Creating a time tracking graph in Numbers

I need to make a chart of an employee's time into work.  I tried inputting time format but didn't graph/chart it.
How do I do this AND show the expected arrival time (they've been coming in late).
Thanks

Here's one possibility:
Columns C and D extract the TIMEVALUE of the Date and Time value in column B, placing the value in column C if the employee has arrived prior to or at the time shown in C1 or in column D if the arrival time is later than the time in C1.
Formulas:
C2, filled down: =IFERROR(IF(TIMEVALUE(B)>TIMEVALUE($C$1),0,TIMEVALUE(B)),"")
D2, filled down: =IFERROR(IF(TIMEVALUE(B)>TIMEVALUE($C$1),TIMEVALUE(B),0),"")
The IFERROR envelope is used to produce the 'empty' cells where no time has been entered in column B.
The chart is a Stacked Bar Chart. Upper and lower limits for the Y axis were set using values calculated for the arrival times entered for January 9 (10:00 AM, 60 minutes late) and January 10 (8:30 AM, 30 minutes early).
The number of steps was set to 6 to give horizontal grid lines at 15 minute intervals.
Labels on the Y axis are in a Text box, and mark 15 minute intervals. Adjust line spacing to match these to the grid lines.
The line at OT (on time) has been added as a shape, pasted to the document and moved into the correct location.
Regards,
Barry

Similar Messages

  • How to create X-Bar R graphs in numbers

    I cannot for the life of me figure out how to create X-Bar R graphs in numbers. It is beyond frustrating. Can anyone provide any insight? Thanks

    Hi Zac,
    I am not sure what you mean by an X-Bar graph. R has a box plot. Is that perhaps what you want?
    More information will lead to a solution .
    A screen shot of what you are trying to achieve will help.
    Regards,
    Ian.

  • Help creating Time Tracking spreadsheet in Numbers

    I need to create a spreadsheet to calculate time spent on each of my tasks at work.
    Can you help me?
    WHat formulas would I need to use to calculate the time between the start time and finish time? and what would I need to put into the start and finish time columns to make that end total time calculation work?
    I have been looking for a template but I just can't find one.
    I love the running log in the standard templates that comes with Numbers it has graphs and totals ata glance, I would love to create somethign like this for time spent on each of my tasks.
    Can you point me in the direction of tutorials or ghelp me?

    Here's one possibility:
    Columns C and D extract the TIMEVALUE of the Date and Time value in column B, placing the value in column C if the employee has arrived prior to or at the time shown in C1 or in column D if the arrival time is later than the time in C1.
    Formulas:
    C2, filled down: =IFERROR(IF(TIMEVALUE(B)>TIMEVALUE($C$1),0,TIMEVALUE(B)),"")
    D2, filled down: =IFERROR(IF(TIMEVALUE(B)>TIMEVALUE($C$1),TIMEVALUE(B),0),"")
    The IFERROR envelope is used to produce the 'empty' cells where no time has been entered in column B.
    The chart is a Stacked Bar Chart. Upper and lower limits for the Y axis were set using values calculated for the arrival times entered for January 9 (10:00 AM, 60 minutes late) and January 10 (8:30 AM, 30 minutes early).
    The number of steps was set to 6 to give horizontal grid lines at 15 minute intervals.
    Labels on the Y axis are in a Text box, and mark 15 minute intervals. Adjust line spacing to match these to the grid lines.
    The line at OT (on time) has been added as a shape, pasted to the document and moved into the correct location.
    Regards,
    Barry

  • How to create a time schedule graph

    I need to create a report with a to show things like
    holidays or business trips of several persons. The available graph types doesn't appropriates this intention. My question is, can I adapt an existing graph type or need I create a new one and in both cases: how?

    i assume you are trying to create some kind of calendar view, right ? i am afraid we don't have a graph type that supports this easily today.
    thanks,
    ph.

  • How do I add moving averages to my time series graph is there a function on numbers on tr iMac?

