DIP profile
Hi
I want to configure the DIP profile for project system - costumer order project
so please send the details
I have tried to create the DIP profile and assigned to doc. type IN in sales B and also assigned WBS in acct. assignment tab
when i run DP81 T.code the systems give the error meassage that
No pricing procedure could be determined : Message no. V1212
Diagnosis
The appropriate pricing procedure could not be determined because no entry with keys '50CC 5C' 'P' '1' exists in table 683V.
System response
The system does not allow further processing of the document.
Procedure
If necessary and if you have the authorization to do so, add the missing entry using the Customizing tool for determining pricing procedures.
<b>As per this message i have maintain same in OVKK</b>
but still same message is issued
Please suggest check pionts and what should be checked
Regards
Suresh
Hi
I think u r say about types of Billing Actual Costs viz:
1. Periodic Billing
2. Flat Rate Billing
4. resource-related billing
4.a. Static Resource-Related Billing
4.b Flexible Resource-Related Billing
if i am on right track, plz explain the difference between then and what are the std cond. type and prcg prod in SAP
In present client remt. senc. there are both material and service in project system
so plz specify suitable cond. type and pricing prod.and while custmz what should be considered
Thanks
Suresh
Similar Messages
-
CS - DIP Profile - Stat line item - DP90 transaction
Hi Gurus,
In CS, after configuring DIP Profile, the DP90 doesn't show any line item. The source was selected as Statistical Line Item. The requirement is DP90 should show List Price in Billing document and not actual cost.
Can you help us.
Regards,
Ashokno answers
-
Assigning DIP profile in Sales order
Hi all,
Here I had a strange issue. I want to assign DIP profile in my Sales order to create DP91. The box for assigning DIP profile ( Control of Resource-related Billing and Creation of Quotations) under SalesB tab of item data is disappearing in specific case.
Sometimes it is appearing and some other times it is not. I am not able to catch the difference. Can anyone please suggest me on this.
RatnaHi Prakash,
Thank you for your answer. My item cat is TAO and schedule line is CD. By default I am not using any requirement type (leaving the field as blank) as my case is service related. In that case I am not getting the above said box. But when I attach KE or any other requirement type manually in sales order under procurement tab, then that box is coming where I can attach my DIP. But why should I give requirement type as I am using material type as DIEN (service)? Where is the linke between requirement type and that box? This is just my analysis. May be I am going in wrong way (but my foundings are correct).
Can you suggest me please.
Ratna -
DIP profile:"No values found" in the sales inquiry
Dear all.
I create an sales inquiry with one item.In the Sales B tab of item detail,I want to input DIP profile.But when I press f4 in the field of DIP profile,the sap show me a message "No values found".So I enter tcode ODP1 to maintain the DIP profile.There are 2 default DIP profile in the sap.I select the "BILLPLAN" and click Usage subtree and add one new line with Sales Doc. Type "IN".Then I go back to sales inquiry.
But the sap still show me a message "No values found" when I press f4 in the field of DIP profile.
So I need the experts give me some useful advice and reference to resolve the problem.
Thank you.
Regards
YodaHi,
Please go through this link.
[RRB|https://www.sdn.sap.com/irj/sdn/wiki]
If can not reach, follow this path
WIKI-ERP operation-Sales and distribution- click on Resource related billing in "Children"
Thanks,
Vrajesh
Edited by: Vrajesh Nayak on Oct 14, 2008 10:58 PM -
Billing Based on DIP Profile - PS - SD Line Items Structure
Hi,
I have created a sales order with 1 line item which is linked with a WBS Element via account assignment.
Based on the line item and WBS structure & Activities. I am billing the customer by creating a debit memo from DP91.
The billing is POC basis and is done on monthly basis. Thus at the end of each month the customer is billed according to quantities confirmed in DP91. Ultimately the complete project is done and all billing is completed as well.
