Derivation rule for Product from Material Group

Dear All,
Is it possible derive product from Material Group. The scenario is as below.
We executed KE30 report (Classic Drill down) for Product, the we are able to see the profitability for different products, when we click on the list button (Find button) againist the product at the bottom we found not assigned, we selected that and we found there are some un assigned amounts (without product). when we see the line items for the same the line items are coming with out product ( product field is emply)
Another observation is we created profitability assessment cycle (KEU5) in which cost center is the sender and material group is the receiver. when we run this cycle system is not distibuting the costs to the products, in the sender and receiver its executed with zero values.
In derivation rule KEDR we gave the logic to derive product from material group.
please guide the way which we are following is correct or not. can we derive product from material group.
Thanks,
Siva Reddy.S

Hi
Yes you can derive using "Derivation" method in KEDR and maintain a mapping of Mat Grp to Product... But that is not the right way
You need to find out why some lines are posted w/o products.. They can be genuine cases....
Also for assessment, either specify the Product as receiver or run KE28 Top Down Dist in order to allocate values from Mat group to Products..... Deriving Product from Mat group does not seem to be the nice way
br, Ajay M

Similar Messages

  • Multiple Local Product Categories for One ECC Material Group

    Hello experts,
    I have a question regarding Product Categories. I am using an Extended Classic Scenario and so, I retrieve Material Groups from the backend. Nevertheless, in order to have a more accurate split than ECC Material Groups in SRM, I would like to create local Product Categories which point on the same ECC Material Group. Eg. : 
    ECC Material Group
      - SRM Product Category 1
      - SRM Product Category 2
    I saw that I can create this kind of structure in COMM_HIERARCHY and I updated it in the PPOMA_BBP (I set * for backend and for SRM).
    Nevertheless, when I create a SC, I can not find the local Product Categories I created?
    Do you know how I could process?
    Thanks for your help
    Patrick

    Hi Patrick,
    Looks like you got confused in understanding the concept.
    You can not create a Local product category (material group) from a back end product category.
    You can have both backend R/3 material groups and local product categoris (material groups) parallelly.
    That means in COMM_HIERARCHY for R3MATCLASS hierarchy you have two nodes created under that, one for backend material groups and the other for local material groups.
    In stand alone scenario or de-coupled scenario you can use local product categories and not in Extended classic and Classic scenarios.
    For accessing a local product category you should have a local P.Org, local P.Group and the users should be assigned to these local P.Orgs or P.groups.
    If you have such a setting in your org. structure then you can create S.Cs for local Product categories and local materials.
    Hope this makes you more clear in understanding the issue.
    Clarifications are welcome.
    Award points for helpful answers.
    Rgds,
    Teja

  • Automatic Business Area Derivation Rule for Vendor Line Item in MIRO

    Hello Experts,
    We trying to use Business Area concept for our client.
    I have completed all configuration setting for the business are derivation like
    1. Creation of Business Area
    2. Assign Business area to Plant / Division (OMJ7)
    3. Business area determination from sales area (TVTA)
    4. Business Area by Sales Area
    5. Checked Field Status Group for Customer and Vendor Reconciliation Account
    It is working for for compelete sales process and in Procurement cylce it is picking business for MIGO transaction both the line items.
    But
    In MIRO (Purchase invoice posting) it is automatically taking Business area to the GR/IR line item and it not taking Business area for the vendor line item (automatically)
    I comes know that there is a business area derivation rule for this to happen automatically.
    Can you please propose the soulution for the automatic derivation of business in MIRO for vendor line item.
    Regards,
    Chalapathi

    Hi,
    I do mot think there is a BA derivation rule for MIRO.
    The best you can do is:
    1.  Use a user exit or enhancement point for deriving the BA from the GR/IR line and populate that in the vendor line
    or
    2.  You make BA as a mandatory field in the field status group for the vendor reconciliation account.  This will then force the user update the BA.  We use this option.  This is so because at times, the vendor item may need a different business area than the GR/IR line.
    Cheers.

