Hi experts,
My client has a requirement where-in they need the presently running Biweekly calendar to be broken.
To be specific, the payroll calendar for a Payroll area (Temp) is a biweekly one with the paydate one week after the pay period.
It has a pattern like this:
PerPa     PayY          PP     Year     Per     Start Date     End Date       Name
98     2009          1     2008     26     12/13/2008 12/26/2008 Bi-Weekly BT
98     2009          2     2009     1     12/27/2008 1/9/2009       Bi-Weekly BT
98     2009          3     2009     2     1/10/2009     1/23/2009       Bi-Weekly BT
98     2009          4     2009     3     1/24/2009     2/6/2009       Bi-Weekly BT
98     2009          5     2009     4     2/7/2009     2/20/2009       Bi-Weekly BT
98     2009          6     2009     5     2/21/2009     3/6/2009       Bi-Weekly BT
98     2009          7     2009     6     3/7/2009     3/20/2009       Bi-Weekly BT
98     2009          8     2009     7     3/21/2009     4/3/2009       Bi-Weekly BT
98     2009          9     2009     8     4/4/2009     4/17/2009       Bi-Weekly BT
98     2009          10     2009     9     4/18/2009     5/1/2009       Bi-Weekly BT
98     2009          11     2009     10     5/2/2008     5/8/2009       Bi-Weekly BT
98     2009          12     2009     11     5/9/2008     5/22/2009       Bi-Weekly BT
We need to stop the way the Calendar runs at PP 11 to go for one week and have it running bi-weekly again from there.
Is this task possible with automation by generatiing the payroll calendar. I tired generating the payroll biweekly calendar with start date as 5/9/2009, but this is internally deleting my PP 11 (5/2 - 5/8) and starting afreash.
I know I can manually build the calendar till the end of the year and then generate it from there.
Is there a way we can trick the system to automate the way we want?
Thanks in advance.

I understand taht we cant have two date modifiers for one payroll area
u have two bi weekly dates but u cannot do that one in one pay roll area so "why cant u create two pay roll areas and run the pay rolls "
while doing this process take care of control period
let me know if there is anything else
Edited by: Sikindar on Feb 15, 2008 11:18 AM

Similar Messages

  • Payroll Calendar and Work Week Changes

    Hi  All,
    Good Afternoon. We are on SAP ECC 6.0 with EHP4. Currently our Biweekly
    payroll Work Week starts on Thursday and Ends on Wednesday . Our
    Management has decided to change the Work week start day will be  from
    Monday and will be ending on Sunday. In Order to meet this Work week
    Calendar changes our Team has proposed two Options. Both the Options
    are provided below .
    1. Option 1 : Change the last period and Extend the Pay Period by 4
    days so that the Last pay period ends on Sunday . We will process only
    26 Pay Periods
    2. Option 2 : Process all the Current 26 pay Periods as usual and
    Create a new payroll period for 4 days from Thursday thro Sunday . We
    will have a Separate 27 pay Periods
    Both the Approaches has Pros and Con's .
    We are debating ourselves to choose one of the Approaches and we can
    really appreciate if you can guide us and shed some light on which
    approach we have to Adopt for a better transistion .
    Do we have any SAP recommended Procedure for this kind of changes .
    I can really appreciate if you can Respond me ASAP .
    Thanks and Regards
    Ramesh Ayyappan.

    Hi andrius.kr,
    I understand. Then I can help to check the settings on the Exchange side.
    As far as I know, Entourage uses web services to connect to Exchange Server. Let's first test the web services by running Test-OutlookWebServices command, more details in the following blog:
    http://exchangeserverpro.com/exchange-2013-test-outlook-web-service/
    Disclaimer:
    Microsoft is providing this information as a convenience to you. The sites are not controlled by Microsoft. Microsoft cannot make any representations regarding the quality, safety, or suitability of any software or information found there. Please make sure
    that you completely understand the risk before retrieving any suggestions from the above link.
    In addition, I also suggest checking the application log to see if there are any related error logs.
    Thanks
    Mavis
    Mavis Huang
    TechNet Community Support

  • 27 paydays -biweekly payroll - FSA "irregular" calculation

    Hi Gurus,
    We run a bi-weekly payroll and the payday of the last payroll period 26 of 2008 falls on 01/02/2009.....and the last period of 2009 has a payday of 01/01/201(holiday). To avoid the last payday of 2009 to fall on a holiday we shifted it to 12/31/2009. Now this has created a situation where 2009 has 27 paydays. The problem is that (FSAs  are setup to be calculated on the no. of Paydays) are dividing the EE annual pre-tax calculation by 27 instead of 26. Need your suggestions on how to tackle this issue.....