Now the problem is: sales order line item had 1 quantity, however debit memo created via DP91 had more than 1 quantities and we have created multiple debit memo request w.r.t. a sales order. now the project is completed, but the status of the sales order is stilll "open". what should be the structure of sales order line items so that order is also set as completed when all quantities in PS are billed.
waiting for any kind of supportive information.
thanks.Hi Robert,
You have 2 questions
1. On DIP
DIP has nothing to do with WBS, though you use WBS as one of teh characteristics in DIP. As per your DIP, many sales orders are created and they are enabled with different material (material determination in DIP). In order to analyse this further, you have to analyse the DIP, which is linked to your item category in VOV7. If not in VOV7, you can see the DIP name in the item level in the sales order. Using this, you can go to PS and there you can see the characteristics, usage and materials configured for this profile. This will give you a lead to find out why multiple items are coming. As per DIP profile, having multiple materials while creating documents in DP91 is expected behaviour.
2. For sales order update, you have to invoice all your billing plans, if your order items are billing plans enabled, (may be MS billing as your system has PS also). If you check this, and invoice all the milestones, then the status will be updated automatically. Before updating the sales order status, you should also close all the WBS elements and the project, which are linked to the sales order (I am not sure about this point, but you can try it in the test system, be have the system of one project per salesorder, may not be the case for you)
If you have any specific questions, pls lemme know. -
DIP Profile assignment for item category
Hi Gurus,
I know at item category Level we can see "DIP Profile" . but i want to now whether any assignment any where in IMG?
Regards,
SeegalHello Seegal
You asked about assignment right? At least that's what I understood it as.
If you are asking about where to set up the profile itself, then here is the answer for that:
T Code: ODP1
Menu path: From SD: SPRO/IMG/Sales and Distribution/Sales/Sales Documents/Customer Service/Service Quotation/Resource-Related Billing/Profiles For Resource-Related Billing/Quotation Creation
Does that help you? -
DIP profile, simple question, no solution?
Hi all,
I have to create a quotation from a service order, and it looks like simple because I have 2 or 3 internal operations everytime and they have to be reported in quotation (DP80).
Work Center for operations is the same, activity type the same... but I have to report exactly the same NUMBER of entry in quotation.
Example:
CS Order:
Operation 10: Internal work center A: TEXT01, activity A, duration 1 hr. cost = 10
Operation 10: Internal work center A: TEXT02, activity A, duration 2 hr. cost = 20
Result in DP80 is:
Item 1: Service material AAA price 30
Requirement is:
Item 1: Service material AAA price 10
Item 2: Service material AAA price 20
Is it possible?
Thanks.Hi Frederico,
yes this is possible. In the settings of the DIP profile you can go to: Characteristics, after selecting the Usage: Quotation creation and sales pricing. In the characteristics list you mark the Activity Type in the field: NoSummarization. If you choose F1 in this checkbox you get this explanation:
No summarization
Controls the second summarization level for dynamic items, meaning from dynamic items to items of the billing request. The indicator defines whether the characteristic is taken into consideration during summarization of the items.
Use
If you do not set the indicator, the system summarizes into an item all dynamic items in the billing request for which the same material was found during quotation or billing creation. This also applies even if, for example, the assigned activity type is different for both materials (see Case 1).
If, for example, you do set this indicator (for example, for the activity type) the system does not summarize into an item the dynamic items for which the same material was found during quotation or billing creation if the activity types are different (see Case 2).
Examples
Case 1:
The indicator No summarization is not set for the activity type.
Dynamic item Activity type Material found
12 h Activity 1 Mat 1
5 h Activity 2 Mat 2
1 h Activity 3 Mat 2
When creating a billing request, the system creates the following items:
Item Material Qty/Unit
10 Mat 1 12 h
20 Mat 2 6 h
Because the indicator is not set for the activity type, the material "Mat 2" is summarized in the item of the billing request.
Case 2:
The indicator No summarization is set for the activity type.
The system does not perform summarization in the item of the billing request, but instead lists the items separately by activity type.
Item Actvy type Material Qty/Unit
10 Activity 1 Mat 1 12 h
20 Activity 2 Mat 2 5 h
30 Activity 3 Mat 2 1 h
Best regards
Lars -
How to assign service tax and VAT to dip profile.
Hi
<b>Configuarion is missing in this case.</b>
Please maintain data in the following tables in SRM side, similar to what is maintained in R/3.. In order to go ahead further.
