Creating a PR for acquisition of an asset
Hi everyone,
This week some friend were talking about the process to buy an asset and we're a little bit concerned about the situation below.
A user created at IMA11 a request to buy some laptops and then he created an internal investment order related the IM request made before. So far everything is fine.
He called our asset sector and asked it to create an asset number related to the internal order that he has been created. With the asset number the user gone to the ME51N transaction to create the PR using the asset number provided by the asset sector.
At this time, for some reason, he didn't notice and instead of buy some notebooks he bought some chairs and the system didn't alert him telling that the asset number are for laptops not chairs.
Is this correct, or the system really doesn't provide that kind of information and an asset number created for some particular demand can be used to buy everything that the user wants?
Another thing, we've noticed that the asset number can be used for more than once, is this correct as well?
PS.: In our company IM management isn't turned on, I mean, Investment acquisitions doesn't check budget .
Thanks a lot for your answers.
Hi AP,
When the user is creating the request via IMA11, there is a tab called Variant.
In this tab, there is an option called Plan Values. In this option the user can assign that the request is related to a Material by inputing the material code. But, based on you've said before, I realized that there isn't any constraint between the material code choosen in IMA11 transaction and the material code choosen in ME51N.
Thanks.
Best Regards,
Rodrigo
Similar Messages
-
Credit memo for subsequent acquisitions in Fixed Assets
According to the Fixed Asset help file - section Credit memo for Subsequent Acquisitions it Says " Fixed Assets *DOES NOT* allow posting a credit memo for a subsequent acquistion. What are the exactt circumstances in which Fixed Assets will block these credit memos. I have added subsequent Acquisitions and Fixed Assets appears to allow credit memo's where depreaction has not been run and also where depreciation has not been run. How does this blocking mechanism work?
Hi John
It appears that there is no good answer to your question. From my undertstanding, the SAP Fixed Assets add-on is a very basic solution, and does not anticipate many of the changes that can occur once an Asset is acquired. Frankly, it is pretty basic when handling the initial acquisition.
Not that this will help you with this particular install, but the Fixed Assets add-on from B1 Fixed Assets LLC does a very thorough job of creating Assets, where you can use any or all of Invoices, Credit Memos, and Journal Entries, mixing and matching to create the Asset. Once the Asset has be added, making Cost Adjustments is almost as thorough, and provides considerably more options to recognize the Cost Adjustment. You can see a viedo of a relatively simple Asset Acquisition on YouTube (www.youtube.com/b1fixedassets).
Let me know how you get this issue resolved - I am very interested.
Joe -
Best Practice for Acquisition of Utility Plant Assets from another utility
My company is located in the United States and will be taking on an initiative of purchasing the Utility Plant assets from another company. We are governed by Federal Energy Regulatory Commission (FERC) Accounting Standards. In the guidance for the accounting where one utility purchases the assets of another utility, it states that the purchasing company must account for the Utility Plant Assets in FERC Account 102 at a net book value until FERC approval is received on the sale of the other utility. Depreciation must be calculated based on the Gross Book Value and applied to this same FERC Account. What must happen in order to track the assets is that the asset's APC Value and the Depreciation Value must transfer from the utility selling the Plant Assets balance sheet to the utility purchasing the Plant Assets balance sheet respectively.
As an example:
Utility ABC is selling their plant assets to Utility XYZ. The NBV of the plant assets is $60,000,000. It is broken down to Debit $80,000,000 for the APC Value (in FERC account 101 on Utility ABC's balance sheet) and credit $20,000,000 associated to Depreciation Value (in FERC account 108 on Utility ABC's balance sheet). When the sale is pending FERC approval the NBV is accounted for on Utility XYZ's balance sheet in FERC account 102. This amount will be processed to the selling Utility on a PO for the purchase.
I have configured the Fixed Asset module of SAP to account for the APC Value and the Depreciation Value in separate sub accounts of FERC account 102, that are se-up as reconciliation accounts on the G/L, in the account assignment of the respective asset classes. we track our assets based on asset class that pertain to the FERC Primary Plant Accounts.
I am trying to load the assets to the Fixed Asset module having the APC Value and the Depreciation Value reported respectively. If the NBV amount is processed on the PO, what would be the best practice to load the APC Value and Depreciation Value to the respective assets?