    Hi
    It's OK to have 27 bi-weekly Pay periods in a year and so the deduction pattern would also change for FSAs. Besides that I would suggest that you should also check for the deduction pattern for Health Savings Accounts and Medical/Dental/Vision Plans as well. Also deductions for some insurance plans may also be affected because of 'extra' pay period in Yr 2009.
    Best Wishes
    Rajeev

  • Error with month end payroll Accruals

    We have an error when posting month end payroll accruals for our weekly payroll, though the bi-weekly payroll works fine!
    I have checked tables T549S and T51A1 and all of the dates are correct and set as I would expect, however the system did not create a month end accrual for the weekly payroll into the following months posting period.  For the biweekly payroll this worked exactly as expected.
    We had no issues with this for the last calendar year, however for 2009 we have changed our month end closing dates, though I do not see that this would prevent this from happening.  I have checked various things in the IMG and have not been able to resolve this, does anyone have any ideas what might be causing this.
    HELP!!!

    Michelle :
    Month-end accrual determination is based on T51A1, T549S (date type '04' and '05'), and T549Q (field Begda and Endda). Pay extra attention on these dates, as if one is incorrect (e.g. miss-type the year in the future entry with an earlier year) would definitely cause month-end accrual to stop working.
    Rgds.

  • Payroll control - RA issue

    1. In payroll, Which retro active date takes precedence ?
    Assume an employee is having payroll area A1
    a. Payroll control record -> Earliest retro acctg period for Payroll area A1 - 01.12.2011
    b. Emp X, who belongs to Payroll area A1 -> Earl.pers.RA date -> 01.11.2011
    Which takes precedence?
    c. When running payoll for emp x, with forced retro as 01.09.2011, which date will apply ?
    2. Is there any program to 'release' payroll control area automatically / should be done by
       payroll admin manually ?
    Thanks!
    any updates ?
    Edited by: ilovesaphr on Feb 22, 2012 7:21 AM

    1. In payroll, Which retro active date takes precedence ?
    [Answer]: Earliest MD Change Date.
    Assume an employee is having payroll area A1
    a. Payroll control record -> Earliest retro acctg period for Payroll area A1 - 01.12.2011
    b. Emp X, who belongs to Payroll area A1 -> Earl.pers.RA date -> 01.11.2011
    Which takes precedence?
    [Answer]: In your case, no retro data can be maintain earlier than 01.12.2011 since A1 is set. However, if the data is created before Earliest retro acctg period for Payroll area A1, it will run error normally.
    c. When running payoll for emp x, with forced retro as 01.09.2011, which date will apply ?
    [Answer]: In PY driver [PC00_MXX_CALC], you can forced the employee to run retro payroll. Or, Earliest MD Change Date / Earliest Personnel RA Date is also another option but need to make sure the PY area's earliest retro should be EARLIER or equal to the same period. Otherwise, you may face error during payroll run.
    2. Is there any program to 'release' payroll control area automatically / should be done by
    payroll admin manually ?
    [Answer]: You may do Payroll Calendar in the configuration, but I have never try it before because it is lack of flexibilities....I would say doing it manually is always better because you need to consider exception cases / weekends / public holidays / etc/
    Thanks!
    [yw, points for reward if it helps :-D]

  • How can I stop Calendar from formatting the location of an event?

    When I enter the event's location (e.g. Concert Hall, 123 Main Street) Calendar breaks it up into multiple fields and sorts them alphabetically (e.g. "123 Main Street" and"Concert Hall"). It also tags each field with "!", meaning presumably that the location was not found in a directory or contact list. I'd like to stop Calendar from doing _anything_ "smart' to the location info and just display it exactly as I enter it. Any ideas on whether this is possible? Thanks much!

