Delivery proposal not possiblre in sales order atp check screen

Hi Gurus,
The system is giving a messsage saying delivery proposal not possible in sales order atp screen and i'm able to save teh sales order but it doesnot show up in MD04. I want the sales orrder to show up in MD04.
PLesae help
Thanks
Anusha

Hi,
Now you have to provide additional information about your scenario;
1) Is it a new material created that gives this problem?
2) Did you create any new MRP type or schedule line category?
3) When you say some materials-sales order is not seen in MD04 and some seen in MD04. Is there any any difference between the materials like in types, MRP views etc?
From SPRO side,
You also need to check the transfer of requirement settings in t.code OVZ1 for what requirement type assigned  to your MRP type and item category. Also check the properties  of the  requirement type  in t.code OVZH what req.class is assigned to the  req.type.
Check the property of the  req.class in t.code OVZG (aval.check and TOR must be checked  at req. class level)
You may also need to check in t.code OPSS on the strategy (which is assigned in the material master MRP view3) on whether TOR and availability check has been activated  or not.
If all are OK, then run the report which is mentioned in the earlier response.
Regards

Similar Messages

  • ATP check for delivery in ECC & Sales order ATP check in APO

    Hi All,
    Can we do an ATP check for delivery in ECC , but for the same set of Materials- Plant combination , the ATP check when a SO is created should happen in APO .
    We do not want to remove the Business event 'B'  which is meant for delivery in  APO . For some materials we need APO ATP check to happen for delivery   & for some it should be in ECC  & for SO  the ATP check should happen in APO .
    Even if we do not have check instructions pertaining to Business event 'B' & a particular check mode (for the materials where the ATP check for delivery should happen in ECC & SO check to happen in APO)  , when we are doing an ATP check for delivery , it is still pointing to APO ATP check rather than ECC check .
    Any pointers for this is highly appreciated.
    Regards
    Surendra

    Hi Surendra,
    For SO, business event is A and for delivery it's B. When integrated with ECC, the check rule in ECC points as biz event in APO.
    You can control ATP check by customized settings for check rule in ECC.
    Also, by setting requirement class and requirement type in ECC, you control check mode in APO. So, even if you dont define for check mode in APO, the system might refer from ECC for the ATP check settings. Look into your ECC customization for how requirement class is derived and settings for requirement type. (based on MRP type, strategy grp and Item cat).
    I'm not sure how you can control ATP to happen for some sales orders/deleveries in ECC and for some in APO, since check mode is mentioned in material master.
    However, there are ATP BADIs (business add-ins) available in both ECC and APO, whch can serve your purpose.
    Regards,
    Bipin

  • SD- Sales Order - ATP check not working for few item in same sales order

    Hi Experts,
    Need help we activated ATP check but for few item i could not find confirmation qty after availability check. In same SO out of 4 items for schedule line it confirming qty for 2 item but  it's not confirming for remaining 2 items though stock is available. Please guide me how to correst and what need to check.
    Manoj

    Dear Manoj,
               As you know, ATP is a big subject & some times its difficult to point the exact problem.
    In your case, I suggest you to execute the function module:BAPI_MATERIAL_AVAILABILITY using Tx:SE37
    key in selection criteria , in results check the "ATPQTY"- it will show you how much actual stock is available for use i.e. ATP qtty.
    still if you find the availability & system not confirming the qtty, then problem could be in checking rule
    Tx:OVZ9 check in relevant combination, whether you are considering RLT or not?
    is this case with MTS or MTO
    because in Sales order -
    for MTS - checking rule "A" & MTO checking rule will be "AE"
    Regards,
    Reazuddin MD

  • Delivery block not updated in sales order after released VKM3

    Hi all,
    I am facing below error
    after released  credit block throuh VKM3 also i am unable to delivery becasue it is not updated still block exist in sales order level.
    i made all nacessary settings for that and also i tried through VKM1 but this tcode through error no poosible entries.
    Thanks in advance
    Srinivasa

    hi,
    check the following steps of assignment you did right or not
    1)first check in  t- code FD32 U  assigned authorization person & each credit limit U shud assign
    an authorization person along with credit limit
    2) check - conditon records with KRML output is there or not
    please read standard SAP config help as a check point doc.[Credit mgmt|http://help.sap.com/printdocu/core/Print46c/en/data/pdf/SDBFCM/SDBFCM.pdf]
    Let me know if it is soling your issue...
    rgards,
    rajeev

