Deprication is posting as debit for an asset.

Dear All ,
1. one asset created at with Gross amount-20,28,383.00 with planned depreciation amount 450751.78 .  and upto december  08  depreciation calculated  properly.
2. In month of Jan 2009 you have add RS 106,360 with ord  deprication amount-23 635.55  by T.code- AIBU . 
3. After this entry , Plan deprication value has changed from Rs 450 751.78 to Rs 23 635.55.
4.Upto december Rs  281,719.86 charged as deprication and now depriction plann amount Rs 23  635.55 only so system find excess depriciation charged .
5. In month Jan deprecition run it has debit  as  Rs 263993.19  ie (281719.86 -23635.55).
Please help me how to correct it.
Thanks,
Manas Kumar.

HI AP,
No, same  depreciation key and no changed in deprication key.
Manas

Similar Messages

  • ABGL Post Credit memo for asset

    Hi,
    In transaction ABGL (Credit Memo in Invoice Year), I wanted to issue credit memo for price difference in acquisition of asset.
    issue background:-
    asset bought without PO (F-90), last year 2010
    Now we want to post Credit memo for this asset.
    Error hit:
    Acquisition value negative in area 01.
    Message no. AA617
    What is this error message mean? How to resolve this?

    Hi,
    in OADB, our setting :-
    Acquisition value = +
    NBV = +
    Investment grants = 0
    Revaluation = 0
    Ordinary depreciat. = *
    Special Depr. = *
    Unplanned Depreciat. = *
    Transfer of reserves = -
    Interest = 0
    Revaluation ord.dep. = 0
    I follow your step, i change acquisition value field to "-", it prompt me this message:-
    Caution: generic values for real depreciation area (refer to long text)
    Message no. AC246
    Diagnosis
    You set up depreciation area 01 so that all types of acquisition values are allowed. However, this only makes sense for derived depreciation areas.
    System Response
    Warning message. The system allows the setting, but note that it can lead to undesired effects for real depreciation areas.
    Procedure
    Check the setting.
    I change theAcquisition value  + to -?

  • Subsequent debit for a vendor before invoice??? (URGENT!!!!!)

    hi all,
    i want to post subsequent debit for a vendor before invoice.  but the system is giving a message "The quantity to be debited/credited cannot be any greater than the quantity invoiced so far."
    can anybody tell me how to post subsequent debit before posting the invoice (i haven't got the vendor invoice yet but i must pay the freight cost).

    Hi,
    Subsequent debit : Rarely, you receive from your vendors invoices or credit memos that refer to transactions that have already been invoiced. Your company wants to use subsequent debits/credits to process these documents. A subsequent debit/credit changes the total invoice value only of a purchase order item but the total invoice quantity remains unchanged.
    The processes are:
    1)     Subsequent credit or even subsequent debit is done when total “VALUE" of invoice is changed.
    2) Total invoice Quantity is remained same.
    3) Only value based transaction takes place & not quantity base.
    4) If credit memo is received from memo then subsequent credit is done in MIRO.
    For example vendor has submitted invoice of 100 Qty for Rs 1000 & we have posted the invoice & subsequently he realized that he has invoice for higher price i.e. it should have been actually 900 Rs as against Rs 1000 .In this case he will send a credit memo of Rs 100 for which we will be doing subsequent credit.
    5) This is done for PO items if an invoice is already posted
    6) cannot refer to particular invoice
    7) Listed separately in PO history
    8) In PO total values is updated but not Quantity.
    For ur case you can pay to Vendor(freight cost ) by selecting Planned Delivery Cost instead of Goods/Services items in MIRO T.Code
    Regards,
    Biju K