  • Assign Source of supply is not working for contract with material group

    Dear Experts,
    I have searched all the threads and gone through before posting my query. So i would ask moderators to go through the thread properly before rejecting this.
    We have value contracts with respect to a particular material group without material and with item category W in the contract item, Please note that for the materials with this material group, the source determination is not set and source list is also not maintained.
    When we create PR for the material with this contract, and when we click on assign source of supply contracts used to get popped up, but recently from few days, when we click on assign source of supply we are getting an error " no source found for this item ".
    Can anybody help on this.
    Regards

    @ Biju,
    As mentioned earlier, we are not creating PR with reference to contract.
    first we are creating contract with item category W (material group), without material and plant details.
    we create PR with or without material with account assignment K and with the material group in the transaction ME51N, and after inputting all the fields, we click on assign source of supply, it was proposing the existing contracts with respect to material group earlier, but it is not happening for particular material group(it is working for all other material groups)
    Hope it is clear.
    @ Dev Patra,
    we are using DIEN-Service material types and we assign that particular material group to only service material type.
    we have not ticked, source list in the material master, we donot have any source list for the materials under that material group.( please check the note 457110- question number 14.)
    Regards

  • Downloading Pricing condition records for products from ECC to CRM

    Hi All,
         I have a requirement where i  need to download condition records for products from ECC to CRM. The Inputs available for me are Product Id or the material number and the Sales org data.Kindly let me know the step by step procedure that i should follow to download the condition records for the products.
    Note: 1. The Products are already in the CRM system.
              2. I have downloaded the adapter object "DNL_CUST_CNDALL" already.
    Thanks & Regards,
    Shwetha.

    First of check and ensure that if the records are already downloaded. To do so,
    1) Log to ECC system and go to tcode V/06
    2) From here select the condition type you are looking at. Dbl click on the condition type and note down the access seq.
    3) Go to V/07. seelect the access seq you obtained in previous step and dbl click on "Accesses". Here you will come to know the condition table numbers. Note down the table numbers. (example: 002, 567)
    Understand at this juncture that tables from 1-500 are SAP Standard tables and 501 - 999 are customer specific tables.
    1) Log to CRM system and go to se16
    2) Type CNCCRMPR002 or CNCCRMPR567 and Choose F4 from keyboard.
    3) you should find an entry which looks like CNCCRMPRSAP002 or CNCCRMPRCUS567.
    4) query the table with input parameters like Product or Sales Org. YOu should find the records.
    If you fail in step 3, it means that the table itself has not come to CRM. For this do DNL_CUST_CNDALL with OPEN client (go to SCC4 and there Dbl clik on your client. There "NO CHANGES ALLOWED" should not have been selected. If it is so, consult your basis team and explain that DNL_CUST_CNDALL should be done on open client.(Repeat this even if you have already done that)
    If you fail in step4, try downloading DNL_COND_A*** adapter Objects. *** stands for the ECC condition table captured from ECC (step3)
    If you still are unable to find the record in the database table level, Check for the log in SLG1 tcode in CRM system. This gives you an idea of what's wrong.
    Note: Even if you maintain conditions via Product master, ultimateley it gets stored in A* tables in ECC and CNCCRMPR* tables in CRM. So the above procedure holds good for whatever the case might be.
    Hope this helps
    Regds,
    Raghu

  • Duty calculation for import PO for a specific material group

    Hi All,
    As per company requirement, we need to do changes in duty calculation for import PO for a specific material group.
    Current scenario :  Currently  duty calculating on MRP with abatement  35% ( We have ABTT condition @ 35% of MRP).
    For example:
    Material: ABC , Basic Price = 1000, MRP = 2000 and duty is 10%
    Duty  Amt = 2000(MRP) - 700(35% ABTT) *10%(Duty) = 130
    Cess 2 % = 2.6
    Ecess 1 % = 1.3
    Total duty =  133.9
    This duty (133.9) paid to custom vendor and loads in material cost.
    New Requirement:  For vendor payment purpose duty should be calculate as above but  for material cost should be calculated on Basic price.
    For Example:    
    Material: ABC , Basic Price = 1000, MRP = 2000 and duty is 10%
    Duty  Amt = 1000(BP) *10%(Duty) = 100
    Cess 2 % = 2
    Ecess 1 % = 1
    Total duty =  103 ( It should load in Material cost)
    New Condition Diff Duty Amt = (1300-1000)*10% = 30
    Cess 2 % = .6
    Ecess 1 % = .3
    Diff Duty Amt = 30.9 ( It should not be added in material Cost)
    Paid to custom vendor = 103 + 30.9 = 133.9
    Kindly suggest how to achieve this.
    Regards
    Jitendra

