Date assignement is absent in test packages.

Hi All,
I have created one project and related to that defined scenarios for the same.
Later when i created the test plan i got the scenarios with test cases.....and also  with actual and plan dates which are coming from solar02 transaction.
When we generate the test plan and later create test packages dates are not appearing.
Please help and points will be rewarded.

Hello Prakhar,
the SAP Solution Manager - Test Workbench integration works as follows:
The assignments that you make on the <i>Administration</i> tab in transaction SOLAR02 are also visible in the Test Workbench STWB_2 transaction on the very same <i>Administration</i> tab. This holds true when generating test plans; when selecting the contents for a test package there is now way to seperately see planned/actual dates for there is no <i>Administration</i> tab available on this leve.
So if you have experienced this behaviour, the functionality works as it has been implemented.
The dates that you maintain in SOLAR01 and SOLAR02 indicate the planned and actual processing time for your scenarios, processes and processes steps. So this information may contain all the efforts for building up the appropriate process structure, assigning documentation, doing the configuration and creating and assigning test cases and so forth - depending on your project scope.
In the Test Workbench (STWB_2) your see all this <i>Administration</i> information as display only, including for example respective key word assignments. You can now go ahead and size and generate your test plan based on those structure filter criteria (status, project team members, keywords).
So to sum up: The <i>Administration</i> information gets displayed on the test plan level and can be used to appropriately generate your test plans. It is not, however, seperately displayed for test packages (test package level), which resemble a view on your test packages.
I hope this clarifies what you were looking for.
Best regards,
Doreen Baseler

Similar Messages

  • Test Package - Assignment to different tester

    hi to everybody,
    I'm using STWB_2 and STWB_WORK during test in an implementation project. I have created a test case with different process steps. Some of these steps are to be executed by a key user, other by another key user. How can I assign the different tester inside the test package. I would like to show this information when the testers display the package. Any idea????
    Thanks a lot
    lelio

    Hi Lelio,
    Ok. So, you have already considered the Package creation at Transaction Code Level.
    One suggestion is, to let the first tester finish his/her transaction, have a test step called 'Create a message', let him/her create a message alerting the next tester to commence the next step. All such messages are with respect to a given 'Test' within a Test package - at Test document/ Transaction level, so they'll have the right 'context' when someone opens the message.
    I know this isn't a great solution, but using a standard functionality for a different use.
    Best regards,
    Srini-
    Hi Lelio,
    I was going through [this|https://websmp107.sap-ag.de/~sapidb/011000358700000193922008E] presentation today - from SolMan Enterprise Edition and it seems like your query is answered by this version of SolMan. Please go to slides 8 to 11 of 25.
    There is also a [SAP Tutor |https://websmp107.sap-ag.de/~sapidb/011000358700000183912008E.sim]file which explains how the new functionality works. It's great to see this - and I wish this was part of normal SolMan pack itself !
    Of course, this would come at some extra cost. Perhaps, a case for you to consider at a later stage, or if your project/support organisation can spare that rightaway
    Warm regards,
    Srini
    Edited by: Srinivasan Radhakrishnan on May 26, 2008 3:08 PM

  • How to assign test cases to test package?

    how to assign test cases(stwb_tc) to test package(stwb_2)?

    Hi
         goto to transaction stwb_1 enter the text and you will a get a screen now
    goto to Menu
    EDIT->Nodes->insert->As subnode
    on the selecting you will get the option to add a test case (stwb_tc) or  a test caltalogue.
    Please reward if useful..

  • How to assign test cases to test package and test catlog?

    how to assign test cases(stwb_tc) to test package(stwb_2) and test catlog(stwb_1)?

    Hi
         goto to transaction stwb_1 enter the text and you will a get a screen now
    goto to Menu
    EDIT->Nodes->insert->As subnode
    on the selecting you will get the option to add a test case (stwb_tc) or  a test caltalogue.
    Please reward if useful..

