Delivery dateis not changing...afs material..

hi,
in our project we are using afs material.this material is extended to two plants.when an order is created in one plant ,the atp check is done and is saved.after that if we are changing the plant the delivery date has to change because of difference in planned delivery time from plant to plant.But it is not happening and it is showing the same delivery date of the first plant wihout atp check....why is it so?

Hi Kapildev,
Thanks for your reply.
But this will be also available in standard sap.In standard SAP if at all we change the plant and without using availability icon the delivery dates will change.Similarly is there any option to see the changed delivery dates in AFS by just changing the palnts.
Can you please provide the document regarding this if u have any information.
Regards,
Deepak.

Similar Messages

  • Schedule line : delivery date not changes

    Dear Gurus,
    When I change delivery date change in delivery documents and sales documents, picking date, pricing date, etc.. changes, but in sales document, schedule line's delivery date does not changes.
    Please help me to change the same and kindly tell me, will it make any problem.
    fyi..
    If I have not created delivery for the respective sales document, then I can able to change the delivery date in the schedule line(sales document).
    I'm just a new born in this area so please feed me...
    Regards
    Viswanthan.G

    Hi Viswanath,
    When you change delivery date change in delivery documents and sales documents, picking date, pricing date, etc.. changes, but in sales document, schedule line's delivery date does not changes.
    This is because the system calculates the dates based on avaliabiltiy check and it picks data from material master as well, based on purchasing processing time, GR processing time, loading time ..etc and it will conclude accordingly.
    Its like system will do backward schdeuling and establishes material avaliabilty date.
    Thanks & Regards,
    Krishna

  • PuP price not changed in Material master

    Hello All experts
    I have one question about the material ledger related transaciton, I have a Material with 2+V (price deter. and price control) setting in Material master data in Accounting 1 TAB. And material ledger is active for this material, the Periodic Unit price is 1 USD in current period and stock is 0.
    One PO posted for this Material for purchase with actual price 100 USD, and 101 movement type with special stock indicator E was used in Goods receipt posting. I think these stock will be treated as valuated sales order stock. But GR posting didn't trigger any PuP price change in Material master. Is that situation normal? Pls kindly help.

    With price control V in activity-based material price determination (indicator2 in the material master), the moving average price is calculated. With price control S, the material is valuated with the standard price and the moving average price is calculated for information purposes.
    In single-/multi-level material price determination(indicator 3 in the material master), the valuation price (standard price) remains unchanged and a periodic unit price is calculated for the closed period.
    This option is only for materials with price control indicator S,and is only recommended if in addition to multiple currencies and/or valuations, you use single-/multi-level material price determination.
    In single-/multi-level material price determination, a periodic unit price is updated for information, but it can only be used for material valuation in the closed period.

  • Delivery date not changed in ME22n but only in ME21n.

    Hi all,
    I have an issue with the PO transaction.
    In ME21n,if I change the shipping instructions under the delivery tab,via an enhancement the planned delivery time (no of days) changes and hence the delivery date also.
    However this behaviour is not obeserved when changin a PO but only when creating a PO.
    CAN anyone direct me how do I debug this issue?
    AS I mentioned we have done a custom develpment via BADI ME_PROCESS_PO_CUST to change the planned delvery time when shipping instructions are chnaged but this develoment doesnt affect the delivert date.

    Hi
    Did you check if in change mode whether your enhancement is actually triggering or not..? Please share the method which you are using along with sample code as an attachment
    Nabheet

  • BAPI_PO_CREATE1 - Delivery date not changing

    Hi All,
    I ''m using BAPI_PO_CREATE1 for po creation.
    When I try to enter the po creation date using the bapi its not taking the value I enter.
    It takes from the system .
          it_shed-po_item       = git_input-ebelp.
          it_shed-sched_line    = '0001'.
          it_shed-delivery_date = '25.05.2008'.
          it_shed-stat_date = '25.05.2008'.
          it_shed-quantity      = git_input-menge.
          it_shed-DEL_DATCAT_EXT = 'D'.
          APPEND it_shed.
          it_shedx-po_item   = git_input-ebelp.
          it_shed-sched_line = '0001'.
          it_shedx-po_itemx   = 'X'.
          it_shedx-sched_linex = 'X'.
          it_shedx-delivery_date = 'X'.
          it_shedx-quantity      = git_input-menge.
          it_shedx-DEL_DATCAT_EXT = 'X'.
          it_shedx-stat_date = 'X'.
          APPEND it_shedx.
    Please let me know how to enter the date.
    Thanks

    Hi Ann,
    Currently I don´t have a system to test it myself, but can you please try the following:
    Replace '25.05.2008' by '20080525', the first is a external format and the second is the format used internally.
    I don´t know you copied the code or you have written it again, but the field sched_line in the second structure is still pointing to the first (missing x)..
    I hope this helps you!
    Good luck!

