Copy UI elements between views

Hi!
I hope this will be easy for you, but for me it's unknown yet.
I have 5 views within the same WD component, and these views have a section, which supposed to be the same within all 5 views (display some additional data).
They are working from a CONTEX of the componentcontroller.
This section contains a tray, which contains many inputfields and their labels. I've completed with it on the first view, and now I wanted to copy them to the other views.
How can I do this?
Thank you
Tamas

Hi,
I checked it in NW release 7.02 and 7.01 and it is possible to copy UI elements from one view ( right click on UI element present under rootelementuicontainer  and copy it ) and paste it in another view ( same way - insert copied element )
But
Why dont you consider the option of creating another view which contains UI elements to be replicated to other views.
Now create view container UI element in each view and then embed your newly created View in this view container.
This could save lot of your effort
Regards
manas dua

Similar Messages

  • How to pass values between views in FPM - GAF

    Hi Experts ,
    i have a doubt in FPM how to pass values between views .
    For Example:  i am having 2 views -  1 ) overview , 2 ) edit  using  the GAF
    in 1st view (overview ) i have a table displaying the employee details , i will select a single employee from that table for editing .
    how to pass the selected employee details to the 2 nd view (edit ) .
    Thanks & regards
    chinnaiya P

    Hi chinnaiya pandiyan,
    Please follow below steps:
    1. To achieve this u need to create two context nodes in the component controller.
    2. Say one is EMPLOYEE_DATA and other is SELECTED_DATA.
    3. Set the Cardinality of EMPLOYEE_DATA to 0..n and SELECTED_DATA to 1..1.
    4. Add same attributes to both nodes. (probably all those fields that are required in table and/or in edit view.
    5. Map both these nodes to OVERVIEW view.
    6. Map only SELECTED_DATA node to EDIT view.
    7. Create table in OVERVIEW view based on EMPLOYEE_DATA node.
    8. Create edit form in EDIT view based on SELECTED_DATA node.
    9. While navigating from OVERVIEW view to EDIT view, read the selected element of EMPLOYEE_DATA node and copy it to an element of SELECTED_DATA node. This should be written in PROCESS_EVENT method of component controller inherited from FPM component.
    10. Now u got the selected data in SELECTED_DATA node which will be displayed in EDIT view.
    Regards,
    Vikrant

  • How to pass internal table between views

    Hello Experts,
      How to pass an internal table between views? I have followed some steps but its showing an error.
    i have created a table type of ZTTYPE_VBAP and line type  VBAP.
    I have declared in component controllers attribute  LT_VBAP of associated type ZTTYPE_VBAP .
    But when i am using this in my method in component controller its not taking.

    Venkata123# wrote:
    Hello Experts,
    >
    >   How to pass an internal table between views? I have followed some steps but its showing an error.
    >
    > i have created a table type of ZTTYPE_VBAP and line type  VBAP.
    > I have declared in component controllers attribute  LT_VBAP of associated type ZTTYPE_VBAP .
    > But when i am using this in my method in component controller its not taking.
    you will have to declare a node with the attributes in the context tab of component controller. by doing this you will make this node a global one in your entire application . now copy the value you have in the internal table of yours in this node.
    after doing so you can read this node anywhere in the program and you can retrieve the values.
    regards,
    sahai.s

  • Applications that can copy and paste between Keynote?

    I am looking for both graphic and web appliations that can copy and paste scalable elements between it and Keynote.  I create a lot of graphics in Keynote and I am hoping to find editors that can handle those elements.  I already own PowerPoint, and it does an OK job.  I you have any suggestions, I would like to here it.

    Shapes created in PowerPoint can be placed on to a Keynote slide using copy and Paste.
    Illustrator is the number one vector application and Illustrator files can drag and drop on to the slide.
    The HTML export from Keynote as you have discovered, is only designed to make simple HTML slide shows
    see some free applications here:
    Free vector apps

  • I can not copy a transition between multiple clips in premiere 12

    Following the procedure described in the manual, I can not copy a transition between multiple clips in Premiere 12.
    Premiere copy a single transition in the clip closer to the time bar.
    I had tried in various ways but to no avail. The problem can be solved?
    Thanks for the help.

