Changing units before making a document

While specifying pages size I want the units to be inches or millimetres according to my choice. How can I do it? I know changing units after the document is made but is there a way for a prior setting?

With no document open go to Preferences, then click on Units & Increments. You can also toggle through available units by pressing Command Option Shift U. There is not much feedback to tell you that you are changing anything, but some panels will change. The Control Panel has a field for the size of corner effects. The units there will change as you toggle through available units using that shortcut.
Here it is with Pixels selected…
And after one press of Command Option Shift U…

Similar Messages

  • I need to change the settings of my acount, right know my acount says that I live in the United States but actually I live in Belgium and I need to change this before I can order/download photoshop

    I need to change the settings of my acount, right know my acount says that I live in the United States but actually I live in Belgium and I need to change this before I can order/download photoshop

    Select a Store

  • Inserting pages before pg 1, document then opens to old page 1 (XI Pro)

    Dear Support Team,
    I am baffled.  I use Adobe Acrobat XI Pro 11.0.2.  Here is the scenario that is driving me crazy:
    I open a multi-page pdf document (titled Report).
    I then view the thumbnails of that document.
    I find another pdf document (titled Charts) and drag it unopened from my desktop and place it before the thumbnail of the first page of my opened document (Reports).
    All seems well, all pages of the Charts pdf were inserted before the first page of the Reports pdf and are showing correctly in thumbnail view.
    However, if I close the pdf and reopen it, it will automatically open to the old first page (what used to be the first page of Reports), let's say page 5.
    So, I have to go to the file properties and change the "open to page 5" and make it say "open to page 1"
    This happens every time I insert a pdf document or even just a pdf page from another document before page 1 in my open document.
    It's like Acrobat keeps making the document open to the old page 1 no matter how many pages I insert before the old page 1.
    I just want to insert pages and have it open to the new page 1 without having to go to the file properties menu every time.
    Can anyone help me?

    Hello,
    Thanks for your time.  My acrobat preferences were already set to disable the restore last view settings, so that didn't work. 
    I've done a bunch of testing since you responded and have discovered that this issue only happens when I insert pages into a pdf document created by our office scanner (Konica Minolta bizhub C452).  When I scan a document, it creates a pdf.  If I then take that pdf and try to insert another document or page before page 1, the document properties immediately change to "open to page 5" or whatever the original page 1 used to be. 
    I'm not sure what's going on here.  I tried copying the scanned pdf to a different location/drive, and still no luck.  This is a bummer because we work with scanned documents so often and frequently need to insert and rearrange pages.  For now, whenever I insert pages before page 1, I promptly go to the document properties and change the "open to page" to page 1.  Very annoying.

  • ITunes no longer asks for my password before making purchases or updating apps

    iTunes no longer asks for my password before making purchases or updating apps... my restrictions are set so that is should ask for a password immediately but it doesn't seem to ask for this since iOS7... anyone got any ideas????

    Try changing Settings > General > Restrictions > Require Password to 'immediately'

  • Change Unit of Measure for Non-stock item PR

    Good day!
    I have created a non-stock PR. After I saved it, the transaction was then converted to RFQ and then to PO. In PO, it was found out that the unit of measure was incorrect. We have reverse/cancelled both RFQ and PO but the unit of measure field is non-editable. Is there another way to change this aside from deleting and recreating the item?
    Thank you.

    hi,
    Its correct...It is always follows the same scenerio...
    You can only change the Unit of measure when you have just saved the document and can change it till the further document is not made for it...
    Once you make the further document like as you said you have made RFQ, its not possible to make change further...
    So, the alternative is you delete the exsisting line item and create the new one...
    For the same, create the new RFQ and PO items as well...
    Regards
    Priyanka.P

  • When copying there is a lot of verticle black and white lines making the document unreadable.