My first thought would be to process the PO for the NBV of the assets against a generic FERC Account 102, that is not set-up as a reconciliation account. I would then process an asset transaction using t-code ABSO with transaction type 158 and use the generic FERC account 102 as the Offsetting Account in the entry and using Document Type AA.
I would like to follow best practice in this scenario.
You help on this subject would be greatly appreciated.
Wayne
Edited by: Wayne Rochon on Mar 31, 2011 9:19 PMThank you very much for your response.
I hope I can provide some clarity on how the accounting needs to be handle per FERC Regulations. The G/L balance on the utility that is selling the assets will be in the following accounts (standard accounts across all FERC Regulated Utilities):
101 - Acquisition Value for the assets
108 - Accumulated Depreciation Value for the assets
For an example, there is Debit $60,000,000 in FERC Account 101 and a credit $30,000,000 in FERC Account 108. When the purchase occurs, the net book value for the asset will be on our G/L in FERC Account 102. Once we have FERC Approval to acquire the plant assets, we will need to enter the Acquisition Value and associated Accumulated Depreciation onto our G/L to FERC Account 101 and FERC Account 108 respectively with an offset to FERC Account 102.
The method that I came up with is to purchase the NBV of the assets to a clearing account. I then set up account assignments that will track the Acquisition Value and respective Accumulated Depreciation for each asset that is being purchased. I load the respective asset values using t-code AS91 and then make an entry to the 2 respective accounts with the offset against the clearing account using t-code OASV. Once my company receives FERC approval, I will transfer the asset to new assets that has the account assignments for FERC Account 101 and FERC Account 108 using t-code ABUMN or FB01. -
How to create a Credit Note to the client for purchasing of an Asset last y
Hi,
I have an issue in Asset Accounting as it showed bellow:
Assets depreciation start date is 1st October 2007.
We have run the depreciation up to November 2007.
Than we sold the asset in December.
However, after the end closed year 2007, client returned the asset in 1 st January 2008.
So i need to create a Credit Note to the client for purchasing of an Asset last year, but we don't know how to create it?
We thinks that correct movement should be debit in extraordinary cost / profits account, debit in asset account, credit in accumulated depreciation account and credit in client account.
Plz help. I will assign full points for any useful answer.
Thanks
Edited by: Ricardo Pedro Rodrigues Ferrão on Dec 20, 2007 10:09 AMHow did you sell the asset?
You can just reverse the sale transaction by going to transaction AB08.
Hopefull this may work for you.
Regards, -
Not able to created Number Ranges for Asset Classes in AS08
Dear Friends,
I am not able create Number Ranges for Asset Classes in AS08.
It is giving me an error message as company code does not exist.
When I Check Consistency under path SPRO -> Financial Accounting -> Asset Accounting -> Preparing for Production Startup -> Check Consistency -> Overview Report: Company Codes. I am getting the following
RSOL Reliance Sealink One PLtd
CoCode no. alloc. NKTR
Fiscal Year Variant V3 Apr.- March, 4 special periods
Start 2nd half month 00
Transfer date 31.03.2006
Chart of dep. TOLL Chart of Depreciation - For Highway Projects
Net worth tax 01 Book depreciation as per Compinies Act 1956
Enter net book value
Status company code 2
Current fiscal year 2007
Doc. type dep. pstng AF Dep. postings
> Number range &1 in co.code &2 for doc.type &3 must be defined as internal
Calc.insur.value
Input tax exempt
If you see the above first two line you will find the difference is that Company code RSOL in the first line and NKTR company code in the second line.
Actually CoCode no. alloc. has been wrongly copied as NKTR while copying CoCode it should be RSOL and not NKTR.
I think because of this wrong allocation it is giving me an error in AS08. Also it is not showing me CoCode in drop down list in AS08.
Please help me to resolve the problem.
