agreement
    u2022 Can create/change Service Receiver Agreement
    RWB
    u2022 Can access Component Monitoring
    u2022 Can access Message Monitoring
    u2022 Can access Performance Monitoring
    u2022 Can access Alert Configuration
    u2022 Can access Alert Inbox
    u2022 Can access Cache Monitoring
    Role: SAP_XI_DISPLAY_USER
    u2022 SAP_XI_DISPLAY_USER (Composite)
    u2022 SAP_SLD_GUEST
    u2022 SAP_XI_DISPLAY_USER_ABAP
    u2022 SAP_XI_DISPLAY_USER_J2EE
    Notes: No access to the Administration of the XI Tools URL
    ABAP
    u2022 Has access to SXI_CACHE but cannot refresh cache
    u2022 Has display access to SXMB_ADM
    u2022 Has access to SXMB_MONI
    u2022 Has access to SPROXY
    u2022 Has access to SXMB_IFR
    u2022 Has access to SLDCHECK
    u2022 No access to SLDAPICUST
    SLD
    u2022 Cannot create/change Technical /Business System
    u2022 Cannot create/delete Software Catalog (Product/Software Component Version)
    u2022 Cannot create/change Development (Name Reservation, Content Browser, Class Browser).
    REP
    u2022 Cannot import SWCV (Software Component Version) from SLD and delete from Repository
    u2022 Cannot create new namespace under a SWCV
    u2022 Cannot create/change new or existing Integration Scenarios and Integration Processes
    u2022 Cannot create/change new or existing Interface Objects
    u2022 Cannot create/change new or existing Mapping Objects
    u2022 Cannot create/change new or existing Adapter Objects
    DIR
    u2022 Cannot transfer integration scenario from Repository
    u2022 Cannot create/change Party
    u2022 Cannot create/change Service WithoutParty
    u2022 Cannot create/change Service Receiver Determination
    u2022 Cannot create/change Service Interface Determination
    u2022 Cannot create/change Service Sender Agreement
    u2022 Cannot create/change Service Receiver Agreement
    RWB
    u2022 Can access Component Monitoring
    u2022 Can access Message Monitoring
    u2022 Can access Performance Monitoring
    u2022 Can access Alert Configuration
    u2022 Can access Alert Inbox
    u2022 Can access Cache Monitoring Role: SAP_XI_MONITOR
    u2022 SAP_XI_MONITOR (Composite)
    u2022 SAP_SLD_GUEST
    u2022 SAP_XI_BPE_MONITOR_ABAP
    u2022 SAP_XI_DEMOAPP
    u2022 SAP_XI_MONITOR_ABAP
    u2022 SAP_XI_MONITOR_J2EE
    Notes: No access to the Administration of the XI Tools URL
    ABAP
    u2022 Has access to SXI_CACHE and refresh cache
    u2022 No access to SXMB_ADM
    u2022 Has access to SXMB_MONI
    u2022 Has access to SPROXY
    u2022 Has access to SXMB_IFR
    u2022 No access to SLDCHECK
    u2022 No access to SLDAPICUST
    SLD
    u2022 Cannot create/change Technical /Business System
    u2022 Cannot create/delete Software Catalog (Product/Software Component Version)
    u2022 Cannot create/change Development (Name Reservation, Content Browser, Class Browser).
    REP
    u2022 Cannot import SWCV (Software Component Version) from SLD and delete from Repository
    u2022 Cannot create new namespace under a SWCV
    u2022 Cannot create/change new or existing Integration Scenarios and Integration Processes
    u2022 Cannot create/change new or existing Interface Objects
    u2022 Cannot create/change new or existing Mapping Objects
    u2022 Cannot create/change new or existing Adapter Objects
    DIR
    u2022 Cannot transfer integration scenario from Repository
    u2022 Cannot create/change Party
    u2022 Cannot create/change Service WithoutParty
    u2022 Cannot create/change Service Receiver Determination
    u2022 Cannot create/change Service Interface Determination
    u2022 Cannot create/change Service Sender Agreement
    u2022 Cannot create/change Service Receiver Agreement
    RWB
    u2022 Can access Component Monitoring
    u2022 Can access Message Monitoring
    u2022 Can access Performance Monitoring
    u2022 Can access Alert Configuration
    u2022 Can access Alert Inbox
    u2022 Can access Cache Monitoring
    cheers
    reward points if found useful