    Sig. T.T. Romano,
    javascript:void(0)
    I finally figured out that you can not copy a transition between multiple clips at the same time and it will copy one at a time.
    What seems strange, however, because in Pinnacle, which I used until recently, this could be done, and Adobe is not less than Pinnacle.
    Maybe Adobe does not consider interesting this thing, or maybe it is inserted in Premiere Pro. How, for example, in the titles, the ability to animate multiple lines. In Premiere Elements missing but I knew that in the Pro's.
    I thank you anyway for your helpful answers.
    Vincent Chiti

  • Navigate between View with Value Node.

    Dear Expert,
        I would like to know the best way to carrying data in Webdynpro between View.
       For example, I have a Quiz applcation with 10 pages (View) of question.  I would like to submit the answer at the end of the page (10th View).   So, at the end of the page, I need the to retreive the answer from page 1 to 10 and submit it.
    1.   I am using copyToLocal.  What that does it when the application fire Next event plug.  it will
    Quiz.<b>set</b>QuizAns1(Quiz.<b>get</b>QuizAns1)
    and do the same thing for next 9 pages in order to bring the answer from page 1 to the end.
    To simplfied, I am considering.
    2.  Model Beans
    /people/valery.silaev/blog/2005/06/29/apojo--almostplain-old-java-objects-as-model
    3.  Session Beans.
         Is any concern that I shouldn't use session bean in webdynpro??
    Or any other way to make the Code more organize?
    Thanks all.

    Hi,
    The best way to carry data in WebDynpro views is through context attributes.
    Create a context as below in component controller
    Context
    +Questions (node:cardinality 0..n,selection 0..n)
    ---Question
    +Answers
    ---Ans (node:cardinality 0..n,selection 0..n)
    Map the above context to all the views.
    In the wdDoInit() of component controller create Ans elements under Answers node equal to question node.
    for(int i=0;i<wdContext.nodeQuestions.size();i++)
    wdContext.nodeAnswers().addElement(wdContext.nodeAnswers().createAnswersElement());
    // This way we need not create the elements in each view before going to the next view.
    Populate the Question attribute with Questions.
    Through indexing show the question corresponding to views as
    In first view (index 0)
    wdContext.nodeQuestions.getQuestionsElementAt(<b>0</b>).getQuestion();
    In second view (index 1)
    wdContext.nodeQuestions.getQuestionsElementAt(<b>1</b>).getQuestion();
    and so on..
    // Note: The Answer node will not be populated intially with values as your answer might be multiple choice.
    After the user gives answer store the answer in the corresponding index of Ans attribute under node Answers as
    For the answer in first view
    wdContext.nodeAnswers.getAnswersElementAt(<b>0</b>).setAns(<get the answer from the view>);
    For the answer in second view
    wdContext.nodeAnswers.getAnswersElementAt(<b>1</b>).getAns(<get the answer from the view>);
    In your last view you can get the Questions and Answers by looping through the Questions and Answers node.
    This way you will need only one attribute for Question and Answer respectively.

  • The new Element Quick View in DW CC 2014

    Hey guys,
    Have you checked out the new Element Quick View in the latest DW release yet?
    The Element Quick View lets you navigate your page layouts using an interactive hierarchical tree. You can see the outline of the DOM structure in a list view, and then click, select, drag, rearrange, delete, copy, paste and duplicate HTML elements.
    All from one place ! And while you do so, the Live view renders your changes immediately. Isn't that cool?
    Now you don't have to worry about all those nested tags lying inside one another and can easily re-arrange them without wading through a single line of code.
    Here's a small demonstration and exercise to try out the new Element Quick View:
    How to visualize and visually modify your HTML structure | Adobe Dreamweaver CC tutorials
    Tell us how you like it/ dislike it. We are excited to hear back from you.

    Design View is not available in Fluid Grid Layouts.  You need to use Code View / Live View to edit.  And they're are numerous problems with it.  See related discussion.
    Is there any way to display the Design View in fluid grid pages?
    Nancy O.

  • Difference between view and window ?

    Hi All,
    Can you tell me a basic difference between view and window , maybe you can correlate your answers with concepts of HTML.
    Rajeev

    Hi Rajeev,
    A window is a place for displaying your views. Your view is not available to the outside world. View is available only to your component. However, your window is an interface view, which can be displayed in other components.
    A view contains your UI elements. It has a layout (a window does not). A window contains embedded views.
    In the window, you can define how navigation between views takes place (by creating navigation links).
    Regards,
    Neha
    <i><b>PS: Reward if helpful</b></i>

  • Copy blog entry between two blogs?

