Data changing with change of printer..

Dear All,
I am facing a problem of data changing (Description which is a column) in the table defined in the main window of a smartform by changing the printer.
We have a printer defined for dotmatrix printers and other is LP01.
Presently in our application we are using Dotmatrix printer for output. The printing was fine till today. today we have seen that description is repeating for some rows at randomly.
When we check the same with LP01 (which is of type HP laser jet ) the print is fine, that is description is not repeating.
This problem occuring randomly and we could not reproduce the error in quality or development systems.
Please give your valuable inputs on this, what could be the problem and how can we rectify this..
Thanks in advance
Ravi

Hi Frank,
Thank you for the reply.
Transported the smartform again by making a small change.
Printer and page formats also reimported in production.
But of no use..
Regards..
Ravi

Similar Messages

  • Sql query to bind data from grid and print total count and amount total when date changes

    SELECT SLHD.VOUCH_CODE,SLHD.VOUCH_DATE,SLHD.VOUCH_NUM,SUM(SLTXN.CALC_NET_AMT) AS AMT,ACT.ACT_NAME,SUM(SLTXN.TOT_QTY) AS QTY
    FROM SL_HEAD20132014 AS SLHD,ACCOUNTS AS ACT,SL_TXN20132014 AS SLTXN
    WHERE SLHD.ACT_CODE=ACT.ACT_CODE AND SLTXN.VOUCH_CODE=SLHD.VOUCH_CODE
    GROUP BY SLHD.VOUCH_CODE,SLHD.VOUCH_DATE,SLHD.VOUCH_NUM,ACT.ACT_NAME
    ORDER BY SLHD.VOUCH_DATE 
    i want to print total quatity and total sale in grid when data changes
    like
    date amount quantity
    01/02/2013 1200 1
    01/02/2013  200 1
    01/02/2013  1400 2 // date changes here 
    02/03/2013 100 1 
    02/03/2013 50 4
    02/03/2013 150 5 // date changes and so on

    this query only print all the data from table i want total quantity and total amount of daily sale in same grid when ever date changes
    You may add the date filter to Visakh's query:
    SELECT SLHD.VOUCH_DATE,SUM(SLTXN.CALC_NET_AMT) AS AMT,SUM(SLTXN.TOT_QTY) AS QTY
    FROM SL_HEAD20132014 AS SLHD,ACCOUNTS AS ACT,SL_TXN20132014 AS SLTXN
    WHERE SLHD.ACT_CODE=ACT.ACT_CODE AND SLTXN.VOUCH_CODE=SLHD.VOUCH_CODEand SLHD.VOUCH_DATE = @yourdate --passed from the front end application
    GROUP BY SLHD.VOUCH_DATE
    WITH CUBE
    ORDER BY SLHD.VOUCH_DATE
    Having said, each time when you select the date, you query the table would be expensive method. May be you can filter the date within your dataset already populated if you have entire data in the dataset.

  • Can not see the option Execution with Data Change in the infoprovider?

    Hi team,
    i am using query designer 3.x, when i go into my bex brodcaster settings and schedule my report
    i can not see the option "Execution with Data Change in the infoprovider",
    i can only see 2 options
    Direct scheduling in background process
    create new scheduling
    periodic,
    is there any setting which i would be able to see the option "Execution with Data Change in the infoprovider"?
    kindly assist

    Hi Blusky ,
    check the below given link.
    http://help.sap.com/saphelp_nw04/Helpdata/EN/ec/0d0e405c538f5ce10000000a155106/frameset.htm
    Regards,
    Rohit Garg

  • Updated my iphone4 with ios6.1 software. App store is not working. Tried rebooting, restoring, changing date, signing with another apple id etc. but no luck. can someone please help?

    Updated my iphone4 with ios6.1 software. App store is not working. Tried rebooting, restoring, changing date, signing with another apple id etc. but no luck. can someone please help?

    I guess I will wrap this up. I have abandoned iPhoto and viewing my Photo Streams using it and moved to Adobe products (Bridge + PS). So that's that.

  • Is anyone else having problems with an iPhone 6 delivery date changing on them?