    The site file is a database that keeps track of all your assets (and much more), including the scriptLib file. As soon as the page is saved (when you use the site file and it's open) the link will be change to the correct path that will work on the server.
    If you're not using the site file you might as well use a text editor, since most of GL functionality is gone.

  • Incorrect URL on Calendar List Event in Overlay View

    Hello,
    We're using Standalone SharePoint 2010 installation.
    The agency I work for has a Clerical Staff calendar list. This is the principal calendar staff use so it has several other calendars overlaid in the list view.
    One such calendar was Volunteer Schedule. Once this was no longer used I renamed the volulnteer calendar to payroll calendar and changed the URL in sharepoint designer 2010. This was successful, I can hit the payroll calendar and the URL is correct.
    However, I'm having issues with the payroll calendar items. When you click on any Payroll Calendar Event in the Clerical Calendar overlay view, the URL for the payroll calendar item resolves to a completely different calendar list and throws
    an "Item Does Not Exist" error.
    I can still add, edit, and delete those items on the payroll calendar specifically, and new adds do show up in the overlay... it's only when you click the Title of that item in the Clerical calendar overlay does the error happen, it's almost as if the Calendar
    list items have lost their connection to their parent calendar list.
    Further investigation has brought no answers, I'd rather not delete and recreate the payroll calendar as it's densely populated.
    Any thoughts or links will be much appreciated.
    Thanks,
    Brian H.

    Hi,
    According to your post, my understanding is that you wanted to solve the issue about the Payroll Calendar Events when you clicked on any Payroll Calendar Event in the Clerical Calendar overlay view in SharePoint 2010.
    I try to reproduce the issue, however, the result is the same as yours.
    If you need to rename the Volulnteer Calendar to Payroll Calendar and change the URL in SharePoint designer 2010, I suggest that you can delete the previous Volulnteer Calendars Overlay and create a new one Payroll Calendars Overlay in the Clerical Calendar
    list.
    I recommend that you can follow the steps as below to implement it.
    1. Open the Clerical Calendar list, go to the “Calendar Tools”, and click the “Calendars Overlay” under “Calendar”.
    2. Click the previous Volulnteer Calendars Overlay, and click the “Delete” button to delete it.
    3. Click “New Calendar”, type the Calendar Name, select the Color and click the “Resolve” button to get the latest information of the Calendar list in the Web URL.
    4. Select the new Payroll Calendar list and click “OK” button.
    Now, you can go back to the Clerical Calendar list and test the new Payroll Calendars Overlay in your environment.
    In addition, you can rename the Volulnteer Calendar through the UI, then the URL will be changed automatically. And then you can click the Calendars Overlay directly.
    To rename the Volulnteer Calendar through the UI, you can follow the steps as below:
    1. Go to “List Settings” of the Volunteer Calendar, and click the “Title, description and navigation” under “General Settings”.
    2. Change the name to “Payroll” and click “Save” button.
    Then, you can see the new Payroll Calendar list on the Quick Launch.
    For more information, you can refer to:
    How
    to Change the Url For a SharePoint 2010 List or Library
    Changing
    the URL of an existing document library or list
    Best Regards,
    Linda Li
    Linda Li
    TechNet Community Support

  • Need to develop Payroll monthly deduction report in ABAP-HR

    Hi,
    If any body know standard report which will suit to my requirement please help me.
    Thanks in advance.
    Regards,
    suresh