  • Not able to access pa_project_pub.add_task API

    Hi,
    I am not able to execute pa_project_pub.add_task. I get "*Your current responsibility does not have access to this function*" message when i execute my custom procedure from toad. I also tried for other responsibility but i get same error.
    I was able to create budget with same responsibility "Projects, Vision Operations (USA)".
    BEGIN
         fnd_global.APPS_INITIALIZE(1005151,20420,275,0);
         DBMS_APPLICATION_INFO.SET_CLIENT_INFO (204);
    --custom procedure which calls pa_project_pub.add_task api
         pkg_task_upload.tasks_main;
    END;
    Can any one please let me know what could be the problem.
    Regards,
    Sonali

    Are you using a vision instance? Which release are you in?
    If the issue is yet to be resolved after checking and compiing the invalid objects, as suggested by Hussein, then you can do the following:
    - Check the responsibility ID of "Projects, Vision Operations (USA)", the one you are using. In vision instances the responsibility ID 20420 (as provided in apps_initialize) is little odd. In 11.5.10.x and R12 vision instances the responsibility ID is normally 56486. Though it can be different in your instance.
    - If the responsiblity ID is correct OR you are using a different responsibility then check whether responsibility Menu is having "Open Integration Toolkit Funtions Menu" submenu (without any prompt) assigned and active (grants checkbox). Please also check within this submenu whether "Activity Management Gateway:Add Task" function is assigned and active (grants checkbox)
    - For seeded Project responsibilities the submenu & underlying function is seeded, but if you using a non project responsibility for creating project/ task etc then that responsibility should have "Open Integration Toolkit Funtions Menu" submenu (without any prompt) assigned and active.
    Thanks
    Supro

  • Upgrade project - Roles and Responsibilities

    Hi All,
    Can any one tell me what are the roles and responsibilities of a SD consultant in a upgrade project.
    thanking you in advance for your kind help.
    regards
    S D Toshniwal

    major reponsibilities of SD consultant would be
    Configuration and customization of various sales documents delivery documents and billing documents.
    Partner functions at various document levels.
    Incompletion logs at pre-sales, sales and at Delivery documents.
    Copy controls
    Maintaining pricing at various document levels
    Output and text determination
    Account determination
    Carrying rebate agreements at billing document level etc.
    Regards,
    Vishal

  • Responsibilities of ABAPer in a Implimentaion project - Reg...

    Hello Masters,
       Could any one write the responsibilites of the abaper in a implimentaion project as well as support project.
    Thanks in advance.
    Regards
    Yubi

    ASAP methodology
    Project Preparation:
    The first step in ASAP is Project Preparation. In this step the Functional Consultant will analyse the business process and define the system for SAP and will give the time line for the project. The Manpower required and the budgets are also considered in this step.
    Blue Print Preparation:
    This is second step in ASAP Methodology. In this step the Project Preparation scenarios are finalised. A out line of the Project is given in this step.
    Realisation:
    In this step actual development is taken place. The ABAPer is responsible for this step.
    Testing:
    In this step the development done by the abaper is being tested. This is the area where the Unit Test Document is prepared (i.e. Positive Testing and Negative Testing).
    GO live and Support:
    This is the final stage where the project is running in the live environment. In this step the bugs if any that are found in the go live procedure are fixed and the project will be considered as support project.

  • Support Project roles and responsibilities.