  • Run Sales order wise MRP - AFS material

    Dear Experts,
                       Here my client asking to run the MRP for sales order wise. recently we did the AFS implementation for one of our client. there is an common T-code for MRP run, for AFS material is /AFS/MD02 . they are using material based BOM ( Bill of material). so there might be common material for different sales order i.e if am using material XXXX for Sales order 500 mean , same material will present in  Sales order 510 too. current system
    ( T-code /AFS/MD02) will run MRP of material XXXX Both 500,510 sales order but my requirement is i need to restrict to single sales order.
    any one guide me to resolve my requirements.
    Thanks in advance...
    Regards,
       Thangam.P

    Dear Venkat,
    You are right MD50 does not support AFS material.
    Please Try running : /AFS/MD02.
    Also Check SAP Note: Note 981747 - FAQ - AFS Production Planning
    Hope it will help you.
    Regards,
    Alok Tiwari

  • How can i change the Material by IDOC

    Hello.
       I have a question in change Material by IDOC. I config the output bound & input bound in 2 system.And create a program to distribute Material using
    CALL FUNCTION 'MASTER_IDOC_DISTRIBUTE'
    EXPORTING
    MASTER_IDOC_CONTROL = G_IDOC_CTL
    OBJ_TYPE = ''
    CHNUM = ''
    TABLES   COMMUNICATION_IDOC_CONTROL = GI_RET_CTL
    MASTER_IDOC_DATA =  GI_IDOC_DATA
    i fill the GI_IDOC_DATA with material detail.
    At first I create a new material.It's ok. But i change samething detail and excute the program again. I can not change the material.......the result status of Output bound and Input bound is both OK.
    Please help ...thanks.

    No one can help me?? I am been puzzled for several days...Who had solve things like this can discuss about me in here.
              Best Regards

  • BOM item qty does not change when header qty changes in Outbound Delivery

    Hi,
    We are using sales BOM and exploding it in Sales Order.  ( Item category of components as TAE )
    I am creating a delivery with reference to  a sales oder ( i have maintained copy controls to copy header and item data). Now when i change BOM header quantity in delivery document system is  not redeterming the components quantity , item quantity of the components does not change.
    Please let me how can i control item qunatity when BOM heade quantity changes in outbound delivery document
    Thanks
    Venkata Rama Reddy.K

    Hello Venkata,
    The components item category is TAE, that means the item category for the header item will be TAQ. Also the pricing will be carried out at the header item level only.
    Now for your query:
    The standard item category controls of TAQ will not have any connection between the header & the item level quantities in the delivery. If you change the quantity of the header item in the sales order, the quantity of the compnenets will be automatically adjusted. But this will not happen in the delivery with the normal settings of TAQ.
    Solution:
    Go to transaction code VOV7 - select TAQ - double click - In the Bill of Material/Configuration section , there is a field "Create Delivery Group" - select "X - Form delivery group with one delivery date".
    Save the settings. Now create a new sales order & then create the delivery & try to change the quantity of the header item, the system will automatically change the quantity of the components. (the system may not change the quantity of the components in the delivery of the old sales order - change it manually)
    With best regards,
    Allabaqsh Patil.
    Idhasoft Ltd.

  • Why the delivery date in the order not changing with P.O???