    Hi Amit,
    Thank you for your prompt reply.
    I have got confidence on you that you can help me out as I am new to ABAP-HR.
    My actual requirement is below.
    Fields/Column Names to be included on report output:
    u2022     Personnel Number
    u2022     Last Name
    u2022     First Name
    u2022     SSN
    u2022     Cost Center Number/Text
    .               EE Subgroup
    .               Adjustment Reason
    u2022     Personnel Area
    u2022     Effective Date
    .               Deductions Start/Change Date (This date is always the first of the month for the next payroll deduction/pay period  - may require payroll calendar)
    u2022     Date of Change (on the individual benefit infotype)
    u2022     Name of person who made Change
    u2022     Health Plan Type (and Text)
    .               Medical code
    .               Flexible Spending Accounts Plan Type/Text          (PA0170 u2013 PLTYP u2013 1100, 1150)
    .               Insurance Plan Text (only)                PA0168 u2013 PLTYP u2013 0200, 0250, 0300, 0350)(All of the insurance amounts will be combined, so there is only a need for text and not the type)               
    .               Bi-Weekly Deduction Amount (Pre-tax)          (EECST u2013 Employee Cost Pre-tax deduc)
    .               Bi-Weekly Deduction Amount (Post-tax)          (PTCST u2013 Employee Cost Post-tax deduc)
    u2022     EE Subgroup
    .               Imputed Income Amount      
    .               Retroactive Calculation Amount     
    .               Hire Date
    .               Prev Personnel Num (use u2018PSIDu2019 as column header) (PNALT u2013 IT0032)
    u2022     Hire Date
    u2022     Prev Personnel Num (use u201CPSID Numberu201D as column header)
    Infotypes Within Report Scope
    u2022     0000 Actions
    u2022     0378 Adjustment Reasons
    u2022     0041 Date Specifications
    u2022     0170 Flexible Spending Accounts
    u2022     0167 Health Plans
    u2022     0037 Insurance
    u2022     0032 Internal Data
    u2022     0001 Organizational Assignment
    u2022     0002 Personal Data
    Selection screen inclue the select options and parameters as below:
    From Date / To Date  (range in time analysis) - Select-options
    Personnel Number
    Country Grouping
    Personnel Area                                          -   Select-options
    Plan Type
    Adjustment Reason
    I will be waiting for your help.
    Regards,
    suresh

  • Sync iCal - iPhone - Exchange 2007 broken after MobileMe Calendar upgrade

    I need to keep contacts and calendars in sync between my work pc (XP, Outlook 2003, Exchange Server 2010), my home Mac (10.6.6) and my iPhone (3GS, iOS 4.3). Until recently, that worked fine by the following (roundabout) way: PC syncs with Plaxo online via Outlook add-in; Plaxo syncs with Mac; Mac syncs with MobileMe; MobileMe syncs with iPhone. However, the recent upgrade to new MobileMe calendar breaks this workflow, at least for calendar syncing, because Plaxo cannot synchronise with the new CalDAV cloud-hosted calendars. Can anyone suggest another way of getting this to work?
    I thought MobileMe for PC might be a solution, but while it can show MobileMe calendars in Outlook, it can't synchronize them (and it seems not to work with Windows XP). A while back, I tried using Google Calendar as the focal point, but found Google Calendar Sync for Windows created a lot of duplicate items, lost items and general mess.
    PS The office network doesn't run Exchange ActiveSync and does not allow a vpn connection from Mac or iPhone.

    Hi JWilson@ch,
    So I thought I was the only person doing that crazy workflow to get everything synced. I do it exactly the same way.
    I stupidly upgraded to the new MobileMe last year when first invited, and spent the next few days working out how to get it all back and working. I have been happily syncing everything the old way since then.
    My major concern now is that I just received an email from MobileMe today saying I have to upgrade now as they have stopped syncing the old calendar! I haven't checked this yet (I will in a sec), but if I have to upgrade, that means I lose everything that has worked so well since MobileMe started.
    My crappy work Blackberry is useless for mirroring my Outlook calendar, so syncing my work onto the much more user friendly iPhone had been a saviour. Now I have all of my work and personal appointments in the same place, and I never miss anything.
    What to do now? Is there another way to get my PC calendar onto my iPhone, apart from the Exchange Activesync option which my office also doesn't support.
    I'll hold out as long as I can...
    Garry
    Work PC (XP, Outlook 2003, Exchange Server 2010), home MacBook Pro (10.6.7), iPhone (4, iOS 4.3)

  • VBA script for custom Outlook 2010 calendar "first day of week"

    I need Outlook 2010 to use "week starting with the Saturday before Jan 1" as "first week of year" to match our company payroll calendar. (For example, Saturday 12/26/2015-Sunday 1/3/2016 would be "first week of 2016".) Is there
    a way to do this in a VBA script?
    -Thanks, zogg

    Hello zogg,
    The settings are stored in the registry at
    HKCU\Software\Microsoft\Office\15.0\Outlook\Options\Calendar
    where 15.0 stands for Outlook
    2013.
    Make changes in
    the Outlook settings and see which registry values change and in what way depending
    on the settings you change. 
    Also take a look at the How
    can I get the work week and day number in VBA (outlook 2010)? page which states the following:
    WW = Format(Now, "ww") & "." & Weekday(Now, vbMonday)
    The "Format" function returns an expression from a string formatted with the provided "format" argument (ww in
    this case, which returns the week of the year) and the Weekday() function
    returns the numbered day of the week where the first day is a VBDayOfWeek enumeration
    provided as the second argument (vbMonday in
    this case).

