BW Reporting Database in BW

Has anybody ever seen BW Functionality used to create an application which can then be used by business users to identify reports in BW, based on Input Parameters ( eg. Sales Org, Material, Division etc. ) and / or Key Figures ( eg. Shipment Value, Order Quantity etc. ) ?  In effect, a report detailing available reports.  Any insights would be appreciated !
Thanks

Hello ,
You want to store the report name are the Key Field to identify the reports and other Key Figures are Nav. Attribute. Hmm thinking beyond SAP, sounds very good.
First we cannot keep a Key Figure as a Nav attribute...but as per your requirement...
I just want to share my thoughts....
SAP has already provides various intergration to various 3rd part applications and tools such as BO, Ascential, Microsoft, Java so on and so forth.
Only thing is we need to use or customize its service as per our need.
In you case, we can develop a .Net application, even an web based to fullfill your requirement.
We need to design the DB so that the BW Report name will be the key identifier and Chars and Keyfigures are the table fields.
But its not possible to bring all the keyfigure in SAP, so we have to restrict it to the InfoProvider level.
So we can have all the InfoProviders queries (Can be a multiprovider also).
The structure would look somewhat like this,
PK              Field1 .....Field N
PRTID         CHARS  ... Keyfigures
The main thing is we need to identify the Intergration between these two system to have a communication framework, so as to exchange data.
This is just my view. As you said it requires lots of skill set
Anyway I will keep you posted with any new updates on this topic.
If someone has a view to share on this is always welcome.
Thanks
Chandran
Edited by: Chandran Ganesan on Feb 9, 2008 7:03 PM

Similar Messages

  • TF244069: An error occurred while checking the provisioning status of the reporting database schema for a PWA instance.

    The command TfsAdmin ProjectServer /RegisterPWA causes next error:
    TF244069: An error occurred while checking the provisioning status of the reporting database schema for a PWA instance.
    Project Server returned the following error: "Server was unable to process request. ---> The request failed with HTTP status 401: Unauthorized.".
     (type ProvisionException)
    Exception Stack Trace:    at Microsoft.TeamFoundation.Sync.Provisioning.ProvisionPwaDBSchema.HandleSoapException(SoapException soapException, String errorResourceString)
       at Microsoft.TeamFoundation.Sync.Provisioning.ProvisionPwaDBSchema.IsDBSchemaProvisioned()
       at Microsoft.TeamFoundation.Sync.Provisioning.ProvisionManager.Provision()
    I installed SharePoint 2013 and Project Server 2013 as farm and TFS 2012 and my account has permissions everywhere. I read article
    http://msdn.microsoft.com/en-us/library/gg412653.aspx and gave full permissions for TFS account to SQL and Project, Project app pool account to SQL, but still have an error.
    How can I find out what exactly permissions are not enough???

    The problem was in claims authentication. Changed to Windows and all worked out.

  • P6 user name is not valid for connecting to the reporting database

    No data is available because your P6 user name is not valid for connecting to the reporting database
    I am getting above error in the following environment:
    P6 running on wls instance 1.
    BI Publisger running on wls instance 2
    MS SQL server 2005
    Note that the error appears when I clink on the 'Reports' tab in P6. My admin user on P6 has access to report/analyser modules.
    To connect P6 to BI Publisher I am using 'PxRptUser' in the P6 configuration for Bi Publisher. I know as well that the WSDL URL is correct and I can test this in SoapUI tool.
    In BI publisher I have created the PMDB data source using PxRprUser, and the test of this connection works.
    (Because the report samples come with Oracle flavoured SQL that SQL server does not like, I have configured BI Publisher so I have just a single report left that sources it data from an xml file. This works in BI Publisher. It also helps me in that I do not need to add 'WHERE' clauses and parameters required for SQL server?)
    Furthermore, using a DB tool, I can connect to my SQL server using PxRPTUser.
    So why do I get the error above?
    I picked up somewhere that I should not be adding users to BI Publisher. Funny enough, testing the 'login' method the BI Publisher exposes through its WSDL (as above) I noticed I HAD to create the user PxRptUser in BI publisher application itself (on top of PxRptUser in database) for the login web service to work with PxRptUser
    That did not solve the connection between P6 and BI Publisher though. What am I missing ...
    Edited by: user3674522 on 10/11/2011 20:16