  • Transfer posting (OASV) issue for the existing Intangible Assets

    Hi SAP Experts,
    In our system the APC and Acc. Dep. for ord. dep. has maintained the same G/L Account (A090) so due to this in Fin. Statement it shows the Net Book Value. Now, our client wants to migrate to IFRS, as per this it has to show like ( Intangible Assets - Acc. amortization - Acc. Impairment Loss).  Now, I have created new account i.e. 'Accumulated Amortization for Intangible Assets A/c and removed the old G/L A/c (the one which is same for both APC and Acc. Dep.). Now, the old G/L has the APC and Acc. Dep. values so I need to transfer the Acc. Dep. from old G/L to New G/L A/c by using OASV (Transfer posting).
    If I make the transfer posting like (the both G/L Accounts are Recon. A/cs)*
          Debit Old G/L A/c    - xx,xx,xxx
          Credit New G/L A/c - xx,xx,xxx
    Is it any impact on the values (Intangible Assets) Dep. Area wise? Since, APC and Acc. Dep. already posted to old A/c up to this point of time. Another doubt is, while posting the above entry shall I need to switch off (Reset) Recon. A/c for this Intangible Assets? OR without Reset Recon. A/c can I post this transfer posting? Is this correct procedure or other than this is there any other alternative?
    we have 9 Dep. Areas out of which 3 Dep. Areas have posting indicator as '1'. In that out of 3 Dep. Areas one Dep.  Area namely 'Impairment Loss' is there but there are no positings till now. After config. change it should allow ABIF tr. that we completed already.
    Could anyone explain why this 'Investment Support' Dep. Area (Impairment Loss) doesn't allow APC values by default?
    Thanks in advance.
    Best Regards,
    Sri.

    Hi Sri,
    Let me clarify your points individually.
    1) From system the prospective, it does not make any diff in functionality for a tangable asset or an intangable asset.
    2) Add the new GL account in the respective account dtermination as a balance sheet account for accum dep. (while adding, the GL account should be as recon account)
    3) Please switch off the recon account indicator in the both GL accounts with OAMK.
    For Ex: Lets say you have already posted APC  value 10000 Dr and Accum dep 2000 Cr to the old GL account, so the net book value will be 8000 Dr.
    In this case Please find out the total value of line items (2000 Cr as per the above example) for accum dep, that was already posted to the old GL account.
    4) Post a journal voucher through F-02 like
                                                      Old G/L A/c Dr - 2000
                                                                    New G/L A/c Cr - 2000
    So after passing this entry you will find account balance as 8000 Dr in old GL account and 2000 Cr in new GL account.
    5) after passing the above entry you need to switch on the recon account for both the GL accounts
    Hope this will help.
    Thanks,
    Srinu

  • Post revaluation to selected depreciation area for an asset

    Hi,
    We are using depreciation area '01' for posting to GL accounts and '02' for fiscal reporting. It turned out that couple of assets had wrong depreciation key specified for depreciation area '02', which resulted in wrong depreciation calculated for '02' in last 3 years.
    We would like to correct it now, once we discovered this issue. One of the ideas was to create new revaluation transaction type which is active only for depreciation area '02', which will only change value of asset in that particuaral area without affecting correct '01',
    However, after configuring new transaction type in AO84 and assigning it to '02' depreciation area in OAXJ, when I tried to run ABAW for this asset - it gave me error AA 380.
    +Inconsistency between the specifications for transaction type Z11 and for the depreciation areas in chart of depreciation PTI.
    Depreciation area 02 is defined (in Customizing), so that it is required to take over values from area 01. However, one of these ares cannot be posted to, due to the specifications in transaction type Z11. This combination is not allowed.+
    Is it possible to configure postings only to one depreciaton area? If not - is there any other easy way of revaluating only one depreciation area for an asset.
    Thank you,
    Karol
    Edited by: Karol on Oct 6, 2011 9:54 AM

    Hi Blaz,
    Thank you for your reply. I am trying to increase the value of the asset in depreciation area 02, because due to wrong depreciation key it got fully depreciated last year in 02. I want to add the value to 02 which should have not been depreciated in last 2 years. Is there a way to increase its value using ABAA?
    Thank you,
    Karol