  • SCAT - Tester in the Test Package

    Hi! All Experts,
    I have created a Test Package and assigned Tester to each Test Case. e.g.Data Entry Clerk to Test Script A, Approver to Test Script B.
    However, when I run the Test Case in the Test Package, the system always logon as user "ALE-BATCH" and run the Test Scripts A and B.
    Is it possible to logon as the Tester and run the Test Script ? E.g. logon as Data Entry Clerk and run Test Script A, then logon as Approver and run Test Script B ?
    Thanks in advance for all the advise.

    It is because I have picked a RFC Destination with default user id ALE-BATCH and password.
    To solve this, I have to build another RFC Destination which will prompt for logon ID and password.

  • Can I Test the Test Package Created in SolMan Directly from ECC?

    Hi,
    the test plan and test packages are created in Solution Manager. The Test Packages are comprised of transactions (on ECC).
    (The business scenarios and processes are defined in Solar01, ECC is defined as logical component and assigned to every tx, the test case description is uploaded in Solar02,...)
    The needed Trusted RFC (to enable the tester to start the tx from within SolMan) is running late, but I can see that STWB_WORK tx is also available in ECC.
    Of course - when I open it in ECC (logged on as a test user - defined in test package in SolMan) the test package is empty in ECC.
    What kind of connection is there within STWB_WORK in ECC and SolMan?
    Can one somehow "transfer" the packages from SM to ECC, so the tester can start to test the transactions from ECC directly?
    Is it possible to see the results and status overview in SolMan during and after testing?
    Thank you in advance,
    cheers,
    Nenad

    Hi
    You getting confused between old ECC test workbench and Solution Manager Test workbench.
    Test workbench is present there from r/3 version onwards.
    When you are performing testing via solman then you have to use the test packages assign to you in STWB_WORK which has the relevant transaction and doc for you to test
    here you upload the test result and update status .Later any PM can generate report for overall testing including entire landscape and not one system.
    But remember it has got no connection to ur r/3 workbench
    The diff between 2 is...solman test workbench is for entire landscape including BI R/3 ECC any other system ...but in r/3 etc the workbench is alone and obsolete now is used for standalone testing.
    Hope it carifies ur doubt completely
    Regards
    Prakhar

  • The test package does not point to the correct logical system

    Hello,
    I have defined SMSY logical componant, I have copied project1 to project2.
    I have changed within the system landscape of project2, the logical componant.
    I have also defined a project plan, and the test packages.
    Hence, the test packages still do not point to the logical component that is defined in the landscape...
    I must have missed something !
    Can you help ?
    Thanks a lot

    hi
    try following
    1 check in smsy the logical component is correctly defined with clients dev qa and prd
    2 same logical component is assigned to solar_project_admin
    3 Project IMG is generated in the respective system
    4 in solar01 check the logical component is shown correctly
    5 Re- Generate the test plan once
    hope above steps will resolve issue
    regards
    prakhar

  • Regenerating test packages in Solution Manager 4.0 after blueprint changes.

    Hello,
    This is the scenario.
    A test plan and test package (1 process = 1 test package) have been created.
    The blueprint has changed and a new step has been added to the process (the process that has already been assigned into a test package.
    How do you get that new task/step into the test package??
    Current situation:
    I've managed to regenerate the test plan with the new task listed under the process. However when I go into change test package the new process is NOT there. Why is that? Can I had a new step to a package or not?
    Regards
    Dan

    You must go down to the transaction leveland click and then regenerate it will then be eligible in the package for regeneration.

  • Transport of Test Plan / Test Packages

    Dear all,
    We intend to transport a test plan with all test packages from the development Solution Manager to the productive Solution Manager because in the productive Solution Manager no configuration is allowed.
    We are using the Solution Manager functionality to execute manual testing in the following way:
    On SOLAR02 the project 'FOUNDATION' is stored. The project 'FOUNDATION' has been migrated from a outstanding sandbox Solution Manager system to all three Solution Manager Systems: DEV, TEST and PROD. Test scripts have been uploaded on the 'test cases' tab of the respective business process branch.
    In the development Solution Manager SMD a test plan has been generated using the uploaded test scripts mentioned above.
    On the quality assurance Solution Manager the same project 'FOUNDATION' is stored and the same test scripts are uploaded on the same branches.
    When the test plan is transported (using the recommended STWB_2 transport functionality) from the development SM to the quality assurance SM there are two issues.
    1. The transported test plan cannot be edited / regenerated anymore. An error message "The specified structure does not exist" is displayed. Message number is SOLAR056.
    2. The transported packages can be assigned to users but no notes can be added to the test cases. The error message is: "Unable to find template". Message number is SOFFICEINTEGRATION231.
    It seems that the transported test plan cannot retrieve the underlying project structure, even it is identical to the project structure of the development SM.
    This problem is urgent to us, as the test phase is starting next week.
    Thank you very much for your support.
    Best Regards,
    Marc Reinhardt

