Display present day calender on display of E75

Hi
On a previous symbian Nokia phone I got my appointments for each day displayed on the desktop of my Nokia, so that I could read my calenda without opening the phone.
Does anyone know if this is possible, and if so, how?
Rgds
Steinar

Hi,
Go to Menu => Ctr.Panel => Settings => General => Personalisation => Home Screen Mode => Mode Settings => Home Screen applications. Check that calendar tick-box is checked and uncheck any other unnecessary components.

Similar Messages

  • How do I enlarge the "presenter notes" window when running my presentation on an external display?

    In the latest version of Keynote, the "Presenter Notes" window is a small horizontal field at the bottom of the presenter's computer screen.  Only 3-4 lines of text can be seen.  This means that when you have a few paragrahs of notes, you have to scroll through them as you are presenting.  This is very cumbersome.  In the previous version of Keynote you could change the relative size of the slides versus the "presenter's notes" boxes when running a presentation on an external display, but in the new version, I can't find a way of enlarging the "presenter's notes" field.
    Also, in the new version, the preview slide doesn't show the initial text on the next slide if that text emerges as a "dissolve in" build when you advance forward through your slides.  I always have the initial text on my slides automatically "dissolve in" after each slide transtion.  But in the new version of Keynote, when in presenter mode, I can't see any of the text on the "next slide."  This makes it difficult to anticipate what slide comes next . . . without going to the Navigator.  Does any one have a solution for this?
    Thank you.

    I figured it out with the help of a post from a few days ago.  Although posted for a different problem, I followed these steps from Cornelia-I and it worked like a charm:
    You can change the link of LR to the images from the network drive to your local drive, best done on parent folder level: right-click the highest folder in library left panel, and choose update storage location. In the opening dialog window point it to your internal folder.

  • How to config EM performance page to display 30 days Average Active Session

    Does EM supports displaying 30 days ASH data in the performance page without clicking the calendar tool?
    Now EM only can show 7 days view.

    AWR collects performance related statistics and derives performance metrics from them to track a potential problem. Unlike Statspack, snapshots are collected automatically every hour by a new background process called MMON and its slave processes. To save space, the collected data is automatically purged after 7 days. Both the snapshot frequency and retention time can be modified by the user. To see the present settings, you could use:
    select snap_interval, retention
    from dba_hist_wr_control;
    SNAP_INTERVAL RETENTION
    +00000 01:00:00.0 +00007 00:00:00.0
    To change the settings--say, for snapshot intervals of 20 minutes and a retention period of two days
    begin
    dbms_workload_repository.modify_snapshot_settings (
    interval => 20,
    retention => 2*24*60
    end;
    Hope this helps,
    Regards,
    http://www.oracleracexpert.com
    Overview of Transparent Application Failover in Oracle RAC
    http://www.oracleracexpert.com/2010/04/overview-of-transparent-application.html
    In function 'lcdprm':: Warning after patch in RAC
    http://www.oracleracexpert.com/2010/04/in-function-lcdprm-warning-gets.html

  • Events added in iCal don't display in Google Calender

    I'm using my google address for iCal as I don't have a MobileMe account.
    Events added in Google Calender display in iCal, but events added to this account in iCal don't display in Google Calender. I have tried subscribing to my Google Calender in iCal, but the address isn't recognized by iCal.
    I have even tried deleting and re-adding my Google Calender, but still no joy.
    Are the calenders I am using in iCal and Google the same calender, or are they actually different calenders with the same username? Someone help me sync the **** calenders!

    Hi Ellyenne,
    Ellyenne wrote:
    It didn't help. 
    I want my iCal events from my HOME calendar to display in my google calendar. 
    I DO NOT want to move my iCal events to my google calendar.  I have way too many.  So, why won't my iCal events show up on my google calendar??  My google events show up on my iCal. It's a SYNC. They should be the same.
    I'm sorry my answer to Clint is not what you want.
    iCal and Google on their own do not do what you want.
    There are/were some third party add-ins that worked in the way you describe that were mainly developed before Google Calendar had CalDAV integration.
    Best wishes
    John M

  • How to display presentation variable in a column

    Hi all....I have to display presentation variable in a column...
    I tried placing @{variable_name} in column formula..
    But it is displaying a value 0 ..where the variable carries a date value.
    Any suggestions?

    Take a look at this blog: http://gerardnico.com/wiki/dat/obiee/presentation_variable
    Try it out by providing a default format.
    Thanks,
    BIPuser

  • I wanted to know if others were having difficulties getting All Day Events appear in the Notification Center in iOS 7.   Currently my Calendar in the notification center will show events that are at certain times, but they will not display All Day Events.