  • Problems posting depreciation for legacy assets taken over

    We recently loaded conversion balances for asset with a takeover date of Aug 2nd, with various prior capitalization dates. The date of last depreciation posted was set as Dec 31st 2004. When we try to post unplanned depreciation for all of 2005 in December, the system says depreciation for period 12 was already posted, so do a repeat run. There was no depreciation actually posted for period 12, because there were no assets before today. A check of the expense account and depreciation report and a search by depreciation doc type confirm this.
    When we try a repeat run, it says cannot do it for period 12, need to do it for period 000. When we try it for period 000, it says no depreciation areas to post to. The config has been checked and the depreciation areas and posting periods are set up correctly.  The load, the depreciation posting and all steps for closing of asset fiscal year were successfully carried out in DEV and QA. The only difference in PRD is that the year was closed before the load, but we reopened it.
    Also, the opening balance in the asset history sheet for 2006 does not agree with the closing balance for 2005, the difference being the planned depreciation amount. The FI-AA reconciliation report RAABST02 also shows a difference only in the Accum Depn accounts, equal to this figure. So clearly the system THINKs depreciation was posted. When we try to close asset fiscal year it says depreciation was not completely posted for 2005, but it won't let us post it. HELP!

    I tested this whole thing in DEV and QA before we did the same process in PRD, and I was able to run depreciation in those clients, so I think the problem is specific to PRD. As I mentioned, the only difference in PRD is that we had closed the fiscal year so I had to re-open it to perform the load.
    Yes, the problem I have been experiencing has been for Dec 2005 and I don't expect there to be anything in TABA because the system simply will not let me post depreciation of any type, for any period in 2005. I've tried it for period 8 as well. No matter what, it keeps insisting that depreciation was already run for period 12 2005 and to do a repeat run. When I try a repeat run, it says 'the last posting run was for period 000' and that only period 000 can be posted in the repeat run. When I try doing it for period 000, it says "there are no areas to post to". 
    I did try to reverse the Y/E close with OAAQ for 2005, but still no luck getting depreciation running. So you see why resetting it was looking like a good option? :-0

  • Planned Dep not posted for retired assets

    Hi ,
    We are running the asset depreication everymonth end, and it was posting without any errors.
    But suddenly we found that some assets which we retired have still not posted the balance depreication and it is still reflecting in Planned Depreication in AW01N for previous months.
    Eg: Asset retired on 29th of a month. Depreciation was not posted for this 29 days. and this balance still lies in planned depreication even after the depreciation run.
    When i try to do a repeat run it gives an error message,
    depreication for Peirod...... already posted.
    As we have already run the depreciation, kindly suggest what best can be done without affecting the depreciation which is posted for other assets which is correct.
    Thanks & Regards
    Sanjay Marathe

    Dear Ramesh,
    Thanks for the update, i have got once more important information on this.
    The problem lies only in one asset.
    When they posted the depreiciation, in the actual run it gave a warning message that
    " The posted depreciation and estimated depreciation are different" .  But as the user was not aware regarding the Rerun and he has posted depreciation for subsequent periods.
    And now it is not allowing to do a rerun for pervious periods.
    Acq date :           9/11/2004
    DOC       :           9/11/2004
    Retirement date : 29/05/2007
    useful life  :          5yrs
    Dep key LINR :     SLM from remaining life to book value zero.
    Depreciation to the day is checked in the Dep Key
    Exp useful life 2 years 161 days as on 31st march 2006
    It was migrated on 1/4/2006 to SAP.
    Points will be awarded.
    Thanks & Regards
    Sanjay Marathe

  • Depreciation Posting for Single Assets

    Dear All,
    We are in ECC5.
    We are trying to Run Depreciation (AFAB) for Single Assets by giving Assets Number.But it is not Executing.
    Can U Pls help us Regarding this.
    Thanks & Regards,
    Pankaj