    I've created a time series graph on numbers on my iMac but I need to add moving averages. Is there a function an if so where is it and if not is there a way to get around it

    Badunit,
    Here is an example plot, data sorted from most recent data at top of the table...
    You can see the moving average (of 20) is plotted from right to left.
    The Moving Average calculation is now wrong, and should have been calculated and presented from oldest to most recent.
    Here is the same data, with table sorted from oldest data at the top of the table.
    The moving average is also plotted from right to left, and shows the correct Moving Average for the most recent data.
    That is, it is calculated from oldest to most recent, with the last Moving Average data point plotted on "todays" date.
    What I want to see is my table displayed from most recent at the top (the top table), and moving average calculated and displayed as per the bottom graph.
    Edit: So, think about this some more,
    I need an option to tell Numbers to do the Moving Average calculation from the bottom of the table up, not from the top of the table down.

  • Regarding Time Series Graph in OBIEE 11g

    Hi,
    I need to create a time-series graph in OBIEE 11g. However, the value for time on the x-axis of the graph automatically comes for days.
    Is there any way to change it to hours or minutes?
    Thanks,
    Naman Misra

    Yes, it shud be a prob. Try using seperate tables for fact n timedim

  • How can i make a graph y is unmber pasing from UDP port,x is the time stamp.and in the same time this graph can display several numbers to compare.

    how can i make a graph
    y is number(the blue wire)pasing from UDP port,
    x is the time stamp.
    plus in the same time this graph can display several differenr numbers to compare.

  • Problem while creating a new track

    Hi,
    When we create a new track, we get the following exception:
    Unexpected error; inform your system administrator: com.sap.cms.util.exception.CMSUnexpectedException: com.tssap.dtr.client.lib.cms.DTR.connect(Ljava/lang/String;Lcom/tssap/dtr/client/lib/protocol/ISessionContext;)V
    We have created a new product and a software component and defined the dependencies for the software component (SAP_BUILDT, SAP_JTECHS & SAP-JEE).  In the CMS, we have done Update CMS.  We are able to see the software component and have added the same in the 'Software Components for Development'.  All the usage dependencies are clearly visible.
    When we save the track, we get the above exception.  Can any one of you please respond this query?
    Thanks in advance.
    Regards,
    Ravi

    Hi Ravi,
    We enocounted a similar problem once.  For our situation it was a missing DTR url in the lanscape configurator.  To check/fix this do the following:
    1) login to CMS
    2) click on the Landscape Configurator link
    3) if not already selected, choose the track in the list of tracks on the left
    4) click on the Track Data tab for the selected track
    5) verify that the Design Time Repository URL is specified and correct (e.g. http://<server>:<port>/dtr
    Save the configuration.
    Hope this helps.

  • Glitch?  track creating a new track...

    ok, so lets say I have 3 tracks... and in my window, you can see both "tracks"' and "mixer"(with volume/pan/level)
    when I push the big "+" to add a new track, it "collapses my tracks" ( as if I am pushcin the little arrow at the top right by "tracks") - now the mixer is no longer visible for each track...
    so then, I push the arrow again, and each of the tracks fall down into their place, as they should, but only like part of the gray box for each track (like where it says new track) is visible... I have to roll my mouse over the box for the rest of it to show up.. does that make sense.. it seems like some sort of graphic glitch- it is the latest version of GB.. I don't get it... on top of all this, my mixers have dissapeared again too, so I have to push the arrow again..
    in short, every time I create a new track, I have to click the arrow, then roll my mouse over the gray boxes for me to able to see them, then click the arrow again so the mixer pops back out.. its strange..
    I am new to GB, but want to know if this has happened to others, or if anyone knows how to fix it.. its annoying!
    thanks
    in short, after I

    I really appreciate that. I went through every setting I could think of and didn't "check" or uncheck the obvious.  Lifesaver.

  • Time Series Graph Show Inappropriate Data for Continuous Analysis

    Hi All,
    I have marked Month as the Chronological Key in my BMM Layer but still I am unable to view the data correctly in my Time Series graph because it shows Inappropriate Data for Continuous Analysis at the time of creating the Graph. Can anybody help me out with the same.
    Thanks

    What data type is your key? The chronological key is required for the time series formulas (ago etc.).
    The time series chart requires a date or datetime data type to work - perhaps a new column with the first of the month/period would help? Regards,
    Robret

  • Time series analysis in Numbers

    Has anyone done any chart showing time series analysis in Numbers? I could not find a way to change the axis to reflect the right data series. 