    Hi All,
    I am encountered with an issue that in a P.O the delivery dates are kept as customer requested delvery date and these cahnges are not updating in the order.
    According to standard SAP the change in delivery dates in a P.O should get updated in sales order.But its not happening if we keep this date as customer requested delivery date,Why is it so?
    I would explain with an example so that it would be clear:
    An order is created say 03/31/2011 and the requested delivery date is 05/02/2011.
    Confirm delivery date is 05/10/2011  (because in purchase info record it is 40 days)
    Now when P.O is created this confirm delivery dates will come.If we change these dates to any other dates it would replicate in the order.But if we keep these dates as customer requested delivery date, it is not changing in the order.
    Please any one help me out....
    Regards & thanks.
    Edited by: deepak567 on Mar 31, 2011 7:50 PM

    Dear,
    Please check the timing in work scheduling view. other wise schedule the routing and maintain time there and check your result.
    In material Master MRP2 screen you will get Scheduling Screen where you will get
    In-house production
    GR processing time
    Plnd delivery time
    These are lot size independent but value in work scheduling view are lot size dependent.
    Go to VOV8 and check the Lead time part. If u will maintain lead time of 2 days, the req deliverty date will be 2 days frm order creation date.
    You can configure this in the configuration of the Sales document type in VOV8. Here we can specify the value and as per that configuration the date will be defaulted.
    Regards,
    R.Brahmankar

  • Delivery dates in schedule lines is not changing in sales order

    Dear all,
    delivery dates in schedule lines on line item in sales order is not changing.delivery dates are different in schedule line of partial qtys.i have to do same delivery date on all schedule lines.
    Regards,
    Praveen

    Hi Praveen
    1. Schedule Line dates can be changed manually or by doing an availability check only.
    2. In case if you change the delivery date in the header it will not change automatically in the line item level.
    3. You need to do it manually only.
    kindly let me know more details.
    reg
    dsk

  • Save_text not working when material changes

    Hi,
    I am working on a sales order exit. The requirement is to keep the text of the line items intact evn if material number changes. Let's assume tht there is a material 'A' on line item 10 which is having text ' This is test' maintained. If the user changes the material  on lineitem 10 from 'A' to 'B', the text 'This is test' shoud remain intact. I am using Userexit_read_document to read the text maintained in the line item 10 for 'A' and then using Userexit_save_document to save the text for material 'b'.
    The problem is that the texts are not getting saved. I am using Read_text to get the texts and then using save_text in the userexit_save_document to save the chanes. The text name, id, object are same for both cases. Save_text does not give any exception and the sy-subrc is 0 but still the changes are not getting reflect on material 'B'. Am i missing something?Can some one help?
    I have attached my save_text code along with this.
          l_thead-tdobject = 'VBBP'
                l_thead-tdname(10) = vbak-vbeln .
                l_thead-tdname+10 = w_lines_all-posnr .
                l_thead-tdid = 'ZEDI'
                l_thead-tdspras = sy-langu .
                l_thead-mandt = sy-mandt .
                CALL FUNCTION 'SAVE_TEXT'
                  EXPORTING
                    header          = l_thead
                    savemode_direct = 'X'
                  TABLES
                    lines           = tbl_lines
                  EXCEPTIONS
                    id              = 1
                    language        = 2
                    name            = 3
                    object          = 4
                    OTHERS          = 5.
    Regards,
    Venkat

    Hi,
    Check whether the field w_lines_all-posnr is having a proper value. Have to used proper conversion exits, to chage the format of POSNR (line item 10 should be converted to 000010).  Also check whether the values are updated in STXH table after the order is saved.
    But, I don't think you should use SAVE_TEXT with SAVE_MODE_DIRECT = 'X' in the user exit. (Does this triggeres an explicity commit during user exit processing ?  Any comments ?)
    Regards
    Vinod

  • System not changing the G/L account when material group is changed in Pr

    Hi Experts,
    Issue- System not changing the G/L account when material group is changed in Purchase requistion.
    Process followed:
    1. Create Service Pr with material group 5040 which is assigned to valuation class 3511 and 3511 is assigned to g/l account 51370000
    2. Changed Service PR material group from 5040 to 5050. 5050 is assigned to valuation class 3512 and 3512 is assigned to G/L account 51260000
    The issue is when we changed the material group from 5040 to 5050 system is not picking the g/l account which is assigned to 5050 i.e. 51260000
    instead the g/l remains remains as before which is there for 5040 i.e. 51370000
    Please let me know how can we resolve this problem and pick the correct g/l. Please find the attachments
    Regards
    Badri

    Hello Badari,
    if you are using the item category D "Services", explanation from note  663983 - ME22(N), ME52(N): No new G/L account from material group applies:
    Please consider the following:
    You can maintain the material group both at item level and at service line level. If you subsequently change the material group at item level, the material groups remain unchanged in the services. As a result, the G/L account is not redetermined at service line level.
    In order for the G/L account to be redetermined, you must explicitly change the material group in the service line.
    Kind Regards
    TomT

  • AFS material-/mrp-status not active for plant.