    Hello
    As per the standard sap functionality you can run the depreciation for all assets, if u want correct the old one, using repeat run or reposting run.
    I hope it will be suffice ur requirement
    Regards
    Madhav

  • Depreciation posted as debit instead of credit

    Hello Gurus'
    For few Assets only,  Deprecation in 7th month (Calender year is followed) got posted as debit instead of credit & also amount posted was 6 times than the usual monthly depreciation.
    Please help.
    Thanks,
    VK

    Hi,
    If you posted depreciation for a period, then your FI entry will be like below.
    Depreciation expense GL account         Dr
            To Accum Dep B/S GL account            Cr
    Since your debit entry will be posted to an P&L GL and credit goes to accum dep B/S GL account.
    This is the standard functionality only.
    Please check your accounting entry for depreciation posting.
    Thanks,
    Srinu

  • Stop depreciation for an Asset

    Hi,
    I understand when we create a asset master, the number of life years and the depreciation key are copied from the asset class it belongs to.
    However, the finance side requires to pause depreciation for a asset, or they could want to stop depreciation for this asset, and how do we go about doing it? The situation now is that this asset already have depreciation posted.
    I appreciate any help.
    Thanks

    You can use the asset shutdown functionality so you can pause the depreciation for a given period of time.
    AS02 > Time dependent tab , click the asset shutdown. In case asset shutdown is not available, check spro and customise fixed asset master data.
    Hope this helps.
    Regards,
    Robert Sayo

  • Excise Accounting document not generated for Imported Asset GR

    Dear all,
    Excise accounting document is not generated for imported asset goods receipt(MIGO)
    but "C" Register part 2 no. is generated,usual accounting document is generated for GR,
    Asset is Dr to GR/IR
    Process is
    1. Create asset purchase order with acct. assignment "A",
    2. Customs miro based on p.o.
    3. Do GR with excise
    4. Post invoice for orginal vendor.
    What will be cause of this problem ?
    How to solve this issue ?

    The above issue may be due to Accout assignmnet -A . Check your accout assignment  in spro -mm-purchasing -accout assignment - Asset A - GR Non valuated has Ticked on . If it is ticked on - No Fi entry will happen at the Time of GR .
    The reason being , if an FI entry happen for the first time , asset is capitalised . To avoid this GR is made in ur config as this .
    rewdzzzz is full if correct
    Edited by: manu m on Apr 24, 2010 11:11 AM

  • Error occured while doing depreciation for an asset

    Hi,
    I could running the depreciation for an asset in AFAB t-code.
    The msg is ""Testrun Completed successfully" and "No document were created for this run". I have purchased the asset for the month of April and wanted to run the depreciation for that month.
    Please Advice.
    Thanks
    Bnoy

    Dear Bnoy,
    If you look at the message itself saying Testrun completed successfully. So mean you are runnning depreciation posting program in TEST RUN mode, so it is understood not to post any document in system in real time and if any error occurs must show in simulation mode.
    If you dont found any error in TEST RUN, next running time remove TEST RUN and execute the same again, here at this time system will post the document and asset explorer will get updated with posted values.
    I hope this will help you to understand depreciation posting functionality, and you will be able to overcome the facing issue.
    If you have any doubts feel free to share, you are welcome !
    Regards,
    Pankaj A Bhalerao.

  • Creating a Purchase Order for the Asset

    Hi,
    Please see the following steps:
    1.Create a purchase order for the asset.
    2. Post a goods receipt from this PO.
    3. Quantity of asset will be transfered from goods receipt.
    But I find quantity of asset(AS02) was not be transfered and still was equal to 0.
    Could you help me?
    Thanks and Regards,
    Colin.

    see the field status varient for the gl account see the qty field is optional field or not
    and check in the asset group also qty field is the optional field
    Assign point if useful
    Regards
    A.k

  • Calculation of Depreciation for Group Asset

    Hi Experts,
    I am getting a problem while doing depreciation for group asset
    Ex:  80,000;  Rate 10%
    total depreiaiton p.a is Rs 8000/-
    as per the Indian standards if it is below 180 days it should take Rs 4000/-, but in my system it is showing Rs 3333.33
    my depreciation start date & capitlization date is 01.11.2007.
    Regards,
    Satya Vani.

