Different Phases of SAP Implementation ??

Hi Experts,
Please tell me the diff phases of implementation project.
Regards,
Kali Pramod

Hi Pramod
All implementation projects have the the following phases:
Scoping -
What is to be implemented i.e. which submodules are to be implemented some clients may not require credit management for example. Look at the project scope document carefully it will tell you what SAP sub-modules in SAP you should be prepared for. Usually the sales people along with project manager do it.
As is -
Here you understand the existing business processes of the client . Your BPOcollect all the ISO-documentation (if client is ISO certified), reports and forms at this stage and you analyse how and when the reports/forms are generated, where the data is coming from. You also do a Level -2 training for your BPO so he is made aware of all the required transactions in SAP.
Once this is over BPO can start learning with the consultants help more about SAP. This is crucial because if you miss out any transactions the BPO may forget about some of his Business processes which may come up later. It is a good practice to ask the BPO to make flow charts to explain business processes.
To-Be -
Parallely you map these processes to SAP. Processes that you are not sure of as to whether they are present in SAP or not you try to do a configuration of those processes, and along with the BPO(Business process owner he is the clients employee who knows about the clients business processes probably a middle management guy, ther can more than one), BPO involvement is required as he may be able to tell you his requirements better. Once you do the business modelling you will also be made aware of the gaps between as-is and to-be , here decisons have to be made as to wether a ABAP development/system modification is required or not and so on. Involve the BPO as much as possible and document everything it is good practice do not be lazy about it.
Business blueprint:
Here the as-is and to-be and gap analysis is explained. This is the document that you will be using to do your configuration in the realization phase.
Realization phase:
Here you do the configuration in the development server (there are three clients -development,quality, production). You also decide on the master data format, so that BPO can go collect the master data. You also gove ABAP specifications for forms, reports etc, system modifications etc. Unit testing: Your BPOs and a few key users sit down and test your configuration in your module only. It is good to test the BDCs that you need for uploading data at this stage so you have more realistic data and your BDCs are tested.
Integration testing:
Once all modules unit testing is over then the configuration is trasported to the Quality server, where testing for all the modules is done by BPOs and end user, this is to check if any problems are there in integration between various modules. Once all is okay from the QA server config is transported to the production server.
Go live preparation
Data uploading: The collected master data is checked and the uploaded into production server(sever and client I have used interchangeably). Now you are ready for go live i.e. users can now use the production server.
Hope this helps !!!
Britto

Similar Messages

  • SAP Implementation Process !!!

    Hi Folks,
    I need brief information about the SAP implementation process. As per the ASAP Methodology we have different phases involved in the entire implementation process from Project preparation,Blue print analysis,Realization,Final Preparation and Go Live Support.
    I did not involve myself into implementation. Being a Basis consultant I would like to know what is the involvement of basis consultant in each phase in detail and what are the activities being carry out by a basis team, what would be the avg team size and what would be the duration of the project approximately. I know it depends on the project and modules being used,architecture and all. i just wanted to know the rough details for information.
    I would really appreciate for any useful information.
    Regards,
    Vinod