    Hi sanjay,
    Yes, Numbers has a different style. Instead of a single large, multi-purpose table, Numbers uses several small tables, each with a purpose.
    To plot a time series (or any Category graph) the X values must be in a Header Column. Here is a database of measurements over time as a tree grows:
    That database can be left alone. No need to juggle with it. You can even lock it to prevent accidental edits.
    A table to pull data and graph them:
    Formula in B1
    =Tree Data::B1
    Formula in B2 (and Fill Down)
    =Tree Data::B2
    Next graph, pull some other data
    (Scatter Plots do not require X data to be in a Header Column. Command click on each column to choose.)
    Regards,
    Ian.

  • Can I create my own categories in a Numbers checkbook?

    Can I create my own categories in a Numbers checkbook? If so, how?
    I would be most grateful for anyone's help with this matter.
    Respectfully,

    Hi 'sounder,
    This topic has been discussed several times since the beginning of the year. Click here for a prebuilt search that will pull up several useful discussions.
    Regards,
    Barry

  • Creating a progress tracker like Domino's Pizza website?

    Hi,
    I'm interested in creating a progress tracker using dreamweaver or another adobe product. I want to create a website that can display the progress of a product being made in real-time. Additionally, it would be helpful to create "lights" on the website indicating whether the machine making the product is functional (green) or broken (red).
    Thanks

    Contact your machine's producer to find out if it can send "real time" messages to a web server.
    Nancy O.

  • Display of Column Headings in Time Tracking System

    Hi
    In Time Tracking Application, instead of displaying the Day of the week like
    MON, TUE , Wed, Thu, Fri , Sat, Sun
    iS it Possible to display along with the date like below in the column headings based on the week
    selected?
    Mon TUE WED THU FRI SAT SUN
    03 04 05 06 07 08 09
    Can any one helo me on this regard.

    Hi,
    Please check if you are created the elements for the dynamic node and corresponding attributes are set.
    if you want to display the corresponding column heading in the dynamic table you should use ResultSetMetaData, like retrieving of data from table using ResultSet.
    ResultSetMetaData rsm =(ResultSetMetaData)st.executeQuery("select * from <Table_Name");
    IWDTableColumn tabColumn1=(IWDTableColumn)view.createElement(IWDTableColumn.class,"Column1");
    IWDCaption column1Cap=(IWDCaption)view.createElement(IWDCaption.class,"column1Cap");
    nameCap.setText(rsm.getColumnName(1));
    tabColumn1.setHeader((IWDCaption)column1Cap);
    like this you can add columns to table and set column headings.
    regards
    karthik

  • Time tracking problem

    Hi there,
    I have created application for employee time tracking using oracle forms 6i...My problem is,The application doesn't work during the abnormal shut down..I have no idea to how to track the point of abnormal shut down..
    Is any trigger to solve this ?
    pls help me

    Reading up on system event triggers should give you some ideas:
    http://download.oracle.com/docs/cd/B19306_01/server.102/b14220/triggers.htm#sthref3268

Maybe you are looking for

  • How do I convert a pdf file to word document?

    How do I convert a pdf file to word document?

  • Creating new record(child)

    Hello everyone.Ive been working with OAF for several months(new to this technology, finished the provided tutorial material) and Im facing a problem,which im hoping someone could help me out a bit. First, ill describe the task: created a page with se

  • Abend while executing alter system kill session command

    I have a ML350 G3 Hp server(Xeon 2.4 Ghz) running oracle 8.1.5 on Novell 5.1. Frequently i have locking problems in my software. So when i tried to kill the active session using alter system kill session 'sid, serial#' my server produce following err

  • The billing document has incorrect gross weight on the output

    Hi All, I'm facing a problem - the billing document has the incorrect gross weight on the output. The output of gross weight is 3 x the true gross weight. The program was looping three time during this select causing the value in t_weights-brgew to b

  • Cin j2i9 report

    dear mm gurus, in CIN standard SAP provides a report in t-code J2I9 (<b>PERFORMA FOR MONTHLY RETURN UNDER RULE 57ae OF THE CENTRAL EXCISE rule</b>) which give a list of all the invoices and bills of entry for which you have made a Part II credit post