Calculation of basic salary

dear all experts
i have one issue as
in a month there are 30 days & 26 days are working days
now
employee takes two unpaid leaves & two paid leaves(1PL&1CL)
of the 4 wt in it 0008 ,two r to be calculted on the basis of 24 days & remaining two wagetypes on the basis of 22 days(physically present)
kindly help me with the solution
thnkx

That is the factoring. for your requirement IBP1 rule is enough may be.  If it is suitable for your requirement write the rule.  Get the total days from TADIVI and get the paid and unpaid asences from the TSAP** and TSAU**.
Good luck
Devi

Similar Messages

  • Pricing procedure mm Packing and forwarding to be calculated on Basic price

    Hi experts
    we are having one pricing procedure where in details are as follows.
    basic price                                                 100
    excise                                                           12.36
    total                                                             112.36
    P & F 2 %  0n (112.36)                                   2.24
    total                                                             114.60
    Vat 5 % 0n (114.60)                                       5.73
    Grand total                                                   120.33
    Now we require new pricing procedure wherein  Packing & forwarding to be calculated on basic price & not on basic + excise
    so can we change in same pricing procedure or we have to create new ?
    Can you elaborate with the  configuration steps ?  Any changes required in Tax procedure also or not ?
    Thanks in advance
    regards

    Hi,
    No need you can add the condition type to the pricing procedure at spro--mm---purchasing--pricing procedure ---calculation schema with proper calculation to get the percentage on base price and add to the total .
    Regards,

  • ESI IS CALCULATING ON GROSS SALARY AS WELL AS INCENTIVES,IS IT RIGHT?

    Hi  Friends,
    I have one problem regarding ESI Issue. ESI is calculating on gross salary as well as incentives,is it right or Not?
    In Our company they are calculating on gross only,but in sap it is including incentives.
    For example:
    Employee having  gross salary Rs 6000 and incentives - Rs 4500,petrol allowances - Rs 1500 and mobile allowances -Rs  500
    In Our company they are deducting ESI Rs-102 ,but in SAP It is not deducting .if it is deducting on Gross salary ,then how can i do modifications in table v_512w_d.
    Please give me advice for this issue.
    Thanks in Advance.

    Hi Lakshmi Ram,
    Have you checked whether these are checked for /101 i.e., Cumulation Class 01.
    These should not be checked in the check box, means not included in the gross salary.
    And also check
    Processing Class: 20.  Cumulation at the end of the Gross Part.
    These should not be included in Gross part.
    Check once.
    Regards
    Venu

  • How to get Basic salary amount in the Housing formula to calculate the housing value as I used the DBI (NICDP_EMPLOYEE_BASIC_SALARY_AMOUNT_ASG_ENTRY_VALUE) but when run the Quick pay for the housing element alone result come 0, How to get Basic salary amo

    How to get Basic salary amount in the Housing formula to calculate the housing value as I used the DBI (NICDP_EMPLOYEE_BASIC_SALARY_AMOUNT_ASG_ENTRY_VALUE) but when run the Quick pay for the housing element alone result come 0, How to get Basic salary amount in the Housing formula to calculate the housing value as I used the DBI (NICDP_EMPLOYEE_BASIC_SALARY_AMOUNT_ASG_ENTRY_VALUE) but when run the Quick pay for the housing element alone result come 0

    Hi,
    Is your formula attached to basic salary element or some other element? You need to make sure that basic salary element has some value and is processed before this formula is called. Are you able to see value for basic salary element after payroll run?
    Regards,
    Pawan

  • One month Basic salary

    How do i config in V_512W_B
    This is for the WT :Payment in lieu
    Answer will Rewarded

    Hey hi RAM
    My Question more in detail
    I hav a WT in which V_T511 is Number/unit (not amt)
    When i enter number at 0015 Infotype it should take ONE MONTH BASIC SALARY
    Ex. 0015 is 1 (number) so result should be one month basic salary
    For this i am using Valuction base V_512W_B
    But what i do to meet my requirment.

  • Query to find basic salary

    Hi ,
    I need to find basic salary of all the employees from their actual salary
    10% of his basic salary will be debited at the end of the month 
    If the employee is about to relieve the company ,he should be paid by 5% extra bonus from his final settlement
    How to write a query for the above scenario

    Hello,
    PFB structure and expected result
    Name  Location  Salary
    smith newyork  
    6000
    adam  dallas   
    5000
    john  delhi    
    7000
    scott laondon  
    4000
    Name  Location  Salary  Basic salary Monthly_Debit Extra Bonus
    ================================================================
    smith newyork   6000      250              25                12.5    
    adam  dallas    5000      208              20.8             10.4    
    John  delhi     7000      291              29.1             14.55
    scott laondon   4000      166              16.6             8.3

