Cost of BOM

Hi
How can I easily calculate the cost of a BOM?
I create a BOM with several items. I now want to know what the cost of all the items of the BOM, the cost of the product is. All items used are in stock and have an item cost (average) in master data.
Thanks
Franz

Hi Franz,
If you are using Standard Cost as default inventory valuation method, your itemcost price list will be grayed out because it is based on system calculation.  Item Cost will become a variable so that you may find BOM could be affected by all different kinds of inventory transactions. If you need a clear picture of the cost for BOM, you may need to define all component items' default price list not to be itemcost.
Thanks,
Gordon

Similar Messages

  • Cost From BOM, WorkCentre, Routing

    Hai Techies,
    Could you please help me with some inputs for my query related to capturing cost from BOM, Workcentre, routing. To capture the cost should it always require to have an production order?
    My doubt is mainly with respect to new product where they are creating a new product and during the new product implementation. So for the new product there wont be any production orders(correct me if im wrong). In that case how to compute the cost of the product.
    Is there any possibilities.
    Thanking you in advance.
    Regards,
    Gopalakrishnan.S

    Hi,
    In SAP you need to have either production order ( Discrete ) or planned order ( REM) in place to capture the cost.
    cost are captured when you book confirmation in Co11n or MFBF.
    From PP side you need to maintined OPL8 custmizing for planned and actual costing variant. These costing varaints are created in CO.
    In BOM you need to mainating stock items and in staus / langauage text view maintin indicator , item relevent for costing.
    In Routing operations you need to maintin contorl key which allows costing as well as in detailed operation view maintain indicator, costing allowed for operations.
    Work center has cost center attched to it. It also has different costing formulas which helps you to claculate activity costs of individual operations to which work center is attached.
    Regards,
    Santosh Sarda

  • Costed Multilvel BOM for more than one material

    CK86 report shows costed multilvel BOM for one material.Is there any report whereby I can see costed mulitilevel BOM for more than one material
    Regards
    Paresh

    Dear Paresh,
    I dont think there is some standard report to meet this requirement,also please check whether this link can help you,
    Re: Product cost report
    Re: Report for Cost of Multiple products with Multilevel BOM explosion
    Regards
    Mangalraj.S

  • Transaction code for change in cost of BOM component

    Hi Gurus,
    If BOM or any source materials has been updated in the system, the header material need to be re-costed. Is there any existing T-code to get the list of the materials , the changed might impact to.
    Regards
    Kaisar

    Dear Kaisar,
    There is no standard T code to meet this requirement wherein you get all the required details.
    Only you have to identify and cost it using CK11N/CK40N.
    If you are ECM - change numbers,you can identify the made changes by a customized report and then
    you recost those materials alone.
    Again its a very big customized development.
    check and revert back.
    Regards
    Mangalraj.S

  • KKF6N - Preliminary cost estimate- BOM explosion

    Dear All,
    When I try to cost a product cost collector on a finished product/production version with MF30 or KKF6N, the BOM is not exploded as if all the components were raw material - despite the BOM is multilevel. I don't understand why. Maybe i miss something... 
    On the other hand, when I cost the same finished product with CK11N, the BOM is exploded as expected.
    The settings on cost variants and valuation variants used for cost collector and material cost estimate are similar.
    Thank you very much if you can help !
    Chris

    Hi,
                                                                                    The difference between CK13N / CK11N and KKF6N exists due to the method in which both of them calculate costs.                                                                               
    CK11N performs 'multi level costing' which means it considers the prices and the corresponding quantity structure for materials  across the entire hierarchy of the BOM for the material and re-calculates it every time it is run based on current settings.                                                                               
    KKF6N performs 'single level' costing which means it considers only the price data for the input material and its immediate sub-components. It then displays the price according to the valuation strategy used in the costing variant.                                                                               
    CK11N also uses the valuation strategy, but the price is estimated  based on a calculation of prices across the entire hierarchy of the BOM for the material also factoring in the quantity structure at the time the material is costed.                                                                               
    This is the reason why there is a difference in the price shown in CK13N and KKF6N, but it is the way the system is designed to work.                                                                               
    Kind Regards,     
    MLM