    I wanted to know if others were having difficulties getting All Day Events appear in the Notification Center in iOS 7.
    Currently my Calendar in the notification center will show events that are at certain times, but they will not display All Day Events.

    Have you looked at the previous discussions listed on the right side of this page under the heading "More Like This"?

  • Cisco TANDBERG Edge 95MXP Black and White display Presentation mode

    Hello, was wondering if anyone would know why our Cisco TANDBERG Edge 95MXP only seems to work in Black and White display Presentation mode, it is a new problem and we have checked the cables and it seems to be okay. The camera works on the screen in full colour.

    You need to eliminate the monitor, cabling and presentation source first of all, this is quick and easy to do if you have a monitor tester, but if not...have you tried bypassing the Edge 95MXP and connected the presentation source directly into the monitor? Still b/w?
    Tried different presentation source? Still b/w? Try another cable and do it again. Anything else in the circuit, i.e. DA, switcher etc?
    What input are you using on the monitor; HDMI, DVI, VGA? Is it b/w on all inputs? Any converters involved, i.e. HDMI to DVI etc?
    /jens
    Please rate replies and mark question(s) as "answered" if applicable.

  • Is it possible to loop a Keynote presentation on an external display while working in another program (say numbers) on my laptop screen?

    I have a 2012 MacBook Air.
    What I would like to be able to do is plug into an external display and project a looping Keynote presentation on the external display. The problem is when I play the Keynote presentation, my laptop screen goes black. Is it possible to play/loop a Keynote presentation on an external display while working in a different program (Pages, Numbers, etc) on my laptop screen?
    Thank you!

    Grant Bennet-Alder West of Boston, USA 
    A new 1TB External drive (suitable to replace your current Internal drive if you choose to) and enclosure can be had for under US$160
    Ehh, you meant $60 ,  not $160
    CassHeger 
    I do need to buy an external HD to be used solely for that purpose.
    Yes, quality HD are cheap as dirt.
    however a likewise Toshiba Internal HD 1TB is $70   (same as used by Apple)
    http://www.ebay.com/itm/TOSHIBA-MQ01ABD100-1TB-5400-RPM-8MB-Cache-2-5-SATA-3-0Gb   -s-Internal-Notebook-/121107538930?pt=US_Internal_Hard_Disk_Drives&hash=item1c3 2 9263f2
    best options for the price, and high quality HD:
    Quality 1TB drives are $50 per TB on 3.5" or  $65 per TB on 2.5"
    Perfect 1TB for $68
    http://www.amazon.com/Toshiba-Canvio-Portable-Hard-Drive/dp/B005J7YA3W/ref=sr_1_ 1?ie=UTF8&qid=1379452568&sr=8-1&keywords=1tb+toshiba
    Nice 500gig for $50. ultraslim and perfect
    http://www.amazon.com/Toshiba-Canvio-Portable-External-Drive/dp/B009F1CXI2/ref=s r_1_1?s=electronics&ie=UTF8&qid=1377642728&sr=1-1&keywords=toshiba+slim+500gb
    2.5" USB portable High quality BEST FOR THE COST, Toshiba "tiny giant" 2TB drive (have several of them, LOT of storage in a SMALL package)    $117
    http://www.amazon.com/Toshiba-Canvio-Connect-Portable-HDTC720XK3C1/dp/B00CGUMS48 /ref=sr_1_4?s=electronics&ie=UTF8&qid=1379182740&sr=1-4&keywords=2tb+toshiba
    *This one is the BEST portable  external HD available that money can buy:
    HGST Touro Mobile 1TB USB 3.0 External Hard Drive  
    $88
    http://www.amazon.com/HGST-Mobile-Portable-External-0S03559/dp/B009GE6JI8/ref=sr _1_1?ie=UTF8&qid=1383238934&sr=8-1&keywords=HGST+Touro+Mobile+Pro+1TB+USB+3.0+72 00+RPM
    Most storage experts agree on the Hitachi 2.5"

  • How can I add the date at the top of the screen along with the day and time display?

    Hello,
    How can I add the date at the top of the screen along with the day and time display?
    Thanks so much!

    Open System Preferences>Date & Time:
    Ciao.

  • Date Parameters displaying a day prior on Report Layout

    Hi,
    I am currently creating some reports using Oracle BI Publisher 11.1.1.6.2.
    The reports in question have a Start Date from Parameter and an End Date To Parameter.
    I also display the values for the parameters in the Report Layout which appears to display the values entered correctly in the Interactive Viewer, but looking at other outputs (i.e. HTML, Excel, PDF etc.) the value in the parameter field in the layout always displays a day prior to what has been entered.
    Has anyone come across this?
    Thanks in advance.