  • PY: HRA Calculation on Basic

    Hi,
    HRA = (Basic salary __ 1000 rupees) %10.
    Example:-  Basic is 10000 rupees, so system shoul deduct 1000 rupees from basic automatically and calculate HRA 10 percent on 9000 rupees.
    How to do this? pls help me
    Can anybody help me please
    Edited by: Mudupu123 on Mar 17, 2010 9:44 AM

    if you want this one at the infotype level
    i think useing the User exit is the best option
    or else try to make the percnetage as 10 %  on basic  at infotype and - the Rs 1000 at schema level
    but i feel you are looking at the ifnotype level if yes check the option of useing User Exit

  • How to Calculate Basic Salary by Calculating 2 Wage Type

    Hi SAP Gurus
    I want to calculate basic pay = norm salary * RSP %.
    RSP% is just a wage type for an employee.
    If we configure RSP % as a wage type  and Norm salaray as a wage type, is it possible to set-up basic-pay = Norm salary * RSP %, Both these values will be entered in Infotype 0008. (RSP% is different for each employee. It will be entered in IT0008 directly).
    The SUMME and PRZNT modules use percentage stored in the summe and prznt table and not the number entered in wage type in 0008. Is it possible to use UNITS Module for that, IF yes then How let me know pls.
    Thanks in Advance
    Regards
    Rajiv Maheshwari

    The other way coming to mymind is - configure annual wage type or total salary wage type  - then you can define the % of basic and other WT you want to include in IT0008.
    hope this helps...
    Bas

  • Calculation of basic dates and schedule dates

    I update material master from routing with CA97 to material master
    work scheduling data with base quantity 1000
    When MRP running, planned order for 54000 PCS is schedule with work scheduling data.
    when i schedule planned order (change)
    the calculation basic date & schedule date differs for 19 days
    cause basic start shift
    why is this happend?
    is this cause by rounding when transforming minute from routing to days in material master?
    is this because i used shift sequence and scheduling with breaks?
    some strage case again is
    for base qty 1000 processing time is 0.97
    for base qty 10000 processing time is 6.93
    is there any solution for this case?
    please help.
    Best regards,
    Freddy Ha

    i forgot i used overlapping
    sorry

  • Calculation of basic date and schedule date

    I update material master from routing with CA97 to material master
    work scheduling data with base quantity 1000
    When MRP running, planned order for 54000 PCS is schedule with work scheduling data.
    when i schedule planned order (change)
    the calculation basic date & schedule date differs for 19 days
    cause basic start shift
    why is this happend?
    is this cause by rounding when transforming minute from routing to days in material master?
    is this because i used shift sequence and scheduling with breaks?
    some strage case again is
    for base qty 1000 processing time is 0.97
    for base qty 10000 processing time is 6.93
    is there any solution for this case?
    please help.
    Best regards,
    Freddy Ha
    Edited by: Freddy Halim on Jan 28, 2010 7:40 AM

    Hi,
    Yes. The schedule date is generated considering your factory calender also in addition to the routing data. For eg.. Suppose if Saturday and sunday are holidays, the schedule date will be extended to 2 days.
    Pl. check the  unit in your routing for the second query.
    Pl. refer the link
    http://help.sap.com/saphelp_47x200/helpdata/en/b1/c042b7439a11d189410000e829fbbd/frameset.htm
    Madhava

  • Rebate calculation from Basic Price PR00

    Hi,
    This query is related to rebate conditions. At present the rebate base is calculated from the subtotal, that is Basic price - discount(The subtotal 7 is assigend to the step 300).
    As per the requirement from the business, the rebate should be calculated from the 'Basic Price'. They don't want the discount value should be considered in the rebate calculation. I explained them regarding the burden which company has to bear, but the business still want to go with the changes.
    My plan is to create another step in the pricicng procedure right after the basic price and assign subtotal 7 to it and delete the exting reabte subtotal step, and assign the new step number to rebate conditions, so the reabte will be calculated based on this.
    My questions are:-
    1. Can I edit the existing pricing procedure to make these changes?
    2) Will there be any impact on the existing rebate agreements (open) and its settlements on a later date?
    3) Will there be any impact on the process of billing of open sales orders/deliveries (not billed) after the change in pricing procedure?
    Please guide me.
    Regards,
    SAM

    Hi Ivano,
    Thnak you very much for your suggestion.
    As the note says, the best way is to copy the existing pricing procedure and create another and assign it in OVKK.
    Will there be any effect for partially billed delivery items? (at the time of creation of billing document for the unbilled items in the delivery)
                                                                        OR
    when we create a billing document from the delivery (in the case of sales order and delivery created with old pricing procedure and the billing document is getting created after the assignment of new pricing procedure)
    Your valuable suggestions will be highly appreciated.
    Regards,
    SAM

  • Urgent : TDS - Cess Calculation on Basic + Surcharge

    < MODERATOR:  Message locked.  Please read the [Rules of Engagement|https://www.sdn.sap.com/irj/sdn/wiki?path=/display/home/rulesofEngagement] before posting next time. >
    Hi Sirji
    I am trying to configure the following in tds
    basic rate ( A1)
    surcharge ( A2 )
    cess  ( A3 ) &
    ecess ( A4 )
    but the problem is cess is on basic + surcharge
    and surcharge is applicable after 1,00,00,000.
    so how to built the condition taking this value consideration.
    I tried with "Define formulas for calculating Withholding tax" but didn't work.
    my requirement is
    If invoice value = 10,00,000
    basic tds = 2,00,000
    surcharge = 0
    cess = 2000
    ecess = 1000
    If invoice value = 20,00,00,000
    basic tds = 4,00,00,000
    surcharge = 40,00,000
    cess = 8,80,000
    ecess = 4,40,000
    kindly let me know if anything can be done on this.
    my mob is 9821050905
    thanks in advance

