Deletion Time Period at SNP Optimization

Hi!
I'm facing some problems at my SNP Optimization due a wrong Deletion Time Period.
Where could I maintain the "Deletion Time Period" (DEL_TRANS and DEL_PROD) for SNP?
Thanks a lot!
Victor Leao

Hi Pawan,
Thanks for your reply.
In fact, it is not a program error. The situation is the following:
For example:
I have some SNP documents (stock transfer) at 23.12.2011. They were generated at the last optimization.
Now, a new optimization is run and some documents at 23.12.2011 were not deleted.
Checking the "Deletion Time Period" (DEL_TRANS) at SNP Optimization Log, I see that for those products the "Start" is 06.02.2012 and the "Finish" is 06.05.2012. So, documents before 06.02.2012 are not considered for deletion.
The products wich documents were deleted have "Start" at 01.01.1970 and "Finish" at 06.05.2012.
I would like to understand how can I maintain those dates for DEL_TRANS.
Thanks in advance,
Victor Leao

Similar Messages

  • Error : Period dimension 'Period' is missing a Base Time Period member 'Jun' that has been deleted since the last deployment. Base Time Period members cannot be deleted once the dimension is deployed

    HI,
    I am using V11.1.2.2 Hyperion Planning. I am currently getting an error:
    Error : Period dimension 'Period' is missing a Base Time Period member 'Jun' that has been deleted since the last deployment. Base Time Period members cannot be deleted once the dimension is deployed
    This is what i got when i tried to add alternate hierarchy to my shared dimension. I tried to delete it and it messed up.
    NOw it wont deploy my application.
    Can any one suggest.
    Thanks in advance
    Cheers,
    XXX

    EPMA!!!!! EPMA!!!!
    I'm playing around with it to write a blog post and it is crazy. Only possible workaround (till now i'm not able to figure out a solution to it) is to copy the application and deploy it as a new one. Take copy of all objects (forms, tasklist etc). Delete the corrupted application and rename the new one to old.
    Regards
    Celvin
    http://www.orahyplabs.com

  • Problem in Delete Time Quota Compensation

    Hi,
    There is a problem in Infotype- 416 (Time Quota Compensation) with subtype - Workmen SL Encashment.
    When I click on delete button, it goes in nexr screen - Delete Time Quota Compensation. From here, in Absence quotas, i want to delete 1 line item.
    There is a one problem in deleting this.. system shows the message Change before earliest retro. date 01.04.2009 acc. to control rec. to py area WK.
    Please let me know, what it is???
    Regards..

    What is the beginning date of the infotype record you are trying to delete?
    Please delete the payroll control record and re-create (by checking my prev message) so that the payroll period and retro period are in line with the start date of the IT.
    e.g. if IT record is 01.01.2009 - 31.12.2009 --> So create the payroll record for 01.2009 period and 01.2009 retro period. Make sure status is Rel for correction.
    As the infotype you're trying to delete belongs to a prior payroll period, control record acts as a shield to changes on this data since it is already used for a prior payroll calculation.
    Dilek

  • Division of time periods

    I will be working with periods in time. Each period has a start and end date (along with other data..but for the help I need only the start/end are relevant). I have a list of default periods. The default periods are arranged perfectly so the start of one is exactly one day greater than the end of the previous..etc.
    Now the fun part.
    I need to be able to add new periods to the existing group (defaults). The new period being added may span more than one "existing" period. Existing periods need to adjust their start/end as needed to fit in the incomming period.
    Here is an example showing 2 default periods and one custom period being added:
    period - start=1000 end=2000
    period - start=2001 end=3000
    ..new incomming period: period - start=1500 end=2300
    After the addtion of the new period I would have the following:
    period - start=1000 end=1499
    period - start=1500 end=2000
    period - start=2001 end=2299
    period - start-2300 end=3000
    Any help/pointers in the right direction would be helpful.
    One last note: I realize as dates the values will be nothing like "2300". I'm not looking for a date specific answer. I am looking for the core concepts behind being able to take a group of objects which have start and end values and adding new objects to that group such that the final result is a sorted group of objects (by start value) which have been diveded up correctly to accomadate any new incomming objects.