Thanks
Rahul JainLook in TC OAOB if the company code is assigned to a chart of depreciation
-
Create a LSMW for abumn asset transfer upload
hi all
we have a requirement form the user to upload all the existing assets to new asset shells through ABUMN, we need to create the
lsmw recording for the same, iam doing the lsmw recording and each time i do the recording the system says cant save the recording
has anyone worked on ABUMN asset transfer upload LSMW. please suggest your views on the same.
kind regards
aman
sap ficoHi ,
Please see below docuemnt which will help you in creating LSMW
LSMW for Functional Consultants in simple step-by-step way
Please search before you post -
Error when creating a bdc for asset master upload
I am getting a warning message (AA186), when changing the depreciation start date to capitalization date. It says,
"Different Order Dep. start date in depreciation area 01. Check"
This error is a problem in creating the BDC for asset master upload. We have only one depreciaton area 01 (book dep).
Please help.This is normal message you get when you try to change depn start date. I think this should not be a problem for BDC posting. This message can always be bypassed.
-
Contentbase Issues - Why does it create 2 proxies for every video assett?
I am trying to deploy a SAN and a Media Asset Management System. After testing Final Cut Server, I've noticed that within the Proxies.bundle you get:
1) Duplicate Thumbnails
2) Duplicate Poster Frames
3) Duplicate Low Resolution Video Proxies
Why dublicate everything? I want to SAVE SPACE and if I have to create proxies (since you can't really turn this off yet), why take up twice the space?
Also, Why can't I control or alter the thumbnail or poster frame image generated? I might not want to pick the first frame of video. I might want to change it.
I see no place in the Admin panel to address these issues...At All!
Anyone know what's up?Thanks so far Nicholas and Chris,
Here's the thing: I've read both the admin guide and the peachpit book on FCS now. I don't understand a few things:
1) If I import a FCP project as an asset, it will copy all media associated with the project to either the Media or Library folder. Wow Great. But when it make the proxies (Thumbnail, Poster frame, Low Res Copy--Not Editing Proxy; this isn't enabled in my setup now), it creates a series of folders like:
00000000001a
00000000001b
00000000001c
00000000001d
And in each you get the XML, the thumbnail, the poster frame, and the low res proxy.
However, then it duplicates three files: the thumbnail, poster frame and low res proxy into three more folders:
00000000001e
00000000001f
00000000001g
These are literally the exact duplicate of the first three proxies. (The XML is not duplicated.) If I delete these duplicates manually, the system still works, provides previews, a thumbnail, etc. inside the user UI; no problems.
Additionally, if I import media/an asset directly--not attached to a project--it only creates one set of proxies and no duplicates.
This leads me to believe that it is making proxies for both the media asset and the project file, instead of one set of proxies for both.
Either way, I need a "better way" to integrate our workflow with FCS at our web video company. We have some 5200 raw media files I need to catalogue and import. Most of these files have been edited and exported into final conformed shows--those are about 3700 final QuickTimes.
We also have tons of other still photos, and gfx, that I would like to catalogue. Before I start moving stuff into FCS, I want to be sure that I am not wasting proxy space.
If either of you has more time, I would be grateful to follow up with more technical questions and workflow solutions.
Thanks,
Shawn Larkin -
Acquisition of an Asset with Negative value
Hi Gurus,
How to do acquisition of an asset with negative value?
Please tell me the Tcode for doing this transaction.
Please revert asap.
Thank YouHi,
The business scenario is.............
We have to charge some interest on asset last year but we have not charged it.
Now asset value is zero and if we charge interest on it, it will go to negative.
That's we are thinking to create new asset with negative value.
Hope this will help you understand.
Please revert asap.
Thank You -
Report for acquisition account and vendor account
hello
does anybody know whether it's possible to create a report for Financials to have a certain Acquisition account situation FOR A FIXED VENDOR?
i.e. the amount of acquisition for VENDOR X (I need in Balance Sheet for a group)
Thanks a lot in advance!!
ChiaraHi
For the GL accounts where you need Vendor Number to be displayed,
Edit their master data field sort key to "012"
The you would get the vendor number in the "assignment" field.
(May not work for the existing invoices, but should work for new invoices)
Regards
Sach!n -
ERROR WHILE POSTING MIRO FOR MULTIPLE ACCOUNT ASSIGNMENT (ASSET)
Hi Guys,
We created a PO for asset with multiple account assignment. And we immediately do IR instead of GR.