    Hello Kambli,
    First you need to configure wht types and codes for
    - TDS
    - Surcharge
    - Cess
    - Edu. Cess
    Then after do the following settings
    FA>****>wht>ewht>calculation>wht base amount>portray dependencies between wht types.
    - Here you will give surcharge wht type no to tds wht type
    - You will give cess wht type no to tds + surcharge wht types
    - You will give edu. cess wht type no to tds + surcharge wht types
    Try this if u have any querry pl revert
    If useful pl assign points
    Thanks
    Para

  • Link between Basic Salary Wagetype and Bank Transfer Wagetype?

    Hi Experts
    In my SAP System BASIC, HRA,C.A and E A wage types are assigned only for Expensive A/c's not for Balance sheet account but when am simulating the total figure was going to bank transfer balance sheet account.it is correct.but Where we can find the the link between HRA Wage type and Bank Transfer wage type Account?
    thanks
    venu

    All the wagetypes Basic,hra etc are expenses to the company and salary payable is liability to the company ......So your Bank Transfer WT total consists of all the Wts ....so Basic,hra etc WTs goes to the Expenses a/c and Bank Transfer goes to the Balance sheet a/c . Balance sheet tallied with all expences equal to liabilities .
    Mohan

  • How can i configure hourly rate 9.5 to calculate automatically basic salary

    Dear All,
    Can anyone help on hour to get the hourly rate 9.52 to automatically multiply the monthly hours 173.90 to get the Basic pay monthly amount for hourly employees.
    Regards

    @akspecs -- Yes I was rapidly coming to the same conclusion, thanks.
    Besides, I figured I ought to do it properly and learn how to actually configure and use WINE as it should be, from the command line!
    In the meantime however I'd actually mitigated this problem by committing the ultimate sin -- I installed Windows natively in it's own partition and set up a dual-boot (bring on Steam for Linux so I can remove this evil!).
    It's not even really a 'classic' dual-boot because with my EFI / UEFI mainboard (once I'd got the Windows DVD to play nice) it meant no need to hassle with boot chaining in grub / syslinux etc. Now I have 2 'native' EFI boot options (stored in my mainboard's NVRAM) it's just a case of hitting the button to bring up the boot-menu during POST, then selecting which OS I want to boot -- Arch by default of course!

  • Creation of a PCR for calculation of LTA

    Hi Experts,
    I have an India Payroll requirement where i need to write a PCR with the below conditions:
    1)      The Employees would be eligible for the LTA from the very first month of their Service as per below conditions:
    a)      All active employees in a given month are eligible for LTA for that given month.
    b)      All employees joining the Organization on or before 15th of the month are eligible for LTA of that particular month.
    c)      All employees leaving the Organization on or after 15th of a particular month are eligible for LTA of that particular month.
    2)      Calculation:
    Latest Basic Salary in the month of March *No of months worked in a particular financial year(step2)*LTA Percentage
    For this i would need a wage type which i can use as a counter for the entire financial year.So what model wage types i can use to create a counter wage type which would get stored in CRT and can be used as a factor at the end of the financial year to calculate LTA.
    Thanks & Regards,
    Punam Jha

    Hello Punam,
    Please go through the documentation of payroll function INLTA in your system and then create your schema.
    Best Regards,
    Deepak..

Maybe you are looking for

  • Airport Extreme Network Stability Issues

    My airport base station is within cord reach of the only working jack in my house (old house). My den is down the hall, my boarder's down in the basement. We've been suffering from pretty bad connection issues, and there doesn't seem to be any clear

  • How to deal with Flex Exceptions ??

    Hi , I know how to handle an Exception when dealing with Flex with server side that is , when an Exception comes from the server side (java) i can easily handle that on the fault event with the help of ErrorMessage . But can anybody please let me kno

  • External dvd error

    I have an external DVD drive connected to my mac. I am burning my IPHOTO library to DVD. Everytimte I burn a DVD, it take a really long time to complete. And I get this error... The disc did not verify correctly and is unreliable. Because this disc i

  • Snowflake schema in OBIEE 11g

    Hi Friends, We have a requirement where in we have something like below: IPID CID Account 1000 100 10 1000 100 20 1000 100 30 1000 200 40 2000 300 50 2000 300 60 so the fact table would have the key for Account number(lowest level of granularity) and

  • 10.7.3 Network accounts are unavailable.

    I installed Lion on my work computer yesterday from a USB drive and I got the message that "Network accounts are unavailable".  Today I updated to 10.7.3 hoping that might do the trick and still get the same message.  Any ideas of how I should deal w