    Dear,
    Reshma.
    Looking at your Questions let us take explanation for Group Assets :-
    1 ) We need to create new different asset class for Group Class in OAOA. Then permit the depreciation area for only Group Asset in OAYM as it is in your current scenario India  is Depreciation Area 15 Just select your company code in OAYM and check the Grp Asset field for respective area 15. Then go to OAAX here we have to maintain the assets classes particularly for Group Assets. So check your Group Asset classes for Group Assets. Cerate different Group asset classes for your said requirement.
    In these depreciation areas, it is then possible to make an assignment to a group asset.  You make this assignment in the specifications for the depreciation area in the asset master record.  When you post an acquisition to this kind of asset, the system duplicates the line items from this depreciation area on the given group asset.
    2 ) According to me you have to create different depreciation keys for Group Asset classes. Assign the Depreciation keys to your newly created Group Asset Classes in OAYZ and make sure you are deactivating 01 area which is Book Depreciation area.
    3 ) As far as I know this is the only functionality available to handle Group Assets. How ever SAP does not have any standard Group Assets functionality. SAP does not supply asset classes to be used solely for group assets. It is we have to determine as per varying Business Process.
    I hope this will clear your doubt makes you to understand. Please revert back for further clarification. Welcome you.
    Regards,
    Pankaj A Bhalerao.
    Edited by: pankaj_ab on Feb 3, 2010 8:26 AM

  • MB11/MB1C/MB1B post GL entry for tax for movement type 561 initial stock

    Hi,
    We want to bring in stock into new system using movement type 561. The usual account posting is:
    Debit stock
      Credit account in OBYC GBB
    How can I add additional tax posting in the transaction? For e.g.
    Debit stock
    Debit input tax
      Credit account in OBYC GBB
    I tried to open up the Tax Code in the movement type field status but it doesn't show up in any of MB11/MB1C/MB1B.
    Any customized BAdI/user-exit for this?
    Any suggestions?
    Thanks in advance for help!

    hi,
    you cant update the tax account directly using the 561 mov type.
    please find below the link for more clarifications regarding the tax accounts.
    http://forums.sdn.sap.com/thread.jspa?threadID=2126200
    Regards,
    velu

Maybe you are looking for

  • Can't figure out how to reduce size of printed jpeg

    I have a jpeg image I want to print.  When I click on it on my desktop, it comes up in Preview.   The image as printed is too big, so I want to reduce it.  I thought I could do this by lowering the percentage of the "Scale" radio button (this is part

  • Call script in a workflow and get return value?

    hello I want create a workflow to check some attribute in IDM like for the home directory, use the workflow call some script to check there is enough space in the server? and the folder is almost there or not? then get the return value like if no eno

  • Work Manager Installation Problem

    Hi Experts, I'm currently installing PCM Version 7.5 on Windows 2008 R2 with MS SQL Server 2008. This installation is for a demonstration system, and has all components (database, Application Server, Web Server, etc) installed on one host. The databa

  • JMS in SLD

    Hi! Actually this topic is similar to JCo destination/ SLD configuration/ message server GRANT POINTS! where the problem remains unsolved. So, the question is HOW to make JMS server to appear in step 4.2 of creating JCO connection (http://host:port/w

  • Activity transition event

    Does the engine generate any events (not the audit trail type) when it completes/starts an activity? The use case is this: Lets say I have an interactive activity defined as external. I want to know when I'm able to invoke the prepare method. If the