While doing IR it is giving error
1) Quantity delivered is zero - Warning message
2) Account 245350 requires a Transaction Type or is Invalid - Error message
what may be the problem. how can we eliminate and post it
Regards
palaniHi,
I would assume the G/L account you used was not properly set up. Did you get the same problem if you try to change to another G/L account? Perhaps, get your FI specialist to look into this G/L account-related error and verify it.
Cheers,
HT -
Best practice for "Quantity" field in Asset Master
Hi
I want to know what is the best practice for "Quantity field" in asset master. It should be made displayed only or required field in Asset Master creation.
Initially I made this field as required entry. So user entered 1 quantity. At the time of posting F-90, he again entered quantity. So my quantity in asset master got increased. Hence i decided to make that field display only in asset master creation.
Now i made that field as display only in asset master creation. At the time of posting F-90, that quantity field is not coming only. I check my field status group for posting key as well as GL account. Its optional field. Inspite of that user is able to make entry in F-90. Now quantity field is '0' only in asset master even though there is some value in asset.
Please help what is the best practice wrt quantity field. Should be open in asset master or it should be display only.Hi:
SAP Standard does not recommend you to update quantity field in asset master data. Just leave the Qty Field Blank , just mention the Unit of Measure as EA. While you post acquisition through F-90 or MIGO this field will get updated in Asset master data automatically. Hope this will help you.
Regards -
What is the best way to create shared variable for multiple Real time (PXI) to GUI PC? I have 16 Nos of PXI system in network and 1 nos of GUI PC. I want to send command to all the PXI system with using single variable from GUI PC(Like Start Data acquisition, Stop data Acquisition) and I also want data from each PXI system to GUI PC display purpose. Can anybody suggest me best performance system configuration. Where to create variable?(Host PC or at individual PXI system).
Dear Ravens,
I want to control real-time application from host(Command from GUI PC to PXI).Host PC should have access to all 16 sets PXI's variable. During communication failure with PXI, Host will stop data display for particular station.
Ravens Fan wrote:
Either. For the best performance, you need to determine what that means. Is it more important for each PXI machine to have access to the shared variable, or for the host PC to have access to all 16 sets of variables? If you have slowdown or issue with the network communication, what kinds of problems would it cause for each machine?
You want to located the shared variable library on whatever machine is more critical. That is probably each PXI machine, but only you know your application.
Ravens Fan wrote:
Either. For the best performance, you need to determine what that means. Is it more important for each PXI machine to have access to the shared variable, or for the host PC to have access to all 16 sets of variables? If you have slowdown or issue with the network communication, what kinds of problems would it cause for each machine?
You want to located the shared variable library on whatever machine is more critical. That is probably each PXI machine, but only you know your application. -
Creating Runtime Installer for VI with VISA Read VI
Greetings Fellow Users,
Please let me know which 'ADDITIONAL INSTALLERS' the LabView RunTime engine requires in order to run a VI that reads from the built-in serial port (COM 1) of a Windows XP PC. For instance, I include LabView Run-Time engine 8.0.1 to creat an installer for the VI. If I want to load and run this .exe on a PC that has no other NI software, do I need to include any of the following as 'ADDITIONAL INSTALLERS':
->NI-SERIAL 1.8?
->NI-VISA RUNTIME 3.4?
->NI-DAQmx 8.0?
What does the NI-VISA RUNTIME do anyways? Also, when I do include some of these, I have to dig out my LanVIEW installations CDs and they are loaded from teh D:\. What is the cleanest way to load these onto my HDD so that LabView will select these automatically.
Thank you.FLT CTRL 6 wrote:
Greetings Fellow Users,
Please let me know which 'ADDITIONAL INSTALLERS' the LabView
RunTime engine requires in order to run a VI that reads from the
built-in serial port (COM 1) of a Windows XP PC. For instance,
I include LabView Run-Time engine 8.0.1 to creat an installer
for the VI. If I want to load and run this .exe on a PC that has
no other NI software, do I need to include any of the following as
'ADDITIONAL INSTALLERS':
->NI-SERIAL 1.8?
->NI-VISA RUNTIME 3.4?
->NI-DAQmx 8.0?
What does the NI-VISA RUNTIME do anyways? Also, when I do
include some of these, I have to dig out my LanVIEW installations CDs
and they are loaded from teh D:\. What is the cleanest way
to load these onto my HDD so that LabView will select these
automatically.