    Thought I found something but can't repliacte, som issue is still there:
    Had a look at the wls instance logs where BI publisher is running, and the error I get is:
    111111_023646955][][ERROR] javax.naming.NamingException: Unresolved naming: cn=admin, dc=user, dc=users, dc=principals at [cn=admin]
    That user, admin, is the one I have used to access P6. Why is this passed on to BI Publisher? I thought the idea was that the PxRptUser set in BI Publisher configurations in P6 would be used?
    Edited by: user3674522 on 10/11/2011 20:17

  • Error installing P6 Reporting Database 3.0

    I am a relative noob when it comes to Oracle applications. And my customer has allowed their Oracle support contract to expire, which makes things so very easy....
    I currently have EPPM 8.2 w/Weblogic and OBIEE installed and functional...11.1.1.5....on 2008 R2, with a Solaris backend. I am attempting to install and configure the P6 Reporting Database 3.0. I'm running into errors when running the staretl.bat process for the first time- I believe what is happening is it is trying to pull data into the Star database. It generates the following error:
    *+<12.19.2012 16:50:04> staretl [INFO] (Progress) - Finished Script W_PROJECT_SECURITY_SS.sql+*
    *+<12.19.2012 16:50:10> staretl [INFO] (Message) - Extract2Stage Insert Time for 825327 rows on table W_UDFVALUE_DS is .231 mins (13.85s) at rate 59590.397/s+*
    *+<12.19.2012 16:50:10> staretl [INFO] (Message) - Complete extract on UDFVALUE for table W_UDFVALUE_DS rows=825327+*
    *+<12.19.2012 16:50:10> staretl [INFO] (Message) - Processed 825327 rows in 13.857/s at rate of 59560.294/s+*
    *+<12.19.2012 16:50:10> staretl [INFO] (Progress) - Finished Script W_UDFVALUE_DS.sql+*
    *+<12.19.2012 16:50:10> staretl [ERROR] (Message) - The SQL script W_PROJECT_DS.sql failed+*
    *+<12.19.2012 16:50:10> staretl [ERROR] (Message) - The SQL script W_ACTIVITY_DS.sql failed+*
    *+<12.19.2012 16:50:10> staretl [ERROR] (Message) - The SQL script W_USER_SS.sql failed+*
    *+<12.19.2012 16:50:10> staretl [ERROR] (Message) - The SQL script W_RESOURCE_DS.sql failed+*
    *+<12.19.2012 16:50:10> staretl [ERROR] (Message) - The SQL script W_WBS_DS.sql failed+*
    *+<12.19.2012 16:50:10> staretl [INFO] (Progress) - Step 12/28 Part 2/3 - FAILED (1) (0 hours, 0 minutes, 40 seconds, 16 milliseconds)+*
    I can view those scripts that are referenced, but they don't mean much to me. The info I've posted is from the log files, so you can see how useless it is....when I spool and run one of them individually, to see what the exact errors are, here is what I get:
    SQL> @ W_PROJECT_DS.sql*
    ORA-06512: at "STARUSER.EXTRACT2STAGING", line 74*
    Exception: Error during extract for table W_PROJECT_DS: ORA-00904: "LOCATION_ID": invalid i*
    +(100,PROJECT,W_PROJECT_DS,n/a,n/a)+
    BEGIN*
    +*
    ERROR at line 1:*
    ORA-00904: "LOCATION_ID": invalid identifier*
    ORA-06512: at "STARUSER.EXTRACT2STAGING", line 109*
    ORA-06512: at line 2*
    I don't pretend to know what the error means, or how I might correct it. Anyone have an idea of where I should start looking?