    Find the last period whose start attribute is earlier than the new start attribute. Find the first period whose end attribute is greater than the new end indicator. Adjust these periods to fit around your new period, delete any periods in between these periods, then insert your new period between.

  • Delete time series entries via TS_SET/ TS_GET

    Hello everbody,
    I have a question concerning the TS_SET/ TS_GET functionality.
    In a DP macro I createentries via TS_SET (e.g. TS_SET ('LV_Test ; ACT_IOBJNM_VALUE( 'ZC2003' ) ; '' ; '' ; 1 ; 1 ).
    Is there also a possiblity to delete the time series entry afterwards via macro?
    Otherwise I always have to jump into the table via SE11 and delete it manually.
    Thanks for your help!!
    Stefan

    Hello AA,
    Which SCM version you are using. In case of SCM4.1 version, if you want to do some changes in planning area configuration settings, you have to deinitialize the planning area and then do the changes and reinitialize it. For that you have proper data backup. with out data backup its difficult to retrieve the data back.
    From SCM5.0 onward its possible to do the configuration changes without deinitializing the planning area.
    There are 2 ways to delete the time series of DP Planning Area.
    1) If you use SCM7.0 you will see the menu path  Advanced Planning and Optimization --> Environment --> Time Series Administration --> Deintialize Planning Area (/SAPAPO/TSDEINIT)
    2) Go to /SAPAPO/MSDP_ADMIN t code and select the planning area context menu select Delete Time Series Objects
    you mentioned " it's very strange why this is happened and not sure if you have also experienced it (i.e. for example time series exists for 'active' planning version and then suddenly it's deleted)."
    This means, have you done any of the changes in the planning area structure. Deinitialization of the planning area leads to loss of time series values i.e will lose data in the planning books.
    Your planning area got deintialized, Can you pls explan whats up exactly happened. I mean what are the major changes done in your planning area. At what situation planning area got deintialized.
    For better understanding pls go through the SAP Help regarding Indialize and Deintialize the planning area.
    http://help.sap.com/saphelp_scm50/helpdata/en/8f/9d6937089c2556e10000009b38f889/frameset.htm
    and also the below threads
    Changing a DP Planning Area | SCN
    Initialize and De-Initialize of Planning Area | SCN
    Regards,
    Subhan

  • How to Group discontinued time periods

    Hi All:
    I have an issue which costs me bunch of time to develop. Basically I am trying to use discounted time in a select query but feel  like get nowhere to start.
    the scenarios is like this:
    I have many rows of data of this and I would like to have a solution I can select time period from just like what I can do for integer and text:
    Select *
    From Table
    Where Group = B
    and Open_Date in (select the all group A's time interval)
    to explain this problem in plain text, I would like to select all records from Group B whose Open_Date is within the interval between Group A's Open_Date and Close_Date. Thanks all in advance.
    Record
    Open_Date
    Close_Date
    GROUP
    1
    9/12/2013 9:25
    9/12/2013 10:44
    A
    2
    9/12/2013 10:19
    9/12/2013 10:39
    A
    3
    9/12/2013 10:22
    9/12/2013 10:22
    A
    4
    9/12/2013 10:56
    9/12/2013 12:41
    B
    5
    9/12/2013 12:00
    9/12/2013 12:00
    B
    6
    9/12/2013 12:00
    9/12/2013 12:01
    A
    7
    A+E301:H318
    9/12/2013 12:03
    A
    8
    9/12/2013 13:44
    9/12/2013 13:46
    C
    9
    9/12/2013 13:46
    9/12/2013 13:46
    C
    10
    9/12/2013 13:46
    9/12/2013 14:33
    C
    11
    9/12/2013 14:04
    9/12/2013 14:09
    A
    12
    9/12/2013 14:23
    9/12/2013 17:05
    A
    13
    9/12/2013 15:54
    9/12/2013 15:54
    A
    14
    9/12/2013 15:54
    9/12/2013 15:55
    B
    15
    9/12/2013 15:55
    9/12/2013 15:55
    B
    16
    9/12/2013 15:55
    9/12/2013 15:58
    A
    17
    9/12/2013 16:02
    9/12/2013 16:02
    A