    Hi Viond,
    Please find below an elaborated details for SAP Implementaion.
    The ASAP (Accelerated SAP) Roadmap provides the methodology for implementing and continuously optimizing your SAP System. It divides the implementation process into five major phases and offers detailed Project Plans to assist you (Microsoft Project format). The documentation stored at each level of the Roadmap tree structure contains recommendations on implementing your SAP System and links to helpful tools and accelerators. We use SAP Solution Manager for the same and define the steps and this information can be transformed into MPP.
    The implementation of your SAP System covers the following major phases:
    Project Preparation
    In this phase you plan your project and lay the foundations for successful implementation. It is at this stage that you make the strategic decisions crucial to your project:
    Define your project goals and objectives
    Clarify the scope of your implementation
    Define your project schedule, budget plan, and implementation sequence
    Establish the project organization and relevant committees and assign resources
    Sizing for the SAP Servers (SAPS) Important for Basis.
    Business Blueprint
    In this phase you create a blueprint using the Question & Answer database (Q&Adb) older versions and now it has been replaced by new value adds from SAP in Solution Manager, which documents your enterpriseu2019s requirements and establishes how your business processes and organizational structure are to be represented in the SAP System. You also refine the original project goals and objectives and revise the overall project schedule in this phase.  In short its As is >> To be its from from functional consultant (mapping of business process) Basis will be involved how and when backup will be taken what 3rd party/vendor will be used, how users will be handled (CUA or normal procedure).
    Realization
    In this phase, you configure the requirements contained in the Business Blueprint. Baseline configuration (major scope) is followed by final configuration (remaining scope), which can consist of up to four cycles. Other key focal areas of this phase are conducting integration tests and drawing up end user documentation. Major part will be creation of transport requests and transportation to QAS system. Configuration of SAProuter, Solution manager and its various configuration
    Final Preparation
    In this phase you complete your preparations, including testing, end user training, system management, and cutover activities. You also need to resolve all open issues in this phase. At this stage you need to ensure that all the prerequisites for your system to go live have been fulfilled...Final Check.
    Go Live & Support
    In this phase you move from a pre-production environment to the live system. The most important elements include setting up production support, monitoring system transactions, and optimizing overall system performance.
    You can also download an HTML version of the ASAP Core Roadmap 7.1 on [SAP Services Marketplace - ASAP Roadmaps and Run SAP Roadmaps|http://service.sap.com/asap] (SMP login required).
    All the best !

  • Role of a Security Consultant in an SAP implementation Project

    Hi All,
    What is the role of a Security Consultant in an SAP implementation Project and the stages in which he is involved?

    Hello Mohammed,
    The role of a Security consultant in any SAP product implementation (not just GRC) is wide enough and it's hard for anyone to sum up on a single forum post. Still I can give you some pointers.
    Security consultants come from different backgrounds, some from networking, database administration, infrastructure and even development like me. They contribute enormously to any product implementation from scratch (landscape design) to go-live (and continuous maintenance) so they are active on every phase of the implementation.
    Following are some of the activities they may perform (or participate)
    -System Landscape Design (work closely with BASIS and DBAs)
    -Check Infrastructure feasibility from security perspective (For Portals exposed to internet or extranet work closely with network providers for firewall security, VPS etc.)
    -Propose security guidelines, access policies, disaster recovery plan, business continuity roadmap (work closely with information security consultants and internal auditors or risk management teams)
    - Implement SAP solution specific Security measures (involves almost every SAP solution) for example: SAP R/3 security, GRC, BW/BI, HR, FI, Portal security etc.
    - participate in application integration for example: LDAP, IDM, SAP UME, shared directories etc (User master records security is on high priority).
    -   Check for any possible backdoor access vulnerabilities (ex: open RFCs, function modules like ping_rfc), and it involves almost all SAP solutions and there are special procedures to analyze such vulnerabilities.
    there are many such activities that a security consultant perform on day to day basis. Please do not interprete the above mentioned activities (entirely) as a criteria for any security consultant profile. There are many many possibilities for a security consultants to work from pen testing to SoD violation remediation. That's why I said it's not easy to sum up security.
    Always remember, Security and GRC are two sides of a coin they work together. however GRC is more of a combination of policy, regulation, events and involves management participation whereas security is a purely technical practice.
    You may also be interested to know what it takes to become a forensic security specialist.  Take a quick look at [http://amudee.com/?p=378|http://amudee.com/?p=378]
    Best Regards,
    Amol Bharti

  • Steps and documentation help in SAP implementation

    Hi Experts,
    I need some documents and documentation help.i have never worked in SAP implementation projects.
    So,any body knows the steps and documentation when implementing SAP.
      please,tell me details and example documents with steps.and tell me the difference between support and implementation.What we will do extrain implementation.
    As a ABAP programmer what can i fill in se38 documentation.
    Please tell me.
    It'll be very helpful to me.
    Thanks in advance.
    Regards,
    Nandha