    I have the same issue, but instead of "Location_ID" it claims that the problem is with "LASTUPDATEDATEX" (ORA-00904: invalid identifier). Oracle DB version is 11g, all of the instances (EPPM, ODS, STAR) are hosted on the same server, but are separate instances.
    How does the Multimedia component influence this bug?
    BTW: Reporting DB version is 3.1 - staretl process has 48 instead of 28 in 3.0 steps.
    Edited by: Victor Razumov on 19.03.2013 8:14

  • Project Server 2013 reporting database change in Schema from Project Server 2010

    I have a current Project Server 2010 implementation, I am planning to migrate to Project Online.
    We have Customized Reports that consume from the PS 2010 Reporting DB.
    Are there differences in the Reporting DB schema  between PS 2010 and Project Online?
    My Question is: if we migrated to Project Online, will the reports crash?
    Another question is that, is PS 2013 Reporting DB schema the same as Project Online?

    Hi Atia,
    IN project server 2013 we have only one database instead of 4, it means draft, archive, published and reporting with in one database.Project Server 2013 reporting database schema tool that can be downloaded.
    http://blogs.msdn.com/b/project_programmability/archive/2013/01/28/project-server-2013-reporting-database-rdb-schema-reference.aspx
    There are differences in reporting of on-premises vs. Project Online
    The Project Server 2013 reporting schema includes three new tables, 27 new views, and a total of 33 tables and views that include new fields.
    Answer-1 : Yes there are some differences between PS 2010 and project Online.
    Answer-2 : Reports will crash as In Project Online you have to use ODATA to create report. You can not query project online data for reporting directly you have to have use ODATA. 
    http://msdn.microsoft.com/en-us/library/jj163015.aspx
    Answer-3 : NO, PS 2013 Schema and Project online Schema is different. 
    kirtesh

  • Change report database

    I guys:
    i have a problem when I am trying to change the report database.
    the report is currently using a oracle sql to fetch data into the report. when i try to move it to another database (test envirment) tables' schema name is changed so i basicly want to use another query on the new DB, i use the "database|set datasource location" window put new query in.
    but CR dont let me to. it shows error: "failed to retrive data from database. "
    anyone can help me?
    thanks
    Howard

    You can't if the database tables/fields are not exactly the same as the original report.
    Create a new report and if you want the same feature/functions as the original report then copy paste to the new report.
    Thank you
    Don

  • Task Total Slack Calculated values mismatching with the values in reporting database

    Hi,
    We require 'Task Total Slack' as one of the items in a report for Project Server 2010. We're developing the reports using SSRS wherein the SQL Queries are fired on the reporting database of Project Server 2010.
    We've come across a situation wherein the total slack values from reporting database for tasks are mismatching with the values that are seen in either PWA or Project Professional for total slack field. We also could not find a consistent factor by which
    the slack is multiplied for reflecting in the database in case the Slack in days was being converted into Hours in reporting databse.
    Is there a definite way that these values are being represented in reporting database which is quite different from the way these values are seen in Project Professional? Please help resolving this issue.

    Hi Abhijit PS,
    Can you give an example of the mismatch? Also you could tell us if this is happening for all tasks and all projects. Your concern may be seen from 2 different points of view:
    Either this is indeed a bug with a slack of 2 days for example in Project Pro and 4 days in your report from the reporting DB. In this case, you should check if the projects have been published correctly and if the Reporting DB is correctly sync'ed with
    the draft DB.
    Or it could be the normal behavior and it is just a matter of finding why. For example, the durations are stored in the DB in minutes, meaning that a 1day duration might be stored as 480 if you have 8 working hours in a day (8*60).
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Move SSRS engine to new server, but keep same reporting databases

    We have our SQL Server reporting services (2008 R2) setup as follows:
    ServerA: contains the reporting services engine (including the report manager URL, web service URL and so on).
    ServerB: Is the sql server instance that hosts the reporting databases for ServerA (ReportServer and ReportServerTempDB).
    ServerA is EOL and will be replaced by ServerC. I have two questions:
    1. How do we proceed to install Reporting Services on ServerC so that it points to the databases on ServerB.
    2. How do we migrate the reports (and settings) from ServerA to ServerC.  Will this be automatic by pointing ServerC to the exiting databases on ServerB.
    Thanks.

    Hello,
    All reports / Settings are stored in ReportServer database, so if you Keep your database you have nothing to migrate.
    Install SSRS without configuration on the new machine and afterwards do the configurtaion with Point the "ReportServer" database to ServerB.
    Olaf Helper
    [ Blog] [ Xing] [ MVP]

  • How to report database performance to upper management?