    I sat up until 12:01am to pre order (2) iPhone 6's and (2) iPhone 6 +'s and they had a delivery date of 9/19 for both of the phones at the time I logged on to Verizon's preorder site. The system would not allow me to log in as an existing customer but it would allow me to order as a new customer. I kept trying to order new phones as an existing customer on two different computers and three different browsers without any luck. I finally decided to order them as a new customer and the order went right through the Verizon system without any problem. Two minutes later I received an email from Verizon requesting that I call them as soon as possible to complete the order. I called in and spoke to a rep that explained that I already was an existing customer and that I would need to use the "Existing Customer" preorder link. I explained the issues I was having and she said that I would still need to use that system when it was available. So I tried the existing customer link and it now let me through but the date for the iPhone 6 plus had slipped to 10/7 (It is now 1:30 am). I completed the transaction and it stated 9/19 delivery for iPhone 6 and 10/7 for the iPhone Plus. However once I received the email confirmation it stated that the delivery date for the phones was 10/7. I called Verizon customer service and stated my concern about the later delivery date for the iPhone 6 and they told me that the iPhone 6's would arrive on the 19th and the pluses would arrive on 10/7 so I did not change my order. This morning 9/19 8:00am I called in to inquire about my shipping confirmation numbers for the (2) iPhone 6's and the customer service rep (Robanya) told me that he would call me back at 1:00pm PST and give me the shipping confirmation numbers. He asked specifically which phone number he should call me back on and I gave him my cell number. After not receiving a call back from Robanya, I called Verizon customer service at 5:30pm and spoke Ryan James and he confirmed that the orders were placed on the 12th of Sept and that one system showed all of them due to be delivered 10/7. After insisting that Robanya that I spoke with earlier in the day said they were shipping today, Ryan got off the phone for 5-10 mins and then got back on and said that the iPhone 6's shipped yesterday on the 18th but he did not have a confirmation number. After pressing him that someone should have this confirmation number in Verizon he stated that the delivery dates were subject to change and that all the phones would probably ship on 10/7 and left it at that.
    So after loosing sleep to pre order phones on Verizon, speaking with (3) different Verizon reps, I am rewarded by having my delivery date changed to 10/7 on my iPhone 6's which is the same delivery date they were quoting yesterday 9/18.
    Did any one else have the same disappointing experience that I had?

    Yes, pre-ordered iPhone 6 with a guaranteed delivery date of 19 September; took screen shots after the order just to have record of it.
    Called Verizon 18 Sept because I hadn't received a tracking number yet, and was informed my phone would now ship 7 October.  When I expressed that was different than what was promised and had proof, a manager came on the phone and confirmed that I should have a 19 Sept delivery date based on their records.  She told me however she could not confirm when my order would ship.
    19 Sept came and went with no phone delivery.  I have tried calling Verizon, posting here, and posting on their FB page for customer service.  Every rep I talked to (except for the first manager on 18 Sept) has been unable to admit that they mislabeled their product sales page, and mislead the customer.  One rep told me the guaranteed delivery date was an "estimate"; when I asked her to show me on the website where it uses the term "estimate", she admitted it didn't communicate that, but still was unable to utter the words "we made a mistake".
    VZW needs to take a 101 class in customer service and crises management; rule #1 is if you screw up, admit it!  I know I am not going to get my iPhone as promised, but pretending like there is nothing wrong with that customer service experience is just making things worse. Not a single employee I have communicated with to date has attempted to do anything proactive to correct or mitigate the customer failure.  I am truly amazed at how poorly VZW has been handling this to date; again (removed) happens with supply/demand, website errors, etc, but the failure to acknowledge how the screw up shafted a lot of (formally) loyal long time customers is criminal.
    >> Edited to comply with the Verizon Wireless Terms of Service <<
    Edited by:  Verizon Moderator

  • PDF file size grows each time form is saved (with no data changes). Why?

    I have an SAP Adobe form (PDF) and we are seeing a difference in the Save behavior between when it is viewed in Adobe Reader vs. the adobe plug-in(?) for Internet Explorer.
    When the form is viewed in Internet Explorer, every time the user saves the form the file size grows (even with no data changes in the form - i.e., open the form, hit save).  This is not true if the form is opened in Adobe Reader.
    The form in question has multiple pages but the only fields directly bound to the SAP source are a handful of identifiers (e.g., order number) and a dynamic table.  It appears from our testing that the more entries in the table when the form is created, the greater the size increase each time the file is saved.  The table length is not changed after the form is first generated.
    Is there a known difference in the behavior of Adobe Reader vs. the browser plug-in which would account for this difference?  Our users have Adobe Reader X installed on their machines.