    Any SAP R/3 implementation is a big effort which is done by a team of experts from different backgrounds, not by an individual. So if you are going to be on a project as technical person, in all probability you will join the team as a member of the technical team during the implementation phase. By this time, the blueprint and design phases would have been almost complete and some standards and procedures with regards to documentation, coding, transports and migration accross systems will have been established.
    A team lead will brief you all the requirements of the project as far as documentation standards are concerned and migration of the objects, testing procedures etc. You don't have to worry about that. This will be specific to the project, so you cannot generalize it and apply it to every project.
    Now the difference between a new implementation and support is that the first one is new one which goes through the phases of blueprinting, design, implementation, testing and go-live. The support phase comes after go-live. You will just be supporting the production system, in that you will be fixing any bugs in the existing programs or change some existing programs to add some more logic or remove some logic, or write new reports or programs as per the users' request.
    Srinivas

  • Critical Issues During SAP Implementation or After Golive

    Can anybody tell me one of  the most critical/ challenging issues During SAP Implementation or After Golive
    in these modules:-
    MM implementation
    PP implementation
    SD implementation
    FI/CO implementation
    PS implementation
    QM implementation
    HR implementation
    BI implementation
    XI implementation
    Thanks and regards
    RS

    hi,
    I will list out few of critical issues in
    Implementation :
    1 . Ensure 100% mapping of business process for all modules with SAP(avoid customization in support phase)
    2.  Unit & Integeration testing should be through with all validations
    3.  Master datas(Vendor,Customer) care must be taken will uploading datas thru LSMW,
    If there are common vendors for all plants,Create a vendor for a plant extend it to other plants
    4. Check tax procedures are customized according to requirements.
    5. Complete all print document customizations before go live
    6. Complete end user training(2 or more cycles) should be top priority before go live(This will avoid
    cancellation/reversal of documents after post go live)
    7. Ready with standard MIS reports & customized reports for business decision making
    8. Excise opening balance updation in tables for RG1 register in tables(Note 951955) on go live
    9. Check all tables datas are updating correctly
    10. Declare go live to SAP Support
    11. Check All user authorization should be correct according to their roles.
    12. Centeralize all master datas creation(avoid duplication)
    13. Create transaction variants to avoid entires in unnecessary fields & make certain fields mandatory.
    14. Ensure document numbering is completed for all documents
    15. Validate accounting entries are hit properly according to requirement in quality client with FI CTM(Core team member).
    After Go live :
    1. Missing authorization for users will play key part here,For ex : PGI while doing delivery,Excise capture & post in MIGO/J1IEX.
    2. Do internal audit every month,identify transactions if there will possibility for misuse or wrong entries,requires validation,identify users weak in certain areas.
    3. Identify there is enhancements to be done in transaction process(By step-2)
    4. Prepare a list of month & year end activities to be performed for all modules give to users
    5. Prepare  a list of frequently used transaction codes module wise give it to users
    6. If there is subcontracting,ensure challan creation,GR,reconcillation should be done regulary(monthly)
    7. Train the users,take reports in respective modules.
    8. Additonal customization might be done in print documents.
    9. Instruct users/CTM's to adapt SAP Standard practise
    10. Update excise tax rates after every indian budget
    Hope it helps.
    Edited by: Jeyakanthan A on Apr 29, 2010 6:48 PM

  • I Need all Documentation Templates / Blank Formats during 5 phases of SAP

    Hi Friends,
    When we just start SAP implementation afresh. Then we also keep doing lots of documentation (and that too according to what & how SAP suggests). This we do in a phase-wise and in a proper systematic order.
    I need all those blank forms or formats or templates (whatever we call them) which are used from PreProject survey / study / analysis to Project-Preparation to BluePrinting to Project-Realization uptill Go-Live phase.
    These templates / Blank Formats are in MS-Word or MS-Excel sheets.
    I need all these documents templates / Blank Formats because they contain relevant fields to fill-in while implementing an SAP Project.
    Can anybody please provide me all those Templates / Blank Documents because I do not have access to SAP Sevice MarketPlace NOR to SAP Solution Manager.
    I will definitely give full points at my disposal.
    Thanks in advance.
    Regards
    Rajeev
    Message was edited by:
            Rajeev Sharma

    Everything that you need should be provided in the Business Process Repository.