    Hi Guru,
    I am new in SAP BW/BI support Project. What are the roles and responsibilities in support project as a  BW/BI consultant. plz give details with examples. what are the tools are using in support project. and what are the transaction codes using.
    Thanks & Regards
    Manas

    Hi Manas,
    For Supporting  mainly
    1) We have to do Monitoring of Processchains
    2)Scheduling the Loads
    3)If there is any requirement of new Process Chain we have to Create the processchain
    Transaction Codes Mainly we use :
    SM37 --To know the status of backround job.
    SM12--To unlock the objects
    RSMO--To see how many Infopackages are running
    SM50--To see work process
    SM64--To trigger the event.
    Regards,
    Marasa.

  • Daily responsibilities  in migration project

    Hi ,
      we  are going to be assigned a new project which involves migration to BI 7.0.  I want to know the daily responsibilities we will come across in this  project.
    Sorry guys,I searched SDN for this query but didn't found the answer I was looking for..
    So, any help is appreciated.
    Thanks,
    Swathi Reddy.

    Hi Swathi,
    You may wish to refer the link.
    http://help.sap.com/saphelp_nw2004s/helpdata/en/43/f00e2696d24c5fe10000000a155369/content.htm
    Regards,
    Anil

  • Need help with a graduate student project

    Hi Apple Community!
    My name is Gordon and I'm posting here to see if I could possibly interview someone via email or over the phone for a training project I am doing for a course in Graduate School. I'm a first year Industrial and Organizational Psychology masters student attending San Francisco State University. The main purpose of this project is to help me get familiar with the entire process of developing, carrying out, and evaluating a technical training. I have chosen to create a training for iWork 09' because most of my class mates (myself included), have not had much experience with the program. My original idea was to tailor the training towards sales individuals, but I can modify that depending on who I'm able to interview (educators and other professionals).
    The kind of person I'm looking to interview must either train others on how to use iWork and/or uses iWork themselves for work on a regular basis. It would be best if you are familiar with all 3 programs, but it is fine if you only use one or two of the programs. The entire interview will take no longer than 30 minutes, and if it's over email it'll just take two messages (1 for the original set of questions and a follow up email asking to expand on some of the original answers). As a part of my professor's requirement I will also need your contact information including: name, title, affiliation, address, phone number and email address. I don't believe my professor will actually be contacting you to verify that I haven't cheated on the assignment though.
    Some sample questions include:
    1. In your line of work, what are some of your major responsibilities?
    2. How does iWork help you accomplish some of your work tasks/projects?
    3. If you've received formal training on iWork, what was the environment like, and what parts of the training did you find enjoyable and helpful; what parts did you dislike?
    etc.
    I cannot offer you any monetary compensation for your time. I can only give you my sincere thanks, and perhaps send you a copy of my training outline when I'm finished with it.
    Thanks in advanced for your help and time!
    Please reply to this thread if you're able to help me with my project.

    Hi Apple Community!
    My name is Gordon and I'm posting here to see if I could possibly interview someone via email or over the phone for a training project I am doing for a course in Graduate School. I'm a first year Industrial and Organizational Psychology masters student attending San Francisco State University. The main purpose of this project is to help me get familiar with the entire process of developing, carrying out, and evaluating a technical training. I have chosen to create a training for iWork 09' because most of my class mates (myself included), have not had much experience with the program. My original idea was to tailor the training towards sales individuals, but I can modify that depending on who I'm able to interview (educators and other professionals).
    The kind of person I'm looking to interview must either train others on how to use iWork and/or uses iWork themselves for work on a regular basis. It would be best if you are familiar with all 3 programs, but it is fine if you only use one or two of the programs. The entire interview will take no longer than 30 minutes, and if it's over email it'll just take two messages (1 for the original set of questions and a follow up email asking to expand on some of the original answers). As a part of my professor's requirement I will also need your contact information including: name, title, affiliation, address, phone number and email address. I don't believe my professor will actually be contacting you to verify that I haven't cheated on the assignment though.
    Some sample questions include:
    1. In your line of work, what are some of your major responsibilities?
    2. How does iWork help you accomplish some of your work tasks/projects?
    3. If you've received formal training on iWork, what was the environment like, and what parts of the training did you find enjoyable and helpful; what parts did you dislike?
    etc.
    I cannot offer you any monetary compensation for your time. I can only give you my sincere thanks, and perhaps send you a copy of my training outline when I'm finished with it.
    Thanks in advanced for your help and time!
    Please reply to this thread if you're able to help me with my project.

