Demand Management Versions and Reference

Dear Gurus,
To create new versions in Demand Management, is to go via SPRO path--> Production --> Production Planning --> Demand Management --> Define Version Numbers
There is another setting which want to understand.
SPRO path--> Production --> Production Planning --> Demand Management --> Allocate version and for auto spilitting to reference
What is reference we are talking about? From where is this reference for eg 1 - Reqm Plan has come from?
Is version maintained here is standard or you can change it?
If we can change which version is to be taken for each reference?
Pl. reply.
Srini

Hi Srini
The first sap path is to create version no which you can use to create PIR in demand management like version 01, 02, AA, AB.
The 2nd path is about splitting of demand management PIR into lower period say year to week, week to day during copy of version and here you assign one version number which will be used during copy.Reference is from where you are getting demand.

Similar Messages

  • Upgrading to new version and references for repository export

    Hello,
    We have made a reference for repository export / import in MDM7.1 sp2.
    Now we want to upgrade to the newest version of MDM 7.1 .
    Is this reference automatically upgraded to the new version too or do have to upgrade and then start with a new reference?
    Thanks in advance
    Harrie

    Hi Harrie,
    You need to download the latest upgrade patches from Service Market Place. And install them.
    1. Browse to SMP - https://websmp105.sap-ag.de/~sapidb/011000358700001827872008E
    2. Navigate/scrowl down to section - 'What`s New - Release Notes'
    3.Select the latest patch you need >A window with details of that Release opens up > Select 'Download Corrections' > add patch to download basket > 'Download'to download the patches.
    Your SMP ID must have Download authorization for dowloading the patches.
    Regards,
    Vinay M.S

  • Demand management Version

    Hi..
    I am Creating Demand in MD61 . In planning table Its version 00 is inactive ...How to make it Default as ACTIVE.
    In SPRO ....OMPD default Value is 00 and active.
    till i am getting version is inactive.
    My requirement type is VSF and Consumption mode is 4
    Please suggest me to default active

    Hi
    In the MD61 Userparameter Screen ensure whether it is Active. If it is inactive, make it active
    Prabakaran K

  • SOP and transfer to Demand management for MTO material

    Hi all,
    I have the following situation:
    I have a material, a finished goods product with planning strategy 20 Make to order defined in the material master. I enter a sales forecast for the material in SOP in SAPECC (transaction MC87), works fine.
    But when I try to release the forecast to Demand Management (MC74), I get the following error message: "No requirements type exists for material 110100 1 in plant 2". I can see that planning strategy 20 MTO does not have any requirement type defined.
    But what is the best practice then to forecast on MTO materials (with strategy 20 MTO)?
    What I want to do is to bring down the requirements of the MTO material to Long term planning to get a BOM explosion for the components. I realize that I should not start a production plan for the MTO material, but I want to plan the requirements for components several months ahead.
    What is the best practice? Should I use a different production strategy? Am I missing config or any fundamental thinking here?
    I need to have the material as a MTO strategy, but I want to plan the components.
    Please, give me input on this if you have any solution.
    Regards,
    Lars

    Hi Lars,
    Here's what you need to do:
    1. Instead of pure 20, customize a strategy group that has in it 20 and 10, and attach this strategy group to your material.
    2. In MC74 specify requirements type LSF, demand management version, and make sure to uncheck the "active" box (otherwise you will get requirements in the operative system, and not only in LTP).
    3. Do the transfer, and include the version in a LTP scenario.
    Regards,
    Mario

  • Demand management - Priority of Demand

    Dear friends,
    I have got one requirement as below
    User wish to enter Productwise demand & also the priority , based on available stk of components & SF goods , systems should tell us Which products & How much quantity can be produced?
    I can use one demand version for entering demand for this requirement but How a provision can be made for entering priority? One text field is available for item level but for entering a text you need to do 3/4 steps , is tedious job.
    Please suggest.