    When copying in black ink there is a lot of verticle black and white lines making the document unreadable. I have changed the ink cartridge and that does nothing. The printer works

    Hello vorantes74
    So that the community may better assist you please include your printer model, operating system, and include anything that has changed.
    Don't forgot to say thanks by giving "Kudos" to those that help solve your problems.
    When a solution is found please mark the post that solves your issue.

  • I can't access my itune account? Error message : your accout is not valid to access US Store. Youvat switch to Philippine Store  before making any purchase.

    Why I can't I access my iTune account on my iPhone 5? This error message appears: Your account is not valid in US Stores. You must switch to Philippine Store before making a purchase.
    I have recently change my address to US where I'm staying and revert back to my old address in the Philippines but I can't still access my account using my iPhone.

    Go to Settings - iTunes&Appstores - Tap your Apple ID - Log out - Log in again - Try again to download/purchase an app.
    Let me know if this doesn't solve the issue

  • Color correct clips before making muliticlip?

    Hello,
    I would like to color correct my three camera clips before making a multiclip to save time, but the video scopes will not allow me to see my changes when I color correct. I have to drag each clip to the timeline and color correct each clip before I see modifications to the videoscopes. Even then, I have to use only the clips in the browser to make the mulitclip. Is there a more efficient process to put my clips through a filter(s) process (ie..color correction, de-interlace) before making a multiclip?
    Thanks,
    Jordan

    Hello Andy,
    Yahoo! Thank you Andy for your information. You just saved me a lot of time. Cheers!
    Jordan:>)

  • Do I color correct angles before making multiclip?

    Hi guys,
    I have two individual angles I'm going to sync and make a multiclip out of. One of my clips is horribly bright and requires some serious fixing in Color.
    Do I color correct or add filters to the individual angles BEFORE making the two angles into one multiclip? Or is there some way to color correct the entire angle after making it into a multiclip?
    --also, any reason why my canvas when changing angles in a multiclip would show it in 4:3 while the actual video is 16:9 in both the viewer and timeline?
    Thanks

    You could color correct before if you like, if your angle is rock solid and the changes will be consistent throughout. I don't do it that way but have been tempted.
    If you do it after finishing the multiclip edit then you will need to copy one color corrected clip and then paste attributes to the other appropriate clips.
    As a rule I color correct when my edit is finished.

  • Handling units before GR

    hi,
    while doing HU02 getting error " ILN for plant 2000 not found"
    actually after production order with ref to packing instruction we received handling units next level with ref to handling units we
    are doing handling units kindly provide any document related to this process. this two steps doing before GR only
    thanks in advance
    Chandu

    Hi,
    Yes you are right, the above requirement shall be addressed by using Handling units.
    Please refer the below link for more info
    http://wiki.scn.sap.com/wiki/display/ERPSCM/HU+Creation+on+HU+Managed+Storage+Location
    If you are going to receive the materials in Pallets (i.e. with Packaging) then better follow the Inbound Delivery route.
    As per std. SAP process, when you receive the material with pallets in a HU Storage location system will automatically create an inb.delivery.
    Refer the below thread
    http://scn.sap.com/thread/1630703
    Materials with Pallets you can receive in HU location and others you can receive in a different SLoc. After Unpacking, you can automatically move the materials to a different (SLoc) where 311 mov. will be posted automatically.
    Thanks,
    Ram

  • How can I change one section of the document to a landscape orientation and not the whole document?

    How can I change one section of the document to a landscape orientation and not the whole document?

    Page Setup, including page orientation, is done in the File menu. The setting applies to the whole document. As Peter says, you can rotate the contents of a page (not including the text layer of a word processing document).
    As an alternative, you could use Numbers, where Sheets are empty canvases onto which you may place images, charts, tables and text boxes, and where page orientation may be set for individual Sheets. The main tradeoff is that you lose many of the built-in word processing and page layout features of Pages.
    Regards,
    Barry

  • Changing the size of a document in Pages?

    How can you change the size of a document in pages? I need to change a poster size document to 8.5 x 11?