    Is there a way to move/copy a blog entries or a series of blog entries between two blogs? I have some entries in one blog that I want to move to another blog within iWeb, and I do not want to have to recreate the entries manually in each blog.
    Thanks,
    Robert

    Hello
    I would be interested in this as well. It would make it easier to setup a hidden blog draft page and then just copy the finished entry to the "real" blog page when it's done.
    I haven't found a way yet - so far, I've just been copying the elements one by one to the real blog page or just composing in email (using the drafts folder there) and then pasting it in the blog and finishing off the formatting at that time.
    Alex

  • Can't download my purchased copy of Elements 12

    I purchased Photoshop Elements 12 on Dec 23, 2013. Adobe later offered an update to version 12.1.  I installed the update.
    I just bought a new computer running Windows 7, and I would like to download and install the Photoshop Elements that I had purchased.
    According to the Help in Photoshop Elements 12, I had to uninstall Photoshop Elements 12 on my old computer.  I did this.  During the uninstall a check box is supposed to appear that says something like "Deactivate product".  No such checkbox appeared during the uninstall.
    I have signed in to my account on the Adobe website several times.  It lists my purchased copy of Elements 12 but will not allow me to download it to my new computer.
    Not only will Adobe not allow phone tech support for Elements 12 owners, but they won't allow me to computer chat with support.
    Is there any way to contact Adobe support?
    How can I download and install my purchased copy of Photoshop Elements 12 onto my new computer?

    Deactivate is for PSE11 and earlier. In PSE12 you use the Help> Sign Out menu. There should be nothing to stop you downloading the software as many times as you want, maybe it is a problem with the servers. Instead of downloading from your 'My Adobe A/c' download the trial instead - it is identical.
    http://www.adobe.com/cfusion/tdrc/index.cfm?product=photoshop_elements&loc=en
    PSE12 allows you to install on as many computers as you have -  even dozens or hundreds. but only two can ever be signed in and activated at any one time.
    Cheers,
    Neale
    Insanity is hereditary, you get it from your children
    If this post or another user's post resolves the original issue, please mark the posts as correct and/or helpful accordingly. This helps other users with similar trouble get answers to their questions quicker. Thanks.

  • How can i navigate via navigational link between views in different windows

    hello
    i am using CRM_UI and have opened a popup
    gv_transcr_popup is a attribute referrring to if_bsp_wd_popup in my implementation class
    gv_transcr_popup = comp_controller->window_manager->create_popup(
        iv_interface_view_name = 'AIC_CM_TRANS/AssignTranspReq' "#EC NOTEXT
        iv_usage_name          = 'CUBAssignTransporReq'         "#EC NOTEXT
        iv_title               = lv_title ).
    get instance of BOL dynamic query
      lo_qs = cl_crm_bol_dquery_service=>get_instance( 'BTQAIC_CM_TRANSPORTREQ').
      gv_transcr_popup->set_on_close_event( iv_view = me iv_event_name = 'AssignTranspReq' ).
      gv_transcr_popup->set_display_mode( if_bsp_wd_popup=>c_display_mode_surrounded ).
      gv_transcr_popup->open(   ).
    through the iv_usage_name i will open in this popup a search view from another window
    in this window is a searchview implemented and now after selecting the line in the result view in want to navigate through outbound plug / inbound plug to the starting view .
    but i get the exception
    Target view AIC_CM_TRANS/TransportReq of the navigation is not assigned to the current window AIC_CM_TRANS/AssignTranspReq ( which is true)
    now the question: how can i navigate between views of different windows?
    Best Regards
    britta

    hi
    i have found a way : you have to use a outboungplug from the windows interface ..then it is working
    best regards
    britta

  • My husband has bought me an iMac which has no disc drive, how do I install my copy of Elements 12?

    My husband has bought me an iMac which has no disc drive, how do I install my copy of Elements 12, thanks

    Hi,
    I know nothing about Mac's at all but you should be able to download the trial version from the web then activate with your product key.
    Flano

  • PC crashed. Attempted to install NEW copy of Elements 10 that I had in reserve. Always get ERROR MESSAGE 400 when trying to open the program. Please advise how I get around this error.