    Hello Everyone
    I am facing an issue while executing the sales order
    Issue  :AFS material-/mrp-status not active for plant..
    CAN ANY ONE RESOLVE THIS...
    Regards,Rajneesh

    Hi Rajneesh,
    Tht prb might be the material master.
    Goto Material master, select AFS MRP View and activate/ press the AFS MRP status button and save.
    Reward with points if it is helpful
    Kishore

  • Not able to transfer changes in material master (periodic)

    Hi Friends,
    Got an issue here. I am not able to transfer the changes I made in material master. I want this as periodic, Made the specific setting in CFC9. And for your information 'Activate ALE Change Pointers Generally' and for massege type are activated.
    But when I execute CFP1 I got massege: 'No appropriate master data changes: Transfer has not happen'.
    I made changes in material master (global level),..like gross weight changed. Material is in active IM, no duplication.
    Any help Please? We are on SCM 7.0.
    Thanks,
    Satyajit
    Edited by: Satyajit Patra on Mar 20, 2010 9:12 PM
    OK, Guys I think I need to raise an OOS... It was for SCM 7.0, but was basic config....thts why I edited the thread so many times expecting some responce.
    Edited by: Satyajit Patra on Mar 22, 2010 7:41 AM

    Hi Satyajit,
    Please look at OSS  Note 1069560 - Data inconsistencies: Activating integration. models in parallel, if this helps you.
    Since  Gross data of material is in the basic view, it is common across plants , whereas, IMs are normally designed to have material masters at plant level.
    We may have same material in different IMs with different  plants. Therefore changes of the basic view fields are then contained in multiple IMs.  SAP advises to have a larger IM or sequential activation of IMs.
    I hope this will  help you .
    Regards
    Datta

  • Changing outbound delivery in EWM does not change the delivery in ERP

    Hello,
    I am working on EWM;
    I create an outbound delivery and it is transferred to EWM. If I reject the outbound delivery request in EWM, system adjust the quantity of delivery for both EWM and ECC.
    But if I activate the delivey the system creates a outbound delivery order(odo). But the problem is that when I change odo the delivery in ERP is not changed.
    Do you have an opinion to about what should i check in the system?
    Best regards.

    As example you can take:
    ex/code: DIFD
    Business Contx TPT
    Exec. Step 02
    Its for inbound delivery, there no record for outbond.
    But i still dont understand the buisnes reason for such process, cose if your customer order 500 PC for example, you warhouse workers simply change his demand and it's not correct, cose you can deliver this open amount later and sales person should decide. You task in EWM use exeption codes and process codes to close ODO or find other bin...
    Like i sad, at the time of good issue adopted amount EWM will send to ERP.
    For delete position from odo use trash button
    pick denal exeption code in WHT conformation.
    Edited by: Andrey Altabaev on Jan 19, 2012 10:11 PM
    Edited by: Andrey Altabaev on Jan 19, 2012 10:13 PM

Maybe you are looking for

  • Calling a method on a jFrame from a jPanel that created by the jFrame

    Hi all I can not for the life of me work out how to do this. Calling a method on a jFrame from a jPanel that created by the jFrame. I have used this code to set a handle for one jPanel to another. i.e I can create new jpanel and pass in handles from

  • ITunes successfully installed but won't start in Windows XP

    My iTunes installation was successful but when I start iTunes, I get the message: "iTunes has encountered a problem and needs to close. We are sorry for the inconvenience. Please tell Microsoft about this problem." Option to send or not send error re

  • SQL server 2005 and MDM components

    Question: 1) Could we make a repository with relevant tables in SQL server2005, and then import to MDM Console? 2) Could we see the tables of one repository in SQL server 2005.e.g. In MDM console, one repository created with the name Test001, Test 00

  • 990fxa-gd80v2 having usb 2.0 issue

    The problem is only with the 4 USB 2.0 slots that are on the I/O of the board. The USB 2.0 slots on my case (that I hooked up when installed) work fine and the USB 3.0 ports and the esata/USB 2.0 combo ports work fine. Windows will "unrecognize" and

  • Is Hyperthreading supported in AE CS 5.5 64-bit?

    I was under the impression that if you went into preferences and selected the number of processors to use or to leave remaining then AE would use the correct number of procs.  However I have found that since my machine is a WinTel system with hyperth