    Sorry cannot test it right now
    Select *
    From Table
    Where Group = B
    AND Open_Date in (SELECT OpenDate FROM Table WHERE  Group = A
    AND  OpenDate  BETWEEN OpenDate  AND CloseDate )
    Best Regards,Uri Dimant SQL Server MVP,
    http://sqlblog.com/blogs/uri_dimant/
    MS SQL optimization: MS SQL Development and Optimization
    MS SQL Consulting:
    Large scale of database and data cleansing
    Remote DBA Services:
    Improves MS SQL Database Performance
    SQL Server Integration Services:
    Business Intelligence

  • PP-PI Exclude time period from scheduling

    I have a design question,
    I'd like to exclude a certain time-period from scheduling, how do I do this?
    Example:
    From 1st of January - 1st of february, I cannot plan any production for material A (I can plan production for other materials). For the rest of the year, I'd like to spread my production for material A equally. How do I design this?

    Hi,
      This can be done by locking the workcenters.
    1. For all your workcenters goto capacity tabpage and choose capacity header.
    2. choose intervals and shifts and choose intervals.
    3. Enter the period as valid from 01.09.2007 and  valid to 31.10.2007
    4. In the same line goto work days and choose 0 ie non working days( if mentioned as working days it will be overrided as non working days) and save.
    5. For this period eventhough you have reqmts while converting the planned orders
         you will get pop up message that no routing is selected.
    6.It is upto you decide whether this planned order can be converted with default values from operation ( ie from tcode opjg).
    7. You can exit
    8. And also you can delete out dated planned orders by using roll forward period.
    Hope you got some solution to your problem and reward if useful.
    Regards,
    nandha

  • Differece between SNP Optimizer and Deployment Optimizer

    Hi,
    Can anyone please list down the difference in the planning method for a deployment optimizer and SNP Optimizer?
    Thanks & Regards,
    Sanjog Mishrikotkar

    Hi Sanjog,
    First of all if we understand the difference between SNP Heuristic Planning run which finds the 'Source' of Supply with dates and quantities and Deployment Planning run which CONFIRMs the Supply .... then it is easy to understand the difference between SNP & Deployment Optimizer.
    The Optimizer as you know Optimizes based on Costs and Objectively tries to MINIMIZE it.  Therefore while the SNP Optimizer finds the most cost effective way of finding the Source of Supply with dates and quantities, identifying where in SC it is better to Store or move the Product,  while the Deployment Optimizer generates the Best way to CONFIRM whether the Supply can ACTUALLY be done for the next few days.  Deployment precedes the TLB Run which after confirmation we put the Quantities on a Transport Load to build Orders for Execution (Shipping).
    Both are Cost based & use the Same Costs Information ... however one Plans and the Other Confirms.  During Deployment Optimization run, the Optimizer may decide to confirm the supply from a different source than what the SNP Optimizer planned based on the Available to Deploy Stock Quanties and the Cost of Confirming the Supply.  The Deployment Optimizer will apply Fairshare & Push/Pull Rules and looks at the Push and Pull Deployment Horizons which SNP Optimizer cannot.  The Difference is also in Planning Time Range.  You plan SNP Supply for mid to long term time range.  The Deployment looks at Confirming the supply in the next few days from TODAY. 
    So in short first understand the Difference between a SNP Heuristic and Deployment Heuristic and apply the same principle to a cost based optimization. This should tell you the difference between the two.
    Try read this ...  First para on Deployment Optimizer ...
    http://help.sap.com/saphelp_scm50/helpdata/en/1c/4d7a375f0dbc7fe10000009b38f8cf/frameset.htm
    Read the First Paragragraph as well as 'Distribution based on Lowest Costs' section
    Hope you find this answer usefull.  Reward Points if it is.
    Regards,
    Ambrish Mathur

  • Product variant constraint in SNP optimizer run

    Dear All,
    I have a business scenario where I require a constraint on the number of FG variants produced per day. A number of FG SKUs come under a particular variant. On any day the factory is able to produce only a fixed number of variants (say 5). I am looking for a way to map this constraint in optimizer run.
    Will appreciate your thoughts to solve this problem.
    Regards,
    biplab