    My PC crashed. I rebuilt it from scratch and tried to install my unopened copy of Elements 10. I get error message 400 when trying to open the program. Windows 8.1 64bit

    if that's a network connection error, Sign in, activation, or connection errors | CC, CS6, CS5.5

  • Copy and paste between apps not possible in iOS 5, suggestions?

    What happened to being able to copy and paste between apps (i.e. copy something I want in Safari and paste in an email or from an Excel attachment to an email)?

    i dont know i can no longer copy and paste from safari to evernote

  • Using Clipmate to copy and paste between projects

    Thanks to Robert Johnston for the inspiration (and perspiration) for this method for copying and pasting between PE projects. One residual side effect of the method is that the audio and video of the copied clips will be unlinked. The renaming folders business is a workaround to avoid the silent audio problem after a project has been saved and reloaded.
    1. Rename the folders of all audio files (including AVI files) used in the project to be copied.
    2. Start PE and load in the project to be copied.
    3. When asked, tell PE where the missing files are. (Check the box marked "Display Only Exact Name Matches".) Press Select.
    4. Highlight parts (or all) of the project to be copied, in the timeline.
    5. Copy the highlighted parts.
    6. Copy into Clipmate:
    6.1 Edit > Capture Special
    6.2 Check both items in the list
    6.3 OK
    7. Close PE without saving.
    8. Rename the folders of the audio files back again.
    9. Open destination project in PE.
    10. Re-select the copied info in Clipmate (closing the project in PE caused the clipboard to be cleared):
    10.1 Select anything in the Clipmate list except the wanted item.
    10.2 Select the wanted item (selecting an item loads it onto the clipboard).
    11. Position the CTI to the wanted insertion point.
    12. Do Edit > Paste Insert.
    13. The pasted items will be highlighted in Media Panel. While still highlighted, select the Media Panel and do: Edit > Locate Media.
    14. Tell PE where the files are.
    15. Save project.

    When combining projects, it is best to do your pruning of unwanted clips and other resources BEFORE you combine them, because once the Media Panel gets heavily loaded, PE is liable to crash.
    Deleting the unused resources in Media Panel is quite easy in PE3 and PE4. Simply click on the "used" column heading, and the resources will be sorted into two groups of used and unused. Just click on the resource at one end of the unused range and shift click on the resource at the other end to select the whole range, then press delete. (Note that shift works normally in this panel, unlike in the timeline!) However, it is not strictly necessary to delete unused resources before copying and pasting because only resources selected on the timeline will be copied. PE will load and save a lot quicker if unwanted resources are deleted.
    My feeling is that PE4 is somewhat more unstable than PE3, but I haven't done a proper direct comparison. For some reason after a crash the autosave often doesn't seem to have done its job properly, even though I set it to save every 10 mins. So make use of the Save button Adobe gave back to us in PE4 and save often, particularly before you use the titler or fiddle with the Media Panel.

Maybe you are looking for

  • Attached images too small

    Lately I have been receiving images as attachments coming through as only around 30-50 kb. I need the full sized images, but people tell me they have sent them as large images. Is there some way my mail program could be downsizing them on receipt, or

  • OAS 4.0.8.1 Servlet error - HTTP 500

    for OAS 4.0.8.1 running on NT 4 sp6, whenever a servled attempts to connect to the database, the http 500 error is generated. Any ideas as to the cause of this problem, or how to fix it??? null

  • FBL1N & FBL3N affected when using BTE to add new column in FBL5N

    Hi, I have a requirement to add a new column External Financial document number (AKKB-BAANR) in tcode FBL5N. And I used BTE ( Business transaction event) to enhance the standard program. In order to add the new column, I append new structure in 3 str

  • Elements 12 and Adobe Camera Raw

    If I load a Canon CR2 file into the 'editor' the image is opened in Adobe Camera Raw 8 - that is fine. If I then make a change to the exposure slider, or any other, and click 'done' ACR shuts down. Not very good, anyone know what is going on? Regards

  • ORACLE'S BITCHES SONS! I WANT ORACLE 8i iso download!

    ORACLE'S BITCHES SONS! I WANT ORACLE 8i iso download!ORACLE'S BITCHES SONS! I WANT ORACLE 8i iso download!ORACLE'S BITCHES SONS! I WANT ORACLE 8i iso download!ORACLE'S BITCHES SONS! I WANT ORACLE 8i iso download!ORACLE'S BITCHES SONS! I WANT ORACLE 8