Delete reference operation set CA12

Hi,
how to remove "reference operation set " so that isn't visible on list of searching ?
regards
Artur

Dear Arthur,
1) in CA12, input Group number & enter
2) then select the operation & Got o EDIT option in menu bar
3) now press on delete, os that this particular operation will be deleted
Regards
kumar

Similar Messages

  • Reference Operation set and Material link

    Hi,
    Can anyone tell me how the material is linked to reference operation sets.? In ca13 transaction, I can search the group number using Material number also.
    Thanks in Advance,
    Sabitha

    Hi,
    In CA12, enter the routing number, & click on Routings push button. Then click on Matl Assignment push button, there enter the material with plant & other details.
    Regards,
    Vivek

  • Link for reference operation set

    Dear SAP Guru's
      Can anyone provide me the link for Reference Operation Set in SAP Library?
    Thanks in advance
    Regards
    Kalyan

    Dear kalyan,
    i think ur looking for Rework order, Reference operation set
    Plz refer my reply from this Thread
    [http://forumsa.sdn.sap.com/click.jspa?searchID=32188014&messageID=8172970]
    Regards
    kumar

  • Is it possible to transport Reference Operation Sets?

    Hallo,
    I want to transport Reference Operation Sets from the productive to the consolidation system. Later on I want to transport the Sets back to the productive system.
    Is this possible with a transport request or is their any other possibility?
    Thx in advance!

    Markus Meier ,
    To my knowledge there was a 3rd party tool named Infoshuttle which is add-on to SAP, if you have that in your system then it is possible to transfer transaction data from Production to Non-Production system. It can also transfer from Non-Production system to production system though this is NOT recommended at all as it could create data inconsistency.
    [Information on Infoshuttle|http://www.erpgenie.com/products/infoshuttle.htm]
    Hope this helps....
    Regards,
    Prasobh

  • Rework using reference operation set

    Dear Gurus,
    Am working in an ECC 6.0 environment.
    Want to create rework order using reference operation set.
    Master data created:
    BoM
    Reference Operation set to which the header material is assigned to which a BoM is assigned.
    The settings in OPL8 for order type ZXXX are:
    Production version :  manual selection
    Routing:
    Application: Routing
    Selection Id: RW (priority 01, task list type 'S', and usage 1)
    Task list type: S
    Routing Selection: 4
    BoM:
    Application: PP01
    Create a production order (CO01), with order type ZXXX. The system asks to select the task list group once the order quantity and dates are entered. On selection of the Group for the reference operation set system generates an error 'No valid BoM exsists for Material xxxxx Plant xxxx'.
    SAP helps says - A reference operation set cannot be used directly in production.
    Am I doing something wrong?
    Your expert advice please.
    Tarang

    Dear first create a reference operation set go to CA11 just press enter without entering anything then enter plant,usage,status and lot size in component allocation you can select the required BOM and assign with the operation.
    and create the order in CO07 enter the plant and order type in next screen don't give any material code give description rework and give the quantity to be reworked and in components give the required components for consumption during rework before this you need to give the reference operation set group and task list in the popup and in settlement rule maintain the category and settlement receiver and save the order.
    You can confirm the order in CO15 by providing the order number and enter the yield quantity to confirm and save.
    Please note that during this rework order confirmation, only Goods issue will happen based on the input given in the components tab rework order and NO GOODS RECIEPT will happen.
    Cheers
    KK

  • Prod.Order Creation- Using Reference Operation set.

    Hi
    While creating a production order of particular order type,after entering the quantity and order finish date as today's date(05.06.2007),backward scehduling,it's showing no routing found for the material (as we are using REM-Repetitive manufacturing,we are having rate routing) ,and in the same mesaage box itself I choosed the Reference operation set(that I have created today) and entered the  group no,and after entering its showing me an error as <b>Ref. operation set 50000008 is not valid according to the selection conditions</b>,
    So I created a routing for the same material nd in MRP4 view of the same material under for selection method i kept blank(Selection by order qunatity) and tried to create Prod.order,and there was no problem,but if the same i'm trying to create using Reference operation set I'm not able to create the Production order.
    Kindly give me a solution for this,Is there anything to do with order type dependent parameters of the particular order type?
    Thanks & Regards
    Raj

    Hi,
    Is your problem solved ?
    One more solution to create a order with reference operation set,is to use a trigger point.
    Once you create a reference operation set.
    Use T.code co31 to create a trigger point, chosoe create order with reference & choose a system status eg: PCNF. & click the user parameter tab.
    The system will aks for the reference operation set no & group counter.
    Then assign this reference operation set to the routing operation.
    When you do partial confirmation of this operation, this will trigger the generation of a order.
    Regards,
    Senthilkumar SD

  • Reference Operation Sets

    Hello Everybody,
    Can someone tell what is meant by a Reference Operation Set?
    Where can we create it and how can we assign it to the Routing?
    What are the important feilds to be passed to it?
    Please help. Its urgent.
    Thanks,
    Shashi Devi.