  • "Case use" technique for SAP implementation?

    Hello all,
    has anyone used "case use" technique for SAP implementation? I mean for standard process, not only developing.
    Any recommendation about it?
    Thanks in advance and best regards,
    Adolfo

    It would be helpful to go through the help document of ASAP Methodology.
    The following information may clarify some doubts/requirements you have.
    Generating the Project IMG through ASAP:
    After you have set the project scope, the next step is to generate the Project IMG. From the Business Process Master List (BPML), you can directly access the IMG activities relevant for configuring each process.
    BPML: The Business Process Master List, along with the Business Blueprint, is a key result of the second phase of the Roadmap. Microsoft Excel tables contain the SAP scenarios, process groups, and processes that have been set in scope in the SAP Reference Structure, and are crucial for configuring your SAP System. In Realization, the third phase of the Roadmap, the BPML provides the basis for monitoring and steering test activities and for configuring your SAP System. It contains the titles of the structure items, and displays the status, the owner, links to documentation and links to the SAP System. Amongst other things, the BPML allows you to:
    1) Set your baseline and final scope. These are used for baseline and final configuration.
    2) Access the Project IMG and specific IMG activities assigned to structure items.
    3) Access integration test plans, which help you carry out all required integration tests.
    The Prerequisite is you have set the project scope.
    Process Flow to use the Business Blueprint as a basis for configuring your SAP System:
    1) Set the project scope.
    2) Generate the Project IMG.
    3) Generate the BPML.
    4) From a specific processes in the BPML, you can go to the relevant IMG activities and make Customizing settings.

  • Tasks/activities of a Basis consultant during SAP implementation

    Hi,
    Could someone share the list of tasks/activities of a Basis resource to handle during an SAP Implementation project.
    Thanks in advance,
    Srinivas

    HI,
    i think these are the simplest Basis activities in an sap implementation.
    1. Preapration of the Landscape of the systems
    2. Connectivities btw. different systems like SAP R/3 - BW and so on
    3. Transport Administation i.e TP creation, release, importing to QA - PRD and so
    4. configuration of RFCs and TRFCs if needed
    5. Config. of Data Transmissions
    6. Config. of IDOCs and Message Types
    7. Cutover plan preparation for the Go-Live
    8. System back ups and Logs Maintanance
    9. Installation of all required Patches and Notes
    10. system down time estimatations and planning
    Rgds
    Radhakrishna D S

  • Sizing of different components in SAP

    How can we measure the average and peak throughput of different elements in SAP say CO-PA-BIL, CO-PA-FI  for sizingI

    Krishna,
    we hesitate to give you estimates on database and hardware sizing because, as Gabi states, sizing for EIS will vary from customer to customer based on the characteristics of the supply chain being modeled.  Inputs for the sizing are the number of stocking points, number of supply paths, Bill of Material details (if applicable), the number of future periods to model, the number of historical periods of forecast and sales provided, lead times across the supply chain model and the number of models you will keep.
    To make some very GENERAL comments, the more material sharing that occurs in your network the more memory needed to optimize (solve for Safety Stock) the model.  Two customers can have the same number of stocking points and supply paths but if one has a distribution-only supply chain while the other has a model with a very detailed Bill of Material the distribution-only model will require much less memory to optimize.
    Any further sizing information should go through Consulting as Gabi has indicated.  Sizing an EIS implementation is somewhat unique and therefore general, cookie-cutter recommendations are not useful.
    Hopefully that is helpful to you.
    Chris