    Nevermind. Found it! Sorry, new to Mac

  • How can i change unit of measurement in sales order on header

    Dear all,
    I have material master with base unit of measurement " Ea ".
    I have to take unit Pc in sales order.
    how can i change unit on header in sales order.
    i changed unit on line item in sales order by setting in sales unit field in material master.

    Hi,
    You can very well do it, please do the following steps,
    Go to material master and select the Sales Org.1 and 2, here maintain the sales unit PC and
    it will ask you for the conversion, so maintain your conversion for PC to EA. Then maintain
    the Division, delivery plant, material pricing group and account assignment group(if not maintained) and save it
    Now create the sales order for that resp. material, you will find that system will pick up
    the sales unit which is maintained in the material master's sales orgnization tab.
    For this you need not to change at the header level of sales order
    Please check and revert.
    Thanks,
    Hrishi

  • Error when changing unit of Issue in material master

    Hi,
    When i am  trying to change Unit of issue in Qualitymanagement view of  a material using MM02 transaction, we  got error message - "The unit of issue cannot be changed because the material is used in a BOM-------Mesage no. M3214"
    Can anyone suggest what is the reason behind this. ?. how to avoid this error.
    Thanks in advance.

    HI Aditya,
    "The unit of issue cannot be changed because the material is used in a BOM-------Mesage no. M3214"
    The reason is that material is used as a component in BOMs with the present unit of issue as a unit in the bom line item.Unless you change that bom line item unit to its base unit ,system will not allow you to change the unit of issue in QM.
    First check in which BOMs the material you were changing is used as a component.this you can do in transaction CS15.
    then change the unit of measure used for the material in bom line item to base unit of measure.if one only one BOM is there change in CS02.if more BOMS are there do mass change in CS20.
    Then try to change the unit o fissue.now system will allow you to do the changes.

  • Implications of Changing Posting date of parked document.

    Hi,
    I have changed the posting date, document date & translation date to current period
    of an already parked document in a closed period.
    (e.g) Document parked in month of 28.04.2009(closed period) & i have changed the dates to
           28.05.2009(current period)
    I need to know what are the implications of the changes in dates for (posting date, document date & translation date) induvidually for both the periods(closed & current).
    Thanks
    Kenn

    Hi,
    There is no implications of change the the posting date of parked document because parked documents are not affected in financial.When you post the doucment then it will affect in finance.so there is no problem. You can change the posting date or document date only in a Fiscal year.

Maybe you are looking for

  • Unable to activate Genius

    I am unable to activate Genius since upgrading to Windows 7. Prior with Vista and iTunes 9 Genius worked fine. Upgrade to Win7 and I cannot activate Genius. It goes through step 1 fine then goes into step 2. It pops up an error message after about a

  • Turn off all Adobe Services and Cloud

    Hi Everyone, I had an Academic version of CS6 and after I changed jobs and was no longer eligible I purchased Creative Cloud for access to Photoshop.  I only want the Photoshop program and will save to a different location.  I also don't want the upd

  • Develop the custom report on payload

    Hi I want to develop a report on the basis of payload  in XI for eg  i send some sales order , then sales order no ,time of sending ,receiving at the other end , success  etc Regards Vijay

  • Error message after opening Microsoft Ecosystem Metadata Exchange Powershell Module

    Hi, I am running into issue who I launch the Microsoft Ecosystem Metadata Exchange Powershell Module Here is the error message: Import-Module : Could not load file or assembly 'file:///C:\Program Files (x86) \Microsoft Ecosystem Metadata Exchange\Met

  • Can I use Boolean parameters and 'is empty ' in smart groups & mail rules?

    How do you do the following smartgroup in Mail? State is MA or NH or ME and Email is not 'empty'? I also would like to make the following rule in Mail: If FROM is 'empty' and Subject is 'empty' then move to Trash. In other words is it possible to use