  • Change to the Payroll Frequency feature does not update Annual Salary IT8

    We are running a biweekly payroll but in 2009, because of the way the calandar falls we will have 27 pay periods.  The Payroll Frequency feature was changed but for salaried employees, their info type 8 annual salary still shows their biweekly amount * 26.  However if we give the empoyee a pay increase (or, I suspect, change the record in any way) info type 8 will now correctly show annual salary as 27 * the biweekly amount.
    Is there a way (like a sap standard report) to make info type 8 recalculate annual salary by multilplying the biweekly amount * our previosly changed Pay Frequency feature (which is now 27 not 26)?
    Thanks very much.

    Mark :
    Per SAP document, annual salary "should not necessarily represent the actual amount paid but rather a value that can be used for purposes of comparison". SAP does not recommend changing the number of periods in 'PFREQ' feature as this could lead to inconsistencies for existing data.
    Payroll calculation is based on the 'pay period' amount, not base salary. I think it's better off not having to change anything just because your bi-weekly happens to have 27 (instead of 26) pay periods for this year.
    Rgds.

  • OWA Calendar want to display a link to other users shared calendar that was created in Sharepoint at login

    Site is using Office 365.  They do not have the actual Office apps on their PC's, they access everything via OWA.  (sorry if I did not use correct nomenclature).
    Users currently access calendars etc, by accessing the site's SharePoint site after login to the Microsoft Portal (https://login.microsoftonline.com).  Then going to "site contents", and then
    accessing the calendar that was created.  Just a generic calendar that they use to schedule a conference room.  They log into O365 Portal, and just drill down.
    What the users' WANT to be able to do, is access the calendar off of their initial OWA screen that they get when they log into the portal.  At worst, just go down to "calendars" break it out, and click on "conference room calendar"
    or whatever.  I tried to do a copy and paste of the link from the page that has the calendar displayed, into a new link, but that did not bring up anything.
    So, to recap, the site is not using AD, they are all on generic Win7 and Win8 PC's that are not in a domain.
    They do not have Office on their computers.  They use OWA for everything.
    They do not want to drill down to calendars etc after login to access these resources, they want to be able to just click on a link on their OWA main default page they get when they initially log into the O365 portal, and get what they want.  Not
    drill down to the SharePoint shared calendar, which is only four clicks, but they don't want to have to do it. Whay want "ease of access".
    Thanks for your help.
    Rick

    You can move the iTunes folder to a separate drive on your pc an then configure each account to use this drive / folder as iTunes library ... The problem is, that iTunes by default stores everything in your personal music folder which is separate for each user account in windows (and by default is on "C" drive).
    I create a separate partition on every pc/laptop (and map a drive name) where I store music, videos and other mass data. This will also keep the "C" drive small, which is backed up from time to time and so my backup is also small.

  • Tcodes payroll

    Hi,
    Tcodes to run payroll.
    start
    run
    pl do needfull

    PC00 - Run Payroll
    PC10 - Payroll menu USA
    PE00 - Starts Transactions PE01 PE02 PE03
    PE01 - Schemas
    PE02 - Calculation Rules
    PE03 - Features
    PE04 - Create functions and Operations
    PE51 - HR form editor
    PRCA - Payroll Calendar
    PRCT - Current Settings
    PRCU - Printing checks USA
    PRD1 - Create DME
    SM31 - Maintain Table
    SM12 - Locked Secessions
    TSTC - Table Look up
    SPRO - IMG
    SE16 - Data Browser (Table Reports)
    PP03 - PD Tables
    PPOM - Change Org Unit
    PO13 - Maintain Positions
    PO03 - Maintain Jobs