    Hello Marc,
    We have experienced similar problems. A transport of the test plan and copies of the test plans have resulted in us loosing status values and test notes. 
    I was informed it had to do with the fact the information is stored in the GUI. How I don't know, I am not a technical person.
    I was wondering if you may have encountered the similar problems I have had above and found ways around it.
    You can reach me at [email protected] as well.

  • Test packages cant be created in locked system

    I am using project management part of solution manager, & because the info structures are sap objects, I have to transport any change to a test package. I cannot create them in the production system as it is locked to changes. Other sap objects lets you tick the current settings box in sobj & then sap treats it like master data (which in reality this is !!)
    Has any found a way around this, I think it is crazy to have to transport test packages

    Rajesh,
    Answer is very simple. I did get same kind of problem. It is very simple answer depending on your R3 version.
    Use password all capital letters. Don't include any small letter at all. unlock your user id and change password to capital letter. BW doesn't like small and capital letter mix. this bug is fixed in ECC 6.0
    <removed_by_moderator>
    *Do not ask for points
    Read the "Rules of Engagement"
    Regards
    RK
    Edited by: Juan Reyes on May 21, 2009 9:30 AM

  • Sequence in Test Package

    Hi,
    I have a sequence in a test package test1, test2, test3 say. The status and status value in the tester worklist is working i.e if you try execute test3 before test2 get message 'previous test case not yet finished'.
    However, the 'ready to test' tick has decided to have it's own sequence of  test1, test3, test2 so when test1 is marked as 'test ended' it moves to test3 looking like test3 is next to test when it's not!!
    any ideas?
    thanks

    Hi,
    Your worklist seems to be ok: the test cases are displayed in the order you need: test1, test2, test3 according to the sequence numbers 1, 2, 3.
    But the 'ready to test' does not mark test2 as the next test case to be ready for test after the test1 has received the status 'test ended'.
    One reason for this is:  You have assigned the test cases test1 and test3 to the user TESTER1 and the test case test2 to the user TESTER2. Then TESTER2 sees in his worklist that test2 is marked to be ready for test. TESTER1 can see his next test case assigned to him to be ready for test. Is that describing your problem?
    Therefore I have removed the confusing 'ready to test' information and have provided the 'test end' information instead for default settings of the layer for the worklist.
    Best regards,
    Adelbert

  • Data should be processed with one package only

    Hello,
    I need to load data from ods1 to ods2.
    The logic if the transformation requires that data should be processed with one package only. Otherwise the result will be misleading.
    I can increase the package size up to 1 mln but its not the best solution as actual numbers of records is unknown.
    What would you recommend?
    thanks

    Hi,
    We had a similar requirement for one of the projects, where data for the same key from base DSO were required in the same DP.
    We worked it out in the End routine, where during the load we sort the data package for the same key combination and delete adjacent duplicates. then we lookup in the active table of the base DSO(ODS1 in your case) to get corresponding records for the same Key combination. Carry out the computaton and then populate the data package again..
    Similar Sample Code in 3.5 update rule routine:
      SORT DATA_PACKAGE[] BY material
                           /bic/zcdpcntry .
      DELETE DATA_PACKAGE[] WHERE material       IS INITIAL OR
                                  /bic/zcdpcntry IS INITIAL .
      CHECK DATA_PACKAGE[] IS NOT INITIAL.
      DELETE ADJACENT DUPLICATES FROM DATA_PACKAGE[]
                            COMPARING material
                                      /bic/zcdpcntry.
      lit_dp[] = DATA_PACKAGE[] .
      REFRESH DATA_PACKAGE[] .
      SELECT material
             datefrom
        FROM /bic/azmd_o***00
      INTO CORRESPONDING FIELDS OF TABLE lit_cc
        FOR ALL ENTRIES IN lit_dp
      WHERE  material = lit_dp-material AND
            /bic/zcdpcntry = lit_dp-/bic/zcdpcntry.
    ***Processing KLogic..****
    Assigning to the datapackage.
        DATA_PACKAGE[] =   lit_dp[] .
    Hope this Helps..
    Regards