    If this is an XFA form, as opposed to an Acroform, you should ask in the LiveCycle Desiger forum or a more relevant LiveCycle forum.

  • Material with PPM allow the date change

    Hi Experts,
    I have a issue regarding the date change in process order which is effected by the APO scheduling dates.
    Now i have observed that materials having PPM are not allowing me to change the dates even if i try manually.
    But Materials without it are easyily taking the dates in changed mode.
    My requirement is to change the date manually and APO should not effect the dates later on.
    Any timely suggestion will be rewarded .
    Reagrds
    Athilles

    Hi,
    In R3, check under "Adjust dates"  in  define scheduling parameters for process orders ( OPUZ) what is the setting defined.
    Try with different settings.
    Thanks,
    nandha

  • Table - Issue with Logging Data Changes

    Hi Experts,
    My client's requirement is to log data changes happened in a table which is critical. I've selected 'Log data changes' check box in technical settings of the table. Now, I'm able to see log for all the changes i did after that. But, I'm facing following issues. Kindly help me in fixing the same.
    1. The table is having two fields with same data element. In the change log SCU3, under the field name, field label mentioned in the data element is getting displayed. As, the data element is same for two fields, its difficult to find out which particular field is changed. Is there any way to display table field name instead of field label from data element?
    2. Sometime, even there is change in the data record, I'm able to see a log record in the change log with caption 'Data record unchanged'. What might be the problem and how to resolve?
    Thanks in Advance,
    Siva Sankar.

    Hi Moha Nan,
       You just use ABAP to change the table P? In this way I think it is not change to X table.
    You can upload master data to add navigation,it is a good way to bulid the SID of P table and X
    table .
      Hope it is help to you!

  • Modification Date changes when updating Open With?!?!

    Forgive me if this is mentioned elsewhere. I have been searching these forums and not seen this problem.
    If I do a 'Get Info' on a file in the Finder and change the application it opens with, the Modification Date changes to 'now'. Why in the world would this happen? This is not how 10.3.x worked, and certainly doesn't make any sense since I am not actually modifying the file. I am simply changing the OS's metadata about which app to use. This info isn't even stored in the file itself, as evidenced by burning such an document to a CD or moving it through a network server then opening it on a machine with different default apps for certain extensions.
    Is this just another wacky step backwards in the world of the Apple OS X Finder, or am I missing a way to avoid this?
    PowerMac G5 2.5DP   Mac OS X (10.4.3)  

    This is not how 10.3.x worked, and certainly doesn't make any sense since I am not actually modifying the file.
    Actually, I am using "Panther" now, and can confirm that changing the application to be used to open an individual file through "Get Info" does in fact change the modification date.
    When the "Change all" button is used, the modification date of other files of that type won't be affected by this change since that modification is presumably made somewhere in the "Launch Services" database to set the "default" application to be used for that file type. Perhaps this is what you were thinking of.
    However, for that first file (or any file changed individually), the file is in fact modified, and the "Open with" information is stored with the file, in its "resource fork". Usually, a 'usro' resource (specifying the application) and an 'icns' resource (for the app's custom icon for that file type) are added. You can try this yourself - drag any image from Safari.app to the "Desktop" and open the info window for that image - such images usually don't have a "resource fork". Make note of the file's size, then change the "Open with" application. You should immediately see an increase in the file's size (to account for the addition of the "resource fork") accompanied by an update of the file's modification date to reflect this modification.

  • Date changes with iphoto 6

    When I send photos from my Samsung D900 to my Mac (via bluetooth) the date info does not seem to come with it. Instead the file is dated as per the date of import onto my computer. When I then put this into iphoto the date changes again to 01/01/06. I know I can manually change the date back again in iphoto for individual photos or batches but this is tiresome. Any ideas?

