priya2207 wrote:
actually i have taken a numeric control of time- date format in which display format of time is 24-hour type but the requirement is that the numeric control should be converted into string type in which display format is 24-hour type.
You have two options: Format Date/Time String or Format String.  I prefer Format String since I am usually combining other things.  For the format string, follow formats given in the LabVIEW Help (follow the links I already gave you).
There are only two ways to tell somebody thanks: Kudos and Marked Solutions
Unofficial Forum Rules and Guidelines

Similar Messages

  • Type conversion from numeric value to time format

    hi guys,
    i hvae column called (Time in seconds).i need to convert the numeric value of one column into time format HH:MM:SS. for example 3012 =00:50:12.
    how can i proceed the same in the front end.
    Thanks & Regards,
    Nandu

    Hi..
    here is the code.. (assuming 10000 in the following code is your seconds, replace that with your value...)
    cast(TRUNCATE(10000/3600,0) as varchar(2)) || ' : ' || cast(TRUNCATE(60*((10000/3600)-(TRUNCATE(10000/3600,0))),0) as varchar(2)) || ' : ' ||cast(60*((60*((10000/3600)-(TRUNCATE(10000/3600,0))))-(TRUNCATE(60*((10000/3600)-(TRUNCATE(10000/3600,0))),0))) as varchar(2)) You can also use floor instead of truncate...
    Above will give only h:m:s format if hh (or) mm (or) ss are between 0 and 9. So, you may need to add case when condition before each concatenation: if hh is between 0 and 9 then need to concatenate with 0 else the same code...
    Thanks...

  • TIME format conversion

    Hi
    Please help me out
    I have data
    Input = 2.00+e4 ( Exponential Form)
    i want out put = 20:00:00 ( time format)
    how to do this? any function module ???
    regards
    aryan

    Hi,
      When we assign a floating point number to a field of type T
    then the floating point number is converted into Packed number (As no. of Seconds) and then the Packed number is converted to time format(HH:MM:SS).
      data:
      w_float  type f,
      w_time   like sy-uzeit.
    w_float = '2.00+e4' .
    w_time  = w_float.
    write w_time.
    output :
      00:00:02.
    I think this will help you

  • Time format conversion problem

    Hi there,
    I am tryng to get excel data thats in time format lets say : 03:30
    i have key transform it into key figure in time format, when i load data and check the data in cube, it comes ina a format that is like 03::3:0
    and also when i try to report that it shows 00:00 in reports.
    thats why i  can not get time differences.
    Thanks

    Hello john,
    The sugestions to change the format in excel are correct but if u dont want to change it in that way, u can write an abap routine
    in the transformation for add the time seconds.
    Data : time_excel TYPE char LENGTH 8.
    *rename time1with the name of ur field
    CONCATENATE source_fields-time1 ':00' into time_excel.
    move time_excel to result.
    Hope this helps.

  • Ack file date and time format is same as in source xml format

    Hi...All,
    1) my scenario is file-rfc-file using BPM,
    we are getting file in xml format from source along with timestamp and this data will be going to R/3 and the acknowledgement (success or failure) file will be sending back to source system.
    in this sceneario we have to fulfill in the follwing client requirement
    File1.<same File1 date and time>.XML
    Is it possible to make it as the following? if it is possible
    could u please let me know how to fulfill the follwing requirement.
    ACK File1.<same File1 date and time>.XML
    Where <same File1 date and time> format = u2018YYYYMMDDhhmmssu2019 .
    2) Is the XML file name visible in the SAP-XI monitoring screen and will it help to trace the messages?
    thanks in advance,
    Pasi.

    Hi,
    I didnot under stand your first question coulf you be more specfic.
    2. Ans : In general , we will follow the below steps
    --First we we check for the file is picked or no, if not see the Sender side CC parameters like mode and path details
    --If file was picked then we need to check whether we are using the File content conversion parameters or not if yes we need to check the FCC parameters ,
    Goto RWB-Channelmonitoring by the following link
    http://host:port/mdt/channelmonitorservlet
    select the sender side CC name and check for errors
    If no errors in above, goto SXMB_MONI for Integration Engine xml processing , check for successful or error occured black or red color
    --if success in SXMB_MONI then we need to check in RWB as above channel monitor now select the receiver side CC
    If no errors then check for output file is placed intarget or not
    Please reward points if it helps
    Thanks
    Vikranth

  • Time format in 'Write To Measurement File' express vi

    Hi,
    I'm using the 'Write To Measurement File' express vi to save data acquired using a PCI-6221 board and the DAQmx vi s. The acquisition is continuous.
    When I set the 'number of samples per channel' property of the DAQmx Read.vi to -1 (ie, read all available samples), the time is saved in relative format. When I set any other value (ie a certain quantity of samples), the time is saved in absolute format.
    Do you know why the vi does this, and if there's any way of controlling the time format ?
    Thanks,
    ps : I use Labview 8.0 

    Hi Scalpas,
    I look into what I believe you are doing , but I didn't see the same results. Can you explain what datatype you are transferring to the Write to Measurement file VI? Or provide a sample of code that demonstrates the issue.
    I think it might have to do with the DataType conversions when writing that file.
    Sappster

  • Day timer format calendar

    Does anyone know of software that can create what you can do with Calendar but in a week at a glance day timer format? IE - a 5 x 7 size with photos on the left and a week calendar on the right?
    Thanks!