    Hi,
       Please check whether the requirement is logical or not.  Did you check the requirement with your accounts team?
       If you have different duty calculation for MIGO and MIRO, how the GL accounts will get balanced? As of my understanding, the requirement is clearly not logical.
    Regards,
    AKPT

  • Derivation Rule For Fund Management

    Dear All,
                   Where we can maintain derivation rule for fund management???
    Mahendra
    help.sap.com

    Dear Mahendra,
    Please follow following link for PSM-FM
    http://help.sap.com/saphelp_pserv472/helpdata/EN/ba/43d43ab8029b66e10000000a114084/content.htm
    and for FI-FM
    http://help.sap.com/saphelp_pserv464/helpdata/EN/ba/43d43ab8029b66e10000000a114084/content.htm
    Hope this solves your query
    Regards
    Saurabh
    Edited by: Saurabh Khandelwal on Nov 23, 2011 3:05 PM

  • Default VAT 4 % for 1 particular material group

    My client wants to default VAT 4 % for 1 particular material group...It means if i create PO for that particular material belonging to that material group  it should fetch VAT  4 % default.
    How to map it?

    Hi,
    For the VAT condition type, maintain access sequence with the field material group and then create the tax condtion using FV11 for the said material group with 4% tax rate. All subseqent PO's created with that particular Material Group will automatically calculate VAT with 4% based on the conditon record, Pl check
    Regards
    Merwyn

  • Derivation rule for value fied

    can any one tel me how we define derivation rules for value fields. is it posible to put derivation and how it
    will effect.
    Thanks&Regards
    Amar

    Hi
    In COPA Derivation rules you can only map characteristic.. i mean you can derive only Characteristic values not for Value fields.
    Value fields are normally mapped with SD conditions or GL accounts.
    If you want to manipulate or recalculate the values flowing into value fields you need to use enhancements.
    In this step you can set up system enhancements which are not supported in the standard R/3 System. These so-called "standard enhancements" can be used in the following areas of Profitability Analysis as below.
    Derivation of characteristic values        (COPA0001)
    Valuation                                    (COPA0002)
    Direct postings to profitability segments  (COPA0003)
    Currency translation                        (COPA0004)
    Actual data update                          (COPA0005)
    Hope this helps
    Regards
    Venkat

  • Copa derivation rule for customer group

    Hi All,
    I am currently facing an issue with Derivation rule and hope someone can help me on resolving  this.I have created a COPA derivation rule which has field as
    Source Field
    company code
    Plant
    Target field
    Distribution channel
    Condition
    customer group 3 = 18.
    so ideally with this conbination the distribtion channel gets updated
    for the sales order.
    However the issue we are facing is that the rule is working for only 1st line item and not for the others. I have also kept setting as" overwrite values only if new values found"
    e.g if we see the accounting doc of billing then
    line item 1 customer: x
    line item 2 SaLes GL: rule works fine and dist channel is updated.
    line item 3 discount GL: rule does not work.
    Have checked the derivation rule and it looks correct.
    Can you kindly suggest solution to this.

    Hi Ajay,
    Thank you so much for your reply.Please note that the GL is a cost element but the category in system is 1 and not 12.However I would like understand as to why is this happening.why does the system picks up derviation rule for a Gross sales GL and not for Discount GL(Cost element).
    The distribution channel  gets updated for sales GL when i check the prof segment of the line item, however this is not the case with doscount GL.
    I would like to understnad the implication before changing cost element category from 1 to 12 as it runs across system.
    Kindly provide some more explaination.
    thanks in advance.

  • Deleting derivation rule for the existing characteristic in operating conce

    Hi all
       My customer has two characteristics" Billing Doc(VBELN)" and" Warranty status" in the development and testing client and not in the production now.
    Option 1 : Is to delete them but as the data is already posted for the same in the test and development client,it is lot more complex( involves  implementation of OSS notes-SAPNET note 21207) .
    Option 2: If we decide to keep them for now:These two have a derivation rules too. So  can we simply delete the derivation rules so that data will not get posted to them( So will not effect the PSG i.e ce4xxxx table in production once the same transport is moved to production). There are no dependencies on this derivation rule.
    Option 3: Can we also remove them from segment level characteristics?
    Please let me know pros and cons ?
    I really appreciate your time and effort.
    Thanks & Regards
    Sri