    Hi,
    Does SNP Optimzer considers the Set up costs in the planning run ?
    SNP Optimizer considers following factors for the optimizer Run:
    Factors Considered During the Run
    u2022        Valid transportation lanes
    u2022        Lead times
    u2022        Transportation capacity
    u2022        Transportation costs
    u2022        Handling capacity
    u2022        Handling costs
    u2022        Production capacity
    u2022        Production costs
    u2022        Storage capacity
    u2022        Storage costs
    u2022        Time stream (location master data)
    u2022        Lot size (minimum, maximum, and rounding value)
    u2022        Scrap
    u2022        Alternative resources
    u2022        Penalty costs for not fulfilling demand (supply shortage)
    u2022        Safety stock violation penalty costs
    u2022        Procurement costs
    u2022        Shelf life
    u2022        Cost multipliers
    u2022        Location Products
    u2022        Fixed PPM/PDS resource consumption
    u2022        Fixed PPM/PDS material consumption
    Regards
    Datta

  • Logical time in deleted time events - RPUAUD00

    Dear All,
    We are using standard report RPUAUD00 to read deleted time events (Infotype 2011) from system. In certain cases, deletion entries are displayed without any entry for field LTIME (Logical Time). Can any one throw some light, as of why and how this LTIME entry is not logged in change log?
    Thank you.
    Regards,
    Kartik

    Dear All,
    We tried replicating this behaviour, but unable to. Any thoughts on this behaviour please..
    Regards,
    Kartik

  • Report workload by calculating how many versions of SharePoint list items created in a certain time period

    I have a total of 66 SharePoint 2010 lists - yes, 66! - each lists contains between 1500 and 3200 list items.  My employees update these various list items throughout their workday.  Each update to a list item creates a new version of the list
    item.  On average each list item will have anywhere from 5 to 10 versions before it is done.  I need to create a report that tells me how many list items they've updated in a certain time frame.  I have come close but still cannot arrive at
    the data I'm looking for. 
    This is what I have so far:
    I've created a report using SQL Report Builder 2008 v3 where I've filtered it to show only items MODIFIED between, for example, Feb1 and Feb28.  Of those records, I want the report to tell me how many versions were created during that time
    frame.  The result is one list item with 5 total versions.  Versions 1.0, 2.0, & 3.0 were created on 12/12/14.  The last two versions, 4.0 and 5.0, were created on 2/24/15.  Therefore, the answer I'm looking for is 2 because they
    created 2 versions between Feb1 and Feb28.
    However I get the following results using these queries:
    If I do a =Sum(Fields!owshiddenversion.Value) in the expression field I get the total versions which is 5
    If I do a =Count(Fields!owshiddenversion.Value) in the expression field I get the instance which is 1
    Is there a way to count ONLY the number of versions created in a time period?  Is there another hidden field in SharePoint that I can use in the expression that will give me results I'm looking for?

    Hi Rafael70,
    Per my understanding that you have already get all the need fields and informaiton of the updated version of list items and now you want to calculate how many versions of SharePoint list items created in a certain time period, you can't get desired result
    using sum and count function, right?
    I have tried to tested on my local environment but because I am not clear what is value in the field "owshiddenversion", I assumed you have two datatype parameters (StartDate and EndDate) to help filter the report in a certain time period.
    Generally, if you have add the filter correctly, it will filter the correct number's updated version in this time period, I would like you to provide details information as below to help better analysis the requirements:
    Could you please provide sample data of the table.
    Please provide snapshot of the report structure you have currently designed.
    Please try to provide all the expression you have used.
    If you still have any problem, please feel free to ask.
    Regards,
    Vicky Liu
    Vicky Liu
    TechNet Community Support

  • Closing characteristic after a time period

    Dear All,
    I am looking for a way to close an inspection charcateristic automatically after a certain time period.
    I have 3 characteristics for my inspection lot. The first should be closed 20 hours after generation of the inspection lot. The second 15 hours after that and the third 5 hours after that.
    Is there a way to do it?

