Change unit with a calibration curve

Hi,
I have aqcuired data in a 0-10 V channel. the measured value is picked up by a pressure sensor. the sensor is not completly linear and i have the data of the calibration curve. I have about 10 points from the calibration curve. my question is how to convert the data of 0-10 V into bar using the calibration curve point in DIAdem? is there a way to use some curve fitting with a specific values?
My calibration curve is
0.6202V = 100 Bar
0.9647V = 200 Bar
4.9396V= 1400 Bar
is there a function in which i can enter this vector and use it to convert the unit of the 0-10 V channel into Bar?
thanks
Gal

Hi jool,
Yeah, I think you need to create a high resolution set of XY lookup channels so that you can provide your measured Voltage value and retrieve the correct scaled value from the curve fit.  If you're willing to just do linear interpolation between your 10 scaling points, I'd recommend Linear Mapping.  You could alternatively use the Approximation function to calculate the best-fit Taylor series polynomial to approximate your scaling curve.  Or you could use a Spline fit if your scaling curve has lots of features.
Once you have the XY lookup curve, then the next step will be to apply that to your input Voltage channel to get the output scaled values channel.  We can handle that as a second step depending on which of the above methods you choose.
Brad Turpin
DIAdem Product Support Engineer
National Instruments

Similar Messages

  • How can i change unit of measurement in sales order on header

    Dear all,
    I have material master with base unit of measurement " Ea ".
    I have to take unit Pc in sales order.
    how can i change unit on header in sales order.
    i changed unit on line item in sales order by setting in sales unit field in material master.

    Hi,
    You can very well do it, please do the following steps,
    Go to material master and select the Sales Org.1 and 2, here maintain the sales unit PC and
    it will ask you for the conversion, so maintain your conversion for PC to EA. Then maintain
    the Division, delivery plant, material pricing group and account assignment group(if not maintained) and save it
    Now create the sales order for that resp. material, you will find that system will pick up
    the sales unit which is maintained in the material master's sales orgnization tab.
    For this you need not to change at the header level of sales order
    Please check and revert.
    Thanks,
    Hrishi

  • Met problem to change unit of measure in material master

    Our prime made mistake when creating material master with MM01. He used wrong unit of measure EA instead of right one M. And when he recognized this issue and tried to change it with MM02 in view Basic1, system prompt him an error message that "Standard cost estimates for the current period already exist".
    So, please help to let me know how can I delete related records about cost estimates and avoid this error. Thanks a lot.

    Robbie,
    You can delete Cost estimates using T-code:  CKR1 , I am not sure if you can change UoM if you have any goods movements  on the material. The best option would be create new material with correct UoM and transfer stock from old Material to New one with proper Conversion.
    Thanks
    Sivaram

  • Error when changing unit of Issue in material master

    Hi,
    When i am  trying to change Unit of issue in Qualitymanagement view of  a material using MM02 transaction, we  got error message - "The unit of issue cannot be changed because the material is used in a BOM-------Mesage no. M3214"
    Can anyone suggest what is the reason behind this. ?. how to avoid this error.
    Thanks in advance.

    HI Aditya,
    "The unit of issue cannot be changed because the material is used in a BOM-------Mesage no. M3214"
    The reason is that material is used as a component in BOMs with the present unit of issue as a unit in the bom line item.Unless you change that bom line item unit to its base unit ,system will not allow you to change the unit of issue in QM.
    First check in which BOMs the material you were changing is used as a component.this you can do in transaction CS15.
    then change the unit of measure used for the material in bom line item to base unit of measure.if one only one BOM is there change in CS02.if more BOMS are there do mass change in CS20.
    Then try to change the unit o fissue.now system will allow you to do the changes.

  • How to save as AI file in same location with all text curves?

    Hi Guys,
    I am also looking for a script. Here are the details....
    I do have lot of AI files (from different paths), which are completly work  done. So I just need to make them (all files) a copy with all text  curves in the same path should create folder name called 'LC'.
    From  the given path all the files should save as to 'LC' folder. ('LC'  folder needs to create at the same location and original file should  stay as it was, so no changes in original/source file)
    While  making curves we must remember that layers contains lock. So have to  unlock all the layer and make curves and lock them back.
    While save as the all files in the file names should add '_LC' at last. For example: file name is 'xyzxyz.ai'. It should come 'xyzxyz_LC.ai'
    FYI: Using Adobe CS4...
    if you help me that would be really grateful...
    Thanks in advance..
    Kind Regards
    HARI