  • Apply Overhead to Cross Company Costing without BOM

    Hi,
    We are maintainin BOM's only in one plant and want to be able to cost materials in all the plants using costing run. The problem in doing so is we have  the prices at different plants marked up by a specific percent when compared to the plant which mainatins the BOM's. It is possible to bring in the cost estimate of the material from the plant which has BOM's using the cross company costing and using special procurement keys but it is not possible to add an overhead to this cost estimate since the overhead is not added to this cost estimate. Please suggest an alternative approach if it is possible to add an overhead to a cost estimate from an another plant. Any help in this matter is greatly appreciated.
    Thanks,

    If I am understanding you,  a manufactured material cost 10.00 in the mfg plant; you want to uplift it by 30% so in second plant it has a cost of 13.00
    To do this, we turned off Cross plant costing and used Profit center transfer pricing. By creating overhead groups for shipping plant and pricing them in conditions (trans VK19) based on "from" plant "to" plant.
    One draw back - the entire cost in the receiving plant is a "material" component Labor and overhead are not broken out.
    The other issue, for you, is that a consultant and the SD Pricing guru did the configutation, created new key combination to include overhead group, so I can not explain in detail how it was done.  I do not think that any user exist is involved.
    Perhaps this give you hope.
    Althea

  • Material costing without BOM and routing

    I have recd an order on sample basis. I want to cost the materia. I don't have BOM and routing.  I want to cost that material manually.  Is there any provision in SAP to do costing in such type of scenarios.

    Dear BSR,
    I guess you are meaning about cost estimate without quantity structure.
    Check T Code KKPAN.
    Regards
    Mangalraj.S

  • Costing for BOM

    Hi,
    I have a BOM that consist of Material A and Material B.
    I have assigned the BOM as a material component to the network activity.
    Currently the cost is getting from the standard price of the BOM material itself.
    Is is possible that the cost is the sum of the total value of Material A and Material B that is assigned to the BOM?

    Hi,
    Create a header material (only with basic data, general view maintained) and assign all the components with reference point , then transfer BOM using CN33 transaction to project structure. all the components will be assigned to the activities based on the reference point maintained in activity.
    Now when you generate cost report this will give you the total cost at WBS level for all components assigned to it.
    Hope this helps
    Thanks,
    Srihari.G

  • Product Costing - CK11N BOM component wrong quantity

    Hi,
    I have a question regarding Material Cost Estimates. I have a material (Product A) which has a BOM header Qty of 524. One of the Components (Product B) has a Qty of 560. When I run the Cost Estimate for Product A, the component costing list doubles the quantity of Product B, and therefore doubles the cost (this is when I change the report Qty to 524).
    The Costing Lot Size on the product A is 1. When I change this Costing Lot Size on the material master to 100 and rerun the CK11N, the Component Qty and Cost are correct.
    Is there some rule that I should be following when it comes to Costing Lot Sizes?
    Thanks for any help.
    Daniel.

    TO MY KNOWLEDGE,
    COSTING LOT SIZE IN MATERIAL MASTER, FOR WHICH YOU ARE DOING STD COST ESTIMATE,
    COSTING LOT SIZE IN MATERIAL MASTERS, OF BOM COMPONENTS,
    BASE QUANTITY IN BOM,
    BASE QUANTITY IN ROUTING ,
    ALL THE ABOVE SHOULD BE IDENTICAL.

  • CK11N increasing cost of BOM item (another SFG) by a constant percentage

    Hi
    I am facing a problem that while running cost estimate for different SFGs, the system is calculating cost of a bom item (another SFG) by increasing 10.2293 %.
    I have check BOM, component scrap percentages, but unable to find the root cause of the problem.
    Please help and consider the following example data
                                        Cost in CK11N         Qty           SFG material price     Cost should be     Difference     Diff. %
    SFG A in SFG 2 BOM          43,353.34     1.238     31,769.10              39,330.15             4,023.19                   0.102292888
    SFG X in SFG 5 BOM          49,958.64     1.11             40,988.78            45,322.48              4,636.16                   0.102292659

    Review the following scrap percentages:
    1.     Component Scrap on the Material Master MRP4 View
    2.      Component Scrap on Bill of Material
    3.      Assembly Scrap on Material Master MRP1 View 
    Any of those is causing your increase.