  • Sales order ATP Check

    As per our clientu2019s requirement during MRP run that stock as well as the receipts ( planned orders, Pos ) are not to be considered, we used the Storage Location MRP indicator (MRP 4 View, Storage Location MRP u2013 1), as a result Planned orders were created at plant level and were executed which was fine. During Sales order creation and availability check receipts are not considered as the availability check is carried out at Storage Location Level (Storage Location entry is mandatory while creating sales order ). Client wants to see the receipts while doing availability check in sales order and during MRP run they do not want to consider Stock and receipts.
    Can you get back to me on the above.
    *P.S:*
    *It is MTS Scenario with Strategy 11--Mixed MRP2.*
    *2)Activated the POs and planned orders in OVZ9 even.*
    *3)Checking Rule assigned to the sales order type..*
    Need a Quick Response on this.
    Thanks in advance
    Venkat Reddy
    9963188858.

    Hi All,
    I would like to elaborate my question with an example:
    For material A we have a stock of 1000 kgs.
    There is order reservation(for other production order) for 800 kgs.
    when I create a sales order for material A for 600kgs, I able to create delivery (i am able to confirm 600kgs even though the quantity available is only 200kgs)
    Hope i have given a clear example.
    Please suggest me what configuration/settings that is causing this behaviour.
    Thanks & Regards,
    Nataraj

  • Sales Order ATP Check in SAP B1

    Is there a way to disable the ATP Check upon saving of a Sales Order using the DI API or any other built-in configuration settings?

    SC,
    Is the question that you have related to the SAP Business One integration for SAP NetWeaver (B1i) or is your question with respect to the Business One SDK?  I ask as I am not sure what "ATP" stands for.  If you question is with respect to the SAP Business One SDK, you will want to post yor question in the "SAP Business One SDK Discussion Forum" id related to the SDK.
    Eddy

  • Sales order ATP check - stock transport order

    Hi,
    When the sales orders is created it performs availability check on stock transport order as per the settings and confirms quantity. However, when the stock transport order carries a batch which has a restricted status, the sales order still confirms the quantity based on the stock transport order delivery date. I have applied OSS notes 350864 and 154682, but still the system confirms quantity, which has restricted status at batch level in stock transport order.
    Can any one help with a solution for this scenario?
    Thanks,
    Shiva

    Hi
      Try the following exits.
      EXIT_SAPLATPC_001
      EXIT_SAPLATPC_002.
      Reward points if this helps.
    Regards
    Karan

  • Material Susbsitution in ECC Sales order ATP Check

    Hello all,
    I have used GATP and implemented Material susbtitutions.
    Now i am looking to achieve the following in ECC:
    1) During ATP check, ECC should first look for availability on the material in the sales order item
    2) If enough supply is not found(ATP Check fails), then system should substitute this material with another material; this substitution should happen only if the ATP check on the customer ordered material fails;
    Is ECC capable of doing this? I already tried Material determiantion and all reason codes; But material determination is directly replacing the customer ordered material with the substituted material even though there is enough stock on the sales order material.
    thanks

    In std, you can achieve this.
    In Material Determination, while Creating Condition records in VB11,
    maintain appropriate Substitution reason ( for eg:0001)
    enter Customer Ordered Material in "Material Entered" field & substitute Material in " Material" field.
    now Goto- Alternative materials or Press F2, Enter the another material to substitute Material if the first Substitute material doesnt have enough Stock , Tick the "MRP Indicator" & save the record.
    ( ref: Help doc of MRP Indicator,
    MRP indicator for alternative material in product selection
    Material requirements planning (MRP) indicator for automatic product selection.
    Use
    The MRP indicator displays the alternative material for which a subitem can be created in case a requirement can't be met. Material requirements planning uses the subitem to determine the requirement shortage.
    Note:
    Only one alternative material can be indicated as relevant for materials planning.)
    Test & revert.