    >Dear colleague,
    Unfortunately there aren´t more available fields inisde MD61/2 to update the required additional information.
    maybe you cna use the Req. Plan number. , It is a at iniital screen.
    Myabe you can create a Req.Plan number for each priority.
    This information is also displayed in MD04,
    THis or maybe you can create a new requirement type for each priority. Aa copy to the one you have, and assign this new requirement type  to each item regarding the priority,
    Unfortunately the priority is a concept not used in Demand Management.
    thanks and regards,

  • VS 2005 with CR XI R2 version 11 managed DLLs and Viewer

    I have a development PC with VS 2005 and I need to interface with CR XI R2 reports.
    I wanted to take advantage of Dynamic Graphic Location in CR XI (which the flavor of CR that came with VS 2005 does not have).
    I installed CR XI R2 but still found the reference from VS 2005 to the engine was 10.2.51. Similar, the CR Viewer in VS 2005 was 10.2.51
    If I build the rpt in CR XI and then run it in a VS project, because the engine is version 10, it ignores the logic wrt dynamic graphic location by formula.
    In an attempt to fix, I then built and ran an install that had CR XI merge module. I think this then placed version 11.5.9710.1332s of CR such as CrystalDecisions.CrystalReports.Engine.dll on my PC (but not in GAC). i.e. I found version 11 objects under C:\Program Files\Business Objects\Common\3.5\managed, that I don't think were there before - and if they were I don't know how to get them there again. I did originally install CR XI off a disk that was not R2 - perhaps it was from that? I dunno.
    I then referenced the ver 11 engine (and related dlls) in my VS 05 project it seemed to work fine.
    My next problem was to get the CR Viewer to work. So, similar to the engine fix, I added the ver 11 viewer to my VS toolbar and manually referenced the ver 11 dlls.
    At first this seemed to work - but after I saved and opened another project in VS, when I tried to do the same thing (use ver 11 viewer and reference ver 11 dlls) I got :
    Could not load file or assembly 'CrystalDecisions.VSDesigner, Version=11.5.3700.0, Culture=neutral, PublicKeyToken=692fbea5521e1304' or one of its dependencies. The located assembly's manifest definition does not match the assembly reference. (Exception from HRESULT: 0x80131040)
    I even get this now when I go back to my initial project I tried this in (that did work at first).
    So then I went to a clean PC, and installed VS 2005 (including the CR that comes with it), then installed CR XI R2.
    That put me back to square one - where I have VS 2005, but it references version 10 CR dlls and viewer (and it doesn't have any of the .NET ver 11 managed dlls).
    What is the proper way to get VS 2005 CR references and CR viewer in VS 2005 upgraded so I can take advantage of XI R2 ?
    Edited by: al smyth on Aug 13, 2008 10:49 PM

    I have given up and found a different solution.
                  Upgrade to Crystal Reports 2008 (version 12).
    The install detected Visual Studio and seemlessly integrated the assemblies and controls.
    BTW - I was very impressed with the install logic and interface in this regard.
    Nightmare over.
    My understanding of how such an issue came to be is that it is a case of chicken and egg.
    In my adventures trying to find an answer, I read that when MS was creating VS 2005, it had to have a commitment date and cut off from CR.
    By the time VS 2005 was released CR had advanced and as a result they were out of sync (although I don't understand why I couldn't find any patch or update to VS 05 that would have put the assemblies for managed code in sync with CR XI R2)
    So now CR releases CR 2008, and it has finally 'caught up' and provides the needed detection and SDK updates for VS (i.e. now the egg and the chicken co-exist).
    I had read a few times on problems such as mine to "uninstall CR and then reinstall". I had done this, and I had tried also on a totally clean PC (in both cases 1st install VS w CR, then install CR XI R2). No dice
    I had also read that it could have been because of the flavor of CR (professional vs developer or whatever). But that didn't seem to make sense because I thought CR now basically comes in one flavor - but I don't know exactly when that started.
    Thanks to Mark for giving a reply and specifying exact file version and assembly version numbers.
    I'll leave this as unanswered for a while just in case there's some poor S.O.B (son of a banker) who cannot upgrade to CR 2008 and is having similar problems.
    Now, back to our regularly scheduled programming....

  • Fund Management Configurations and user Documents - ECC 6 Version

    Dear all,
    If anybody have the Configuration and user documents pertaining to Fund Management - Government - ECC 6 Version and also the Configurations and user documents pertaining to Budget Control System (BCS), kindly send it to me.
    My E-mail ID is [email protected]
    Regards
    V.Krishnan

    Hi Ezequiel,
    Thanks I have got it. After activating EA_PLM and EA_SCM i am able to get it.
    Thanks a lot.
    Warm regards
    Purnendu
    P.S. - Full reward points for you.