  • Cost in BOM comparisom

    hi all,
    I am using CS14 for BOM comparison..
    It has the field for cost which will aid cost comparison.
    But I am getting 0.00 value for all the material in the report... ( Accounting view shows cost as 123.56 INR)
    Any speciifc customising needes to be done for this.
    Regards

    hi Manoj,
                    Last Purchase price of the item is only updated after posting the A/P Invoice.So please post the A/P invoice first for those raw material if it is yet to be posted.

  • COSTS of BOMS

    Hello All,
          Is there any way to get boms and relevant metarial costs with a transaction.Very urgent, thanks for help.

    Goto MM60 and enter the Plant, you get the list of all materials with prices. If you don`t see the price, select it from the layout-variants.
    Reward if cleared and close the thread.

  • Regarding manufacturing cost of BOM

    Hi Friends,
    If we wants to calculate manufacturing cost , how to calculate it from BOM. Please guide me.
    Regards,
    Mahesh

    Calculating manufacturing cost based on quantity structure (BOM and Routing) is done in SAP in CO (PC). First there are some settings that need to be maintained (like costing variant), then you run a cost estimate run (transaction CK11N).

  • How to roll up costs in BOM

    Folks
    Can anyone please tell how to go down in Bill of Materials and calculate the components qty.
    I could figure out all the component materials for a finished good, but I cannot calculate each components qty to make the final finished good.
    I want the solution in either PL/SQL or SQL.
    Please help me,
    Regards
    Srikanth
    [email protected]
    null

    BOM is an Oracle Discrete Manufacturing Product. In Oracle Process Manufacturing, the Module is known as "Formulas".
    There is standard functionality in OPM for performing cost rollups that are described in the OPM Cost Management Users guide. Please contact me directly if you need further assistance.

  • Invenotry Valuation for BOM or regular items in standard cost

    How SAP defines Inventory Valuation for BOM (Parent, Child) with different Inventory types?  If Parent Items is Inventory and Sales only but Child Items are Inventory and Purchase Items then the inventory value will base on each Item Cost or....
    When you use Inventory Good Receipt the Item Cost grayed out that forced you to use Unit Price in Inventory Master Data file for this transaction and reflected to the Inventory Valuation Report. Is this the way for "Standard Cost" method? 
    For Standard Cost method, the Item Cost will be used from regular SO, Delivery and Invoice only?

    Inventory value will be base on each Item Cost when you use Standard Cost method.  It will apply to all marketing and inventory document.
    As for BOMs, they are only templates.  You could assign any price lists to them.  Therefore, until the production order created, any cost of BOM would only be a reference.
    Thanks,
    Gordon

Maybe you are looking for

  • How can I make AKO work on firefox because it turns a normal website into fort knox and it's annoying

    I'm sure you heard this before. but the Army website AKO ( us.army.mil) acts like a complete demon on firefox which is unfortunate because i love firefox and use AKO ..ALOT! every link on every page asks for certificates and some will not allow you t

  • Standard Crystal Layout for General Ledger Report, Development Limitations

    Hi Guys, I have experienced some development limitations in the standard crystal general ledger layout for "General Ledger report" in SAP. So if we are running standard "General Ledger" report we have a lot of columns but we unable to get these colum

  • Combing movie and trailer

    I have made both movie and trailer in separate projects and now would like to combine them with the goal of sharing them on a DVD the way a professional DVD does with its bonus features.  How do I combine the two projects? I am using iMovie '11 on a

  • 5D Mark III RAW Files with LR 4.1RC - Cross Pattern Noise

    While processing a images from this past weekend taken with the 5D Mark III... Images taken at high ISO (6400 and 12,800) with no noise reduction show a very clear criss-cross pattern across the image faintly. Once you apply about 20 on the NR slider

  • Unable to install any ver of Flash Player

    In trying to incorporate new external HD, by selecting and dragging the computer HD into that folder,  I didn't see any change in the availabe space on the ext. HD. I clicked the icon and dragged it to the original venue, I was met with two successiv