    Hello Hari,
    maybe this could be a startingpoint for you:
    var lb="\n";
    function writeNtimes(max){
         // read about namespace and visibility
         var string2 = "Read the F. Manual!";
         for(i=0;i<max;i++){
              //about loops
              alert(string2);
    function tieMyShoes(){
         if(willingness){
              //about conditional statements
              var refs = "Mozilla js reference and guide - very good\nAdobe Illustrator and ESTK references";
              alert(" Please start with the following "+lb+lb+refs);
              // about Strings
              gotIt=true;
         }else{
              var moocher = confirm("are you just looking for someone doing your work for you for free?");
              if(moocher){
                   writeNtimes(10);
              }else{
                   gotIt=confirm("Yes I understand");
    var aString = "Hello HARI";
    alert(aString);
    var gotIt = false;
    var willingness = confirm("are you interested in learning Illustrator JS?");
    var string2="RTFM!";
    while(gotIt==false){
         tieMyShoes();

  • Balance carryforward consolidation unit with equity method

    Hi experts,
    One question in relation with balance carryforward in SEM BCS 4.0. Do Additional finantial data of Consolidation unit with equity method must be carried forward to following periods?
    I have a problem with AFD validation for equity method.
    Best regards,
    Beatriz B.

    Thanks Halim,
    I am not using consolidation unit combination. It is only Legal Consolidataion. However, I have fixed the problem by changing the master data of consolidation unit. I have enabled FCEP.
    I have one more question. Do I have to run Consolidation Group Change Task also when I am switching from Equity method to Purchase method for Associate companies?
    When I am changing from Equity to Purchase method all the previous C/I postings are reversed, but the profit of Associates which was already accounted by holding company in the previous period is transfered to Net Income-Method Change and second effect is given to Goodwill (GW is enhanced).
    Hence, post change of method, when I upload TB of Associate, the Net Income is not eliminated to the extent of the profit Adjusted on account of Method change.
    Please suggest,
    Thanks,
    USR

  • Changing units before making a document

    While specifying pages size I want the units to be inches or millimetres according to my choice. How can I do it? I know changing units after the document is made but is there a way for a prior setting?

    With no document open go to Preferences, then click on Units & Increments. You can also toggle through available units by pressing Command Option Shift U. There is not much feedback to tell you that you are changing anything, but some panels will change. The Control Panel has a field for the size of corner effects. The units there will change as you toggle through available units using that shortcut.
    Here it is with Pixels selected…
    And after one press of Command Option Shift U…

  • Problems with camera calibration

    Hi!
    I am trying to create a project that realises stereo vision with two cameras using the VIs provided by LabVIEW. During development I ran into problems with the calibration of my camera(s).
    My questions are:
    I would like to calibrate the camera-images with the IMAQ Learn Camera Model VI. For this purpose I have to show the camera a calibrational image (containing a group of points) in different angles. However even after multiple shots the value of the Insufficient Data part of the Internal Parameters output remains TRUE. I also experienced the same thing while running the Stereo Vision Example.vi. I held the calibrational image according to the directions in both cases. I would like to know what does this VI need for finishing succesful computations? Is the implementation of other VIs is necessary (apart from IMAQ  Calibration Target To Points - Circular Dots VI)?
    Another question: If I give a TRUE value to the Add Points And Learn input, will the VI use every previously given data for computation or it will use only the currently received values until I change it back to FALSE to start accumulating data after that?
    I generated the data to the Reference Points input with the IMAQ Calibration Target To Points - Circular Dots VI. Are there other VIs with which I should use the Learn Camera Model VI?
    Apart from the things listed above a general description of this VI (and the other calibrational VIs) would be very useful and maybe a simple example program that illustrates the function and work of the Learn Camera Model VI.

    Hi nagy.peter.2060!
    I found just a few hints and example:
    Learn Camera Model
    This VI has 2 images as input, Calibration Template Image and Grid Image
    When First Image comes as input, we have to wire that image to Calibration Template Image.
    We will only learn Grid of Calibration Template Image if and only if no Camera model is attached to the image.
    If no camera model is attached, we have to learn Grid and calculate camera model and attach calInfo to Calibration Template Image
    If Calibration Template image and grid image both are present, we have to learn grid of Grid Image and attach calInfo to Calibration Template Image.
    I searched for examples related to camera calibration.
    The example number 1666 illustrates how to use a calibration grid, either with a live acquisition or from a file, to correct for perspective distortion. The example documents the process for calibration as you learn a grid, apply the calibration information to your image, and then either correct the entire image or convert individual pixels to real-world distances. Link: http://ftp.ni.com/pub/devzone/epd/1666.zip
    I found an other example without description, but it uses Learn Distortion Model VI. Please find the image of the VI attached, I hope it will be useful.
    Balazs Nagy
    Attachments:
    vision.png ‏9 KB