  • SAP Implementation Critical Areas

    Dear Gurus,
    i want to know the details of the SAP Implementation Process kindly send me the details of
    1)SAP Implementation Process
    2)Critical Areas in SAP Implementation.
    3)How to implement Better.
    4)BASIS Critical Areas.
    5)What is the Role of Technical Team in SAP Implementation.
    Thanks and Regards
    AMAN

    Check this links regarding implementation
    Re: SAP implementation
    SAP-IMPLEMENTATION.
    SAP Implementation
    Phases for SAP Fresh implementation
    SAP Vanilla Implementation
    new methodolgy in sap implementation
    regarding basis refer below link
    basis
    Role of abaper involves development of programs/reports based on inputs from functional consultant,
    he should have basic understanding of functionalities of respective modules they are working on it.
    Edited by: Jeyakanthan A on Apr 9, 2010 3:24 PM

  • Phased SAP implementation - Quick qestion

    Hi,
             We are having a phased implementation for the plants in SAP and BI is also going live at the same time. Only few plants are going live at the time of Go-live and the rest of the plants will be implmenting SAP in a phased manner. BI needs to give the reports for the plants with and with out SAP implementation. Can any one give me suggestions how we can acquire the data from the plants which have not implemented SAP and combine both the data and publish the reports.
    Please keep in mind tht there is no point in creating one for SAP and another Infocube for legacy data, as this will be phased out. I want to be able to combine the data only at the report level

    Hi Tanu:
      The InfoCubes in SAP BI can contain information from different Sources. Probably you would need to load the data from the Plants without SAP via flat files, once those Plants implement SAP you make the switch to load the data from SAP instead of the flat files.
    Regards.
    Edited by: Francisco Milan on Sep 25, 2009 11:33 AM

  • How to creat a Data provider  based on different fields in SAP BW ?

    Hi,
    Experts,
    There are  20 fields  of  Plant Maintainace  like : 
    SWERK
    BEBER
    STORT
    TPLNR
    EQUNR
    INGRP
    QMDAT   ---peroid
    STTXT
    QMDAT  - Date of Notification
    QMNUM
    QMTXT
    QMART
    AUSVN
    AUZTV
    AUSBS
    AUZTB
    AUSZT
    ERNAM
    QMDAB
    AUFNR
    I  want to creat a  Report based upon these fields  ?
    For that I h'v  checked the relevant Fields to the   existing standard  Datasource  in Bw side   &
    Checked  cubes   created  based upon these Datasource  in Bw side !
    i h'v found  some fields are  existing different cubes & some are  missing .
    How to creat a Data provider  based on different fields in SAP BW ?
    plz suggest      !!!!!!!
    Thanx,
    Asit
    Edited by: ASIT_SAP on Jul 15, 2011 6:25 AM
    Edited by: ASIT_SAP on Jul 15, 2011 6:27 AM
    Edited by: ASIT_SAP on Jul 15, 2011 12:37 PM

    Hi Lee, Please see below..
    DECLARE @Machine2 TABLE
    DispatchDate DATE
    INSERT INTO @Machine2 VALUES ('2014/02/01'), ('2014/02/02'), ('2014/02/03')
    DECLARE @DateFrom DATE
    SELECT @DateFrom = DATEADD(D,1,MAX(DispatchDate)) FROM @Machine2
    SELECT @DateFrom AS DateFrom
    Please mark as answer, if this has helped you solve the issue.
    Good Luck :) .. visit www.sqlsaga.com for more t-sql code snippets and BI related how to articles.