  • APO gATP vs R/3 ATP - To check sales order ATP across multiple plants

    Hi There,
    I am trying to evaluate gATP functionality for SD sales orders.
    The primary requirement is to have sales order ATP checking take place across multiple plants.
    E.G.
    Sales order line is entered for qty 100
    60 is available in plant A, 40 is available in plant B
    System checks both plants and creates 2 lines - one for delivery from plant A and one for delivery from plant B
    (we are currently heading down the road of writing ABAP to do this 'multi-plant' check in R/3 but the more complex the requirements get the more interested I am in understanding more about APO/gATP)
    I would like to understand the benefit of implementing APO / gATP as opposed to using standard R/3 ATP and perhaps writing custom ABAP code to search for inventory across multiple plants.
    I would appreciate any insight regarding what is required to setp gATP to perform such checking and any other feedback regarding this issue - especially if you have had to implement something similar at your company.
    I have looked here but not much clear help:
    http://help.sap.com/saphelp_scm50/helpdata/en/26/c2d63b18bc7e7fe10000000a114084/frameset.htm
    Thanks,
    Niall

    Hi Niall
    you are probably looking at RBATP (Rule based ATP). Look at transaction /sapapo/rba04 in APO where you develop your own location and product substitution rules. Going down an ABAP road in R/3 may work short-term but not long-term as the requirements may get more complex.
    Regards
    Srinivas

  • Error when trying to create a delivery note from a sales order -  Internal error (-2010) occurred

    Hi
    I am trying to create a delivery note form a sales order in B1 V9 PL8 and I am getting the following error -
    Internal error (-2010) occurred
    The code has been working but we seem to be getting problems now
    Can anyone suggest anything please ?
    Copy of the code attached
    Thanks
    Andy

    Hi Andrew,
    Try replacing this line:
    odel.Lines.BaseLine = lineno - 1
    with this:
    odel.Lines.BaseLine = oorder.Lines.LineNum
    Beni.

  • VL10C double delivery notes for one sales order

    Dear all,
    Currently we encountered an very strange issue in our SAP.  we found that via VL10C, SAP create two duplicated ourbound delivery notes for one sales order, which resulted in a double items and amount in the billing document. These two deliveries notes are complete the same, which were created with 7 sec interval via VL10C. Check in the sales order, we can see delivery Qty was double against order Qty for all the items.
    does anyone have a clue on this issue? your effort and feedback will be most applicated!
    Thanks & Best Regards,
    Kyo NG

    Hi,
    I forgot this possible cause. Check Note 61148 - VL04 VL02 AME807 AME815: Insert to table VETVG and related notes, specially Note 931297 - VL10x, VL10HU - Duplicate entries displayed in STO.
    Regards,
    Eduardo

  • How to Add Delivery Note based on sales Order

    How to add a delivery note based on sales order.
    say i have a order no. 10 and linenumber 0 to 3.
    each time i book with order no 10 and line no.3,i need to add to delivery note.
    i also in need of adding just one Header and Multiple lines(Header for order Number - 10 and multiple lines for each Booking ).
    How can i achieve this.

    Hi
    You can search the samples....C:\-->Program files->SAP----->SDK->Samples->DiAPI----->OrderandInvoice...
    Here invoice is added for a particular sales order.....the same can be done for delivery.....
    Hope it helps

  • Sales Order ATP (ECC) with Working Times - available customizing methods?

    Dear All.
    We're having some issues with sales order atp and working times.
    Seems like the sales order atp function is not looking at the time zone assigned to the working times.  I would have guessed the time zone would have come from the shift sequence or just the time zone off the shipping point or plant.
    Seems like it's taking the time zone assigned to the user though.
    Any thoughts on this ECC functionality?  
    Seems like it works ok if atp is checked in APO.
    Otherwise, we may need to do a little customizing update the material availability date to the correct date, or update the correct timezone if possible, or possibly roll back the confirmed dates by one day if the  request misses the cut off on the working times due to the delta in the timezone checked.
    I've been reviewing:
    userexit_availability_in, userexit_availability_out, exit_saplatpc_001, and userexit_check_vbep but nothing jumps out at me as a good option.
    Any thoughts on an approach for this?
    Anyone made any similar updates through userexit, badi, cmod, other?
    Looking for structures, tables, fields in these programs which we could use for this purpose, or possibly just adding a check to skip the working times under certain circumstances.
    Many thanks.