  • Version and Configuration Management in Oracle Portal

    Hello ...
    How is version and configuration management applied to real-life, large Oracle Portal applications, where e. g. both development, test, and production environments are used?
    The build-in version management in Oracle Portal is inadequate for such environments.
    Any suggestions, opinions, ... on this matter would be highly appreciated.
    Regards,
    Poul

    In my opinion, Portal has a lot of work to do in terms of configuration and change management. If you are using Portal as an application platform, as opposed to KM, you are better of developing java portlets, so that you can use the SCM with JDeveloper and stay away from the application components. If you do want to use the components, then application export/import is the only way. You can setup your own procedures for handling the exported files (version etc).
    You don't really version KM apps. Content is meant to be posted and otherwise administered by content area admins and users. It is not a "application", that must be change managed. There are versioning features available at the item level, which is adequate (but by no means a complete versioning system. Use iFS if you want that).
    I have heard quite a few horror stories about exporting and importing content areas.
    A 3-system Portal landscape, in my opinon, is overkill and trying to fit an existing approach to a new tool. A test/dev and a production Portal might be more palatable to the IT budget.
    My 2.5 cents

  • Versioning and Change Management in VC 6

    Hi there,
    I couldn't find documenation on VC change management or version management for vc model.
    Could someone shed some light on this?
    Cheers,
    Paul

    Hi Lior,
    I am looking for a soluation that would assist in versioning and migration in a team environment.
    Thx,
    PL

  • I keep getting the message when I open Muse CC, that the latest version is here and that i need to download it... But when i click "Download Latest Version" and it takes me to the applications manager it tell me that Muse is "Up to date"..... I also downl

    I keep getting the message when I open Muse CC, that the latest version is here and that i need to download it... But when i click "Download Latest Version" and it takes me to the applications manager it tell me that Muse is "Up to date"..... I also downloaded a template from Muse and it tells me when I open it that i also need the latest version... Can anyone explain why Iam getting this message and Why I can not up date?... Much appreciated

    Download the creative cloud desktop app using the below link:-
    Download Adobe Creative Cloud apps | Free Adobe CC trial
    And then check if you get install Button for Muse CC 2014.3
    Regards,
    Neha

  • SOP and Demand Management!

    Hello SAP Gurus, I need a litle help,
    I have created a SOP in transaction MC87 for a material/plant with quantity 100 for month 10. Then I make a copy to Demand Management and in MD04 I have the requirements. So far so good.
    The problem is: when I change the quantity in MC88 for the material/plant to 0, the system doesn't copy to demand management the 0 quantity.
    Is there any way to put this to work this way or do I have to go in MD61 and delete the requirements for the material/plant?
    Thanks in advance,
    Adelmo Silva

    Hello again SAP friends,
    Maybe I can explain myself beter:
    SAP v4.6C
    1. MC88 - I change de Rough-Cut Plan for my material/plant with production values equal to 0 (zero).
    2. I transfer to demand management and everything works fine!
    SAP ECC 6.0
    I do the same as SAP V4.6C and I get the error: "No data maintained for material ARS_PA_01 plant 1000 in transfer period Message no. MA640"
    Can someone help me with this?
    Thanks in advance,
    Adelmo Silva

  • BizTalk artifact versioning and configuration management

    My customer is asking me to give us the 'BizTalk artifact versioning and configuration management' document.it should contain's recommended strategy
    / approach to version control of messages / schemas / artifacts ,handle multiple messages version to handle or avoid changes to interfaces  etc.Please let
    me know if any one having such a document with you.
    Please help what kind of TOC should in the above document should contain and share if anydody having similar kind of doc ASAP

    Hi,
    Here are few good articles which can help you creating the document:
    Dynamic BizTalk Versioning Strategy with Cruise Control
    Versioning Strategy for
    BizTalk Assemblies
    Implementing
    a Versioning Strategy
    Best
    Practices for Updating Applications
    Upgrading
    and Versioning Strategies for Applications
    If this answers your question please mark as answer. If this post is helpful, please vote as helpful by clicking the upward arrow mark next to my reply.