    Hi,
       If the characteristics have not been transported to production then why don't you delete them in the dev/test system ? Here you can take the risk.
    To delete characteristics or value fields, perform the following
    activities:
    1. Delete the corresponding characteristics and value fields from Customizing in all clients (this includes forms, reports, planning
    layouts, and so forth). To locate characteristics and value fields, use the appropriate where-used list in the Customizing Monitor. You can access it by choosing Tools -> Analysis -> Check Customizing Settings (TA KECM).
    You can jump directly from the where-used list to the relevant Customizing transaction and then delete the appropriate field there.
    2. Switch to the screen for maintaining the data structure of an operating concern (Maintain operating concern).
    3. If you need to effect other changes to the datastucture for the operating concern before making any deletions, effect those changes and save the data structure.
    4. In order to be able to select the fields of the data structure, choose Extras -> Characteristics (or Value fields) -> Unlock.
    5. Select the characteristics and value fields to be deleted and remove them from the data structure with the "Reset fields" function.
    6. Reactivate the operating concern. The system starts by checking whether the operating concern contains any data and whether the fields to be deleted are still being used in any Customizing settings.
    7. If none of the fields are still in use, the system then starts the re-activation. If the operating concern does not contain any data or does not require the database system to be converted, the tables are activated. You are then able to activate the environment for the operating concern. In this case, the following activities no longer apply.
    If the operating concern already contains data, a system message tells you that the database needs to be converted. If you proceed, an activation log appears (at the top of the list).
    8. Analyze the activation log. If it only contains error messages telling you to convert the tables, proceed with the next activity.
    You must otherwise remove the cause of the errors before the tables can be converted. In this case, you should answer "No" to the next prompt, which asks whether the conversion transaction should start.
    9. If you still only receive error messages telling you to convert the tables, choose "Back" and start the conversion.
    10. Plan a job for the conversion. A list of the tables to be converted is shown for this. If the tables only contain a small amount of data (less than 10 000 records), then all the tables can be converted in one job. In that case, you can select all the tables.
    For larger tables, conversion should take place in several jobs.
    However, you should ensure that table CE4xxxx (where xxxx = operating concern) is the last table to be converted.
    Warning. No other changes can be made to the operating concern during the conversion.
    A copy of the table is generated during the conversion. The database system should have sufficient memory available for this copy.
    To schedule conversion as a job, use the "Schedule selections" function.
    You can display the current status of the conversion by selecting the "Refresh" icon. Tables disappear from the list once they have been converted sucessfully. If a conversion is taking a while, it is also possible to leave the transaction. You can then continue the conversion using DB requests -> Mass processing in one of the following ways:
    With the job overview. You access this by choosing System -> Services ->Jobs.
    Using the database utility transaction. You access this by choosing Utilities -> Database Utility in the ABAP Dictionary menu.
    You can use the status function to call up the status of the operating concern during operating concern maintenance. You need to activate all tables after conversion.
    11. To analyze errors that have occurred during the conversion, you can use the database utility transaction by choosing Extras -> Logs. The log has the same name as the conversion job: TBATG-date. You can also restart the conversion with this transaction.
    For more information on the database utility, choose Help -> Application help while still in the above transaction.
    12. Once you have activated all the tables in the operating concern, generate the operating concern environment from within operating concern maintenance.
    You can then use the operating concern again.
    Please, refer to the IMG documentation under Controlling ->Profitability Analysis -> Structures -> Define operating concern
    -> Maintain operating concern, for further details.
    regards
    Waman

  • Rules for population of Purchasing Group in PR/PO

    Hi,
    Can someone please clear up the rules on how standard SAP works in terms of the purchasing group field in either a PR/PO.
    In short, a material master exists and a PIR. When the PR is created the purchasing group is populated from the material master and not the PIR, is this correct?
    When the PO is created w.r.t the PR, the purchasing group is copied from the PR and not the PIR, is this correct?
    Simply I want the purchasing group to be taken from the PIR and not the material master, any ideas?
    Thanks.