  • Need Information on Support  Project

    Hi,
    I am new to Production and support  project
    whta r the points we need to discuss with the clints in support prj..
    what r the responsibilities in support prj
    Any one of u send me the docs for the Production and support project
    Thanks in Advance,
    P.C.V.

    Hi,
    Refer todays thread.. as dinesh ans
    Some of the typical questions would include:
    1. How is the data loaded - Do they use process chains?
    2. How often is the data loaded?
    3. Are the loads full upload or delta enabled.
    4. For which areas of SAP are the loads done. Do they use Business Conetent or Generic Extractors.
    5. How do they do "data validation" after each load.
    6. What are the source systems from which data is loaded.
    7. what are the kind of reports that are used - Bex or Web.
    8. What are the typical(most common) errors faced while doing the dataload.
    9. Any plans for upgrade?
    10. What is the Backup Recovery and Archive Strategy
    11. What is the system landscape (how many environments, how many source system, how everything is connected to...)and the used transport strategy
    12. Co-existence with 3rd party Scheduling Tools...
    13. aggregates to maintain ?
    14. how many users to assist..
    15. are roles and user management in scope ?
    16. how are managed space issues (procedure, warning and so on...)
    17. how are monitored performance (technical content...)
    The activities in a typical Production Support would be as follows:
    1. Data Loading - could be using process chains or manual loads.
    2. Resolving urgent user issues - helpline activities
    3. Modifying BW reports as per the need of the user.
    4. Creating aggregates in Prod system
    5. Regression testing when version/patch upgrade is done.
    6. Creating adhoc hierarchies.
    etc....
    Also refer these posts:
    Re: In production Support , how i can acquire the knowledge
    Re: How to resolve tickets  its urgent
    and post ur id

  • For a beginner to work in Oracle EBS, Which is better start, support project or implementation?

    Dear Experts,
    I have just joined a company which works on Oracle ERP. and i have been assigned to a support project with an idea that there i will have more opportunities to learn and then I can shift over to Implementation project. Since I am a fresher I have no clue How the career growth goes. So my question is whether I should first take support and then Implementation or I should Take an Implementation Project Directly.
    Secondly I want to know what are differences In Roles and Responsibilities as a fresher in Support and Implementation projects.
    Please reply ASAP.

    Dear Experts,
    I have just joined a company which works on Oracle ERP. and i have been assigned to a support project with an idea that there i will have more opportunities to learn and then I can shift over to Implementation project. Since I am a fresher I have no clue How the career growth goes. So my question is whether I should first take support and then Implementation or I should Take an Implementation Project Directly.
    Secondly I want to know what are differences In Roles and Responsibilities as a fresher in Support and Implementation projects.
    Please reply ASAP.

  • Could anyone please tell me how to expalin an informatica project in interview..

    Hi Narayan, As you provided below points abt project explanation - i have added generic explanation about project. But my explanation is not proper. Request you to please guide  me in right direction and add some point from your side which will help me in interviews. > Project Domain with (Optional: Architecture or Design format that your client is following) -  Our project is in aviation domain. Objective of our project is to fetch data from heterogeneous source systems and load data into DWH depending on business scearios/requirements. > Your responsibilities in details My responsibilities are to develope mappings depending on business requirements. We are getting LLD in which flow of mapping is provided along with transformation details. So we have to develope mapping based on LLD. > What kind of data is coming & some brief of different Source Our source system are mostly files and relation table (Oracle) and target are relational table (Oracle) > Bottleneck’s that you have encountered in your project with solution what to explai here. Plaese provide with example > Some new experience(Technically). Request you to please add two/three points here