    This is an example of code:
    <?xdofx:substr(season_start_date,6,2)?>
    This would take the month out of the repository variable: season_start_date, in the format MM.
    (MM is on the 6th position, with a length of 2.)

  • How to display 6 days, 29 months, today, etc

    Hi experts,
    Been trying to figure out how to display 6 days, 29months, 1 month in result but couldnt figure out how. I searched in the internet and it gives me the idea of using add_months().
    However, im not sure how am i gonna use it on my end.
    For example,
    Last login date was September 5, 2012. Then it should display 2 months. im not sure how to implement it on a query.
    oracle version:
    Oracle Database 11g Enterprise Edition Release 11.2.0.1.0 - 64bit Production
    PL/SQL Release 11.2.0.1.0 - Production
    "CORE     11.2.0.1.0     Production"
    TNS for Linux: Version 11.2.0.1.0 - Production
    NLSRTL Version 11.2.0.1.0 - ProductionLet me know if you need more info.
    regards,
    j

    hi,
    thanks for your response.
    This is my query
    select us.n_unitid
        ,  u.c_externalid
        ,  us.c_unitname
        ,  (select to_char(sysdate,'MM') - to_char((to_date(max(d_date),'dd/mm/yyyy')),'MM') from dual) -- your query
        ,  (select (to_char(max(d_date), 'dd.mm.yyyy'))
            from userstats
            where n_unitid = us.n_unitid) "Letzter Login Date"
        ,  (select count(*)
            from userstats
            where n_unitid = us.n_unitid) "Logins"
    from userstats us, unit u
    where us.n_unitid = u.ip_unitid
    and u.nf_statusid = 1
    and us.n_groupid = 97
    group by us.n_unitid, u.c_externalid, c_unitname;how would I add your query to my query? sorry if im asking so many questions.. you are using dual here. How would i get the d_date value from userstats table?
    Thanks.

  • How to display only Day value instead of DATE in Bex Report

    Hi Experts,
    We have a Month to date Report, in this report we need to display only day value instead of DATE value,
    Like
    if Date is 14.05.2010 we need to show only  14
    Regards,
    Chandra

    Hi ,
    Thanks for Quick Response
    we does have the option to create the char(calday or ...) value variable replacement with char (calday or ...) info object, we can  replace with Report r variable value only not with info object.
    i hope we can replace the with info object only with formula variable with replacement.
    My BEx Report is Designed like
    Columns
    0Calday
    Rows
    Plant
    Keyfigures
    Actual
    Plan
    Report output Looks like month to date
    0CALDAY            01.06.2010   02.06.2010  03.06.2010
    P1  ACTUAL            10                     8                    4
    P1  PLAN                 15                     6                    2
    P2  ACTUAL              5                   10                     7
    P2  PLAN                  4                      8                    3
    Report should be
    0CALDAY            1    2     3
    P1  ACTUAL      10     8      4
    P1  PLAN           15     6     2
    P2  ACTUAL        5    10    7
    P2  PLAN            4      8     3
    please let me know how can i achive this
    Regards
    Chandra

  • How do I get my I cloud calender to display in Outlook 7

    How do I get my ICloud calender to display on my PC runing Windows 7 and outlook 7

    Make sure that the server sends the ogg file with a supported MIME type.
    * https://developer.mozilla.org/En/Media_formats_supported_by_the_audio_and_video_elements
    * https://developer.mozilla.org/en/Configuring_servers_for_Ogg_media

  • Display dates/days except saturday sunday (ASAP)

    Hi all,
           I am developing a BSP application which run queries to be selected from a  dropdown. It basically displays some meeting data..filled or unfilled depending on the query. I want to display the day,date in different columns and a few other columns. But those should not include saturday/sunday and other holidays depending on the country in which the query is run. I have no idea how to do it.
    Plz provide me with any help asap.
    Regards,
    Rohit Khetarpal
    <i>*Suggestions are always rewarded.</i>