    Crossie:
    Have you tried importing via cable to see if the wireless has anything to do with it? The capture date as assigned by the camera should be recognized. If the file gets copied from one media to another sometimes the modified or created date will be used. Trying a cable can either rule out the bluetooth aspect or confirm that that's the culprit.
    Do you Twango?
    TIP: For insurance against the iPhoto database corruption that many users are experiencing I recommend making a backup copy of the Library6.iPhoto database file and keep it current. If problems crop up where iPhoto suddenly can't see any photos or thinks there are no photos in the library, replacing the working Library6.iPhoto file with the backup will often get the library back. By keeping it current I mean backup after each import and/or any serious editing or work on books, slideshows, calendars, cards, etc. That insures that if a problem pops up and you do need to replace the database file, you'll retain all those efforts. It doesn't take long to make the backup and it's good insurance.

  • HR master data change export with Interface-Toolbox PU12

    Hello out there !
    I implemented a HR master data change export with PU12 at one of my customers.
    It works fine - with one little problem:
    It is only possible to export one period (actual or selected).
    Is there any possibility to export more than one period (also periods in the future) ?
    The request is to export also master data with validity start date in a future period.
    Thanks for any help.
    Greetings, Holger Mächtig

    Dear Holger,
    I am very curious about your problem last year. Is it possible to do a future export with PU12?
    I am now working with PU12 for the first time and I have set up a export file in PU12.
    But when I am doing an update without filling the name for the file layout I have the following error:
    "An error occurred when opening the "export file"
    When I am filling the file layout I have the following error:
    "An error occurred when writing to an export file" (Error Number E107).
    "File processing: end of file".
    When I am not doing an update the export file runs and seems right.
    Do you know what I am doing wrong?
    Thanks in advance!
    Kind regards,
    Yvette

  • Any change to print to Canon MFP mailbox with A. Central Pro ?

    We are using now Hp 4 / pcl5 and a Pdf drivers with Central Pro. Could it be any change to print a document to Canon's mail box by Central Pro ?. ^TRAYOUT command doesn't work with Canon iRC2380i and do not what a we need. Thanks for any help.

    I do something similar to this. At work, I run a script that is launched at login, that does an +rsync -e ssh+ command to home. I use public key exchange for ssh login so the script doesn't get hung up waiting for a password entry. Because of VPN issues at work, I can't do the same thing at home. So instead, at work, I have a second similar script that is invoked by launchd. It kicks off at a specified time that is during my evening commute home.
    Now, those two computers are tethered via ethernet. But I also have a laptop that roams wirelessly. I have the same sort of scripting arrangement set up there at user login, but I have a timer built into it. It loops issuing a +curl -s http://checkip.dyndns.org | awk '{print $6}' | cut -f 1 -d "<"+ looking for an external WAN IP address and if it gets a non-blank answer, then it assumes that it is connected to the internet, and continues with the rsync. If after a certain amount of time no valid WAN IPA exists, it times out and exits without doing the rsync.

  • How to Change date and time on my printer

    I want to know how to change the date and time on my printer.

    annazmussaqib,
    OK, now enter the following command in the administrative user’s Terminal window:
    sudo date -n 122921502013
    When it asks you for a password, enter your administrative user’s password; it will not show the password as you type it.
    After you enter that command, enter this command again:
    date
    It should show a date and time that is close enough to the actual date and time that you should be able to go into the Date & Time pane of System Preferences without it hanging.

  • I can change Image Date, but file now has 2 dates associated with it!

    I have been able to successfully change the image date of the file using Timeature (I need to do this for a handful of images that have an incorrect date), as recommended elsewhere on the discussion board.
    What happens now is that:
    1. The metadata inspector shows the Image Date field as 9/1/02 12:00:00 PM PDT
    (this is correct - I set it to be that date and time, so that is great)
    2. When I click on the "EXIF" button at the bottom of the inspector (which allows me to choose what fields appear in the metadata inspector), the Image Date field is 2/1/04 9:51 AM GMT
    (this is the time the photo was taken, but it is what I am trying to change)
    So I now seem to have 2 image dates associated with the file.
    Any thoughts on how to "clear" the one I am trying to change?
    Thanks!