  • Hi this is mahesh i need SAP/BW info

    hi to alll
    i need what are the available reporting in bw and in which situations we can use those ... what r the differents between all those...
    what are the avaialble bex--- tpes and what are those usages
    plz let me know plz
    can u help me plz
    bye
    mahesh

    Hi,
    it may help u.
    The BW load for Organizational Management data is usually scheduled for the first Friday of each month. In months where HRMS Payroll processing is scheduled to occur over the first Friday of the month, the BW load for Organizational Management data will be rescheduled. This data load will be rescheduled for the second Friday of the month. In the event that the second Friday of the month is not available for the Organizational Management data load, a message will be posted to the BW site and the HRMS Message Center with the alternate date.
    The Payroll calendar can be accessed from this link: http://www.dop.wa.gov/HRMS/CustomerSupport/Schedules/
    BW Custom Reports are available via the HRMS Portal (reference the BW Self-Paced Learning Materials for more info). These reports were designed to provide users with flexible reporting options. This allows both End Users and Power Users the ability to apply “user defined settings”. Users have the ability to add/remove rows or columns, filter and sort report results, etc.
    Sometimes, it's easier to apply user defined settings to an existing report rather than building a new ad hoc query. BW Power Users -- before creating a new ad hoc query, check the BW Reports via the HRMS Portal -- you may be able to apply user defined settings to an existing report.
    BW Power Users are the "agency go to" person for BW reporting questions. If you don't know who your agency Power Users are, contact your agency Security Administrator (or contact the DOP ISD Helpdesk).
    Top
    Assess where your SAP BW-based reporting activities are optimized and where they are underperforming. Take home strategies to bolster the ease, quality and performance of BW navigation, drill-down, formatting, printing, analytics, and dashboards.
    Take a critical look at the skill sets and strategies now required to optimize utilization of SAP BW Business
    Explorer (BEx), Web Application Designer, Information Broadcaster, and Analysis Process Designer (APD)
    Examine the nine key reporting variables, how they should be accounted for when selecting an SAP BW tool for a particular task, and the implications these variables and tool selections pose to users
    Delve into root causes of reporting challenges, from basic navigation and drill-down, to formatting and printing, to functional analytics and dashboards, and leading strategies for addressing them
    Determine whether you are making sufficient use of SAP tools and out-of-the-box Business Content across your current SAP BW landscape, and whether you can reduce the need for time-consuming and expensive custom report development
    Determine if and how rapid application development (RAD) techniques would shorten your report development and distribution times
    Assess whether your setup for accessing non-SAP data and managing data model changes compromises the quality of your reporting environment
    Know when and where it makes sense to use SAP BW for reporting and when R/3 remains the better platform
    BONUS: A flowchart to help you navigate through six levels of reporting requirements, and a decision matrix to help you choose the right SAP BW reporting tool for your needs
    To create attractive, formatted reports using the SAP BW tools you've already invested in. This session draws on real-world examples of how the world's leading SAP BW users successfully create formatted reports.
    Learn the key challenges and requirements when formatting numerical versus graphical reports, and how to address them
    Walk through demonstrations to add margins, column titles, headings, page breaks, sub-totals, and page numbers to your reports
    Eliminate unwieldy navigation blocks in all of your BW reports
    Determine which SAP BW reporting tools are best suited for printing and which are not
    Explore techniques you can use immediately to build printing options into your reports
    Gain real-world insights into how you can reduce the number of requests for printed reports by giving your users powerful ways to display and analyze data on screen
    Learn how to build in key print options to cover logos, headers and footers, unique page sizes, and special fonts
    Know the pros, cons, and challenges of exporting reports to PDF, including how to overcome print and display limitations
    BONUS: Detailed documentation on JavaScript and Visual Basic best practices to create and format SAP BW reports
    regards,
    vasavi.
    kindly reward if helpful.