  • Test Package Sequences in Solution Manager Test Management

    Hello,
    Is it possible to have a sequence in a test package with only one test case but 2 or more testers?
    I have individual test cases which will be tested by several testers e.g. tester1 completes first half, tester2 second half using results obtained from tester1. I do not want to split it into 2 separate test cases.
    Is there any way of creating virtual copies of a test case in a test package so I can assign a sequence or any other possible solution?
    Thank you.

    Hi,
    As far as I know the only solution for this would be to split it in two test cases, so you can assign the two testers in sequence.
    You can assign the same test case for multiple testers but you can't split half of it for each tester.
    Kind regards,
    Fabricius

  • How to Add Non SAP steps in test package

    Hi Experts,
    As our Client requirement is to load end to end test scripts/packages in solution manager. which includes non sap systems where it does not have URL and that legecy system contains 4 to 5 legecy steps(i.e as a place holder as text) along with 5 to 6 sap steps.
    in solution manager test package should show all sap and legecy steps(i.e as a place holder as text) which is total 10 to 11 steps.
    Can any one guide me on this please.
    Regards,
    Naveen Gunda 

    Hello Naveen,
    the approach for non-SAP steps is more or less the same like for SAP steps using SOLAR02.
    The only difference in your case (without URL) is that you can't assign a test object to the related test document and so navigation to the system under test will not work.
    General Infoamtion regarding Test Management in Solution Manager can be found in our Wiki page in section Test Option 1.
    http://wiki.scn.sap.com/wiki/display/SM/SAP+Solution+Manager+WIKI+-+Test+Management
    Let me know if you have further questions.
    Kind Regards Reiner

  • How to select test cases efficiently for a test package?

    Dear experts,
    I would like to ask you if you have found a way administer how to assign test cases to test packages and test packages to testers. For regression tests this assignment remains relatively stable (often the key users).
    Do you know a way to administer this within the solution manager - or do you recommend the old excel table.

    Hello Ragu!
    Thank you for your answer! My question was regarding the organisational side, I didn't get this clear.
    I know how to generate a test package and how to assign a tester to a test package but where do I get the information which test packages I need and which tester to assign to which package.
    Maybe a good option is to assign the tester as a team member on the process step level. Thus the assignments can be listed with SOLAR_EVAL using "Assignments / Test Cases" with option "Display Team Members". This list would help to generate the test packages. The selection of the test cases for the test package has do be done manually because there seems to be no filter for team members.
    Regards,
    Martin

Maybe you are looking for

  • TS3297 My iPod won't let me download any apps or music because there is a problem with a previous purchase?

    So I recently updated my iPod and it crashed while doing this and made me restore my iPod, which took off all of my apps and music. Once my iPod was restored I tried to dowload my music but then it told me to sign in to view billing information. I ch

  • Iphone bluetooth problem with car stereo

    I bought a third party bluetooth adapter for my car stereo. Hooking it up with any other device ( other mp3 players, my husband's windows phone ) all work and stream music. Pairing it with my iphone 5 causes constant crackling and static like blown s

  • IdM doesn't support non-default port on mysql 4.1 as repository??

    Hi IdM doesn't support non-default port on mysql 4.1 as repository?? IdM version is 6.0. I setup mysql 4.1 using non-default port 3307. (default port is 3306) During setup wizard, the URL [jdbc:mysql://localhost:3307/waveset] doesn't work. I am getti

  • Help about Gpshell

    Hi I will use the Gpshell to install the javacard. But anyPoint is very confiuse for me (I am new). I examine the HelloInstall sample. In the install script file(helloInstall.txt) there is some command that I need some informatin about. Especially th

  • OC4J does not start - OVM manager