    No I do not - but it sounds like a good suggestion for Apple - iPhoto menu ==> provide iPhoto feedback
    LN

  • During export from Discover to Excel, Time Format changes to Number Format

    Hi
    I have a seconds column which is of number datatype. But in my report, I am converting the number in *0HH:MI:SS* format. For example, I have *4952534 seconds*. So my report is showing *1375:42:14* which is a Time Format. It looks good when I view the data in Discoverer Viewer or Plus. But when I try to export the data to Excel, the time format gets converted to *4952534 seconds*, which is creating problems. So can you suggest on how can I preserve the formatting during export to excel from discoverer.
    Thanks
    Sachin

    Hi,
    Excel will not implement the 0HH:MI:SS data format, it just gets the field as a number. You will have to format the field into text using the calculation from my previous post.
    Rod West

  • Display value in hh:mm time format in SSRS Report

    Hi Everybody,
    I have an SSRS report where one of the column is sum of time values. When I do the summation, the values are coming in this format. In the last column the minute value is getting displayed more than 60. How can I format it to proper time format as hh:mm
    so that it displays as "08:15" . The expression which I am using is "  Sum(CDec(FormatNumber(Fields!Overtime_Hours.Value,2)),"Month"). Your help would be highly appreciated.
    January
    31/1/2014
    21/04/2014
    00:00
    07:75
    00:00
    07:75
    Thanks & Regards,
     RPC
    Regards RCP

    Hi RPC24,
    According to your description, you can calculate the correct value of time summation. Now you want to make the result into proper time format (hh:mm). Right?
    In this scenario, we can convert the time into string type, split the string based on delimiter ":" and convert each part into integer. Then do the calculation for each part and set the hour increase 1 every 60 minutes (we can adjust in expression).
    We have tested this case in our local environment. Here are screenshots for you reference:
    1. The report design looks like below:
    A: =Format(TimeValue(Fields!StartTime.Value.ToString),"hh:mm")
    B:=CStr(SUM(CInt(split(CStr(Format(TimeValue(Fields!StartTime.Value.ToString),"hh:mm")),":")(0)))+SUM(CInt(split(CStr(Format(TimeValue(Fields!StartTime.Value.ToString),"hh:mm")),":")(1)))\60)+":"+CStr(SUM(CInt(split(CStr(Format(TimeValue(Fields!StartTime.Value.ToString),"hh:mm")),":")(1)))
    Mod 60)
    Ps: In this sample, we used Time data type. You may need to do some modification in your expression based on the data type of the time data field.
    2. The result looks like below:
    Reference:
    Summing the Value of HH: MM: SS In SSRS
    If you have any question, please feel free to ask.
    Best Regards,
    Simon Hou

  • How to get system time format in time stamp

    Hello All,
    I have one problem regarding Time stamp. I want system time stamp format in Time control. If my system date/time format change then automatically my time stamp format should also change.If my system Time stamp format is hh:mm:ss AM/PM dd/mm/yy so in my LabVIEW time stamp format should also same. If System time stamp format hh:mm:ss AM/PM mm/dd/yyyy so in my LabVIEW time stamp format should also same.
    So Please help me its a very important for my automation application.
    Thank You.
    Vinal Gandhi
    Kudos are always Welcome.... :-)
    Vinal Gandhi, CLD
    Software Engineer

    Hi Vinal,
    have you tried the FormatDateTimeString function with a standard string indicator and the "%c" formatcode as described in the help instead of the generic timestamp indicator?
    Best regards,
    GerdW
    CLAD, using 2009SP1 + LV2011SP1 + LV2014SP1 on WinXP+Win7+cRIO
    Kudos are welcome

  • SPA9000 and Day time format

    Hello,
      in linksys administration guide for SPA9000 the Day time format is defined as Start time:   and End time.
    Is it possible to have more than one periods of Day time?
    For example lets say i want to define Day time beetween   08:00 and 13:00  and also day time 14:00 until 18:00. Is that possible?
    Thanks
    KM

    Hi Jeff,
      thanks for the reply. Tried your suggestion but it doesnt work. As soon as first end time kicks in thats it. Night time folks until the next day.
    KM