  • Problem the PSI and Demand Management

    Hi, we have a problem with using the PSI to step through stages in the workflow.
    When we submit a Project to the Next Stage in a Demand Management Workflow with the PSI, the
    Entry and Completion Dates of the previous completed stages changes to
    the Submit date of the Current Stage:
    When using the Normal Submit button in PWA this does not occur at all
    Here is a Code extract that we use to do the PSI Call:
    Has anyone had this before?
    http://blogs.umtsa.co.za/nicoo

    Hi Sai,
    Please check the tabl entries in SE16 or similar
    1. Assigned the site to the WH number (T340DT-LOCAT)
    2. Activated TRM for the movement type/Storage types (T347A-KZINA)
    2. Turned two step confirmation on for source and destination storage types (T331_B-QUEIN  & T331_B-QUAUS)
    Can you see anything in LTRM TRM monitor (no selections = only enter site number) i.e. a delivery number or TO?
    If not please try:
    1 Transaction LTRCC
    2. Deleting the data delivery/TO and recreated it?
    If this does not help, I could take a look at you setup if you allow external access?
    Thanks James

  • How to manage slow and fast moving goods in Demand Planning

    Hi All,
    Kindly let me know how to manage slow and fast moving goods in Demand Planning.
    1. First how to detect slow and fast moving goods
    2. which DP model to use
    3. Any Best practice while dealing with slow and fast moving goods
    Thanks
    Arun

    Arun,
    There are two main concerns with forecasting slow moving goods. For fast moving, yes, trend, level and seasonality combined with a decent demand level gets you through.
    So, either you don't have demand in the market for that product; if the product is not critical (like go/no go spare parts) I recommend just averaging out the demand over a period and going with that. Any errors incurred there won't have a significant business impact. On the other hand if it is critical, safety stock and/or contractual obligations come to play.
    OR, if there is market demand but your market share is too low for whatever reason, then it gets tricky because you need a predictor variable(s) for which you have good knowledge off (such as CPI index, demand for related products, etc). The forecast is then done on the predictor variable(s) and the low market share applied to 'translate' the expected demand to the product in question. Unfortunately, the case of low demand/low market share I have no idea of how to implement it on SAP. Since forecasting is just the tip of the iceberg, it may pay to do it outside of SAP (say in Excel) and manually input it (unless the products are many and varied).
    Hope this helps. Please let me know if this makes sense and/or applies to your question.
    Rodrigo

  • PP and I2 DM(Demand Manager) integration

    Hi PP guys:
    As we known,PP is for production and planning in the whole SCM.but in this field ,there is another tool I2-DM(demand manager).is there someone having the experience on DM and SAP-PP integration. we can talk via MSN and share the experince and resoure each other.
    MSN:[email protected]

    Dear,
    What data you are getting into SAP from I2?

Maybe you are looking for

  • PopulateAttributeAsChanged() and primary keys

    I have a column on a table wich is populated from several entries into transient attributes eg. Field1 A Field2 B Field3 C postChanges() method in the entity has been overriden to concatenate these values together ie. A/B/C I call populateAttributeAs

  • How to connect lumia 1020 to projector

    hi! somebody knows how to connect lumia 1020 to projector??? maybe exists any programs for it? i want to make a presentation in a real time direct from my phone Lumia 1020! Thanks in advance

  • Mighty Mouse Troubles

    The scroll ball on the mighty mouse wont scroll down, but it stil scrolls up. Does anyone else have the same problem or know how to fix it? Thanks, Ross. 17 inch intel core duo 1.83 ghz   Mac OS X (10.4.7)  

  • Can't open Professional after opening Reader

    I have both Reader and Professional on my computer, and I recently upgraded my Reader to 8.0. Since then, the two programs have not been working well together. When I open a file in Reader, I cannot open anything in Professional. I can't even open th

  • Problem in printing ill file ??

    I have Ai file with PSD links, when I try to print this file using XEROX printer the printout comes with  white scrach lins on photos (links), I changed the psd links to eps its come OK but with square around the photos look like dark multiply layer,