  • Issue with Unpaid Absence for Rotating Shift Employees with Averaging Hours

    We run a biweekly payroll where full time employees are paid based on an 80 hr work shift per pay period.    We have a requirement where employees in production are on a rotating shift.  They may work 80, 88 or 72 hrs per pay period because  their work schedule rule is defined this way.  However, regardless if they worked 80, 88 or 72 hrs, these employees should still be paid based on 80 hrs of work (overtime will be paid extra).  Currently, our system handles it this way.  
    However, a problem comes up when the employee has an unpaid absence for the period. The WT  /801 is calculating a factor that results in incorrect pay.  For example, if an employee has an hourly rate of $10 (biweekly rate of $ 800), with a work shift of 88 hrs and 24 hrs unpaid absence for the period, the rule KPPF is calculating the factor (/801) to be: 64/88 = .7272, and therby paying 581.76 ($800 x .7272).   The calculation of /801 comes from the formula:
          total hrs worked (88) - unpaid hrs (24)
                    total hrs worked (88)
    Given our requirement, the correction calculation for the factor  should be:
      80 - 24    = .7
         80
    and the correct pay should be $560 ($800 x .7)
    I tried modifying rule KPPF, along with KPP0 and KPP1 and was able to make it work to fit our requirements.  However, the modification I made only works when there is only 1 WPBP record.  If there are multiple WPBP records , possibly caused by an personnel action , change of IT0007 or  IT0008 in the middle of the pay period,  it becomes way too complicated to modify the rule to handle each and every scenario.
    If anyone has come across a similar requirement, I would really appreciate if you could assist on how this should be handled.
    Thanks.
    Malou Navera

    Thanks Amosha,  Here is the PCR for calculating the factor during an unpaid absence:
    KPP1 Determine partial period factors (subrule)
          /801 Partial monthly factor 1
            RTE=TSSOLL Set
            RTE-TSAU** Subtraction
            RTE*KGENAU Multiplication
            RTE/TSDIVI Division
            ADDWT *    OT   Output table
    Here are the table values for an employee who is on an 88 hr shift, with 52 hrs of unpaid absence:
    Total period parameter
      Individual divisors for total period
      GSDIVI:          88.00
      GADIVI:          11.00
      GKDIVI:          14.00
    Partial period parameter for WPBP period 01
      Individual divisors for partial period in WPBP period 01
      TSDIVI:          88.00
      TADIVI:          11.00
      TKDIVI:          14.00
    Planned values for period from 01/25/2010 To 02/07/2010
    DWS class: 3           Day type: 0             PHoliday cl: 0
    TSSOLL:         88.00  GSSOLL:      88.00
    TASOLL:         11.00  GASOLL:      11.00
    TKSOLL:         14.00  GKSOLL:      14.00
    Table PARTA
      PParType  No  Valid from  Valid to    KAU**   AAU**   SAU**   KAP**   AAP**   SAP**   KAX**   AAX**   SAX**
      T         01  01/25/2010  02/07/2010    8.00    6.00       52.00     2.00     2.00      20.00    0.00       0.00      0.00
      G         00  01/25/2010  02/07/2010    8.00    6.00      52.00     2.00     2.00      20.00    0.00       0.00      0.00
    In this scenario, /801 was calculated at 40,909.09, it should be 35,000.
    Hoping to hear from you soon.
    Thanks.
    Malou

Maybe you are looking for

  • Connecting a 5th Gen Ipod to 2010 Hyundai Tuscon

    Im using a 5th Gen ipod with my new 2010 Hyundai Tuscon. The car is equipped with 2 jacks one is a aux jack for a 2.5mm headphone jack and the other is a USB jack. The dealership gave me a special cable that is fused together. One end has a 2.5mm mal

  • GL Trial Balance has no data using Parent Value

    I have setup a company parent value with two children values. I went to run the stamdard trial balance 1 summary report for the parent value and the report shows no data. Are only fsg's able to print parent value reports? Thanks fin advance.

  • Workschedule - linked to company code

    Hi Gurus, Working on a support project, client has given the details of the company code and name of the workschedule, which is to be copied to a different company code.. How can i get the details of the groupings which ls linked to the company code

  • Whats the difference to a macbook and a iMac

    Whats the difference to a iMac and a Macbook Air?

  • Help in reading browser cookies

    In my app i use Ruby on rails as server side language. I have a login page with "Remember me" option. It stores the user info in a browser cookie. After successful login it should redirect to the flex application. There I must be able to read the bro