    Hello all. 
    I am looking for a way to report database performance to upper management.  I'll start by giving you an overview of our team structure. I manage a team of various roles: Level 2 support specialists, configuration managers, and DBAs - we are dubbed the
    "Production Support Team".  I report directly to the VP of Software Development who oversees the Design, DEV, and QA, team managers.  This means that our team, Production Support, can be considered a peer team of Design, DEV, and QA. 
    The manager of each team compiles metrics from their team members and reviews them on a weekly basis to ensure we are headed in the right direction.  We then take our metrics, and distill them down into a few key metrics that we then report to the VP
    of Software Development.  Those metrics are easy tom compile for the L2 support roles (number of tickets escalated, number closed, etc.).  However, I've been struggling with how to report DBA performance for a long time.  Every time I start
    to compile numbers, I end up with tons of things that are great for a DBA, but don't mean much to upper management.  Does anyone have any suggestions.  Surely I'm not the only person that has had this issue?
    I'd be happy to provide more info if needed.  Thanks!
    Clint

    are you using an RTF template ?
    in the RTF template you need to use this syntax for the HTML enabled field
    <?html2fo:MOSC_COMMENTS?>
    instead of <?MOSC_COMMENTS?>

  • Understand SQL Server 2008 R2 replication features for a reporting database

    Hi, I am using SQL Server 2008 R2 and working on building a reporting database using transactional push replication and want to know the downside that we should aware of using this.
    For instance, is the data always available to the users even when changes are being written from the publisher?
    I am also interested in learning replication mechanism & internals. How should I proceed?
    Thanks in advance........
    Ione

    >>For instance, is the data always available to the users even when changes are being
    written from the publisher?
    Answer is Yes.
    For more information
    http://www.codeproject.com/Articles/715550/SQL-Server-Replication-Step-by-Step
    --Prashanth

  • Project Server 2010 Reporting database corrupt after Administrative restore of Enterprise Lookup Tables

    Hi Guys
    Prosperous 2014 to all . I am stuck with a Huge issue that I am unable to resolve. I did a PWA Administrative restore the other day to try to recover some fields that was deleted.
    After the restore I got a queue error and since then my reporting database is screwed up. I tried to re-save the lookup tables, fields and views to no avail.
    None of my reports are working and every time I publish I get a reporting queue error on the projects.
    Your urgent help to sort this issue out will be highly appreciated
    Thanks
    Willem

    Hello,
    What was the queue error? Have you tried the restore of custom fields again?
    Paul
    Paul Mather | Twitter |
    http://pwmather.wordpress.com | CPS

  • Reporting database advice needed

    I need some advice from you folks that have been doing this a long time.
    I've implemented a reporting database using materialized views. It runs on HPUX 11.23, using Oracle 10.2.0.2.Bottom line is that the performance on it is HORRIBLE. I'm talking on a scale of 1 to 10, it's a 1.
    Are there any other options to doing a reporting database that updates nightly from the production database?
    I'm getting hit hard to get this thing up and functional. But it's so poor, that people won't use it. I've run the sql through the tuner, and it comes back good. Is there some other way of looking into this thing to see where the brick wall is?
    I had thought about using a standby database, running in read only mode. But I learned that once brought online in read only mode, it doesn't update the logs anymore. I guess I could run some nightly scripts to bring it back off line and into recovery mode to update all the logs, then return to read only?
    Is there better options out there? I'm at a loss at this point.
    Thanks.