    You can only make automatic UD for inspectoin lots if you meet the other requirements, which I doubt you do.  I.e. all required characterisitics have a status of 5 and all of those use a fixed scope.  You could make all your characterisitcs optional but that could lead to a whole bunch of non-processed lots.   I.e. if the wait period is met, the lots will be closed out.   This might be problems if some day the lab falls behind or is gone over a long planned outage.  It also runins the ability to indicate to techs the optional vs required characteristics!
    FF

  • How do you set the time period on IMAP email accounts (razr maxx)

    Hi Guys -
    Does anyone know how you can set the time period that the stock email will keep the already downloaded messages for IMAP email accounts?
    Mine never seems to show more than a couple of days worth at a time. I'd ideally like to be able to see at least 2 weeks worth of messages without needing to download them again!
    On other phones I've had there was a setting in the menu, but either I can't find it...or it's not there. I've found the setting for how OFTEN it checks the accounts, but not the setting I am seeking.
    Your help is appreciated!
    Best Wishes for the Holiday Season.
    -Rich

    Hey Rich.  Once in 'settings,' there should be a "days to sync' under the 'data usage' section.   You don't have that?

  • Is there a way to create a smart playlist that lists my top 25 plays from a specific time period (i.e. - top plays from the last 90 days)?

    Is it possible to create an itunes smart playlist that lists my top 25 most played songs in a specific time period (i.e. - the last 90 days)?  It seems that any "most played" list I create counts every spin a track has had in it's history of being in my library. 

    The challenge is is not to determine which of the tracks that have been played in the last X days has been played most since the beginning of time, but which have been played most in the last X days. iTunes can do the first one but it simply doesn't have the power to do the second.
    tt2

  • Hyperion planning data form in smartview: problem with summary time period

    We are using Planning ver. 11.1.2.2.300.20 and smartview 11.1.2.2.300 (build 070)
    We use common Data Form:
    In columns: Periods (Descendants including YearTotal - with no checkbox on start expanded)
    In Rows :accounts
    In some of our users computers,
    When they open Data Form in Excel (with Smart View) - its appears very strange:
    Summary Accounts are displayed as level 0 account in the summary Period columns (i.e. not in grey) and permit entering data.
    In addition when Entering data in summary time period (i.e. Year or Quarter),
    strangely,  the data doesn't  spread to the descendants months (level 0) .
    This phenomenon occurs just in few of the computers.
    Please help, how can we overcome this problem?
    Thanks and Regards
    Tami Kedem

    Hi Celvin,
    Thanks for your rapid response!
    All computers have the same version of planning and smartview.
    The computers where the Periods spreading and aggregation properties in Data form are not working,
    do work wonderfully when opening the Data forms in the web.
    I've tried everything, (remove suppressing, validations etc.):
    In all kind of data forms the spreading and aggregation properties on summary time periods are not working in smartview -
    and summary accounts on rows are not displayed in grey and permit entering data.
    We remove and reinstall MS-Office (2007) from the problematic computers, but it didn't help.
    Do you know if there is any kind of settings or softwares that might cause this phenomenon
    i.e. interrupts the smartview translation of the web Data Forms.
    Thank and best regards,
    Tami Kedem

Maybe you are looking for

  • Large Fact Tables

    I have some transactional tables that are quite large. Anywhere from 1 to 3 million records. I have been doing my best to find information on the best way to deal with these and I am having some trouble. I am a little tight for time and could use a l

  • Can we have BI and PI on same server

    Hi guys i have a server having 250gb hard disk and 4gb ram. Can I install Netweaver 2004s with both PI and BI . thanks in advance. -sandeep

  • Loading properties in JAR directory

    I am trying to load properties files that are in the directory structure of the JAR file. The first properties object loads, but subsequent properties objects will not load. The code is as follows: public Properties loadProperties(String file_name) I

  • N80 SMS Slowdown FIXED!!

    Hi guys, In case anyone hasnt spotted it, Nokia have release a fix to cure the problem of the N80 hanging for a few seconds when sending a text message http://www.europe.nokia.com/A4149142 I've installed it and it works amazingly, gets the phone righ

  • Bootcamp 2nd monitor resolution changes upon restart

    Here's my problem: I have 3 monitors connected to my Mac Pro (specs listed below).  Whenever I restart in Windows 7 (drivers updated, installed monitor control panel, Mac drivers updated) one of my monitors always gets screwed up with the resolution.