    Yeah, and worse the date set by Timeature is not set in the EXIF data so if you try to export the version the date you set won't go with the JPG. Even worse, I'm pretty sure the export will have the original photo's EXIF date, if it had one. You can get export to put the version date in the file name with the right export options.
    Export should really allow you to set the EXIF date on versions you export. One reason I bought Aperture was to be able to manage metadata so well that I wouldn't be beholden to it forever. Figured paying the big purchase price for Aperture was my ransom. We'll see in the next few versions if they fix this.
    The two dates are 1) the date in the per-version metadata and 2) the EXIF date in the original JPG. It doesn't modify the EXIF date in the original because Aperture doesn't modify the original by convention. Not updating EXIF data in the original jpg is probably right (IF they would provide a way to export all the version meta data into EXIFs).
    I've resorted to using some command line freeware jhead to set the EXIF dates before import for most of the stuff. You have to do that before the import though because once imported Aperture seems to ignore the EXIF date save for displaying it (to confuse you :-)).
    Since I don't actually care that the original JPG is preserved for me it would be nice to have a utility that read the date out of the latest version meta data and set the EXIF date on the original. That would compliment Timeature (which I find really really tedious and slow).
    Please correct me if I got this wrong!

  • Delta queue with transparent tables based on table data changes

    Dear all,
    once, I was able to find a document (maybe a how-to, if I'm not wrong) that covered a very interesting solution, that I need to implement due to a specific requirement.
    Let me explain what's the catch.
    In the source system (SAP based), there's a couple of tables that have an unsorted key but doesn't have dates or timestamps. I need to retrieve the information from such tables with a delta procedure. Due to the lack of delta supporting fields, I can't enable generic delta or even FM-based extraction.
    The solution I saw once, suggested that Source System's tables could have the change log enabled from within the data dictionary (SE11) and then, that data change monitoring could be coupled with the delta queue mechanism (tRFC or qRFC enabled).
    Could you, please, help me with that subject or, if possible, try to recover the document that explained that? Be sure I have put all my efforts trying to find that doc. by myself.
    Many thanks,
    Michel

    Hi Michel,
    I'm not aware of any document but I made use of such a delta-mechanism a couple of times. Be aware that you should not use it for large tables or tables of which the content changes a lot (inserts/modifications/deletions). The system will create many huge logs which will consume a lot of disk-space.
    Procedure:
    1) Activate the logging on your table (SE11 -> enter table name -> go to Technical settings -> flag 'Log data changes')
    2) Create a Generic DS based on FM (should be possible!) but do not touch the delta functionality; this has to be build into the FM
    3) For the FM e.g. use a copy of RSAX_BIW_GET_DATA_SIMPLE
    4) Customize the code to your needs; in the first call fetch the data from the change logs using FM DBLOG_READ_WITH_STATISTIC
    5) This FM has dates and times as import parameters. As you don't have them you could create a Z-table in which you keep track of the extractions done. For the next load you then exactly know which logs to fetch (since stored date & time of last load).
    Hope this helps you getting up to speed! It's a bit of a hassle but once set up will work fine.
    Grtx
    Marco

Maybe you are looking for

  • Time machine backup from 10.6 server to Lion

    Hi I am running a Mac mini Server with SL Server, but I do not use the server features, it's pretty much a regular workstation. Now I want to upgrade to Lion (workstation) by formatting the hard drive and do a clean install. My question is if it is p

  • Win10: 7.5.0.102 crashes after changing language v...

    Windows 10 build 10130 @ English MUI Skype 7.5.0.102 Language changing is set up to use Alt+Shift+(1\2\3) to switch to English\Russian\Ukrainian accordingly. After pressing Alt+Shift+2 or Alt+Shift+3 in any chat Skype stops responding. Bug existed si

  • Netgear WPN824v2 MIMO Router Help

    Hi. I am not recieving good signal around my house. What is happening? Wasn't this router suppose tu boost up the performance? I am not using my iBook right now... I am using a Toshiba Satellite notebook with 54g Intel Pro connection. Is this the pro

  • Strange Colors in CS5 when using 2nd Monitor

    Hey here, lately i connected my hardware calibrated Monitor to my MBP and as i dragged the Picture from the MBP screen to the second Monitor, the colours changed into some ugly ****. It only happens in CS ( Bridge / PS) other Programs ( capable of co

  • SAPGui installation with /nodlg parameter runs silent without progress

    Hoping someone can help me here.  I'm installing sap 710 via SMS 2003 and it works fine.  The problem I am having is the fact that if I run it with the /nodlg parameter it doesn't show the user progress of the installation even though its installing.