  • Time Format using text variable with replacement path

    Hi Friends,
                                 I've used "Text variable with replacement path" to make the column heading dynamic by replacing the values referring from "0calday"...
    everything is working fine, but here it is displaying the time format like
    YYYYMMDD (20030101), i want it to be displayed DDMMYYYY (01012003) in the column heading... how to make it possible?
    pls waiting for ur inputs, it's an urgent...
    Regards,
    Pattnaik

    Hi Satyakam,
    In the text variable properties make sure that in the replacment path you have chosen "Text" to appear date as per user setting . Other wise as in your case it must be set to "Key" which always shows in the format YYYYMMDD.
    Hope that helps.
    Regards
    Mr Kapadia

  • Data services with SQL Server 2008 and Invalid time format variable

    Hi all
    Recently we have switched from DI on SQL Server 2005, to DS(Date Services) on SQL Server 2008. However I have faced an odd error on the query that I was running successfully in DI.
    I validate my query output using a validation object to fill either Target table (if it passes), or the Target_Fail table (if it fails). Before sending data to the Target_Fail table, I map the columns using a query to the Target_Fail table. As I have a column called 'ETL_Load_Date' in that table, which I should fill it with a global variable called 'Load_Date'. I have set this global variable in the script at the very first beginning of the job. It is a data variable type:
    $Load_Date = to_char(sysdate(),'YYYY.MM.DD');
    When I assign this global variable to a datetime data type cloumn in my table and run the job using Data Services, I get this error:
    error message for operation <SQLExecute>: <[Microsoft][ODBC SQL Server Driver]Invalid time format>.
    However I didn't have this problem when I was running my job on the SQL Server 2005 using Data Integrator. The strange thing is that, when I debug this job, it runs completely successfully!!
    Could you please help me to fix this problem?
    Thanks for your help in advance.

    Thanks for your reply.
    The ETL_Date is a datetime column and the global variable is date data type. I have to use the to_char() function to be able to get just the date part of the current system datetime. Earlier I had tried date_part function but it returns int, which didn't work for me.
    I found what the issue was. I don't know why there were some little squares next to the name of the global variable which I had mapped to the ETL_Date in the query object!!! The format and everything was OK, as I had the same mapping in other tables that had worked successfully.
    When I deleted the column in the query object and added it again, my problem solved.

  • What are the special conversions for time in update rules?

    What are the special conversions for time in update rules?

    Hello,
    Special conversions for time in update rules are automatically conversion rules.
    Example: If the cube contains calendar month and your transfer structure contains date, the date to month is converted automatically.
    Assign points if this helps,
    Regards,
    Jorge Diogo

  • String conversion of time to Java.Sql.Time

    Hello,
    Im developing a servlet based application where I need to take the time from the user in the hh:mm format and then add it to the database ( MS SQL Server 2000) . I do so via a HTML page.
    Now in my servlet I retrieve the value using request.getParameter which gets retrieved as String.So now I need to convert it to the Time format so that I can add it to the DB.
    Can someone please guide me as to how this is done, Ive tried SimpleDateFormat but Im not quite clear with that concept and so I think Ive messed it up. Hence Im not posting anything here.
    Please help me out.
    Thanks in advance.
    null

    String dateStr = "15:00";
    SimpleDateFormat format = new SimpleDateFormat("HH:mm");
    try {
                Date date = format.parse(dateStr);
                System.out.println("date: " + date);
                Time t = new Time(date.getTime());
                System.out.println("date: " + date);
    } catch (ParseException e) {
    }

Maybe you are looking for

  • Time Machine using Leopard- can't get it started

    I have an iMac OS 10.5.8 using along with a 1GB Lacie drive. I used Disk Utilities to create two partitioned volumes in the external drive, one partition for saving the backup of Time Machine and the second for just storing extra file from my main iM

  • How to bulid client and server on differen machine

    i want to build client on a sco unix machine and server on a tandem unix machine.how can i complete it? i made a test.the application is simple sample TOUPPER. below is my ubbconifg #ident     "@(#)apps:simpapp/ubbsimple     60.3" #Skeleton UBBCONFIG

  • Copy and paste a Text-Layer to another picture - Its not a Textlayer more

    Hello, i tried to copy a text-layer from one psd-Picture and i want to paste it into  other pictures: var dok_textebene = app.documents.getByName ("text.psd"); dok_textebene.artLayers["name of the textlayer"] .copy() ;            //chage to a other p

  • Breakdown of total percentage in matrix

    Hi I am amending a report that wasn't created by me. I have a matrix table that looks like this (month is the column group and code is the data value Columns Month Code(Sum(field.value)),Sum(Field2.value)) This brings back the following Mar  Apr     

  • PO Financial Commitments

    We need to identify our Financial Commitements for open purchase orders.   Is there a SAP transaction / report that will show the open PO values?