  • Issue with Compliance Calibrator 5.2 SP9 Background Jobs

    Hello,
    I'm having an issue with Compliance Calibrator 5.2 SP9 where If I run a role analysis as a background job that has the same parameters as a previously run role analysis background job, the second job that is run will display a failure message.  It does not appear to matter if the similar background jobs were run by the same individual or separate individuals.  As long as the job that was previously run is still in the background job history, than any job with the same parameters run by a user will fail. 
    Is this normal operation for CC? 
    Is there a configuration change that could allow a job to be rerun in the background multiple times?
    Is there a fix for this issue in a later support pack or with upgrade to 5.3?
    Thanks for the help it's much appreciated,

    To better clarify what is occurring, the 1st job will run and complete successfully and return/display the appropriate results correctly.  The 2nd job will than be subsequently kicked off and finish same as with the previous job except when you open the background results no data is displayed and the message at the bottom reads: Failed to display result.  To make more sense of what Iu2019m doing, these are the logical steps Iu2019m following:
    1.  Select Role Level analysis
    2.  Enter parameters for analysis
    3.  Schedule background job to run immediately
    4.  View background job results (successful job and correct results)
    5.  Select Role Level analysis (with same or any other user)
    6.  Enter same parameters as step 2 for analysis
    7.  Schedule background job to run immediately
    8.  View background job results (successful job, but the error message: u2018Failed to display resultu2019, instead of seeing the CC reports)
    I believe the error is somewhere in the running of a job with the same parameters (Same Role and same Report Type).  If I delete the previous jobs from the background history that have the parameters Iu2019m using and try the analysis again, a third time, with the same parameters as before, it will run successfully and display the correct results.
    Is this normal and acceptable operation for CC5.2 SP9?
    Is there a configuration change that would allow a job to be run in the background multiple times with the correct CC results?
    Is there a fix for this issue in a later support pack or with upgrade to 5.3?

  • Continuous change management with SolMan?

    Hello,
    I wonder wether it is possible do run a continuous change management with Solution Manager for all changes I want to implement in a System?
    What I need is a solution to manage all the common change requests and not only for single projects.
    Can you help me?
    Thanks in advance
    Bye

    yes it is possible across the project using Quality Gate management in EHP1 version
    http://help.sap.com/saphelp_smehp1/helpdata/en/a9/0473a0d3f74adcaa6c6b4be7635867/frameset.htm
    Quality Gate Management gives you an overview of the status of the software distribution of your projects. It gives an integrated and consistent overview of the implementation of changes to your SAP software solution, for all operational units of the various organizations in a company. This increases the transparency of the software change process.
    Quality Gate Management combines different software developments in one logical structure. These developments are in turn collected in projects. You can organize and monitor the distribution of software by projects and their changes.
    http://help.sap.com/saphelp_smehp1/helpdata/en/a9/0473a0d3f74adcaa6c6b4be7635867/frameset.htm
    The prerequisites for setting-up quality gate management are:
    Assign quality gate management roles
    Configure the system landscape in the Transport Management System (TMS)
    Create a project in the Project Administration and enter required data in Quality Gate Management.
    also check this note
    Note 1256490 - General note for Quality Gate Management (QGM)
    Hope it solves ur doubt
    Regards
    Prakhar

  • I cant remember my password to logon to my mac, how can i change it with out needing the old one?

    i cant remember my password to logon to my mac, how can i change it with out needing the old one?

    http://support.apple.com/kb/HT1274

  • Best Buy lies in their ad about what they will do with their calibration!

    Best Buy lies in their ad about what they will do with their calibration!
    The ad that promotes Best Buy calibration here:
    http://images.bestbuy.com/BestBuy_US/en_US/images/abn/2008/tvv/pcon/BestBuy_HDTV_Calibration.pdf?h=4...
    clearly states:
    A calibration session
    includes two inputs on
    the set, so if you have a
    DVD player and cable
    box, for example, the
    HDTV’s inputs will be
    calibrated specifically
    for the video output
    from those two devices.
    Calibration also
    adjusts the sound levels
    and positioning of the
    speakers in a surroundsound setup, so your
    entire home theater
    will look and sound as
    good as it can
    The actual calibration you get is:
    No Audio, just the picture!
    The following are NOT included with this service:
    Setup of audio or video components
    You were warned!