    <b>And my earlier code as suggested by Durairaj Athavan Raja was this:</b>
    <b>Layout:</b>
    <%@page language="abap"%>
    <%@extension name="htmlb" prefix="htmlb"%>
    <htmlb:content>
      <htmlb:page title="Account details" >
        <htmlb:form method = "post">
          <htmlb:tableView id            = "tv2"
                           headerText    = "Account Details"
                           headerVisible = "true"
                           footerVisible = "false"
                           design        = "ALTERNATING"
                           table         = "<%= holidays %>" >
         <htmlb:tableViewColumns>
              <htmlb:tableViewColumn columnName = "date"
                                     title      = "partner"
                                     edit       = "FALSE"
                                     width      = "100%">
              </htmlb:tableViewColumn>
              <htmlb:tableViewColumn columnName = "freeday"
                                     title      = "Start date"
                                     edit       = "FALSE"
                                     width      = "100%">
              </htmlb:tableViewColumn>
              <htmlb:tableViewColumn columnName = "holiday"
                                     title      = "End Date"
                                     edit       = "FALSE"
                                     width      = "100%">
              </htmlb:tableViewColumn>
              <htmlb:tableViewColumn columnName = "HOLIDAY_ID"
                                     title      = "Product"
                                     edit       = "FALSE"
                                     width      = "100%">
              </htmlb:tableViewColumn>
              <htmlb:tableViewColumn columnName = "TXT_SHORT"
                                     title      = "text"
                                     edit       = "FALSE"
                                     width      = "100%">
              </htmlb:tableViewColumn>
              <htmlb:tableViewColumn columnName = "TXT_LONG"
                                     title      = "text"
                                     edit       = "FALSE"
                                     width      = "100%">
              </htmlb:tableViewColumn>
            </htmlb:tableViewColumns>
          </htmlb:tableView>
        </htmlb:form>
    </td></tr></table>
      </htmlb:page>
    </htmlb:content>
    <b>OnInitialization event:</b>
    data: holidays type standard table of  ISCAL_DAY .
    CALL FUNCTION 'HOLIDAY_GET'
    EXPORTING
       HOLIDAY_CALENDAR                 = 'US'
       FACTORY_CALENDAR                 = 'US'
       DATE_FROM                        = '20070101'
       DATE_TO                          = '20070131'
    IMPORTING
    YEAR_OF_VALID_FROM                = year
      YEAR_OF_VALID_TO                 = YEAR_OF_VALID_TO
      RETURNCODE                       = RETURNCODE
      TABLES
        holidays                         = holidays
    EXCEPTIONS
       FACTORY_CALENDAR_NOT_FOUND       = 1
       HOLIDAY_CALENDAR_NOT_FOUND       = 2
       DATE_HAS_INVALID_FORMAT          = 3
       DATE_INCONSISTENCY               = 4
       OTHERS                           = 5
    IF sy-subrc <> 0.
    MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
            WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
    ENDIF.
    In this code, i am not getting any values display under the column names when i execute.Can you suggest something on this too...
    Regards,
    Rohit Khetarpal
    Message was edited by:
            Rohit Khetarpal

  • While displaying date its displaying 1 Day  behind

    Hi All,
    I am saving date using ,
    <t:inputCalendar renderAsPopup="true" value="#{Bean.startDate}" />
    After saving I am retriving date & displaying as,
    <h:outputText value="#{beanVar.startDate}"/>
    But its displaying 1 day behind.
    Do i need to use converter while displaying
    Thanks.

    Hello Gurus,
    I am new to GRC, I have to create a background job for RA&R daily  Management Reports. I have created a background job by going to Risk Analysis>user level->Risk level>Critical>Report Format>Management summary>clicking on Background>setting the backgorund job for daily.
    But the background is failing to display the report. I ran in the foreground and it works fine.
    Please let me know if I am doing anything wrong in the steps..
    Thank you!
    Regard's,
    SA

Maybe you are looking for

  • From a mac to a pc with iphone

    Okay strange question here. Is it possible to take an iphone that was used with a mac and use it with a PC? What will be lost? Is there a way to keep all the contacts, pictures, music and everything? Or ... Is there a way to export all the stuff and

  • Can I connect the mini to an older G5?

    Can I connect the new iMac Mini to an older Power PC G5 (3.0) and make the mini the dominant hard drive?

  • I need help urgently

    while logging into enterprise manager i got to my home with the status pending so i clicked on the startup/shutdown button and i got 500 internal server error so what do i do

  • Aeroflex 2975 driver for LabVIEW 8.0

    Is there a way to convert the Aeroflex IFR 2975 driver for LabVIEW CVI for use in LabVIEW 8.0?  OR, is there a driver already developed for this? 

  • Can i import .pst files containing emails to my  iPad Air?

    I want to use my iPad Air as a replacement for my laptop. How do I import all my emails from Outlook 2010 onto my iPad Air as i have a 64 gb iPad?