<b>The main tables are as follows ->
BBP_TAX Tax Codes for Enterprise Buyer
BBP_TAXT Enterprise Buyer: Tax Code Description
BBP_MAP_TAX_CODE ( Assign Enterprise Buyer Tax Code to FI System )
BBP_DET_TAX_CODE ( Tax Code Determination )</b>
Hope this will help.
Pls reward suitable points.
Regards
- Atul -
DIP profile settings for quotaion creation?
Hi experts
I have to create quotation with reference to Plan cost thru ECP.For the same i have to assign DIP profile. So, i need to know what are the settings should be done in DIP profile steps (like in Usage , charaterstics,Sorces, selection criteria etc..) so that i can use it for quotion creation.
your early replies may help me a lot.
Thanks in advancei am closing this thread
-
In odp2 dip profile red error is showing
Dear experts,
In odp2 I have given the dip profile as zabcxxx and my sales document type is zdr,
DI usage is : 01 billing and result analysis
Dynamic items with material : u221A
Status dip profile is in : RED ERROR
my issue is the status profile is showing red error
In short description has maintained as
Short description field material determination
Activity type lstar x
Cost element kstar x
Material matnr x
Can any on suggest why this is showing as red error,what will be the issue, I am very new to this conceptIn Tcode ODP2,
Further in the consistency check in characteristic screen.
1st Click on Source hyperlink.
Here, you should be able to see cost element with proper status (green)
If everthing is fine source. Then click on Mat. Determination hyperlink.
Here you can see the material to determine.
And field with respective status & sets.
By that you will be able know/recognise cause of error.
Regards
JP -
Hi,
This is an requirement.
In odp1,under characteristics we can find WBS ELEMENT.
My requirement is,In Project System,client wants to bill the customer based on WBS element(as we do with Activity type normally).
The issue is WBS is not a predefined one as like ACTIVITY TYPE.COST CENTER,COST ELEMENT etc.It will get generated whenever project is created.In that case how can I build the profile.
Pl share your views in which scenario we use the WBS element in DIP.
Regards
Arunachalam Sureshbabu.In DIP profile
To use RRB between company codes, you have to adjust the DIP profile. Make sure that Intercompany Line Items are selected as a source for dynamic items of the dynamic item processor.
1. The Characteristic relevant indicator is set for the cost element characteristic.
A dynamic item is created on the basis of sales price for each cost element (planned or actual costs)
2. The Material determination indicator is set for the Cost element characteristic.
The cost element is made available as a characteristic for material determination using sets. If this indicator is set, you can enter only a set for the characteristic in the Material determination table.
3. The No summarization indicator is not set for the cost element characteristic.
Several dynamic items with the same material number and cost element in the sales price basis lead to the item in the sales document.
4. The Structuring indicator is set for the cost element characteristic. The set name PS-ALL or OAS is preset with levels from 1 to 2.
Dynamic items are structured hierarchically using the cost element group.
Do all this setting in DIP profile.& use the DIP to perform thsi billing reqmt.
Assignment to the DIP profile is performed in the service order header or the sales order itmes.
Regards,
ANSAR -
Work center in material determination of DIP profile
Hello,
the source of our DIP-Profile is 0001 Acutal costs - line items.
We have the requirement to use the work center in material determination as criteria.
But in DP90 we get material determination error.
The issue is that in the failed combination no work center is available.
Why can´t the DIP find the workcenter we used in the service confirmation?
Thank you
Kind regards
ManfredHello,
after above setting have tried this in ODP1
select The Work Center in Chr.then >select Source on left hand side ->Select the Actual cost Line Item>select Material determination-->Select Material for which Transfer Cost and Quantity -->Marked the Check Box Material determination and Individual
Also please let me know Which Control Key you are using in service order??????
Regards,
Rakesh
Edited by: RAKESH ASHOK MANE on Sep 9, 2010 3:16 PM -
Link Between DIP Profile and RA Key
Hi All,
As per Result Analysis calculation Method-15 "Revenue from Resource-Related Billing and Simulation of Dynamic Items", the "Cost of Sales" is calculated on the amount of actual cost incurred according to DIP Profile.