    Being that the bad performance is coming off a different server, if I understand the environment, have your compared the hardware capability including cpu, memory, and disk?
    What kind of disk do you have, is it stripped, etc ...?
    Are both databases using the same version of Oracle?
    Are both databases running on the same OS and version?
    What do the OS level IO, memory, and cpu statistics look like?
    What kind of network connection do you have between the two machines? Has anyone verified that the network card is set to full duplex? Has anyone even looked at the network for this situation?
    HTH -- Mark D Powell --
    PS - Is the second server physical or virtual? There are a lot of things that can impact performance. You have not provided much in the way of what the environment looks like. Reviewing the answers to the above questions may allow you to spot the problem.
    Edited by: MarkDPowell on May 8, 2009 5:02 PM Add PS

  • Reporting database concept

    Hi Experts,
    I am looking for best concept for reporting database. Requirement is to send to data warehouse system aggregated data from my database. The idea is to have something like DWH area and prepare data before export. This (let’s say) DWH area can be a separate instance or can be in the main database.
    I am taking into consideration data guard mechanism but I do not want to have whole database – I need only a piece of data from several tables.
    The next idea I have in mind is to simply get data from main database and insert it into the DWH area – but this operation can be very resource (and time) consuming.
    Is there any out of the box Oracle mechanism to develop such as architecture?
    Maybe you have any other suggestion how I can prepare this mechanism to prevent database kill?
    Thank you in advance for your help,
    Michal.

    DWH design is not something that can be answered on a forum. There is just too much detail to explain. Get a good book on the subject.
    It all depends on the data structures, size, transaction volume, and reports you want to run.
    If you want to move a subset of aggregate data to a reporting database (or reporting schema), then you should read up on database links, "merge into" statements, mviews, and streams. Also read up on the OWB product, fact and dimension table design, and bitmap indexes.

  • Reporting database creation without purging any data

    We want to create a reporting database where no 'Purge' operation can be performed & all the records will be retained .Production DB & reporting DB are at different geographic location.In this scenario; what tool should be used for replication ? Can we achieve this using Data guard ? Can streaming be done over the WAN ? Does streaming has lot of overheads due to which performance may get hampered

    Can we achieve this using Data guard ? no
    Can streaming be done over the WAN ?sure
    Does streaming has lot of overheads due to which performance may get hamperedin a downstream scenario, all you have to do is to transport the archivelogs to other site, both capture and apply is done on the target site, no overhead on source site (however processing can be quite demanding on the target site)
    you can write your own DDL/DML handlers according to your needs

  • Reporting database - copy of production. How to create?

    Hi!
    To offload our production environment from heavy queries caused by reporting needs, we need to set up a reporting database. This database must be a copy of our production database. However, the reporting database can be lagging behind the production environment by some time (let's say an hour or so).
    The reporting database may be read-only if that makes it more easy to set up and administer.
    We would like the reporting database to have minimum impact on our current production environment. Preferably the coupling should be non-existent, meaning that the production environment should not know about the reporting database.
    The reporting database can initially be created by a copy of production.
    We can also accept downtime on the reporting database in case creation of new datafiles, or any other reason, in the production database requires a recreation of the reporting database.
    We are currently running Oracle 9iR2, but are planning to upgrade to Oracle 10gR2 later this year. We are running in an enterprise environment.
    Could you please suggest to me how to set up a reporting database as described here? A solution for either Oracle 9iR2 or 10gR2 is welcome.
    Thanks in advance for you help!

    In addition to what previous poster said, you may use Archiver Transmission with maximum performance mode for your standby DB.
    If you choose logical standby, then it can be queried while it is actualizing (constantly), but may not support all data types and DDL operations from your primary DB.
    If you choose physical standby, then these limitations are gone, but you can use it for reports only after interrupting the actualization (versions before 11g, that is) for the time of your query, opening the DB read only.

  • Reporting Database growing rapidly

    Hello,
    Is it normal for the reporting database in SSRS to grow so rapidly? I created a new database 2 days ago, and already it has gone from 300 megabytes the first day to 3gb today. Usually, in a matter of 4-5 months, it grows to 30+ gb.
    Is it normal for it to do this? Once it get's too large it starts to slow the nightly refresh of content down and causes it to take much longer. Also, it seems that when it gets large like that, there are noticeable bottlenecks on the SQL box.
    If this is normal, is the solution just to create a new reporting database once in a while? Shrink it? What? I looked online and didn't see much info addressing this topic.

    It all depends on the number of transactions is carried over the database. If space is going to be constraint
    then take a log backup and shrink the log file.
    Refer the below article
    http://technet.microsoft.com/en-us/library/ms178037(v=sql.105).aspx
    -Prashanth