  • QGM for Greenfield SAP Implementation

    Hi All,
    We are doing a greenfield SAP implementation. As of now we are done with DEV landscape build. We would like to utilize Quality Gate Management for Change Management in our project. I have few queries:
    1) How should I define Transport routes at this stage to activate QGM? We have only DEV systems as of now. QAS and PRD would be ready in next few months. Can I activate QGM now with logical component containing only DEV systems?
    2) Once the QAS and PRD systems are ready; How to include them in the existing QGM project?
    Any documentation or input are really appreciated.
    Regards,
    Vivek

    Achieved this using the virtual systems as mentioned in this excellent blog.
    http://scn.sap.com/docs/DOC-31352
    Regards,
    Vivek

  • Explain me about sap implementation in yarn manifacturing industry

    HI,
    can anybody explain me about sap implementation in yarn manifacturing industry.what type of process it is?either repetitive or SD

    HI,
    can anybody explain me about sap implementation in yarn manifacturing industry.what type of process it is?either repetitive or SD

  • Roles & Responsibilities of a Basis consultant in an SAP implementation

    Hi All,
    What are the Roles & Responsibilities of a Basis consultant before/during/after an SAP implementation project?
    Please list all of them separately.
    Regards,
    Nivas

    1.    1. Perform User administration and role/profile assignment.
    2.   2.  Perform Role Creation, Modification and Full trouble shooting support for the users authorization failures in all SAP applications and resolving the Security issues and support in integration testing of Roles/Profiles.
    3.  3. Maintain the integrity of the SAP environment by managing the SAP Correction and Transport System (CTS) to ensure all configuration and development objects are promoted properly.
    4.    4. Distribute the online SAP user workload and monitor and manage the SAP background job workload.
    5.   5. Perform OSS / SAP Service Marketplace: Searching notes & creating OSS messages for the respective queries to improve the Performance. And software download, Maintain System Data, License Key & Maintenance Certificate, Developer & object registrations and connection maintenance etc.
    6.     Starting and Stopping SAP instance/(s).
    7.   6. Preventive Maintenance activities - Support Pack/Plug-in implementations, Kernel upgrades, OSS note applications and to apply support pack for Java using JSPM.
    8.    7. SAPGUI/SAPLGPAD troubleshooting and maintenance/upgrades/installations.
    9.    8. Prepare and maintain system documentation, procedures, and standards.
    10. 9. Perform SAP Database Administration – Space management, database reorganizations, design and implement backup and restore strategy, maintain database security, administer database performance, database problem determination and resolution, etc.
    11. 10. Perform SAP Installation, Post installation, client administration, System Refresh and Post-Refresh activities as required.
    12. 11. Perform parameter modification, Buffer, memory management, performance tuning and troubleshoot.
    13. 12. Perform SAP Licensing – Indentify inactive user, user classification and prepare System Measurement result for SAP Global Audit team.

Maybe you are looking for

  • OSB cluster howto

    Can anyone cite documentation - formal, anecdotal, on stone tablets even - that explains how to set up OSB in a clustered configuration? We've been beating our heads against this for WAY too long. Oracle's documentation is...how shall I put this...in

  • Users with diff. access

    Hi, I am new to Web Logic. I created a cluster using 6.0SP2. Now I want to give different users diffrent access to Console. For an e.g. I would like some users to deploy ear files but not modify any thing else on the setup. I tried creating users and

  • Names of standard Adobe forms for SD

    Hi there I would like to use the standard Adobe Forms for Change Order(va02) and delivery document (vl03n). I found out the print-prg. names for ChangeOrder = SD_SDOC_PRINT01 Interface = SDOC_INTERFACE formname = ? for delivery document  = RVADDN01 i

  • Firefox switches to new tab, even when I ask it not to.

    I currently have my Firefox set to NOT switch to a new tab immediately when a link opens one. However, each time I do click on a link to open a new tab it does switch. I have tried Firefox in safe mode and still have the same issue. I have read previ

  • Export to CS2 after uninstallation of CS3 ?

    I uninstalled CS3 (I don't see the need to upgrade from CS2 at this point). Now, LR is telling me that it does not find any Photoshop to export to. Is there a way for me to tell LR that CS2 is still there and could be used ? Thanks !