Can anybody tell me How the RA Key and DIP Profile are linked to each other? What is the configuration for this?
Thanks in advance.
Regds,
BijayHi Kedar,
I checked it and it's defined as optional.
The field "payment terms" is alreday displayed for all posting key.
The problem is that the "payment terms" that is defined in the customer master record is fulfilled per default in F-36 (bill of exchange payment) with posting key 14 and not with posting key 16.
Thanks in advance
Tarek -
DIP Profile and Resource Related Billing
Can anyone please explian how DIP profiles are defined and assigned ?
How does this concept work in resource related billing?
Can 'resource related billing' be used in case of SD orders - but the orders which are generated for services only?
If the answer to these questions is long and instead of that, you want to share any document that you may have - please mail it to [email protected]Hi,
Check transaction ODP1 for configuration related to Resource related billing.
Refer to following for further information.
http://help.sap.com/saphelp_46c/helpdata/en/fa/e42c7dd435d1118b3f0060b03ca329/frameset.htm
http://help.sap.com/saphelp_46c/helpdata/en/35/a7b5489af50d14e10000009b38f9b9/frameset.htm
http://help.sap.com/saphelp_46c/helpdata/en/59/54fc37004d0a1ee10000009b38f8cf/frameset.htm
Also, there are various customer-exits available in resource related process. Refer to following like for information related to various available customer-exit.
http://help.sap.com/saphelp_46c/helpdata/en/35/b0e86887a62488e10000009b38f9b7/frameset.htm
Let me know if you need further information.
Regards,
RS -
Hierarchy of SD-items when using DIP profile
Hi guys,
I hope somebody can help, because I didn't find any information to this problem.
I would like to do effort related billing with the DIP profile based on a contract item to which travel costs were posted to.
My idea was to create one main item in the debit memo request for each FI/CO document no. (that means for each trip/person) The structure below should be build up by partial sets of cost elements (that means costs of rental for a car, hotel costs,...) .
So, now I am able to build up this structure in DP91 area "costs", but in area "price" there is only one main item (service product) with several sub items .
In the credit memo request the items will be copied also with only one main item and several sub items.
Do somebody know the "hidden" checkbox to create nore than one main items in th subsequent document? Or is it only possible to create more than one main items by using a userexit?
Thanks for your help.
BR,
Jaqueline
Edited by: Jaqueline Henseler on Aug 11, 2010 5:32 PMHello Manfred
the definition of source-table is in table AD01SRCTAB.
Source Table Name
0001 COVP
0002 COSPA
0002 COSSA
0003 COVPR
0004 COSRA
0005 V_COFP
0006 FMSUA
0021 COSPA
0021 COSSA
0022 COSRA
0023 CKF_DIP_CUSTOMER_EXIT
1005 COVP
GMD1 GMIA
That means that you're reading from COVP.
Regards, Silvia
Maybe you are looking for
-
Dear experts, I had created a table in development client and inserted the values when we transport the table to the production system ,wheather the table along with values are be trasported or it will transport only table without values thanks in
-
When is EXIT_SAPLMEREQ_002 triggered?
Hi all xperts, I've seen on [this page|http://sapass.metro.client.jp/UserExit/MEREQ001.htm] many interesting userexits that in my system (46C) can't get to trigger. One of these is EXIT_SAPLMEREQ_002. I've seen that the INCLUDE contained, ZXM02U02, i
-
What's a good iPod travel case/pouch?
I just bought a 20GB iPod and I need a travel case/pouch to carry it around in. Does anyone have suggestions on a good one?
-
Solaris 8 rebooting with very little info as to why.
I have a Sun E-250 with 2 400MHz CPUs and 1GB of memory. Lately my box will reboot without warning. I get a panic message in the logfile /var/adm/messages with very little other information. Those messages are as follows: Feb 22 10:48:01 storrs SUNW,
-
AMD HD7450 driver crash in Lenovo M82 / Windows 7 x64
Dear Lenovo Community, I tried today to install an AMD HD7450 (not the one sold by Lenovo but does it make a difference ?) on the PCIe port of a Lenovo M82. The aim for me is to use 3 screens on the Lenovo. I have two distinct problems I do not und