    Hi,
    A Reference operation set can be created using transaction CA11.
    Here we can enter a set of operations needed.
    Then in CA01 (create routing) from the operations screen we can add the reference operation set & all the operations from the reference operation set will be copied to this routing.
    Hence whenever we need to create a routing with similar set of operations we can use reference operation set.
    Also to create a rework order we can use reference operation set with the help of trigger point.
    Regards,
    Senthilkumar

  • CA11: How copy a reference operation set without its materials attribution

    Hello gurus
    I have a reference operation set that has many materials attributed.
    Using transaction CA11, when I create a new reference operation using the functionality copy from the existing operation set, also the material attribution are copied in new one. How It is possible to avoid that. I would like to copy only operations not the materials attribued.
    Thank you in advance

    Was it really necessary to post the whole API description?!?
    Locale[] locales = Locale.ENGLISH();ENGLISH is not a method in class Locale, so do not add the braces "( );".
    Also, the constant ENGLISH is not an array, but just a single Locale object.
    You didn't say what your problem was. What do you want to achieve with your program and what is it that you don't understand?

  • CO07 - got error Reference operation set DOOR not found

    Hi PP Experts,
    I'm unable to create prod order without material (transaction CO07).
    The error says 'Reference operation set DOOR not found',
    but I can't click the error to find the message number.
    I checked that reference operation set DOOR has been created correctly.
    Please give me some light.
    Thanks and regards,
    Thomas Wahid

    Many thanks for all your suggestions.
    The problem is now solved.
    We use the unit SHE, this is actually the commercial of unit ZSH, you can see it if you check in CUNI.
    The referenced operation set DOOR uses unit M3, but we do not have the same dimensiond in CUNI.
    The unit M3 has dimensions VOLUME, but the ZSH has not been assigned any dimension so it get the default one AAAADL which is different, so the system can not convert the unit and the error happens.
    Best regards,
    Thomas

  • Assignment of Reference Operation set to routing.

    Dear Experts,
    This is regarding the assignment of a reference operation set to a routing. We have one ref. op. set which is applicable for some 30 variants of our products. Now, we need to assign this ref. op. set to the existing routing. The follwoing points are to be taken care of:
    1. Set up, m/c time, etc are allocated based on the operation number.
    2. Change in the operation number leads to the change in these values. This is not acceptable.
    Now when assigning the ref.  op. set to the routing using the t. code. CA02, the systems asks for operation increment  say 0010 (mandatory field). If we accept this value, the operation number  follows a different sequence. Consequently, the setup, m/c times gets upset. This is due to upsetting of the operation number sequence.
    How can we assign the ref. op. set to the routing without upsetting the operation number sequence i.e., copying the operations as it is in the ref. op. set.
    Pl. suggest.
    Regards,
    Pradeep Santara

    Dear Sharavan,
    Probably, i have not been able to explain the issue. I will give it another try..
    Say for the ref. Op. Set the operation sequence is 12, 14, 19...so on
    But when we assign the Ref. Op. set to the routing CA02, the at the intial screen we come across one mandatory field "operation srl. no. increment", if we use 0010 in that field . The system copies the ref. Op. set with operation serial nos. starting 00,0010,0020 onwards and not in the order of 12, 14, 19....so on...
    If still not clear pl. revert

  • Routing & Reference Operation Set

    Hi All,
           Could you guys please help me to understand the following will be grateful
    What is the difference between Routing & Reference Operation Set?
    When the Routing will be used?
    When Reference Operation Set will be used?
    What are all the advantages and disadvantages behind using Routing & Reference Operation Set in prodution?
    At which Scenario Reference Operation Set is must?
    Thanks in Advance

    Hi,
    Routing defines the sequence of operations that should be carried at a work center to make up a product.
    In the operation you define the values for setting the machine and the machine time to prodduce a finished product for a particular base qty.
    Routing is one of task list in PP module to carry out the production of finished and semi finished parts. it consists operation sequence which requires for manufacture finsihed and semi finished parts like operation 10. 20, 30...
    Ref operation sets is use as template to create routing , rework order.
    These are four types...
    1) Routing and Ref operation sets (used is discreate manufacturing).
    2) Rate routing and Ref rate routings (used in repetative manufacturing).
    3) Recipe (used in process manufacturing)
    Ref operation sets are repeated operations can be use for several products. you have use these always in rotuings.
    For documents and PDF files you can download from the below link
    http://mysapbi.blogspot.com/2007/01/sap-help-in-pdf-files.html
    CA01 = Standard Routings
    CA11 = Reference Operation Sets
    CA21 = Rate Routings (used in Repetitive manufacturing only)
    CA31 = Reference Rate Routing (used in Repetitive manufacturing)
    Regards,
    R.Brahmankar