    More on this one (below) in case anyone has come across this before and found a reasonable solution to it.
    Looks like there is an OSS note on this, but it just describes the fact that it doesn't work.  The note = 547961, and looks to be related to #7.  I'm not sure how adjusting the transportation duration would help as it suggests. Seems like we would then just be sending more packages overnight rather than ground.
    Going to take a look at adding some custom code to set the material availability date (mbdat) to the correct date based on the shipping point cut off time.
    Any extra input would be helpful on issues this might cause, how to go about, etc.....
    Thinking that we could roll the mbdat back one day if the item was confirmed but was rolled forward one day due to the time zone issue.
    Looking at mverf, mverf_pos, xvbep.  Others?
    One possible issue I can think of is that initial delivery scheduling for the requested date has already been completed before the ATP check.  But not sure if there's a userexit, routine, badi, etc... available specific to the delivery scheduling peice?
    Thanks again!

  • Contract not visible in sales order document flow

    Hi
    I am supposed to create sales order from Contract.The requirement is that only header data should be copied.Thus  In Copy Control configuration I did not maintain item level and schedule line level settings for these document types. The issue is that after running the whole cycle from Contract -->SO --> Delivery --> Invoice when I see the Sales Order document flow I can see all other documents but not the contract.Also In Contract document flow I can see only sales order but not delivery and invoice.Please guide.

    Hello,
    Update Document Flow option is available only at Item Level in copy control setting from Contract to Sales Order.
    Check out your Copy Control Records at Item Level. There would be "2" mentioned in "pdate document flow" box.
    2 means Create doc. flow records except for dely/goods issue/billdoc. Here you to maintain "X" for Complete Document flow.
    Hope this helps,
    Thanks,
    Jignesh Mehta

  • Sales order ATP

    HI all,
    How to find the component lead time for a material during sales order ATP process. I am looking for a FM which would give me the exploded component list with commited date. I will be using this date in a user exit of sales order.
    Thanks in advance.

    SC,
    Is the question that you have related to the SAP Business One integration for SAP NetWeaver (B1i) or is your question with respect to the Business One SDK?  I ask as I am not sure what "ATP" stands for.  If you question is with respect to the SAP Business One SDK, you will want to post yor question in the "SAP Business One SDK Discussion Forum" id related to the SDK.
    Eddy

Maybe you are looking for

  • Itunes library both on external hard drive and mac.

    Hello. I wish you could help me. I transfered my itunes library to an external hard drive. However, there are times that I would forget to put it back on. Now, there are some files that itunes can't locate. How do I back up the new files i have on my

  • Ibooks author inspection widget: grayed-out title and caption options when object is selected

    I'm trying to add titles or captions to photos in an iBooks Author project. I select the photo, click on Inspector and Widget, then Layout.  The only active option on Layout is the Accessibility Notes.  Is this a bug? What am I missing?

  • RUNING STANDARD REPORT ON DEVELOPER

    we are using solaris operating system on our server machine, while we are running windows on our client site, we want to run standard report of Oracle Fixed Assets (Cost Sumary Report). we had tried to comment that parameters it gives error of REP-14

  • XI: Combine File - add filenames at bottom

    When combining files (e.g. jpg) to 1 PDF I would like to add the source filename + date (EU format) at the bottom of the each page. It would roughtly be as follows: the combine files steps as usual then a sequ that adds the original filename+date at

  • Querry regarding overriding static methods

    Hi , I m overriding a static method defined in superclass ThreadLocal1 as: public static void mm()      System.out.println("bye"); class Thread1 extends ThreadLocal1{ tt(){} public static void mm()      System.out.println("hi"); public static void ma