Thank you.
->NI-SERIAL 1.8?
This is the driver used for serial port controller boards and
interfaces from NI. You do not need that software when trying to access
built in serial ports or ports on interface cards from other
manufactureres than NI.
->NI-VISA RUNTIME 3.4?
This is the software LabVIEW uses to talk to all kinds of IO interfaces
including serial ports. This is what you will need. Runtime means it is
a stripped down version without LabVIEW, C, VB, Delphi and whatever
development bindings and examples etc.
->NI-DAQmx 8.0?
This is the software driver for NI data acquisition devices (analog IO, digital IO, counter , timers).
These are all to be considered drivers and (very maybe apart from
NI-VISA) it is usually not a very good idea to include drivers into the
application installer. If you use them your user is likely to have
bought his own kind of hardware and no matter if he happens to have
bougt the newest SuperPCI interface board with 256 ultra-high-speed
serial ports over wireless connections or an old standard PCI board
with 2 RS-232 interfaces they both will have come with a CD that is
appropriate for that device, whereas the NI-Serial driver you included
is only appropriate for NI serial boards that are still AND already
sold at the moment when that driver was released. The same applies for
any other driver software.
NI_VISA being able to connect to standard built-in serial ports could
be considered different but it isn't really. I have included NI-VISA on
application installers in the past only to find out that the included
NI-VISA version did not run or not run reliably on newer machines with
new OS versions, so we had to point the customer to the NI site to
download the newest version anyhow, or even burn a new CD with updated
NI-VISA versions and express ship it.
Basically including any kind of driver software in the application
installer may seem like a good idea but will usually cause lots of
additional support after some time due to incompatibilities with newer
OS versions, new hardware, etc.
Rolf Kalbermatter
Rolf Kalbermatter
CIT Engineering Netherlands
a division of Test & Measurement Solutions -
How To Create Style Guides for Web Pages
I need to create style guides for websites. I will be provided with the assets (images and required measurements). It will be my job to create style guides using In Design.
I have never used In Design, but I am a member of Lynda and Total Training online. Neither seem to address simple style guides for websites. Both seem to address designing from scratch for print and newsletter creation.
Any links to tutorials? This seems straight-forward, but because I have never done it, I would appreciate direction.
Thanks!I received a sample of what I'll be working on. Attached is one screenshot (blurred areas to conceal confidential info).
Overall, I will be given web page images (as seen below and as an original sized attachment) like screenshots.
I will be given measurements.
I will create a web style guide with text and the placement of images, and pinpoint where the objects are placed on the pages in pixels. e.g. Hero section - 80 pixels, padding - 40 pixels, etc. You can see this below in the (tiny, or see the larger attachment) text on the sides of the web page image.
The original designer also added some type of padding. You can see it below in blue at the bottom of the page. Is this the norm? How is that done?
Big Question: There are no pixels in InDesign. Are points equivalent, or should I set this (pixel notations) part up in Photoshop?
I hope this provides more details for you to help me, and I know this is a lot to ask. Thanks in advance!
Maybe you are looking for
-
Trouble using firewire drives via thunderbolt adapter on bootcamped Mac Pro 2013 towers
Here at the university, we've just installed a new classroom of Mac Pro towers (late 2013). We like to use Bootcamp in said classroom, and so I (painstakingly) installed Windows 8.1 on a test machine. I've found that the brand new firewire-to-thund
-
Problem of Exponent 2.0E7
Hello i have a simple problem float a=10000000; float b=10000000; float c=a+b; System.out.println(c); result is 2.0E7 what i want to display is 20000000.0 not 2.0E7 //i have just given a sample of problem actually i am doing a lot //of
-
Why my bluetooth does not work anymore?
Why my bluetooth does not work anymore? What can I do? Before I just turn on bluetooth then turn off it, and it worked properly. Now it does not work. I don't understand why.......
-
Box alignment and sizing problems
I have a JPanel (using a border layout). Its centre part holds a vertical Box, which itself holds two boxes: The top box holds three labels with centre alignment, and the bottom box holds 5 boxes, each displaying details about a product. All the comp
-
HT3702 unauthorized charges on my credit card
how do I get unauthorized charges taken off my credit card for itunes purchases that I never made? How doe this happen???