    Hi
    You can not do this with configuration.You have to go for Userexit only where you can build up logic check the allowed item categories and accont assignments for a mateial group.You can maintain a Z- table where you can make entries of Material group and Account assignment/Item categories.
    Regards
    Ramakrishna

  • Authorizations for materials and material groups

    Hello experts,
    Is it possible to limit the authorization to make purchase requerisiton of some materials or material groups depending on the user?
    I heard that it is possible be able to update some materials using the authorization M_MATE_MAT and including them in the material master, material group and user. But this also works for the creation of purchasing documents (PR,PO,RFQ,...)? Do I have to include this authorization for all the materials? If they do not have I understand that works for every people.
    Thanks in advance for your help
    Best regards,

    Hi Madii,
                 actually Authorization works at the object level, i.s if you have provided the authorization for the user to makePR with certain Material Grp, then if you dont define that grp in the PO role, but still user will get the authorization from the PR role.
    why you want to allow the user to make the PR of certain Mtrl Grp for which he should not be making the PO.
    or let a different Body take care of the other mtrl Grp.
    Hope it helps.
    Regards,
    Yawar Khan

  • Derivation rule in COPA from BSEG

    Hi experts,
    My issue is to derivate a field (SEGMENT) from Table BSEG in COPA.
    Unfortunatly my customer donu2019t use the standard customizing from the SEGMENT derivation rule, we donu2019t populate the field SEGMENT in the profit center master data.
    Firstly, with a user exit (U903 - ZRGGBS000) which is trigger with substitution rule we populated the field SEGMENT in BSEG.
    Now I created a new characteristic WWSEG and I canu2019t derive it in KEDR with table look up, can I have your advices please?
    With an abaper, we tried to find a solution with the COPA0005 exit but he donu2019t find the logic to map the source  field BSEG-SEGMENT and the target field COPA-WWSEG
    Thanks
    Kinds regards
    Cédric

    Hi Waman,
    Thanks a lot for all and thanks to Dave.
    But it doesn't work.
    The segment in bseg-segment is filled when posting a FI document.
    For reminder, the field BSEG-SEGMENT is firstly filled with a user exit.
    We implemented the note 1135567, we created the program ZRFI_OSS_KEAK_SEGMENT adapting the code to our characteristic WWSEG, when we tested, in debug we drop in the Abap code but the structure COBL-SEGMENT is not filled, therefore the WWSEG is not filled.
    Have you other idea to solve my issue ?
    Best regards
    Cédric

  • Derivation rule for budgeting

    is it possible to have a derivation rule where we can define for budgeting purpose that if we are using a particular cost center we could use only a particular commitment code only.
    viewers please leave your hints/remarks so that any help could be received

    How to change fund managment period from existing (APRIL TO MARCH)    TO  OCT TO SEPTEMBER.
    WE ARE TRYING TO CHANGE THAT USING
                     public cector mgmt
                                     fund mgmnt govt
                                                   basic setting
                                                             fiscal year setting
                                                                         define fiscal year setting
    there we have                       v3 as    april to march  and
                                               v9 as    oct  to sept
    originally we had  assigned v3 to  Financial year  and   to fund mgmt period both.
                 but now we want to assign v9 to fund mgmt period.
    But system is not allowing us to do that. How can we achive it and what are the reasons for errors

Maybe you are looking for

  • Dbms_crypto package and grants to public

    on 11g RAC installaton we are not getting on default , grants on dbms_crypto to public are set and some time this package is also not installed. what could be the reason ?

  • How to find missing unread message in mac mail

    Hello, I have one unread message that I can not find, it is perhaps one of the mailchains I have. I organized my folder sort by unread and I can not find it neither. Please advise me how to find it. Thank you, Diana

  • When are skype retiring use of skype for OSX 10.5?

    I have Macbook OSX 10.5.8 I have receieved notice on skype page that they are 'retiring' the use of skype for OSX 10.5.8  but do not say when? how can i deal with this without buying a new later model computer. i see that many people have this issue.

  • Email not synching on Galaxy S4

    I have two email accounts (both pulling from my domains) that are set up using the pre-installed email app. One of them quit synching a couple of weeks ago. The other one is working just fine. I can't find a way to delete the email account that isn't

  • Distribute functions

    Hi, Could some one explain me how the below standard functions work and what is the differenec between each of them. 1.Distribute by Keys 2.Distribute by keys from sender to recipient. 3.Distribute by reference data from sender to Recipient 4.Distrib