    What      are your Daily routines?            Cheking any imp mails are came.Need to disucss with Team lead if we have to do anywork. By EOD send the mail to team lead regarding work. need to attend weekly status meeting.How      many mapping have you created all together in your project?        As of now i did 3 projects first project : 48 workflows , second : 52 workflow , third project : 156 worlfows as of now.  In      which account does your Project Fall?          account???         hope its manufacturing and advanced services. What      is your Reporting Hierarchy?           me -->team lead--->Project Manager--->programming Manager         me---> AR--->HR  How      many Complex Mapping’s have you created? Could you please me the situation      for which you have developed that Complex mapping?          i think 8 , one for character by character  comparision (with informatica not possible) so written 950 lines if single SQL code. and one for Dynamical Hierarchy distribution .... and one for Multi byte characters ( japanes,chines,..etc) and so on...      What is your Involvement in Performance tuning of your      Project?   some times any way performance team will take care of my code.What is the Schema of your Project? And why did you opt      for that particular schema?     some_Prd --->that is the souce for us  What are your Roles in this project?            as a developer , desing the workflows , unit testing, and so on... 
    Can I have one situation which you have adopted by      which performance has improved dramatically?         yes ..... my firest project ..i faced perormance issue after go live.  Where you Involved in more than two projects      simultaneously?         of couse ,, i involved 3 projects at a time. Do you have any experience in the Production support?           no
    What kinds of Testing have you done on your Project      (Unit or Integration or System or UAT)? And Enhancement’s were done after      testing?        Unit testing and sometimes integration. UAT will done by business not BI team.How many Dimension Table are there in your Project and      how are they linked to the fact table?           current project 18 and 2 facts . and relationship will always be dimention keys. 
    How do we do the Fact Load?           loding the fact table ??      after dimention load complete .. How did you implement CDC in your project?          change data capture ??        It is always on souce modification date. 
    How does your Mapping in File to Load look like?              souce --->ods--->flat file ( .dat) -- e cap delimeter
    How does your Mapping in Load to Stage look like?           is depends on project ...          Souce -->ods--->stage
    How does your Mapping in Stage to ODS look like?            Stage to ods ???         never ...
    What is the size of your Data warehouse?           10 TBWhat is your Daily feed size and weekly feed size?        feed size>???Which Approach (Top down or Bottom Up) was used in      building your project?            Bottom up ---i mean you are asking about dimention to fact and fact to dimention??How do you access your source’s (are they Flat files or      Relational)?               Relational and some times flat files also.
    Have you developed any Stored Procedure or triggers in      this project? How did you use them and in which situation?              no
    Did your Project go live? What are the issues that you      have faced while moving your project from the Test Environment to the      Production Environment?           yeah...i faced some issues.
    What is the biggest Challenge that you encountered in      this project?          Dynamic hierachy data distribution and moving the files from unix box to informatica directory through shell scriopt , need to clean the data in flatfile itselt. 
    What is the scheduler tool you have used in this      project? How did you schedule jobs using it?           Dollar Universe.. by using $U Sessioin task.   
         ---Naresh Neelam if you have any questions please send me a mail. i dont have access outside network at my work.

  • CO-INTERFACE WITH-PS: Settlement of Project

    Hi Friends,
    What steps involved in settlement of Project. In project system we find Top lvel WBS element under that we can find low level WBS elements and net works. To settle the project to cost center what are the object have to settle to what object and procedure to settle the same. Its very urgent we r going live..its highly appreciated if u provide the info.
    Thanks & Regards
    Ramesh

    hi Ramesh
    to settle project through PS you need to use tcode CJ88
    and for cost centre settle ment u can use tcode cj20 and in WBS basic data then go to responsibilities and put the cost centrre for the WBS elements and then u can close the project by going to edit menu and going to status and selecting wat u need like release lock or close etc..
    then u can use t code cj88 and settle the project
    hope so the answer to your question
    *plz assign points if useful
    Thanx Wasim