  • Creating reference operation set using RCPTRA01

    Hi Experts,
                      I have to create a LSMW for reference operation set (CA11) by using the program RCPTRA01.I dont have to create the routing. Can this standalone task be acieved using the above mentioned program.If yes then please provide me the steps for the same.If no,then why?
    Thanks
    Abhishek

    Hello Abhishek,
    I am trying to do Reference Operation Set upload with component allocation using RCPTRA01 program in lsmw.
    Even though  i assign values to BIMPZ structure fields the component allocation is not happening.
    Could u please give some inputs ?
    Thanks!
    Regards,
    Deepali

  • Phantom, Assembly, Reference Operation Set

    Hi All,
            I am always having a little confusion with follwoings, so could you please help me to understand clearly will be grateful.
    What is Phantom ?
    What is Assembly ?
    What is the difference between Phantom & Assembly ?
    What is Reference Operation Set ?
    What is the difference between Routing and Reference Operation Set ?
    At which situation Reference Operation Set is used instead of Routing in SAP?
    Thanks in Advance

    Hi Madhan,
    Phantom
    Phantom assembly is a logical grouping of material.
    Design point of view it is assembled.
    Physically not assembled, but logically it is assembled.
    Ex: CAR
    BOM Header: CAR
    Item: ENGINE
    For ENGINE: Items are cylinder, piston, crankshaft....Here engine is phantom... while manufacturing car, engine is mandatory so if u assign engine as phantom it won't create planned order for engine. We can direct issue the materials (such as cylinder, Piston, CS) to car; by that time it reduces the work of issue and receiving goods to engine assembly.
    But if u want engine as spare parts that time u can create planned independent requirement for engine and u can stock as ordinary processes...
    In material master of MRP 2 view spl. procurement key - 50.
    or Assign in BOM item - make tick mark in phantom assmbly.
    If you create in material master wherever the material, system consider as a phantom.
    If you mark in BOM, only that particular BOM, system consider as a phantom.
    There is no stocking of phantom material
    Routing and Reference Operation Set
    Refer below link
    Routing & Reference Operation Set
    Regards,
    Sankaran

  • Reference operation set:tr CO48

    Hi guys,
    while I 'm running the tr.CO48 to convert partially a planned order the system have given me the message 'Reference operation set ..&..not found(check entry) ' but I have cretaed the operation set and it exist..which is the meaning?
    Thanks in advance
    Best regards
    Massimiliano

    dear Massimiliano,
    check following things
    1) Check the plan order start date, On that date the Reference operation set is valid?, IF not change the start date in plan order and then try to convert to production order
    2) Is the reference operation set is Released? if not change it to release in Header
    3)  check are you assigned the finish material to that reference operation set by clickimg material assignment If not maintain it
    and then try to convert to production order

  • Reference Operation Set association to a Routing by CP_BD_DIRECT_INPUT_PLAN

    Hi .
    I want to know how we can associate reference Operation Set to a  Routing  with  using the FM: CP_BD_DIRECT_INPUT_PLAN (The Direct Input API for Routing update) . I am successful with creation of Operations(Table: PLPO_DI_TAB). I found few fields in that structure like : VPLNTY, VPLNr etc for Reference Operation Set.
    Can somebody help me with test data for associating reference operation set to a Routing with CP_BD_DIRECT_INPUT_PLAN ?
    Thanks & Rgs,
    ~ Guru

    Resolved. the field VPLNTY should have the vale 'S' for reference operation set....

Maybe you are looking for

  • Problems after problems since the new update

    Ever since updating my ipad air two days ago I have had nothing but problems. At first I thought it was probably my internet connection and got all that fixed. everything works except my Apple devices.  Safari does works but is a little slow. I follo

  • Blue Q? instead of images when using Firefox

    This always happens whenever I update either Quicktime, OSX Updates or the Firefox browser. I reinstalled Flash, I reinstalled Shockwave and the problem remains with most websites. I get the Big Blue Q with a ? in the middle of it instead of the imag

  • Introduce delay of 7 Days for each message of a particular type.

    I have a requirment that after receiving a message of a particular type, PI will hold the message for 7 days before processing, originally I thought a wait step in BPM maybe the appropriate solution but it isnt. (Memory usage/BPM blocking).... Im not

  • Any external HDDs compatible with Tablet 2?

    Hello everyone, Lenovo Solution Center is reporting that the 64 GB of storage in my tablet 2 is running out, and I would like to connect an external hard drive to it and move some programs and files to the hard drive to free up space in my tablet. So

  • Table for all fct codes

    Hi all, can any one give me the table name which stores fct codes Regards Sre