    DarkWingDUCK wrote:
    This is right, calibration does not include setting up of audio or video components.  A calibration tech will makes sure, for instance, your 5.1 system has the speakers in the correct position.  If your rear-left is in the front soundstage, that can be corrected on site.  Most of what they do on site is run the auto-calibration software on an AV receiver if it has not already been done.  Other than that, you can opt to pay up to $800 for a full-fledged ISF or THX calibration from an independent calibrator.  You get a very good value for the $199.
    The service provides a "video" calibration, not audio.
    Well in that website link I provided and in the "First Glimpse" magazine they give you at the store, page 17, says they offer more than what you said:
    Calibration also adjusts the sound levels and positioning of the speakers in a surroundsound setup, so your entire home theater will look and sound as good as it can.

  • Error while changing BOM with change number

    Hi ALL, Please help me with followed error message, I am using ECM. I created ECR and converted to ECO and then released.
    Object management record cannot be generated
    Message no. 29046
    Diagnosis
    You want to change the BOM with the entered change number.
    One of the following situations triggered this error message:
    1. The indicator that allows automatic generation is not set for object type BOM in the change master.
    2. The indicator generation only on initial creation is set for object type BOM
    3. You are processing a change request.
    System response
    The system checks whether the indicator object management record will be generated is set in the change master.
    If the indicator generation only on initial creation is set, the system checks whether the BOM exists in the system.
    Procedure
    If you are authorized to change the change master, execute the following steps:
    For 1.)
    Set this indicator for object type BOM or create the control record in the change master.
    For 2.)
    If the BOM already exists in the system and the generation only on initial creation indicator is set, the system can no longer generate the control record automatically.
    In this case you have to add the object control record to the change master first, then you can change the BOM in relation to the change number.
    For 3.)
    You cannot generate any object control records for a change request.

    Hi
    With your question regarding changing BOM with change number  it looks lke there may be problem in defining the Object types,objects.Moreover whenever converted to ECO you need to enter into cs02 tcode for changing the bom with relevant change number and valid from date.
    Hope this gives you a clear idea.let me know if you need anyfurther inputs.
    Regards
    Praveen

  • Creation of Change request with reference to existing change request

    Hi
    I want to do Creation of Change request with reference to existing change request for MDG-F and MDG c/MDG S Is it possible? If yes, How?

    Hi Sanjay,
    No , its not out of box functionality in MDG. Reason being, MDG framework provided some standard API's with the help of which we can do our development with ease.
    Like Governance API                            : IF_USMD_GOV_API
           Convenience Governance API         :IF_USMD_CONV_SOM_GOV_API
           Change Request API Interface:       IF_USMD_CREQUEST_API
    With the help of which you can play around with your data in MDG with the pre-defined methods of it.
    Best Regards,
    Kaustubh

  • Adding a specific org unit with a user id.

    Hi SAP Master,
    How can I add a specific organization Unit with a particular User Id, i.e when ever that user id logs in into system and create a transaction the org. unit assigned with him determined automatically.
    And one more query, how can we send a org. unit for approval? 
    Thanks and Regards
    Rahul
    Edited by: Rahul07 on Jun 10, 2011 10:18 AM

    Hi Rahul,
    We don't assign the Organization unit to the user in the SU01. In SU01 we assing the PFCG roles and authorization related stuff.
    Rather we create the Organization model, assign positions and then assign the user to the relevant position under the required organization unit using the tcode "PPOMA_CRM".
    When you setup the Organization determination procedure, then automatically while creating the transaction, the Organization Unit of the person who is creating the Transaction gets determined.
    rgrds,
    Randhir

Maybe you are looking for

  • How do I find out if Sql server Agent's login has rights to a DB?

    How do I find out if the SQL server Agent's login has rights to the target DB, that is the DB on which I will be executing a query ? Is there a query for this ? Thanks.

  • How to make an update in adobe player uppod.

    Player pack is inserted into the site http://like-film.ru . Help how to do automatic update to this site.

  • How to trigger an Action

    Hello, I need help to find out how to trigger an Action (Action Definition) from an ABAP program. The program should trigger the Action used to create a follow-up transaction from an existing Contract. Thanks in advance, Jonas

  • [SOLVED]yaourt fail pacman/-color when upgrade sudo to version 1.8.0-1

    same sudoers: with sudo-1.8.0-1: [sl1pkn07@SpinFlo ~]$ yaourt -Syu Contraseña: You are not allowed to launch pacman-color with sudo Please enter root password with sudo-1.7.4.p6-1 [sl1pkn07@SpinFlo ~]$ yaourt -Syu Contraseña: :: Sincronizando las bas

  • Fill Find edit box of Formatted search screen

    Hi, I have an edit box and a choose button. when I click on that choose button I get a formatted search screen. I want the value typed in the edit box to be defaulted in the Find Edit box of the foratted search screen. Say I type "1" in my edit box,